ENGINEERING AID BASIC

Mathematics and Units of Measurement

Drafting Equipment

Drafting Fundamental and Techniques.

Geometric Construction

Drafting Projections and Sketching

Wood and Light Frame Construction

Concrete and Masonry

Mechanical Systems and Plans

Electrical Systems and Plans

Construction Drawings

Elements of Surveying and Surveying Equipment

Direct Linear Measurements and Field Survey Safety

Horizontal Construction

Direct Leveling & Basic Engineering Surveys

Materials Testing-Soil and Concrete

Care and Adjustment of Surveying Equipment

Indirect Leveling and Traverse Computation

 

Chapter 2 Mathematics and Units of Measurement Topics

 

Engineering techs use mathematics as basic tool. The use of mathematics is found in every rating in the Navy, from the simple arithmetic of counting for inventory purposes to the complicated equations encountered in computer and engineering designs. Mathematics is a broad science that cannot be covered fully in formal service school training, so it is up to you to devote some of your own time to the study of this subject. This lesson covers various principles of mathematics. The instructions given will aid you in making mathematical computations in the field and the office. This lesson also covers units of measurement and the conversion from one system to the other; that is, from the English to the metric system.

When you have completed this lesson, you will be able to:

1. Identify the fundamentals of mathematics.
2. Identify the fundamentals of geometry.
3. Describe the procedures for using a scientific calculator.
4. Understand hints of computation operations.
5. Identify the different units of measurements.
 

Contents

1.0.0 Fundamentals of Mathematics

2.0.0 Geometry

3.0.0 Hints on Computing

4.0.0 Units of Measurement

Summary

Review Questions


1.0.0 FUNDAMENTALS of MATHEMATICS

Mathematics is, by broad definition, the science that deals with the relationships between quantities and operations and with methods by which these relationships can be applied to determine unknown quantities from given or measured data. The fundamentals of mathematics remain the same no matter to what field they are applied. It has been subdivided into a number of major branches. Those with which you will be principally concerned are:

1.1.0 Study Guides

Mathematics is an exact science, and there are many books on the subject. These numerous books are the result of the mathematicians’ efforts to solve mathematical problems with ease. Methods of arriving at solutions may differ, but the end results or answers are always the same. Checking out different approaches to mathematical problems make the study of mathematics more interesting, either by individual study or as a group.

1.2.0 Types of Numbers

Positive and negative numbers belong to the class called real numbers. Real numbers and imaginary numbers make up the number system in algebra. In this training manual, we will deal only with real numbers unless otherwise indicated.

A real number may be rational or irrational. The word rational comes from the word ratio. A number is rational if it can be expressed as the quotient, or ratio, of two whole numbers. Rational numbers include fractions like 2/7, whole numbers (integers), and radicals if the radical is removable. Any whole number is rational because it could be expressed as a quotient with 1 as its denominator. For instance, 8 equals 8/1, which is the quotient of two integers. A number like Ö16 is rational since it can be expressed as the quotient of the two integers in the form 4/1.

An irrational number is a real number that cannot be expressed as the ratio of two integers. The following numbers and 3.1416 are examples of irrational numbers.

Ö3, 5Ö2, Ö7 + 5,  3/8Ö20

An integer may be prime or composite. A number that has factors other than itself and 1 is a composite number. For example, the number 15 is a composite number. It has the factors 5 and 3. A number that has no factors except itself and 1 is a prime number. Since it is to your advantage to separate a composite number into prime factors, it is helpful to be able to recognize a few prime numbers. The following are examples of prime numbers: 1, 2, 3, 5, 7, 11, 13, 17, 19, and 23. A composite number may be a multiple of two or more numbers other than itself and 1, and it may contain two or more factors other than itself and 1. Multiples and factors of numbers are as follows: Any number that is exactly divisible by a given number is a multiple of the given number. For example, 24 is a multiple of 2, 3, 4, 6, 8, and 12 since it is divisible evenly by each of these numbers. Saying that 24 is a multiple of 3, for instance, is equivalent to saying that 3 multiplied by some whole number will give 24. Any number is a multiple of itself and also of 1.

1.3.0 Fractions, Decimals, and Percentages

The most general definition of a fraction is “an indicated division.” Any division may be indicated by placing the dividend over the divisor with a line between them. By the above definition, any number, even a so-called “whole” number, may be written as a common fraction. The number 20, for example, may be written as 20/1. This or any other fraction that amounts to more than 1 is an improper fraction. For example, 8/3 is an improper fraction; the accepted practice is to reduce an improper fraction to a mixed fraction (a whole number plus a proper fraction). Perform the indicated division and write the fractional part of the quotient in its lowest term. In this case, 8/3 would be 2 2/3. A fraction that amounts to less than 1 is a proper fraction, such as the fraction 1/4. Follow these rules in the solution of fractions: If you multiply or divide both the numerator and denominator of a fraction by the same number, the value does not change. The resulting fraction is called an equivalent fraction. You can add or subtract fractions only if the denominators are alike. To multiply fractions, simply find the products of the numerators and the products of the denominators. The resulting fractional product must be reduced to the lowest term possible. To divide a fraction by a fraction, invert the divisor and proceed as in multiplication. The method of canceling can be used to advantage before multiplying fractions (using the principle of rule No. 1) to avoid operations with larger numbers. A decimal fraction is a fraction whose denominator is 10 or some power of 10, such as 100, 1,000, and so on. For example, 10 7 , 100 23 and 1,000 87   2-5 are decimal fractions. Accordingly, they could be written as 0.7, 0.23 and 0.087 respectively. Decimal fractions have certain characteristics that make them easier to use in computations than other fractions. A thorough understanding of decimals will be useful to the engineering technician in making various engineering computations. Figure 2-1 shows decimal equivalents of fractions commonly used by Builders, Steelworkers, Utilitiesmen, and other trades. 64 1 = .015625 64 17 = .265625 64 33 = .515625 64 49 = .765625 32 1 = .03125 32 9 = .28125 32 17 = .53125 32 25 = .78125 64 3 = .046875 64 19 = .296875 64 35 = .546875 64 51 = .796875 16 1 = .0625 16 5 = .3125 16 9 = .5625 16 13 = .8125 64 5 = .078125 64 21 = .328125 64 37 = .578125 64 53 = .828125 32 3 = .09375 32 11 = .34375 32 19 = .59375 32 27 = .84375 64 7 =.109375 64 23 = .359375 64 39 = .609375 64 55 = .859375 8 1 = .125 8 3 = .375 8 5 = .625 8 7 = .875 64 9 = .140625 64 25 = .390625 64 41 = .640625 64 57 = .890625 32 5 = .15625 32 13 = .40625 32 21 = .65625 32 29 = .90625 64 11 = .171875 64 27 = .421875 64 43 = .671875 64 59 = .921875 16 3 = .1875 16 7 = .4375 16 11 = .6875 16 15 = .9375 64 13 = .203125 64 29 = .453125 64 45 = .703125 64 61 = .953125 32 7 = .21875 32 15 = .46875 32 23 = .71875 32 31 = .96875 64 15 = .234375 64 31 = .484375 64 47 = .734375 64 63 = .984375 4 1 = .25 2 1 = .5 4 3 = .75 1 = 1.00 Figure 2-1 − Decimal equivalents. In connection with the study of decimal fractions, businessmen as early as the fifteenth century made use of certain decimal fractions so much that they gave them the special designation percent. The word percent is derived from Latin. It was originally per centum, which means “by the hundredths.” In banking, interest rates are always expressed in percent; statisticians use percent; in fact, people in almost all walks of life use percent to indicate increases or decreases in production, population, cost of living, and so on. The engineering technician uses percent to express change in grade (slope), as shown in Figure 2-2.   2-6 Figure 2-2 − Percent Grade.

1.4.0 Powers, Roots, Exponents and Radicals

Any number is a higher power of a given root. To raise a number to a power means to multiply, using the number as a factor as many times as the power indicates. A particular power is indicated by a small numeral called the exponent; for example, the small 2 on 32 is an exponent indicating the power. Examples: 32 = 3 x 3 = 9 33 = 3 x 3 x 3 = 27 62 = 6 x 6 = 36 63 = 6 x 6 x 6 = 216 Many formulas require the power or roots of a number. When an exponent occurs, it must always be written unless its value is 1. A particular root is indicated by the radical sign ( ), together with a small number called the index of the root. The number under the radical sign is called the radicand. When the radical sign is used alone, it is generally understood to mean a square root, and 3 , 5 , and 7 , indicate cube, fifth, and seventh roots, respectively. The square root of a number may be either + or –. The square root of 36 may be written thus: 36 = ± 6 , since 36 could have been the product of (+ 6)( + 6) or ( – 6)( – 6). However, in practice, it is more convenient to disregard the double sign (±). This example is what we call the root of a perfect square. Sometimes it is easier to extract part of a root only after separation of the factors of the number, such as 27 = 3x9 = 33 . As you can see, we were able to extract only the square root of 9, and 3 remains in the radical because it is an irrational factor. This simplification of the radical makes the solution easier because you will be dealing with perfect squares and smaller numbers.   2-7 Examples: 25 = 5x5 = 5 24 = x = 6264 = 2 x 2.236 = 4.472 3 3 3 40 == 525x8 = 2 x 1.710 = 3.420 Radicals are multiplied or divided directly. Examples: 6x3 18 === 232x9 24 3 34 3 12 = ±== x Like fractions, radicals can be added or subtracted only if they are similar. Examples: =+ 53552 +=+ )9(2)4(29x24x2 = + 2322 = 25 When you encounter a fraction under the radical, you have to rationalize the denominator before performing the indicated operation. If you multiply the numerator and denominator by the same number, you can extract the denominator, as indicated by the following example: 10 5 1 25 10 5 5 x 5 2 5 2 = == The same is true in the division of radicals; for example, 2 1 3 3 6 3 6 3 =÷= Any radical expression has a decimal equivalent, which may be exact if the radicand is a rational number. If the radicand is not rational, the root may be expressed as a decimal approximation, but it can never be exact. A procedure similar to long division may be used for calculating square root. Cube root and higher roots may be calculated by methods based on logarithms and higher mathematics. Tables of powers and roots  2-8 have been calculated for use in those scientific fields in which working with roots is frequently necessary. This method is, however, slowly being phased out and replaced by the use of hand-held scientific calculators. 1.4.1 Arithmetic Extraction of Square Roots If you do not have an electronic calculator, you may extract square roots arithmetically as follows: Let’s say you want to extract the square root of 2,034.01. First, divide the number into two-digit groups, working away from the decimal point. Thus set off, the number appears as follows: 34.0120 Next, find the largest number whose square can be contained in the first group, This is the number 4, whose square is 16. The 4 is the first digit of your answer. Place the 4 above the 20, and place its square (16) under the first group, thus: 4 16 34.0120 Now perform the indicated subtraction and bring down the next group to the right, thus: 4 434 16 34.0120 Next, double the portion of the answer already found (4, which doubled is 8), and set the result down as the first digit of a new divisor, thus: 4 /8 434 16 34.0120 The second digit of the new divisor is obtained by a trial-and-error method. Divide the single digit 8 into the first two digits of the remainder 434 (that is, into 43) until you obtain the largest number that you can (1) add as another digit to the divisor and (2) use as a multiplier which, when multiplied by the increased divisor, will produce the largest result containable in the remainder 434. In this case, the first number you try is 43 + 8, or 5. Write this 5 after the 8 and you get 85. Multiply 85 by 5 and you get 425, which is containable in 434. The second digit of your answer is therefore 5. Place the 5 above 34. Your computation will now look like this:  2-9 4 5 425 85/434 16 34.0120 Proceed as before to perform the indicated subtraction and bring down the next group, thus: 4 5 901 425 /43485 16 34.0120 Again double the portion of the answer already found, and set the result (45 x 2, or 90) down as the first two digits of a new divisor thus: 4 5 90190/ 425 /43485 16 34.0120 Proceed as before to determine the largest number that can be added as a digit to the divisor 90 and used as a multiplier which, when multiplied by the increased divisor, will produce a result containable in the remainder, 901. This number is obviously 1. The increased divisor is 901, and this figure, multiplied by the 1, gives a result exactly equal to the remainder 901. The figure 1 is therefore the third and final digit in the answer, the square root of 2,034.01 is therefore 45.1 Your completed computation appears thus: 4 5. 1 901 901901/ 425 /43485 16 34.0120  2-10 1.4.2 Fractional and Negative Exponents In some formulas, like the velocity (V) of liquids in pipes, which you will encounter later in engineering technician Advanced, it is more convenient to use fractional exponents instead of radicals. Examples: 3 = 31/2 3 3 = 31/3 3 3 = 31/3 3 3 2 = 32/3 As you can readily observe, the index of the root in the above examples is the denominator of the fractional exponent. When an exponent occurs in the radicand, this exponent becomes the numerator of the fractional exponent. Roots of numbers not found in tables may be easily computed by proper treatment of the radical used. Examples: 0.6615 4 2.646 7 4 1 16 7 16 7 ==== 2.958 2 5.916 35 2 1 4 35 4 35 4 3 8 ===== In some work, negative exponents are used instead of reciprocals of numbers. Examples: 3-1 =1/3 10-1 = 1/10 3-2 = 1/32 = 1/9 10-2 = 1/100 1/5-1 = 5 10-3 = 1/1000 Very small or very large numbers used in science are expressed in the form 5.832 x 10-4 or 8.143 x 106 to simplify computation. To write out any of these numbers in full, just move the decimal point to either left or right, the number of places equal to the exponent, supplying a sufficient number of zeros depending upon the sign of the exponent, as shown below: 5.832 x 10-4 = 0.0005832 (decimal moved four places to the left) 8.143 x 106 = 8,143,000 (decimal moved six places to the right)

1.5.0 Reciprocals

The reciprocal of a number is 1 divided by the number. The reciprocal of 2, for example, is 1/2, and the reciprocal of 2/3 is 1 divided by 2/3, which amounts to 1 x 3/2, or 3/2. The reciprocal of a whole number, then, equals 1 over the number, while the reciprocal of a fraction equals the fraction inverted. In problems containing the power of 10, using recipricals is generally more convenient than writing out lengthy decimals or whole numbers.   2-11 Example: 250,000 x 300 x 0.02 1 = 5 2 2 2.5 x 10 x3x 10 2x 10 1 − = 15 x1 10 15 10 2.5 2x3x 10−5 −5 −5 == = .0667 x 105 = 6.67 x 10-2 x 10-5 = 6.67 x 10-7 = 0.000000667 Reciprocal is also used in problems involving trigonometric functions of angles, as you will see later in this lesson, in the solutions of problems containing identities.

1.6.0 Ratio and Proportion

Almost every computation you will make as an engineering tech that involves determining an unknown value from given or measured values will involve the solution of a proportional equation. A thorough understanding of ratio and proportion will greatly help you solve both surveying and drafting problems. The results of observation or measurement often must be compared to some standard value in order to have any meaning. For example, if the magnifying power of your telescope is 20 diameters and you see a telescope in the market that says 50 diameter magnifying power, you can see that the latter has a greater magnifying power. How much more powerful? To find out, we will divide the second by the first number, which is 20 50 = 2 5 , The magnifying power of the second telescope is 2 1/2 times as powerful as the first. When the relationship between two numbers is shown this way, the numbers are compared as a ratio. In mathematics, a ratio is a comparison of two quantities. Comparison by means of a ratio is limited to quantities of the same kind, For example, in order to express the ratio between 12 feet and 3 yards, both quantities must be written in terms of the same unit. Thus, the proper form of this ratio is 4 yards: 3 yards, not 12 feet: 3 yards. When the parts of the ratio are expressed in terms of the same unit, the units cancel each other and the ratio consists simply of two numbers. In this example, the final form of the ratio is 4:3. Since a ratio is also a fraction, all the rules that govern fractions may be used in working with ratios. Thus, the terms may be reduced, increased, simplified, and so forth, according to the rules for fractions.   2-12 Closely allied with the study of ratio is the subject of proportion. A proportion is nothing more than an equation in which the members are ratios. In other words, when two ratios are set equal to each other, a proportion is formed. The proportion may be written in three different ways, as in the following examples: 15:20:: 3:4 15:20 = 3:4 20 15 = 4 3 The last two forms are the most common. All of these forms are read, “15 is to 20 as 3 is to 4.” In other words, 15 has the same ratio to 20 as 3 has to 4. In addition to gaining this knowledge, you should develop the ability to recognize a computational situation as one that is available to solution by proportional equation. A very large area of surveying computations—the area that involves triangle solutions—uses the proportional equation as the principal key to the determination of unknown values on the basis of known values. Practically any problem involving the conversion of measurement expressed in one unit to the equivalent in a different unit is solvable by proportional equation. Similarly, if you know the quantity of a certain material required to produce a certain number of units of product, you can determine by proportional equation the quantity required to produce any given number of units. In short, it is difficult to imagine any mathematical computation involving the determination of unknown values on the basis of known values that is not available to solution by proportional equation. Your knowledge of equations need not extend beyond that required to solve linear equations; that is, equations in which the unknown appears with no exponent higher than 1. The equation 4x + 7 = 6 15 , for example, is a linear equation, because the unknown (technically known as the “variable’ ‘), x, appears to only the first power. The equation X2 + 2x = – 1, however, is a quadratic, not a linear, equation because the variable appears to the second power.

1.7.0 Arithmetic

The common arithmetical operations are addition, subtraction, multiplication, and division. Arithmetical operations with common fractions are explained in lesson 4, and arithmetical operations with decimal fractions, in lesson 5 of NAVEDTRA 14139.

1.8.0 Algebraic Notations and Algebraic Operations

Algebraic fundamentals, such as the meanings of terms; systems of groupings; and the addition, subtraction, multiplication, and division of algebraic monomials and polynomials are explained in lesson 9 of NAVEDTRA 14139. The factoring of algebraic expressions is explained in lesson 10 of NAVEDTRA 14139.

2.0.0 GEOMETRY

Since geometry is the branch of mathematics that investigates the relations, properties, and measurement of solids, surfaces, lines, and angles, it follows that just about everything a surveyor does involves geometry in some way or other. Whenever you establish a point, chain a linear distance, measure a vertical distance, turn an angle, or determine an area or a volume, you are working with geometry.   2-13 To begin with, you must know how to recognize the common types of geometrical plane and solid figures and how to compute the areas of the plane figures and the volumes of the solid ones.

2.1.0 Surfaces and Figures

There is a surface on this sheet of paper. A geometrical surface has length and breadth. It has no thickness. A surface may be either a plane surface or a curved surface. When this page is held perfectly level at every point, the surface is then a plane surface. When the page is rolled to resemble a tube, the plane surface becomes a curved surface. A plane is a real or imaginary surface in which a straight line between any two points lies wholly on that surface. Figure 2- 3 shows two intersecting planes. Plane ABCD is shown to be a horizontal plane; plane abed is a vertical plane perpendicular to ABCD. A plane surface is a surface on which every point lies in the same plane. Plane figures are plane surfaces bounded by either straight lines or curved lines.

2.2.0 Polygons

A plane figure bounded by straight-line sides is called a polygon. The smallest possible number of sides for a polygon is three, and a three-sided polygon is called a triangle. Figure 2-3 − Intersecting planes.   2-14 Some terms and definitions relating to polygons are as follows: Sides The boundary lines of a polygon Perimeter The sum of the sides Triangle A polygon bounded by three sides Quadrilateral A polygon bounded by four sides Hexagon A polygon bounded by six sides Heptagon A polygon bounded by seven sides Octagon A polygon bounded by eight sides Equilateral A polygon with sides of equal length Regular An equilateral polygon Irregular A nonequilateral polygon Parallelogram A quadrilateral with both pairs of opposite sides parallel Rectangle A parallelogram in which adjacent sides join at right angles Square An equilateral rectangle Oblong A nonequilateral rectangle Trapezoid A quadrilateral with only one pair of opposite sides parallel, the other being not parallel Trapezium A quadrilateral with no sides parallel Rhombus An equilateral parallelogram in which adjacent sides join at oblique (other than right) angles Rhomboid A nonquilateral parallelogram in which adjacent sides join at oblique angles   2-15 Figure 2-4 shows a triangle, quadrilateral, pentagon, hexagon, heptagon, and octagon. Figure 2-5 shows a trapezoid, trapezium, rhombus, and rhomboid.

2.3.0 Determining Areas

The area of any surface is the number of units of area measure the surface contains. A unit of area measure is a square unit. The main thing to remember when computing for areas is that the dimensions used must be of the same unit of measure—if in inches, all units must be in inches and if in feet, all must be in feet. 2.3.1 Area of a Rectangle Figure 2-6 shows a rectangle measuring 10 feet by 8 feet, divided up into units of area measure, each consisting of 1 sq foot. If you were to count the units, one after the other, you would count a total of 80 units. However, you can see that there are 8 rows of 10 units, or 10 rows of 8 units. Therefore, the quickest way to count the units is simply to multiply 10 by 8, or 8 by 10. You could call the 8-feet dimension the width and the 10-feet dimension the length, in which case you would say that the formula for determining the area of a rectangle is the width times the length, or A = wl. Or, you could call the 10-feet dimension the base and the 8-feet dimension the altitude (meaning height), in which case your formula for area of a Figure 2-5 − Geometric figures of a trapezoid, trapezium, rhombus, and rhomboid. Figure 2-4 − Geometric figures of a triangle, quadrilateral, pentagon, hexagon, heptagon, and octagon. Figure 2-6 − Area of a Rectangle   2-16 rectangle would be A = bh. 2.3.2 Area of a Triangle Figure 2-7 shows a triangle consisting of one-half of the rectangle shown in Figure 2-6. It is obvious that the area of this triangle must equal one-half of the area of the corresponding rectangle, and the fact that it does can be demonstrated by geometrical proof. Therefore, since the formula for the area of the rectangle is A = bh, it follows that the formula for the triangle is A = 1/2bh. The triangle shown in Figure 2-7, because it is half of a corresponding rectangle, contains a right angle, and is therefore called a right triangle. In a right triangle the dimension h corresponds to the length of one of the sides. The triangle shown in Figure 2-8, however, is a scalene triangle, so-called because no two sides are equal. Classification of triangles will be discussed later in this lesson. Now, a perpendicular CD drawn from the apex of the triangle (from angle C) divides the triangle into two right triangles, ∆ADC and ∆BDC. The area of the whole triangle equals the sum of the areas of∆ADC and ∆BDC. The area of ∆ADC equals 1/2 (AD) (DC), and the area of ∆BDC equals 1/2(DB)(DC). Therefore, the area of the whole triangle equals 2 AD (DC) + 2 DB (DC), or DC   + 2 AD DB But since AD + DB = AB, it follows that the area of the whole triangle equals DC   2 AB . The length of AB is called the base (b), and the length of DC, the altitude (h); therefore, your formula for determining the area of an oblique triangle is again A = 1/2bh. You must remember that in a right triangle, h corresponds to the length of one of the sides, while in an oblique triangle it does not. Therefore, for a right triangle with the length of the sides given, you can determine the area by the formula A = 1/2bh. For an oblique triangle with the length of the sides given, you cannot use this formula unless you can determine the value of h. Later in this lesson you will learn trigonometric Figure 2-7 − Area of a triangle. Figure 2-8 − Triangle.   2-17 methods of determining areas of various forms of triangles on the basis of the length of the sides alone. 2.3.3 Area of a Rhombus or Rhomboid Figure 2-9 shows a rhomboid, ABCD. If you drop a perpendicular, CF, from ∠ C to AD, and project another from ∠ A to BC, you will create two right triangles, ∆AEB and ∆ CFD, and the rectangle AECF. It can be shown geometrically that the right triangles are similar and equal. You can see that the area of the rectangle AECF equals the product of AF x FC. The area of the triangle CFD equals 1 /2(FD) (FC). Because the triangle AEB is equal and similar to CFD, the area of that triangle also equals 1/2(FD) (FC). Therefore, the total area of both triangles equals (FD) (FC). The total area of the rhomboid equals the area of the rectangle AECF + the total area of both triangles. The total area of the rhomboid equals (AF) (FC) + (FD) (FC), or (AF + FD) (FC). But AF + FD equals AD, the base. FC equals the altitude. Therefore, the formula for the area of a rhomboid is A = bh. Here again you must remember that h in a rectangle corresponds to the length of one of the sides, but h in a rhombus or rhomboid does not. 2.3.4 Area of a Trapezoid Figure 2-10 shows a trapezoid, ABCD. If you drop perpendiculars BE and CF from points B and C, respectively, you create the right triangles AEB and DFC and the rectangle EBCF between them. The area of the trapezoid obviously equals the sum of the areas of these figures. The area of ∆AEB equals 1/2(AE)(FC), the area of ∆ DFC equals 1/2(FD)(FC), and the area of EBCF equals (EF)(FC). Therefore, the area of the trapezoid ABCD equals l/2(AE)(FC) + (EF)(FC) + 1/2(FD)(FC), or 2 ( ++ FCEFFDAE ))(2 . Figure 2-9 − Rhomboid. Figure 2-10 − Trapezoid.   2-18 However, 2EF = EF + BC. Therefore, the area of the trapezoid equals 2 (AE FD EF +++ BC)(FC) . But AE + FD + EF = AD. Therefore, the area of the trapezoid equals 2 (AD +BC)(FC) . AD and BC are the bases of the trapezoid and are usually designated as b1 and b2, respectively. FC is the altitude and is generally designated as h. Therefore, the formula for the area of a trapezoid is A = 1/2 (b1 + b2) h. Stated in words, the area of a trapezoid is equal to one-half the sum of its bases times its altitude. 2.3.5 Area by Reducing to Triangles Figure 2-11 shows you how to determine the area of a trapezium, or of any polygon, by reducing it to triangles. The dotted line connecting A and C divides the figure into the triangles ABC and ACD. The area of the trapezium obviously equals the sum of the areas of these triangles. 2.3.6 Area of a Circle Figure 2-12 shows how you could cut a disk into 12 equal sectors. Each of these sectors would constitute a triangle, except for the slight curvature of the side that was originally a segment of the circumference of the disk. If this side is considered the base, then the altitude for each triangle equals the radius (r) of the original disk. The area of each triangle, then, equals 2 br , and the area of the original disk equals the sum of the areas of all the triangles. The sum of the areas of all the triangles, however, equals the sum of all the b’s, multiplied by r and divided by 2. But the sum of all the b’s equals the Figure 2-11 − Trapezium. Figure 2-12 − Area of a circle.   2-19 circumference (c) of the original disk. Therefore, the formula for the area of a circle can be expressed as A = 2 cr . However, the circumference of a circle equals the product of the diameter times π (Greek letter, pronounced “pi”). π is equal to 3.14159. . . The diameter equals twice the radius; therefore, the circumference equals 2π r. Substituting 2π r for c in the formula A = 2 cr , we have A = 2 2π r (r))( , or 2 2 2 π r , or 2 π r . This is the most commonly used formula for the area of a circle. If we find the area of the circle in terms of circumference, A = 4π 2 c . 2.3.7 Area of a Segment and a Sector A segment is a part of a circle bounded by a chord and its arc, as shown in Figure 2- 13. The formula for its area is, where r = the radius and n = the central angle in degrees, A = 2 r 2   − sin n 180 π n A sector is a part of a circle bounded by two radii and their intercepted arc. The formula for its area is A = 360 nr 2 π , where r and n have the same designation as above. 2.3.8 Area of a Regular Polygons Figure 2-14 is a regular polygon. In any regular polygon, the area is equal to one-half the perimeter of the polygon times the radius of the inscribed circle. This is expressed in formula form as follows: A = 2 perimeter × r You can verify the above formula by dividing the polygon into equal triangles with the sides as their bases and with r as their altitudes; if you multiply the areas of Figure 2-13 − Segment and sector of a circle. Figure 2-14 − Regular polygons   2-20 the individual triangles by the number of sides in the polygon, you will arrive at the above formula. 2.3.9 Area of an Ellipse The derivation of an ellipse from a conic section and methods of drawing ellipses are explained in lesson 3. An ellipse is shown in Figure 2-15. The longer axis, AB, is called the major axis, and the shorter axis, CD, the minor axis. Call the length of the major axis a and that of the minor axis b. The area equals the product of half the major axis times half the minor axis timesπ . In formula form, it is stated as   = 2 b x 2 a A π =   4 ab π = 0.7854ab 2.3.10 Irregular Areas Irregular areas are those areas that do not fall within a definite standard shape. As you already have learned, there are formulas for computing the area of a circle, a rectangle, a triangle, and so on. However, we do not have a standard formula for computing the area of an irregular shaped plane, unless we use higher mathematics (calculus), and integrate incremental areas using lower and upper limits that define the boundaries. As an engineering tech, however, most areas you will be concerned with are those you will meet in plane surveying. In most surveys, the computed area is the horizontal projection of the area rather than the actual surface of the land. The fieldwork in finding areas consists of a series of angular and linear measurements defining the outline of whatever the shape is of the area concerned and forming a closed traverse. The following office computation methods, which you will learn as you advance in rate, are: 1. Plotting the closed traverse to scale and measuring the enclosed area directly with a polar planimeter (used only where approximate results are required, or for checking purposes). 2. Subdividing the area into a series of triangles, and taking the summation of all the areas of these triangles. 3. Computing the area using the coordinates of the individual points of the traverse (called the coordinate method). 4. Computing the area by means of the balanced latitude and departure, and calculated double meridian distances of each course (called the DMD method). Figure 2-15 − Ellipse.   2-21 5. Computing the area by counting squares; this method is nothing but superimposing small squares plotted on a transparent paper having the same scale as the plotted traverse (or of known graphical ratio) and counting the number of squares within the traverse. The smaller the squares, the closer to the approximate area you will get. 6. Computing an irregular area bounded by a curve and perpendicular lines, as shown in Figure 2-16. Here, you can use the trapezoidal rule. The figure is considered as being made up of a series of trapezoids, all of them having the same base and having common distances between offsets. The formula in computing the total area is as follows: dhh 2 h A e e   +∑+= + Where he and he + = the end offsets of the series of trapezoids ∑h = the sum of the intermediate offsets (h1 + h2 + h3 + …) and d = the common distance between the offsets For the present, try to find the areas of irregular figures by subdividing the area to series of triangles and by the method of counting the squares. There are also areas of spherical surfaces and areas of portions of a sphere. For other figures not covered in this training manual, consult any text on plane and solid geometry.

2.4.0 Determining Volumes

From the preceding section you learned the formulas for computing the areas of various plane figures. These plane areas are important in the computation of volumes, as you will see later in this section. When plane figures are combined to form a three-dimensional object, the resulting figure is a solid. For example, three rectangles and two triangles may be combined as shown in Figure 2-17. The flat surfaces of the solid figure are its faces, the top and bottom faces are the bases, and the faces forming the sides are the lateral faces or surfaces. Some solid figures do not have any flat faces, and some have a combination of curved and flat surfaces. Examples of solids with curved surfaces include cylinders, cones, and Figure 2-16 − Irregular area by trapezoidal rule.   2-22 spheres. Those solids having no flat faces include a great majority of natural objects, such as rocks, living matter, and many other objects with irregular surfaces. A solid figure whose bases or ends are similar, equal, and parallel polygons, and whose faces are parallelograms, is known geometrically as a PRISM. The name of a prism depends upon its base polygons. If the bases are triangles, as in Figure 2-17, the figure is a triangular prism. A rectangular prism has bases that are rectangles, as shown in Figure 2-18. If the bases of a prism are perpendicular to the planes forming its lateral faces, the prism is a right prism. A parallelepiped is a prism with parallelograms for bases. Since the bases are parallel to each other, this means that they cut the lateral faces to form parallelograms. If a parallelepiped is a right prism and if its bases are rectangles, it is a rectangular solid. A cube is a rectangular solid in which all of the six rectangular faces are squares. In determining the volume of most solids, you should use the following general formula: V = B h Where V = the volume B = the area of the base or end area h = the height of the solid (the perpendicular height from its base) 2.4.1 Volume of a Prism For the volume of any prism, then, you simply determine the end area or the base area by the appropriate method and multiply the end area by the length or the base area by the height. 2.4.2 Volume of a Cylinder From the standpoint of volume calculation, the only difference between a cylinder and a prism lies in the fact that the end or base of a cylinder is a circle rather than a polygon. Therefore, the volume of a cylinder is equal to its end area times its length. But you determine its end area from the formula 2 π r which is the formula used for computing the area of a circular plane. Therefore, the volume of a cylinder is 2 π r L. Figure 2-18 − Rectangular prism, showing its height Figure 2-17 − Parts of a prism (triangular)  2-23 2.4.3 Volume of a Cone or Pyramid The best way to approach the problem of determining the volume of a cone or pyramid is on the basis of the fundamental fact that the volume of a cone equals one-third of the volume of the corresponding cylinder, while the volume of a pyramid equals one-third of the volume of the corresponding prism. For any of these solids, volume equals base times height divided by 3. Therefore, the formula for computing the volume of a cone is r h, 3 1 V 2 = π and that for a pyramid is Bh. 3 1 V = A pyramid may have either a rectangular or a triangular base. 2.4.4 Volume of Other Geometric Figures There will be no attempt to illustrate the derivation of formulas presented in this section. The formulas for the computations of volumes and surface areas of the following geometric figures are presented here only for additional information. A frustum is that portion of a cone or pyramid that remains after the upper part is cut off by a plane parallel to the base. 1. SPHERE Volume of a sphere = 3 π r 3 4 Surface area = 2 4π r Where r = the radius of the sphere 2. FRUSTUM OF A CONE Volume of frustum = volume of large cone- volume of small cone = ) 2 221 2 1 h( r rrr 3 1 π ++ cubic units Lateral area = )( srr π + 21 square units Where h = the altitude of the frustum r1 = the radius of the base r2 = the radius of the top s = the slant height 3. FRUSTUM OF A PYRAMID Volume of a frustum = volume of large pyramid – volume of a small pyramid = 1 BBB 221 h( B 3 1 ++ ) Where h = the altitude of frustum B1 = the area of lower base B2 = the area of upper base   2-24

2.5.0 Trigonometry

This section focuses primarily on the study of plane trigonometry. It is intended only as a review of the relationships among the sides and angles of plane triangles and their ratios, called the trigonometric functions. Spherical trigonometry will be covered as you advance in rate. It is a prerequisite to the study of navigation, geodesy, and astronomy. Hence, the subject of spherical trigonometry will be introduced in the engineering technician class C1 school curriculum.

2.5.1 Measuring Angles

When two straight lines intersect, an angle is formed. You can also generate an angle by rotating a line having a set direction, Figure 2-19 depicts the generation of an angle. The terminal line OB is generated from the initial point OA and forms ∠ AOB, which we will call θ (Greek letter, pronounced “theta”). Angle θ is generally expressed in degrees. The following paragraphs will discuss the degree and the radian systems that are generally used by Engineering techs. The degree system is the most common system used in angular measurement. Angular measurement by revolution is perhaps the unit with which you are most familiar. In the degree system, a complete revolution is divided into 360 equal parts called degrees (360°). Each degree is divided into 60 minutes (60´), and each minute into 60 seconds (60”). For convenience in trigonometric computations, the 360° is divided into four parts of 90° each. The 90° sectors, called quadrants, are numbered counterclockwise starting at the upper right-hand sector. When the unit radius r (the line generating the angle) has traveled less than 90° from its starting point in a counterclockwise direction (or, as conventionally stated, in a positive direction), the angle is in the first quadrant (I). When the unit radius lies between 90° and 180°, the angle is in the second quadrant (II). Angles between 180° and 270° are said to lie in the third quadrant (III) and angles greater than 270° and less than 360° are in the fourth quadrant (IV). When the line generating the angle passes through more than 360°, the quadrant in which the angle lies is found by subtracting from the angle the largest multiple of 360 that the angle contains and determining the quadrant in which the remainder falls. Figure 2-19 − Generation of an angle, resulting angle measured in degrees.  2-25 The radian system of measuring angles is even more fundamental than the degree system. It has certain advantages over the degree system, for it relates the length of arc generated to the size of the angle and the radius. The radian measure is shown in Figure 2-20. If the length of the arc(s) described by the extremity of the line segment generating the angle is equal to the length of the line (r), then the angle described is exactly equal to one radian in size; that is, for one radian, s = r. The circumference of a circle is related to the radius by the formula, C = 2πr . This says that the circumference is 2π times the length of the radius. From the relationship of arc length, radius, and radians in the preceding paragraph, this could be extended to say that a circle contains 2π radians, and the circumference encompasses 360° of rotation. It follows that 2π radians = 360° π radians = 180° By dividing both sides of the above equation by π , we find that radian = °°= ° 57.2959 , 57.3or 180 π (approximately) As in any other formula, you can always convert radians to degrees or vice versa by using the above relationship. 2.5.2 Functions of Angles The functions of angles can best be illustrated by means of a “circle of unit radius” like the one shown in Figure 2-21. A so-called “Cartesian axis” is inscribed within the circle. Coordinates measured from 0 along the x axis to the right are positive; coordinates measured from 0 along the x axis to the left are negative. Coordinates measured along the y axis from 0 upward are positive; coordinates measured along the y axis from 0 downward are negative. Figure 2-20 − Radian measure. Figure 2-21 − Circle of unit radius  with quadrants shown. 2-26 Angles are generated by the motion of a point P counterclockwise along the circumference of the circle. The initial leg of any angle is the positive leg of the x axis. The other leg is the radius r, at the end of which the point P is located; this radius always has a value of 1. The unit radius (r = OC) is subdivided into 10 equal parts, so the value of each of the 10 subdivisions shown is 0.1. For any angle, the point P has three coordinates: the x coordinate, the y coordinate, and the r coordinate (which always has a value of 1 in this case). The functions of any angle are, collectively, various ratios that prevail between these coordinates. The ratio between y and r (that is, y/r) is called the sine of an angle. In Figure 2-21, AP seems to measure about 0.7 of y; therefore, the sine which is equal to 45° in this case, would seem to be 0.7/1, or about 0.7. Actually, the sine θ of 45° is 0.70711. Graphically, the sine is indicated in Figure 2-21 by the line AP, which measures 0.7 to the scale of the drawing. The ratio between x and r (that is, x/r) is called the cosine of the angle. You can see that for 45°, x and y are equal, and the fact that they are can be proven geometrically. Therefore, the cosine of 45° is the same as the sine of 45°, or 0.70711. Graphically, the length of line OA represents the cosine of angleθ when the radius (r) is equal to 1. The ratio between y and x (that is, y/x) is known as the tangent of an angle. Since y and x for an angle of 45° are equal, it follows that the tangent of an angle of 45° equals 1. The tangent is also indicated graphically by the line BC—drawn tangent to the circle at C and intersecting the extended r at B and DB—which is also drawn tangent at D. As you examine Figure 2-21, you can deduce that BC is equal to OC. OC is equal to the unit radius, r. The three functions shown in Figure 2-21 are called the “direct” functions. For each direct function there is a corresponding “reciprocal” function–meaning a function that results when you divide 1 by the direct function. You know that the reciprocal of any fraction is simply the fraction inverted. Therefore, for the direct function sine, which is y/r, the reciprocal function (called the cosecant) is divided by y/r, which is r/y. Since y at sine 45° equals about 0.7, the cosecant for 45° is r/y, which is equal to 1/0.7, or about 1.4. The cosecant is indicated graphically by the line OB in Figure 2-21. If you measure this line, you will find that it measures just about 1.4 units to the scale of the drawing. For the direct function cosine, which is x/r, the reciprocal function (called the secant) is r/x. Since x for cosine 45° also measures about 0.7, the secant for 45°, r/x, is the same as the cosecant, or also about 1.4. The secant is also indicated graphically in Figure 2- 21 by the line OB. For the direct function tangent, which is y/x the reciprocal function (called the cotangent) is x/y. Since x and y at tangent 45° are equal, the value for cotangent 45° is the same as that for the tangent, or 1. The cotangent is shown graphically in Figure 2-21 by the line DB, drawn tangent to the circle at D. 2.5.3 Functions and Cofunctions The functions cosine, cosecant, and cotangent are cofunctions of the functions sine, secant, and tangent, respectively. A cofunction of an angle A has the same value as the corresponding function of (90° – A); that is, the same value as the corresponding function of the complement of the angle. The sine of 30°, for example, is 0.50000. The cosine of 60° (the complement of 30°) is likewise 0.50000. The tangent of 30° is 0.57735. The cotangent of 60° (the complement of 30°) is likewise 0.57735.  2-27 Commonly used functions and cofunctions are as follows: sin A = cos (90° - A) sec A = csc (90° - A) tan A = cot (90° - A) 2.5.4 Functions of Obtuse Angles In Figure 2-22, the point P has generated an obtuse (larger than 90°) angle of 135°. This angle is the supplement of 45° (two angles are supplementary when they total 180°). We have left a dotted image of the reference angle A, which is equal to the supplementary angle of 135°. You can see that the values of x, y, and r are the same for 135° as they are for 45°, except that the value of x is negative. From this it follows that the functions of any obtuse angle are the same as the functions of its supplement, except that any function in which x appears has the opposite sign. The sine of an angle is y/r. Since x does not appear in this function, it follows that sin A = sin (180° – A). The cosine of an angle is x/r. Since x appears in this function, it follows that cos A = - cos (180° – A). The tangent of an angle is y/x. Since x appears in this function, it follows that tan A = – tan (180°– A). The importance of knowing this lies in the fact that many tables of trigonometric functions list the functions only for angles to a maximum of 90°. Many oblique triangles, however, contain angles larger than 90°. To determine a function of an angle larger than 90° from a table that stops at 90°, you lookup the function of the supplement of the angle. If the function is a sine, you use it as is. If it is a cosine or tangent, you give it a negative sign. The relationships of the function of obtuse angles are as follows: sin A = sin (180° – A) cos A = - cos (180° – A) tan A = - tan (180° – A) cot A = - cot (180° – A) Figure 2-22 − Function of an obtuse angle.  2-28 sec A = - sec (180° – A) csc A = csc (180° – A) The above relationships apply only when angle A is greater than 90° and less than 180° 2.5.5 Functions of Angles in a Right Triangle For an acute angle in a right triangle, the length of the side opposite the angle corresponds to y and the length of the side adjacent to the angle corresponds to x, while the length of the hypotenuse corresponds to r. Therefore, the functions of an acute angle in a right triangle can be stated as follows: Sine = side opposite hypotenuse Cosecant = hypotenuse side opposite Cosine = side adjacent hypotenuse Secant = hypotenuse side adjacent Tangent = side opposite side adjacent Cotangent = side adjacent side opposite If you consider a 90° angle with respect to the “circle of unit radius” diagram, you will realize that for a 90° angle, x = 0, y = 1, and r (as always) equals 1. Since sine = y/r, it follows that the sine of 90° = 1. Since cosine = X/r, it follows that the cosine of 90° = 0/1, or 0. Since tangent= y/x, it follows that tan 90° = 1/0, or infinity (00). From one standpoint, division by 0 is a mathematical impossibility, since it is impossible to state how many zeros there are in anything. From this standpoint, tan 90° is simply impossible. From another standpoint, there are an “infinite” number of zeros in 1. From that standpoint, tan 90° is infinity. In real life, the sides of a right triangle y, x, and r, or side opposite, side adjacent, and hypotenuse, are given other names according to the circumferences. In connection with a pitched roof rafter, for instance, y or side opposite is “total rise,” x or side adjacent is “total run,” and r or hypotenuse is “rafter length.” In connection with a ground slope, y or side opposite is “vertical rise,” x or side adjacent is “horizontal distance,” and r or hypotenuse is “slope distance.” 2.5.6 Methods of Solving Triangles To “solve” a triangle means to determine one or more unknown values (such as the length of a side or the size of an angle) from given or known values. Here are some of the methods used. 2.5.6.1 Pythagorean Theorem When you know the lengths of two sides of a right triangle, or its hypotenuse and one side, you can determine the length of the remaining side, or the length of the hypotenuse, by applying the Pythagorean Theorem. The Pythagorean Theorem states that the square of the length of the hypotenuse of any right triangle equals the sum of the squares of the lengths of the other two sides.  2-29 Figure 2-23 shows a right triangle with acute angles A and B and right angle C. Sides opposite A and B are designated as a and b; the hypotenuse (opposite C) is designated as c. Side a measures 3.00 feet, side b measures 4.00 feet, and the hypotenuse measures 5.00 feet. Any triangle with sides and hypotenuse in the ratio of 3:4:5 is a right triangle. If c2 =a2 +b2 , it follows that c = 22 − ba . The formulas for solving for either side, given the other side and the hypotenuse; or for the hypotenuse, given the two sides, are a = 22 − bc b = 22 − ac c = 22 ba In Figure 2-23, a2 = 9, b2 = 16, and c2 = 25. Therefore, a = the square root of (25 – 16), or 3; b = the square root of (25 – 9), or 4; and c = the square root of (9 + 16), or 5. 2.5.6.2 Acute Angle of Right Triangle by Tangent One of the angles in a right triangle always measures 90°. Because the sum of the three angles in any triangle is always 180°, each of the other two angles in a right triangle must be an acute (less than 90°) angle. Also, if you know the size of one of the acute angles, you can determine the size of the other from the formulas A = (90° – B) and B = (90° – A). In any right triangle in which you know the lengths of the sides, you can determine the size of either of the acute angles by applying the tangent of the angle. Take angle A in Figure 1-23, for example. You know that tan A = , 0.75or 4.00 3.00 , or b a . Reference to a table of natural tangents shows that an angle with tangent 0.75 measures to the nearest minute, 36°52'. 2.5.6.3 Side of Right Triangle by Tangent If you know the length of one of the sides of a right triangle and the size of one of the acute angles, you can determine the length of the other side by applying the tangent. Suppose that for the triangle shown in Figure 2-23 you know that angle A measures 36°52' and that side b measures 4.00 feet. You want to determine the length of side a. Since tan A = , b a Figure 2-23 − A right triangle  2-30 it follows that a = b (tan A). From a table of natural tangents you find that tan °5236 ' = 0.74991. Therefore, a = 4.00(0.74991), or 3.00 feet. 2.5.6.5 Side of Right Triangle Cotangent Suppose that for the triangle shown in Figure 2-23, you know that angle B measures 53°08´ and that side a measures 3.00 feet. You want to determine the length of side b. You could do this as previously described by applying tan B = a b However, the fact that side b is larger than side a means that tan B is larger than 1 (you recall that any angle larger than 45° has a tangent larger than 1). You know that the cotangent is the reciprocal function of the tangent. Therefore, if tan B = , a b cot B = , b a it follows that b = Bcot a . A table of natural functions tells you that cot 53°08' = 0.74991. Therefore, b = , 4.00.or 0.74991 3 2.5.6.5 Acute Angle of Right Triangle by Sine or Cosine If you know the length of the hypotenuse and length of a side of a right triangle, you can determine the size of one of the acute angles by applying the sine or the cosine of the angle. Suppose that for the triangle shown in Figure 2-23, you know that the hypotenuse, c, is 5.00 feet long and that the length of side a is 3.00 feet long. You want to determine the size of angle A. Side a is opposite angle A; therefore, sin A = , 0.6.or 5 3 , or c a A table of natural functions tells you that an angle with sine 0.6 measures (to the nearest minute) 36°52'. Suppose that, instead of knowing the length of a, you know the length of b (4.00 feet). Side b is the side adjacent to angle A. You know that cos A = , 0.8.or 5 4 , or c b A table of natural functions tells you that an angle with cosine 0.8 measures 36°52'. If you know the size of one of the acute angles in a right triangle and the length of the side opposite, you can determine the length of the hypotenuse from the sine of the angle. Suppose that for the triangle shown in Figure 2-23, you know that angle A = 36°52' and side a = 3.00 feet. Sin A = ; c a therefore, c = , 5.00feetor 0.6 3 , or sinA a If you know the size of one of the acute angles in a right triangle and the length of the side adjacent, you can determine the length of the hypotenuse from the cosine of the  2-31 angle. Suppose that for the triangle in Figure 2-23, you know that angle A = 36°52' and side b = 4.00 feet. Cos A = ; c b therefore, c = cosA b Tables show that cos 36°52' = 0.80003. Therefore, c = 0.80003 4.00 , or 5.00 feet 2.5.6.6 Solution by Law of Sines For any triangle (right or oblique), when you know the lengths of two sides and the size of the angle opposite one of them, or the sizes of two angles and the length of the side opposite one of them, you can solve the triangle by applying the law of sines. The law of sines (which is explained and proved in NAVPERS 10071-B, lesson 5) states that the lengths of the sides of any triangle are proportional to the sines of their opposite angles. It is expressed in formula form as follows: sin C c sin B b sin A a == In the triangle shown in Figure 2-24, ∠ A = °2441 ’, a = 8.00 feet, and b = 12.00 feet. If sin A a sinB b = , It follows that sin B = a b sin A . The sine of °2441 ’ is 0.66131; therefore, Sin B = , or 0.99196. 8 12( 0.66131) Tables show that the angle with sine 0.99196 measures °44'82 . Therefore, ∠ B = °4482 '. ∠ C = 180° - (A + B), or 180° - ( °2441 ’ - °44'82 ) or 180° - °° 52'55or08,124 . If sin A a sin C c = , then c = . sin A a sin C The sine of ° '5255 is 0.82773. Therefore, c = 9.66131 8( 0.82773) , or 10.01 feet. 2.5.6.7 Solution by Law of Cosines Suppose you know two sides of a triangle and the angle between the two sides. You cannot solve this triangle by the law of sines, since you do not know the length of the side opposite the known angle or the size of an angle opposite one of the known sides. Figure 2-24 − Oblique triangle (law of sines).  2-32 In a case of this kind you must begin by solving for the third side by applying the law of cosines. If you are solving for a side on the basis of two known sides and the known included angle, the law of cosines states that in any triangle the square of one side is equal to the sum of the squares of the other two sides minus twice the product of these two sides multiplied by the cosine of the angle between them. This statement may be expressed in formula form as follows: a2 = b2 +c2 – 2bc cos A b2 = a2 + c2 – 2ac cos B c2 = a2 + b2 – 2ab cos C For the triangle shown in Figure 2-25, you know that side c measures 10.01 feet; side b, 12.00 feet; and angle A (included between them), 41°24'. The cosine of 41°24' is 0.75011. The solution for side a is as follows: a = cb 2bc Acos 22 −+ a = 144 100.20 −+ 2(12)(10.01)(0.75011) a = 244.20 − 180.20 a = 64 a = 8.00 feet Knowing the length of this side, you can now solve for the remaining values by applying the law of sines. If you know all three sides of a triangle, but none of the angles, you can determine the size of any angle by the law of cosines, using the following formulas: cos A = 2bc acb 222 −+ cos B = 2ac bca 222 −+ cos C = 2ab cba 222 −+ For the triangle shown in Figure 2-26, you know all three sides but none of the angles. The solution for angle A is as follows: Figure 2-25 − Oblique triangle (law of cosines)  2-33 cos A = 2bc acb 222 −+ cos A = 2( 12) ( 10.0 1) 144 100.20 −+ 64 cos A = 240.24 180.20 cos A = 0.75008 The angle with cosine 0.75008 measures (to the nearest minute) 41°24'. 2.5.6.8 Solution by Law of Tangents The law of tangents is expressed in words as follows: In any triangle the difference between two sides is to their sum as the tangent of half the difference of the opposite angles is to the tangent of half their sum. For any pair of sides—as side a and side b—the law may be expressed as follows: 1/2tan ( A B) 1/2tan ( A B) ba ba + − = + − For the triangle shown in Figure 2-27, you know the lengths of two sides and the size of the angle between them. You can determine the sizes of the other two angles by applying the law of tangents as follows. First note that you can determine the value of angles (B + C), because (B + C) obviously equals 180° – A, or 180° – 34°, or 146°. Now, if you know the sum of two values and the difference between the same two, you can determine each of the values as follows: x + y = 5 x - y = 1 (add) 2x = 6 x = 3 y = 5 – x y = 2 Now, you know the sum of (B + C). Therefore, if you could determine the difference, or (B – C), you could determine the sizes of B and C You can determine 12(B – C) from the law of tangents, written as follows: Figure 2-26 − Any triangle, given three sides Figure 2-27 − Oblique triangle (law of tangents)  2-34 tan cb ( B C) 2 1 ( b c)tan ( B C) 2 1 + − + =− One-half of (B + C) means one-half of 146°, or 73°. The tangent of 73° is 3.27085. The solution for 12(B – C) is therefore as follows: tan 10 8 8)( 10 ( 3.27085) ( B C) 2 1 + − =− tan 0.36342 18 6.54170 ( B C) 2 1 =− = (from table of natural tangents) 1/2 (B - C) = 19°58’ (B – C) = 2(19058’) = 39°56’ Knowing both the sum (B + C) and the difference (B – C), you can now determine the sizes of B and C as follows: B + C = 146°00’ B – C = 39°56’ 2B = 185°56’ B = 92°58’ C = (146° - 92°58’) + 53°02’ 2.5.6.9 The Ambiguous Case When the given data for a triangle consists of two sides and the angle opposite one of them, there may be two triangles that conform to the data. A situation in which there can be two triangles is called the ambiguous case. Figure 2-28 shows two possible triangles that might satisfy this situation. Both triangles shown are with given angle A = 30°00´, given side a = 4.00 feet, and given side c = 6.00 feet. The best way to determine whether or not the given data for a triangle involves an ambiguous case is to lay out a figure to scale on the basis of the data, as shown in Figure 2-29. Suppose, for example, that the data describes a triangle with angle A = 22°00'; side opposite, 5.40 feet; and other side, 14.00 feet. Lay off a line, AB, 14.00 feet long (to scale, of course), as shown in the upper triangle of Figure 2-29. Use a protractor to lay off a line from A at 22°00'. Set a compass to the graphical distance of 5.40 feet (length of side opposite A) and with B as a center, strike an arc. You observe that this arc intersects the line from A at two places. Therefore, the triangle ACB and the triangle ADB both satisfy the data, and you have an ambiguous case. Figure 2-28 −Two ambiguous case triangles (solution of one will satisfy the other).  2-35 Suppose now that the data describes a triangle with angle A = 35°00´; side opposite, 10.00 feet; and other side, 8.00 feet. Lay off the line AB 8.00 feet long as shown in the lower triangle of Figure 2-29, and lay off a line from A at 35°00’, Set a compass to 10.00 feet (length of side opposite A) and with B as a center, strike an arc. This arc will intersect the line from A at only one point. Therefore, only one triangle satisfies the data. 2.5.6.10 Determining the Angle from Three known Sides There are several formulas for determining the size of an angle in a triangle from three known sides. The most convenient involves the versed sine of the angle, which means (1 -cos) of the angle. The formula goes as follows: 1 – cos A = bc 2( s b) ( s −− c) 1 – cos B = ac 2( s a) ( s −− c) 1 – cos C = ab 2( s b) ( s −− b) The value s means one-half the sum of sides a, b, and c or s = 2 ++ cba For the triangle shown in Figure 2-30, you would determine the size of angle A as follows: s= 18.50 2 37.00 2 10.00 12.00 15.00 == ++ 1 – cos A = ( 15) ( 10) 2( 18.50 − 15) ( 18.50 − 10) = 150 2( 3.50) ( 8. 50) 1 – cos A = 0.39667 150 59.50 = cos A = 1 – 0.39667 = 0.60333 Figure 2-30 − Oblique triangle with three sides given and solved by versed sine formula. Figure 2-29 −Comparison of an ambiguous case.  2-36 The angle with cosine 0.60333 measures (to the nearest minute) 52°53´.

3.0.0 HINTS on COMPUTING

As a general rule, when you express dimensions, you express all dimensions with the same precision. Suppose, for example, you have a triangle with sides 15.75, 19.30, and 11.20 feet long. It would be incorrect to express these as 15.75, 19.3, and 11.2 feet, even though the numerical values of 19.3 and 11.2 are the same as those of 19.30 and 11.20. Another general rule is that it is useless to work computations to a precision higher than that of the values applied in the computations. Suppose, for example, you are solving a right triangle for the length of side a, using the Pythagorean Theorem. Side b is given as 16.5 feet, and side c, as 20.5 feet. By the theorem you know that side a equals the square root of (20.52 – 16.52), or the square root of 148.0. You could carry the square root of 148.0 to a large number of decimal places. However, any number beyond two decimal places to the right would be useless, and the second number would be determined only for the purpose of rounding off the first. The square root of 148.0, to two decimal places, is 12.16. As the 0.16 represents more than one-half of the difference between 0.10 and 0.20, you round off at 0.2, and call the length of side less than one-half of the difference between 0.10 and 0.20, you would have rounded off at the lower tenth digit, and called the length of side a 12.1 feet. Suppose that the hundredth digit had represented one-half of the difference between 0.10 and 0.20, as in 12.15. Some computers in a case of this kind always round off at the lower Figure, as, 12.1. Others round off at the higher Figure, as 12.2. Better balanced results are usually obtained by rounding off at the nearest even Figure. By this rule, 12.25 would round off at 12.2, but 12.35 would round off at 12.4.

4.0.0 UNITS of Mengineering techSUREMENT

Engineering science would not be as precise as it is today if it did not make use of systems of measurement. In fieldwork, drafting, office computation, scheduling, and quality control, it is important to be able to measure accurately the magnitudes of the various variables necessary for engineering computations, such as directions, distances, materials, work, passage of time, and many other things. The art of measuring is fundamental in all fields of engineering and even in our daily lives. We are familiar, for instance, with “gallons,” which determines the amount of gasoline we put in our car and with “miles,” which tells us the distance we have to drive to and from work. It is also interesting to note that the development of most of these standard units of measure parallels the development of civilization itself, for there has always been a need for measurement. In the early days, people used night and day and the cycle of the four seasons as their measure of time. The units of linear measure were initially adopted as comparison to the dimensions of various parts of a man’s body. For example, a “digit” was at that time the width of a man’s middle finger, and a “palm” was the breadth of an open hand. The same applies to most other units of linear measure that we know today—like the “foot,” the “pace,” and the “fathom.” The only difference between today’s units of measure and those of olden days is that those of today are standardized. It is with the standard types of measurements that we are concerned in this training manual. At present, two units of measurement are used throughout the world. They are the English system and the metric system. Many nations use the metric system.  2-37 The metric system is the most practical method of measurement, for it is based on the decimal system; in which units differ in size by multiples of tens, like the U.S. monetary system in which 10 mills equal 1 cent; 100 mills or 10 cents equal 1 dime; and 1,000 mills, 100 cents, or 10 dimes equal one dollar. When we perform computations with multiples of 10, it is convenient to use an exponential method of expression as you may recall from your study of mathematics. Table 2-1 − Linear conversion factors. Inches Feet Yards Statute miles Centimeters Meters Kilometers Inch 1 .083333 .0277 ………… 2.540005 .0254 ………….. Foot 12 1 .333 30.48006 0.304801 ………….. Yard 36 3 1 .000568 .914402 .914402 .000914 Statute mile 63,360 5280 1760 1 1609.347 1609.347 1.609347 International nautical mile ……… 6076.10 2025.36 1.15077 ……………. …………. ………….. United States nautical mile ……… 6080.20 2026.73 1.151553 ……………. …………. ………….. Centimeter .3937 ………… ………… ………… 1 .01 ………….. Meter 39.37 3.280833 1.093611 0.62137 100 1 .001 Kilometer ……… ………… ………… ………… ………… 1000 1 Decimeter 3.937 .328 ………… ………… ………… .1 …..……… Decameter 393.7 32.8 ………… ………… ………… 10 ……..…… Hectometer ……… 328’1” ………… ………… ………… ………… .1 Myriameter ……… ………… ………… 6.213712 ………… ………… 10 A unit of measurement is simply an arbitrary length, area, or volume, generally adopted and agreed upon as a standard unit of measurement. The basic standard for linear measurement, for example, is the meter, and the actual length of a meter is, in the last analysis, equal to the length of a bar of metal called the International Meter Bar, one replica of which is kept in the National Bureau of Standards, Washington, D.C. As an engineering tech, you will not necessarily be working with all the units described in this lesson, and therefore need not attempt to memorize them all. Many are included simply to show that units are arbitrary and that there are many different kinds of units.

4.1.0 Linear Measurement

Linear measure is used to express distances and indicate differences in their elevations. The standard units of linear measure are the foot and the meter. In surveying operations, both of these standard units are frequently divided into tenths, hundredths, and thousandths for measurements. When longer distances are involved, the foot is expanded into a statute or a nautical mile and the meter into a kilometer. Table 2-1 shows the conversion factors for the common linear measurements. 4.1.1 English Units In the English system, the most commonly used basic unit of linear measurement is the foot, a unit that amounts to slightly more than three-tenths of the international meter. In what is called engineer’s measurement, the foot is subdivided decimally; that is, into tenths, hundredths, or thousandths of a foot. In what is called carpenter’s measurement, or English units, the foot is subdivided into twelfths called inches, and the inch is further subdivided into even-denominator fractional parts, as 1/2 inch, ¼ inch, 1/8 inch, and so on.  2-38 Fractions or multiples of the basic 1-foot unit are used to form larger units of linear measure as follows: 1 link = 0.66 feet 1 yard = 3.00 feet 1 rod, pole, or perch = 16.50 feet 1 Gunter’s chain = 66.00 feet 1 engineer’s chain = 100.00 feet 1 statute mile U.S. = 5280.00 feet 1 nautical mile (international) = 6076.10 feet A unit of linear measurement called VARA, of Spanish and Portuguese origin, was formerly used to measure land boundaries in those areas of the United States that were at one time under Spanish control. In those areas, old deeds and other land instruments still contain property descriptions in varas, which vary from state to state and country to country from 32 to 43 inches. 4.1.2 Metric Units In many of the non-English-speaking countries of the world, the most commonly used basic unit of linear measure is the meter. The length of a meter was originally designed to equal (and does equal very nearly) one ten-millionth part of the distance, measured along a meridian, between the earth’s equator and one of the poles. A meter equals slightly more than 1.09 yards. The big advantage of the metric system is that it is a decimal system throughout; that is, that the basic unit can be both subdivided into smaller units decimally and converted to larger units decimally by simply moving the decimal point in the appropriate direction. Names of units smaller than the meter are indicated by the Latin prefixes deci- (onetenth), centi- (one-hundredth), mini- (one-thousandth), and micro- (one-millionth), as follows: 1 decameter = 0.1 meter (1 x 10-1 ) 1 centimeter = 0.01 meter (1 x 10-2 ) 1 millimeter = 0.001 meter (1 x 10-3 ) 1 micrometer = 0.000001 meter (1 x 10-6 ) Names of units larger than the meter are indicated by the Greek prefixes deca- (ten), hecto- (one hundred), kilo- (one thousand), myria- (ten thousand), and mega- (one million), as follows: 1 decimeter = 10.00 meters (1 x 10) 1 hectometer = 100.00 meters (1 x 102 ) 1 kilometer = 1,000.00 meters (1 x 103 ) 1 myriameter = 10,000.00 meters (1 x 104 ) 1 megameter = 1,000,000.00 meters (1 x 106 )

4.2.0 Units of Area Measurement

In the English and metric system, area is most frequently designated in squares of linear units, such as square inches, feet, yards, or miles; or square centimeters, meters, or kilometers. In the English system, the land-area measurements most commonly used are the square foot and the acre. Formerly the square rod (1 rod = 16.5 feet) and the  2-39 square Gunter’s chain (1 Gunter’s chain = 66 feet) were used. One of the area measurements, with its equivalents, is as follows: 1 acre = 10 square Gunter’s chains = 160 square rods = 43,560 square feet An equilateral rectangular (square) acre measures 208.71 feet on a side. There are 640 acres in a square mile. Other area equivalents that may be of value to you are as follows: 1 square inch (sq in.) = 6.4516 + square centimeters (sq cm) 1 square foot (sq feet) = 144 square inch = 0.0929 + square meter (sq m) 1 square yard (sq yd) = 9 square feet = 0.8361 – square m 1 square meter (sq m) = 10.7639 square feet = 1.1960 + square yd Actually, more attention should be given to linear equivalents. If you know the linear conversion factor from one unit to the other, you can always compute for any equivalent area or even volume. Just remember, area is expressed in square units and volume is expressed in cubic units. Example: Find the area of a rectangle 2 feet by 3 feet in square inches. Area = 2 feet x 3 feet = (2 x12) (3 x 12) = 864 sq inch

4.3.0 Units of Volume Measurement

From your study of mathematics, you learned that volume is the measure of the amount of space that matter occupies. It is expressed in certain cubic units, depending upon the linear measurements or dimensions of the object. As an engineering tech, you will be interested in unit volume of measurements from the standpoint of earthwork, construction materials, material testing, rainfall runoff, and capacities of structures, such as, for example, a reservoir. The accuracy of your computations will depend upon your knowledge of the correct conversion factors and the units used. Remember that your dimensions must always be expressed in one kind of unit of measure; for instance, if you are using the meter, all dimensions must be in meters. The basic units of volume that you might be using are as follows: 1 cubic inch (cu inch) = 16.3872 cubic centimeters (cc) 1 cubic foot (cu feet) = 1,728 cubic inch = 0.0283 cubic meters (cu m) 1 cubic yard (cu yd) = 27 cubic feet = 0.7646 cubic meter 1 cubic meter (cu m) = 1,000,000 cc = 35.3145 cubic feet = 1.3079 cubic yards 1 U.S gallon = 231 cubic inch  2-40 1 cubic feet = 7.4805 gallons 1 acre feet = 43,560 cubic feet = 1,233.49 cubic meters

4.4.0 Units of Weight

The units of weight most frequently used in the United States for weighing all commodities except precious stones, precious metals, and drugs are the units of the socalled avoirdupois system. Avoirdupois units of weight are as follows: 437 ½ grains (gr) = 1 ounce (oz) 16 ounces (oz) = 1 pound (lb) 100 pounds (lb) = 1 hundred-weight (cwt) 1,000 pounds (lb) = 1 kip (K) 2,000 pounds (or 20 cwt) = 1 short ton (T) 2,200 pounds = 1 long ton Precious stones and precious metals are usually weighed in the United States by the system of try weight, in which there are 12, rather than 16, oz in the pound. Drugs are weighed by apothecaries’ weight, in which there are also 12 oz in the pound. The basic unit of the metric system of weight is the gram, which contains 15.432 grains. The grain was originally supposed to be equal to the weight of a single grain of wheat; The gram of 15.432 grains is also used in the avoirdupois, troy, and apothecaries’ system of weights. Multiples and subdivisions of the basic unit of metric weight (the gram) are named according to the usual metric system of nomenclature, as follows: 0.000001 g = 1 microgram 0.001 g = 1 milligram 0.01 g = 1 centigram 0.10g = 1 decigram 10.00 g = 1 decagram 100.00 g = 1 hectogram 1,000.00 g = 1 kilogram A metric ton equals 1,000 kilograms, which equals 1.1 short tons. The engineering technician is interested in the weight of his instruments and the pull to be applied to the ends of the tape to give correct linear measurements. The common units of weight in surveying are the ounce, the pound, the gram, and the kilogram. The following tabulation gives the relationship between these units:  2-41 1 ounce (oz) = 28.3495 grams (g) 1 pound (lb) = 453.5924 g = 0.4536 kg 1 kilogram (kg) = 2.2045 lb = 35.27 oz

4.5.0 Units of Angular Measurement

Angular or circular measure is used for designating the value of horizontal and vertical angles. For general use in the measurement of angles, the circumference of the circle is divided into some even number of equal parts. The unit of angular measure is the angle at the center of the circle subtended by one of the small subdivisions of the circumference. The various units of angular measure are known as units of arcs. In practice these units of arcs may be further expressed in decimal or fractional parts. The engineering technician may encounter three systems of angular measure in the use of surveying instruments. They are the sexagesimal, the centisimal or metric, and the mil system. 4.5.1 Sexagesimal or North American System In the sexagesimal or North American system, the circle is divided into 360 equal parts known as degrees of arc, each degree into 60 equal parts known as minutes of arc, and each minute into 60 equal parts known as seconds of arc. As an example, angles in this system are written as 263°47’16’’.48 which is read as “two hundred sixty-three degrees, forty-seven minutes, and sixteen point four eight seconds of arc.” In the United States, this is the most commonly used system of angular measurement. 4.5.2 Centisimal or Metric System In the centisimal or metric system, the full circle is divided into four quadrants, and each quadrant is divided into 100 equal parts known as grads or grades. Each grad is further divided into decimal parts. As an example, angles in this system are written as 376g.7289, or 376g72´89" which is read as “three hundred seventy-six point seven two eight nine grads,” or as “three hundred seventy-six grads, seventy-two centisimal minutes, and eighty-nine centesimal seconds. ” 4.5.3 Mil System In the mil system, the circle is divided into 6,400 equal parts known as MILS. The mil is divided into decimal parts. As an example, angles in this system are written as 1728.49 roils, which is read as “one thousand seven hundred twenty-eight point four nine mils.” This system is used principally by artillery people. The significance of this unit of angular measure is the fact that 1 mil is the angle that will subtend 1 yd at a range of 1,000 yds.  2-42 The relationships among values in the three systems of angular measure are as follows: 1 circle = 360 degrees = 400 grads = 6,400 mils 1 degree = 1.1111 grads = 17.7778 mils 1 minute = 0.2963 mils 1 grad = 0.9 degree = ° "00'540 1 mil = 0.0562 degree = ° 22'030 ".5 or 3.3750 minutes = 0.0625 grad

4.6.0 More Units of Measurement

Aside from the units of measurement discussed above, engineering techs must also deal with other units of measurement, such as time, temperature, pressure, and so forth. They must use exact time in computing problems in astronomy and some laboratory works, apply temperature corrections to tape readings, evaluate the effect of atmospheric pressure at different elevations, and get involved in some other types of measure that will be discussed in the following paragraphs. 4.6.1 Time Measurement For practical purposes in everyday affairs and in surveying, the measurement of time intervals is of great concern. The time used in everyday life is known as standard time and is based on the mean apparent revolution of the sun around the earth because of the earth’s rotation on its axis. Standard time is used in surveying to regulate the normal day’s operations. But, when it is necessary to observe the sun or the stars to determine the azimuth of a line or the position of a point on the earth’s surface, the surveyor uses three other kinds of time. They are apparent (true) solar time, civil (mean solar) time, and sidereal (star) time. You will learn more about these different times when you study the lesson on “Geodesy and Field Astronomy” in engineering technician Advanced. In the practice of surveying, it is customary to say, or write, the time of day as the number of hours, minutes, and seconds since midnight. Then the recorded time would appear, for example, as 16h 37m 52s .71 which is read as “sixteen hours, thirty-seven minutes, and fifty-two point seven one seconds of time.” Units of time measure are sometimes used to designate the sizes of angles. The longitude of a point on the earth’s surface is often expressed in this manner. The relationship between the units of time measure and the units of angular measure in the sexagesimal system are as follows: 1 hour = 15 degrees (1h = 15°) 1 minute of time = 15 minutes of arc (1m = 15’) 1 second of time = 15 seconds of arc (1s = 15”) 1 degree = 4 minutes of time (1° = 4m) 1 minute of arc = 4 seconds of time (1’ = 4s ) 1 second of arc = 0.0667 second of time (1” = 0.0667s )  2-43 4.6.2 Temperature Measurement In certain types of measurement, when the existing temperature differs from a standard temperature, the measured values will be in error and must be corrected, In each of the several temperature-measurement scales, the unit of measure is called a degree, which varies for the different temperature scales, When the scale extends below zero, values below zero are identified by a minus sign. Temperatures are written, for example, as 23°F or – 5°C, the letter designating the particular temperature scale. To avoid confusion when writing or talking about temperature, we should always be sure to indicate the type of scale used, Two of the most commonly used temperature scales are the centigrade scale and the Fahrenheit scale. On the Centigrade scale (also known internationally as “Celsius Scale” after Anders Celsius, a Swedish astronomer who first devised it), zero is the freezing point of water, and plus 100 is its boiling point. On the Fahrenheit scale, the temperature of the freezing point of water is plus 32°, and its boiling point is plus 212°. Now let us compare these scales. A Fahrenheit degree represents five-ninths of the change in heat intensity indicated by a degree on the Centigrade scale. Temperatures on either of the two scales can be converted to the other by the following formulas: Degrees C = 5/9 (degrees F – 32°), Degrees F = (9/5 degrees C) + 32° Note that, when converting Fahrenheit to Centigrade, you should first subtract the 32°, then multiply by 5/9. When converting Centigrade to Fahrenheit, you should first multiply by 9/5, then add the 32°. 4.6.3 Pressure Measurement Measurements of atmospheric pressure are used in surveying to determine approximate differences in elevation between points on the earth’s surface and to determine the best approximate correction for the effect of atmospheric refraction. The units of measure for atmospheric pressure and their relationships are as follows: 1 atmosphere = 29.9212 inches of mercury = 760 millimeters of mercury = 14.6960 pounds per square inch = 1,03323 kilograms per square centimeter = 33.899 feet of water = 1.01325 bars, or 1013.25 millibars 4.6.4 Dry Measure Dry measure is a system of measure of volume used in the United States for dry commodities, such as grains, fruits, and certain vegetables. The basic unit in dry measure is the bushel. The standard U.S. bushel contains about 77.6 lb of water. Since there are about 62.4 lb of water in a cu foot, a U.S. bushel has a volume of 62.442 77.6 , or about 1 ¼ cu feet.  2-44 Units of dry measure are as follows: 1 bushel = 4 pecks 1 peck = 8 quarts 1 quart = 2 pints 4.6.5 Board Measure Board measure is a method of measuring lumber in which the basic unit is a board foot (bf). A board foot is an abstract volume 1 foot long by 1 foot wide by 1 inch thick. The chief practical use of board measure is in cost calculations; lumber is sold by the board foot just as sugar is sold by the pound. There are several formulas for calculating the number of board feet in any given length of lumber with given section dimensions. Because lumber dimensions are most frequently given by length in feet and width and thickness in inches, the following formula is probably the most practical: 12 thickness in inches x in width inches x length in feet Bf = Board measure is calculated on the basis of the nominal, not the actual, section dimensions. The actual section dimensions of (for example) 2 by 4 stock, which is surfaced on all four surfaces (S4S), are about 1 5/8 inch thick by 3 5/8 inch wide. Nevertheless, the computation for the number of (for example) 300 linear feet of 2 by 4 stock would be as follows: 200Bf 12 x4x2 300 Bf = = 4.6.6 Liquid Measure In the United States the basic unit of liquid measure is the gallon, which has a volume of 231 cu inch or 0.13 cu feet. The gallon is subdivided into smaller units as follows: 1 gallon = 4 quarts 1 quart = 2 pints 1 pint = 4 gills Units larger than the gallon in liquid measure are as follows: 1 barrel = 31.5 gallons 1 hogshead = 63 gallons or 2 barrels For petroleum products the standard barrel contains 42 gallons. In the metric system, the basic unit of liquid measure is the liter, equal in volume to a cubic decimeter, or about 61 cubic inch. There are 3.785 liters in a U.S. gallon. Following the usual metric system of nomenclature, subdivisions and multiples of the liter are as follows: 0.000001 liter = 1 microliter 0.001 liter = 1 milliliter  2-45 0.01 liter = 1 centiliter 0.10 liter = 1 deciliter 10.00 liter = 1 decaliter 100.00 liter = 1 hectoliter 1,000.00 liter = 1 kiloliter 4.6.7 Electrical Measure In an electrical circuit there is a flow of electrons, roughly similar to the flow of water in a water pipe. The flow is occasioned by the production, at a generating station, battery, or other source, of an electromotive force (E), roughly similar to the "head" of water in a water system. The size of the electromotive force is measured in units called volts. The rate of flow of the electrons through the circuit is called the current (I). Current is measured in units called amperes. The usual conductor for transporting a flow of electrons through a circuit is wire. Generally speaking, the smaller the diameter of the wire, the more resistance (R) to the flow, and the larger the diameter, the less resistance. Resistance is measured in units called ohms. The definitions of the unit’s volt, ampere, and ohm are as follows: 1 volt Electromotive force required to send a current of 1 ampere through a system in which the resistance measures 1 ohm. 1 ampere Rate of flow of electrons in a system in which the electromotive force is 1 volt and the resistance 1 ohm. 1 ohm Resistance offered by a system in which the electromotive force is 1 volt and the current 1 ampere. The ohm is named for Georg Simon Ohm, a German scientist and early electrical pioneer, who discovered that there is a constant relationship between the electromotive force (E), the current (I), and the resistance (R) in any electrical circuit. This relationship is expressed in “Ohm’s law” as follows: R E I =  2-46 From the basic law it follows that = IRE I E R = From Ohm’s law you can (1) determine any one of the three values when you know the other two and (2) determine what happens in the circuit when a value is varied. Suppose, for example, that the resistance (R) is increased, while the electromotive force (E) remains the same. Obviously the current (I) must drop proportionately. To avoid a drop in the current, it would be necessary to increase the electromotive force proportionately. When an electrical circuit is open (that is, when there is a break in the circuit, such as an open switch), there is no flow of electrons through the circuit. When the circuit is closed, however, the current will begin to flow. With a constant electromotive force (E), the rate at which the current (1) flows will depend on the size of the resistance (R). The size of the resistance will increase with the number of electrical devices (such as lights, motors, and the like) that are placed on the circuit, and the amount of power each of these consumes. Power may be defined as “electrical work per unit of time.” James Watt, another early pioneer in the electrical field, discovered that there is a constant relationship between the electromotive force (E), the current (I), and the power consumption (P) in a circuit. This relationship is expressed in the formula P = IE, from which it follows that E P I = and I P E = Power is measured in units called WATTS, a watt being defined as the work done in 1 second when 1 ampere flows under an electromotive force of 1 volt. Suppose you have a 110-volt circuit in your home. The constant E of this circuit, then, is 110 volts. In the circuit there is probably a 15-ampere fuse. A fuse is a device that will open the circuit by “burning out” if the current in the circuit exceeds 15 amperes. The reason for the existence of the fuse is that the wiring in the circuit is designed to stand safely a maximum current of 15 amperes. A current in excess of this amount would cause the wiring to become red hot, eventually to “burn out,” and perhaps to start an electrical fire. Suppose you light a 60-watt bulb on this circuit. Your E is 110 volts. By the formula E P I = you know that the current in the circuit with the 60-watt bulb on is 60 110 or about 0.54 amperes, which is well within the margin of safety of 15 amperes. Dividing 15 amperes by 0.54 amperes you find that this fuse will protect a 27-lamp circuit. But suppose now that you place on the same one-lamp circuit an electric toaster taking about 1,500 watts (electrical devices are usually marked with the number of watts they  2-47 consume) and an electrical clothes dryer taking about 1,200 watts. The total P is now 60 + 1,500 + 1,200, or 2,760 watts. The current will now be 2,760 110 or 25 amperes. Theoretically, before it reaches this point, the 15-ampere fuse will burn out and open the circuit. 4.6.8 Mechanical Power Measure Mechanical power (such as that supplied by a bulldozer) is measured in units called foot-pounds per second (feet-lb/sec) or foot-pound per minute (feet-lb/min). A footpound is the amount of energy required to raise 1 lb a distance of 1 foot against the force of gravity. One horsepower equals 33,000 feet-lb/sec or 550 feet-lb/min. One horsepower equals about 746 watts.

4.7.0 Conversion of Units

To convert a measure expressed in terms of one unit to the equivalent in terms of a different unit is, when you know the ratio between the units, a simple proportional equation problem. Suppose, for example, that you want to convert a linear distance in engineer’s measure (feet and decimals of feet) to the equivalent in carpenter’s measure (feet and twelfths of feet) to the nearest one-eighth in. Suppose that the original distance is 12.65 feet. This means “12 feet and 65 hundredths of a foot.” You want to determine first, then, how many twelfths of a foot there are in 65 hundredths of a foot. The original ratio is 12/100. The proportional equation solution is as follows: 100 12 65 x = 7.8 100 780 100 12 x 65 x === Therefore, there are 7.8 inches. (twelfths of a foot) in 0.65 feet. The next step is to determine how many eighths of an inch there are in 0.8 inch; that is, in eight-tenths of an inch the initial ratio is 8/10, and the proportional equation solution is as follows: 10 8 8 x = 6.4 10 64 10 8x8 x === Therefore, there are (rounded off) 6/8 inch, or 3/4 inch, in 0.8 inches In 12.65 feet, then, there are 12 feet 7 3/4 inch to the nearest 1/8 inch Actually, the proportional method used above can be simplified by using the following solution: Convert 12.65 feet to the nearest 1/8 inch in carpenter’s measure.  2-48 12.65 feet = 12 feet + (0.65 x 12 = 7.8 inches,) = 12 feet 7.8 inches = 12 feet 7.0 inches + (0.8 x 8 = 6.4 eighths) = 12 feet 7.0 inches + 6/8 inches or 3/4 inches to the nearest eighth inch = 12 feet 7 3/4 inch In converting from engineer’s to carpenter’s linear measure, or vice versa, surveyors working with values to only the nearest 0.01 feet frequently use the following conversions to decimal equivalents of the common carpenter’s measure subdivisions of the inch. 1 inches = 0.08 feet 2 inches = 0.17 feet 3 inches = 0.25 feet 4 inches = 0.33 feet 5 inches = 0.42 feet 6 inches = 0.50 feet 7 inches = 0.58 feet 8 inches = 0.67 feet 9 inches = 0.75 feet 10 inches = 0.83 feet 11 inches = 0.92 feet 8 1 inches = 0.01 feet 4 1 inches = 0.02 feet 2 1 inches = 0.04 feet 4 3 inches = 0.06 feet  2-49 Using these values, you can convert decimals of a foot to inches carpenter’s measure, or inches carpenter’s measure to decimals of a foot, very easily. To convert (for example) 0.37 feet to inches carpenter’s measure, you have the following: 0.33 feet = 4 inches 0.04 feet = 2 1 inch 0.37 feet = 4 2 1 inches To convert (for example) 7 3/8 in. carpenter’s measure to engineer’s measure, you have the following: 7 inches = 0.58 feet. 8 3 inch = (3 x 0.01) = 0.03 feet. 7 8 3 inches = 0.61 feet. For a great many types of conversions there are tables in which you can find the desired values by inspection. Various publications contain tables for making the following conversions: Meters to feet Feet to meters Degrees Centigrade to degrees Fahrenheit Degrees Fahrenheit to degrees Centigrade Inches and sixteenths to decimals of a foot Sixteenths of an inch to decimals of a foot Minutes to decimals of a degree Degrees to roils and roils to degrees Grads to degrees, minutes, and seconds A conversion factor is a number that, if multiplied by a value expressed in terms of one unit, will produce the equivalent value expressed in terms of a different unit. The factor for converting linear feet to miles, for instance, is 0.00019. If you multiply 5,280 feet by 0.00019, you get 1.0032 miles, which is close enough to a mile to satisfy most practical purposes. When you know the ratio between two different units, you can easily work out your conversion factor. For example, you know that the ratio of degrees to roils is , 160 9  2-50 The conversion factor for converting degrees to roils is the number of roils in 1 degree which is , 9 160 or 17.8. The conversion factor for converting roils to degrees is the number of degrees in a roil, which is , 160 9 or 0.0562. Some of the common conversion factors are as follows: Linear feet x 0.00019 = miles Linear yards x 0.0006 = miles Square inches x 0.007 = square feet Square feet x 0.111 = square yards Square yards x 0.0002067 = acres Acres x 4840.0 = square yards Cubic inches x 0.00058 = cubic feet Cubic feet x 0.03704 = cubic yards Summary As an engineering technician, the use of mathematics is found in a variety of your day to day duties. Knowing how to compute easily, quickly, systematically and accurately, you will contribute to a project’s and a unit’s success.  2-51

Review Questions

 A calculator and pencil and paper may be needed to solve some of these problems. 1.  Positive and negative numbers are not real numbers. A. True B. False 2. Which one of the following is not a rational number? A. Fractions B. Whole numbers C. Percentage D. Radicals 3. Which of the following is not a prime number? A. 25 B. 7 C. 3 D. 17 4. Which of the following is not an improper fraction? A. 8/3 B. 24/4 C. 1/4 D. 12/5 5.  You can add or subtract fractions only if the numerators are alike. A. True B. False 6. To raise a number to a power means to ________, using the number as a factor as many times as the power indicates. A. subtract B. multiply C. add D. divide 7. 32 = A. 6 B. 8 C. 9 D. 10  2-52 8. 73 = A. 21 B. 49 C. 342 D. 343 9.  The square root must always be +. A. True B. False 10. 24 = A. 2.236 B. 22.36 C. 4.472 D. 44.72 11. = 3 21 A. 2.432 B. 2.345 C. 2.2 D. 2.645 12. If you have a fraction under a radical, you have to rationalize the _________ before performing the indicated operation. +++ 9242 = A. exponent B. denominator C. numerator D. square root 13. If you multiply the _________ and _________ by the same number, you can extract the denominator. A. exponent, square root B. denominator, exponent C. numerator, denominator D. square root, numerator 14. 4 = A. 4 B. 2 C. 41/2 D. 0  2-53 15. = 3 5 A. 51/3 B. 15 C. 53 D. 5/3 16. = 2 6 A. 12 B. 61/2 C. 6 D. 6.2 17. 2 = 3 5 A. 17 B. 53/2 C. 52/3 D. 15 18.  When an exponent occurs in the radicand, this exponent becomes the numerator of the fractional exponent. A. True B. False 19. = 9 7 A. .8 B. .882 C. .9 D. .093 20. = 1 4− A. 4/1 B. -1/4 C. 1/4 D. -1/4 21. 62 = A. 1/62 B. 12 C. 1/36 D. 36  2-54 22. = 3 10− A. 1/103 B. 1000 C. 1/1000 D. -1/10 23. 6.259 x 10-4 = A. 6.2590000 B. 0000.6259 C. .6259-4 D. 0.0006259 24. = 250,000 x 300 x 0.02 1 A. 0.000667 B. 6.67 x 10-7 C. 0.000000667 D. .667 25. A ratio is a comparison of how many quantities? A. one B. two C. three D. four 26. 24 feet and 3 yards written in comparison is equal to _______. A. 24:3 B. 12:3 C. 11 D. 8:3 27.  A plane is a real or imaginary surface in which a straight line between any two points lies wholly on that surface. A. True B. False 28. A quadrilateral is a polygon bounded by _______ sides. A. three B. four C. five D. six  2-55 29. Find the area of a right triangle with a base of 6 centimeters and a height of 9 centimeters A. 27cm B. 27cm2 C. 28cm D. 28cm2 30. The formula for a rhomboid is A. A = 1/2bh B. A = lwh C. A = wl D. A = bh 31. Find the area of a trapezoid with a base of 2.5 cm, 6 cm and a height of 5 cm. A. 21.25 B. 2.125 C. .2125 D. 212.5 32. Find the area of a circle with a circumference of 4. A. 127 B. 1.27 C. 12.7 D. .127 33. Find the area of a segment with r = 4, n = 12 (using 3.14 for π ) A. 16.7 B. 167 C. .167 D. 1.67 34. A = is used to solve what type of problem? 2 perimeter × r A. Regular Polygon B. Ellipse C. Irregular Trapezoid D. Triangle 35. Solve the following formula A =   3 b x 4 a A. 0.262ab B. 37.68ab C. 2.62ab D. 262ab  2-56 36. A solid figure whose base or ends are similar, equal, and parallel polygons and whose faces are parallelograms, is known geometrically as a ___________. A. Parallelogram B. Prism C. Cone D. Cylinder 37. A cone has a circular base of radius 14 cm, a height of 48 cm and a slant height of 50 cm. Calculate the volume of the cone. (using 22/7 for π ) A. 9856cm 9856cm2 B. 9856cm3 C. 9856cm4 D. 38. The _________ is the most common system used in angular measurement. A. Trigonometric function B. Revolution C. Quadrant D. Degree System For questions 39-42 determine the quadrant in which each of the following angles lies. 39. 260° A. First B. Second C. Third D. Fourth 40. 290° A. First B. Second C. Third D. Fourth 41. 80° A. First B. Second C. Third D. Fourth  2-57 42. 1,930° A. First B. Second C. Third D. Fourth 43.  The radian system of measuring angles is even more fundamental than the degree system. A. True B. False 44. Express 160° in radians, using π in the answer. A. 160/180π B. 180/160π C. 8π /9 D. 9/8 π 45. Express π /20 in degrees A. 8 degrees B. 9 degrees C. 10 degrees D. 11 degrees 46. The ratio between y and r (y/r) is called the ________ of an angle. A. sine B. cosine C. tangent D. cotangent 47. The ratio between x and r (x/r) is called the ________ of an angle. A. sine B. cosine C. tangent D. cotangent 48. The ratio between y and x (y/x) is called the ________ of an angle. A. sine B. cosine C. tangent D. cotangent  2-58 49. Secant is the reciprocal function for ________. A. sine B. cotangent C. cosecant D. cosine 50. Cotangent is the reciprocal function for ________. A. sine B. tangent C. cosecant D. cosine 51.  When solving an obtuse angle, if you see the cosine function, you give it a negative sign. A. True B. False Use the given triangles to solve questions 52-57, round to the nearest decimal. 52. sin θ = r y A. 6 B. 0.6 C. 60 D. 6.0 53. cos θ = r x A. 0.8 B. 9 C. 0.9 D. 10 54. tab θ = x y A. 0.34 B. 75 C. 34 D. 0.75  2-59 55. sin θ = y x A. 13 B. 1.33 C. 0.13 D. 13.01 56. sec θ = x r A. 1.14 B. 1.25 C. 125 D. 0.124 57. csc θ = (round to the nearest hundredth) y r A. 1.67 B. 1.6 C. 0.16 D. 16 58. What is the length of the hypotenuse of the right triangle if the lengths of the other two sides are 3 and 4? A. 5 B. 0.5 C. 25 D. 0.25 59. The right triangle shown has a hypotenuse equal to 40 and one of the other sides equal to 10. What is the length of the remaining side? A. 3.87 B. 38.7 C. .387 D. 387  2-60 60. Solve this problem for the triangle given. You know that angle A measures and that side b measures 12 feet. You want to determine the length of side a. °5236 ' A. 12.00 feet B. 3.00 feet C. 9.00 feet D. 5.00 feet 61. Solve this problem for the triangle given Angle B = and a = 3.00 feet. Find the length of b. °0853 ' A. 12.00 feet B. 3.00 feet C. 9.00 feet D. 4.00 feet 62. Solve this problem for the triangle given. Angle = and b = 23.00 feet. Find the length of a. °5236 ' A. 28.00 feet B. 28.72 feet C. 28.74 feet D. 28.75 feet 63. Solve for side b in triangle ABC, given c = 5, B = , and C = . Give side accuracy to one decimal place. 30° °3097 ' A. 2.0 B. 2.5 C. 3.0 D. 3.5  2-61 64. Solve for side a in triangle ABC, given b = 7, c = 5, A =19°. Give side accuracy to one decimal place. A. 2.7 B. 2.8 C. 2.9 D. 3.0 65. Use the triangle given to determine the size of A. A. 14583 B. .14583 C. 1.4583 D. 14.8535 66.  The two units of measurement used throughout the world are the French system and the metric system. A. True B. False 67. 1 statute mile = A. 52.80 feet B. 5.280 feet C. 5280.00 feet D. .5280 feet 68. 1 millimeter = A. 0.01 B. 0.001 C. 0.0001 D. 0.000001 69. How many acres are in 3 square miles? A. 640 B. 643 C. 1920 D. 1922 70. How many grains does a gram contain? A. 1.5432 B. 15.432 C. .1532 D. 154.32  2-62 71. _______________ is used for designating the value of horizontal and vertical angles. A. Circular measure B. Area measurement C. Volume measurement D. Units of weight 72. 1 minute is equal to how many mils? A. 2963 B. 29.63 C. 2.963 D. 0.2963 73. 14h 19m 57s .32 is read as A. 14:19:57.32 B. 14 hours, 19 minutes, 57.32 seconds C. 2:19:57.32 fourteen hours, nineteen minutes, and fifty-seven point three-two seconds of time D. 74.  On the Fahrenheit scale, the temp of the freezing point of water is plus 31°. A. True B. False 75. Solve this equation, when degrees F = 121. C = 5/9(121- ) 32° A. 48.0 B. 48.4 C. 49.0 D. 49.4 76.  Measurements of atmospheric pressure are used in surveying to determine approximate differences in elevation between points on the earth’s surface and to determine the best approximate correction for the effect of atmospheric refraction. A. True B. False 77. The basic unit in dry measurement is the ________. A. kilogram B. pound C. bushel D. gram  2-63 78. Solve the equation: 500 linear feet of 2 by 6 stock = __Board feet (Bf). A. 100 Bf B. 200 Bf C. 500 Bf D. 600 Bf 79. 12 gallons equals _____ quarts. A. 40 B. 42 C. 46 D. 48 80. _______ is used to measure the size of the electromotive force. A. Gallon B. Volts C. Current D. Amperes 81. Use the following to solve this problem. P=2,000, E = 110 Can a 15 amperes handle this load? A. Yes B. No 

Chapter 3 Drafting Equipment Topics

If “a picture can paint a thousand words,” then drafting is the universal language. Drafting is a specialized drawing style engineers and designers use to convey and record ideas or information necessary for the construction of structures and machines. Drafting follows clearly defined usage rules to ensure that it conveys the same meaning at all times. Those who learn the rules can interpret exactly what a drawing presents. In contrast to pictorial drawings, such as landscapes and portraits, engineering drawings use a graphical language to describe every integral part of an object. As an engineering technician, you will specialize in engineering drawings.

In this collection of lessons, you will learn that drafting divides into the following classifications: technical and illustrative, mechanical and freehand, and engineering. You will also learn about charts, graphs, drafting guidelines, and a variety of instruments and materials designed to help you perform your drafting duties. This chapter also contains helpful hints about operating, adjusting, and maintaining your drafting instruments.

When you have completed this lesson, you will be able to:

1. Understand the types of drafting done by the engineering technician rating.
2. Describe the drafting equipment used by the engineering technician rating. 

Contents

1.0.0 Types of Drafting

2.0.0 Drafting Equipment

 

1.0.0 TYPES of DRAFTING

Drafting is classified into categories according to its purpose or how it is accomplished: technical or Illustrative, mechanical or freehand, and engineering.

1.1.0 Technical and Illustrative

Drafting may be technical or illustrative. Technical drafting presents technical information in a graphic form. For example, a technical drawing may show the type and proper placement of structural members in a building. Illustrative drafting presents a pictorial image only; an example is a perspective drawing of a proposed structure. The term illustrative drafting is not commonly used in construction drafting. Figure 3-1 shows the same item as an illustrative drawing and a technical drawing.

1.2.0 Mechanical and Freehand

Mechanical drafting is any drawing in which the pencil or pen is guided by mechanical devices, such as compasses, straightedges, and french curves. In contrast, freehand drafting is any drawing in which the pencil or pen is guided solely by the draftsman’s hand. Sketches are the result of freehand drafting. With the exception of lettering, most technical drafting is mechanical. The term mechanical can also describe certain types of industrial or engineering drawings, regardless of whether the drawings are done mechanically or freehand. Some authorities confine the term, used in this sense, to the drawing of machinery details and parts. Others confine it to the drawing of plumbing, heating, air conditioning, and ventilating systems in structures. In the Seabees, mechanical drawing refers to the arrangements of machinery, utility systems, heating, air conditioning, and ventilating systems. Figure 3-1 – Illustrative versus technical drafting.  3-4

1.3.0 Engineering Drafting

As an engineering technician, you will be concerned primarily with three broad types of engineering drafting:

In performing drafting duties, you will be working from sketches, field notes, or direct instructions from your drafting supervisor. Figure 3-2 shows examples of each type of drafting.

1.3.1 Engineering Charts and Graphs

 Graphic presentation of engineering data means using charts and graphs, rather than numerical tables or word descriptions, to present statistical engineering information. A properly constructed chart or graph offers a sharp, clear, visual statement about a particular aspect or series of related facts, emphasizing the numerical value of the facts or showing the way these facts are related. A chart or graph that emphasizes numerical value is called quantitative; one that emphasizes relationships is called qualitative. The trend of an activity over a period of time, such as the mishaps summary report of a deployed unit rendered over a 6-month deployment period, is more memorable from the shape of a curve describing the trend than from numerical statistics. Successful graphic presentation of engineering data requires as much drafting ability as the graphic representation of engineering objects. Lines must be sharp, opaque, well contrasted, and of uniform weight. Drafters normally execute letters and figures with the standard lettering set according to accepted conventions. Charts and graphs can be technical or display charts. Figure 3-2 – Examples of topographic, construction, and administrative drafting.

1.3.1.1 Technical Engineering Charts

Technical engineering charts are usually based on a series of measurements of laboratory experiments or work activities. Such measurements examine the quantitative relationship between a set of two factors or variables. Of the two variables, one has either a controlled or regular variation and is called the independent variable. The other is called the dependent variable because its values are related to those of the independent variable. The line connecting plotted points is called a curve, although it may be broken, straight, or curved. The curve demonstrates the relationship between the variables and permits reading approximate values between plotted points.

1.3.1.2 Display Charts

The purpose of display charts is to convey data to nontechnical audiences. The message presents a general picture of a situation, usually comparative. There are many varieties of display charts, including bar charts, status charts, and training aids. A Seabee battalion frequently uses display charts in operations and training departments. When so used, they must conform to minimum standards the command prescribes. Any construction job involves quantities of people, materials, and equipment. Good planning, organization, and supervision lead to efficient job operation and completion. Statistics based on the results of past jobs with similar working conditions provide a basis for predicting the amount of time that a proposed job will take. Graphic presentation of past and current statistical data allows for easy comparison. These statistics offer the best possibilities for study when presented graphically, usually in the form of a curve. The prediction of expected achievement is usually presented as a bar chart called a time-and-work schedule. When the scheduled work progress is compared with the actual progress (work in place), the chart is called a progress chart.

1.4.0 Drafting Guidelines

As stated earlier, definite guidelines in drafting provide uniform interpretation of all engineering drawings. Any drawing prepared by or for the Navy must be prepared following the latest military standard (MIL-STD), Department of Defense Standard (DOD-STD), and applicable NAVFACENGCOM design manuals. For subjects these references do not cover, refer to civilian publications, such as the Architectural Graphic Standards. In exceptional cases, you may devise your own symbols as long as you adequately explain with notes or a legend any nonstandard features in your drawing. Many drawings continue in use for years; occasionally, you will have to work with drawings containing obsolete symbols. Look for a legend on the drawings; it should help you identify unfamiliar symbols. If there is no legend, studying the drawing carefully should enable you to interpret the meaning of unfamiliar symbols and abbreviations. The Assistant Secretary of Defense (Supply and Logistics), Office of Standardization publishes and constantly updates the DoD drawing standards. Any Navy activity can obtain copies of these standards by writing to the following: Naval Publications and Forms Center 5801 Tabor Avenue Philadelphia, PA 19120 All requests should state the desired title and identifying number and be submitted on DD Form 1425. To ensure that you have the latest edition of a standard, check the Department of Defense Index of Specifications and Standards, which is issued 31 July of each year. Also, check the supplements to the Index.  3-6 Current editions of the following military standards should be available to the engineering tech: MIL-HDBK-1006/1 Policy and Procedures for Project Drawings and Specifications Preparation MIL-STD-12D Abbreviations for Use on Drawings and in Technical Type Publications MIL-STD-14A Architectural Symbols MIL-STD-17B Mechanical Symbols MIL-STD-18 Structural Symbols DOD-STD-100C Engineering Drawing Practices In addition, the following civilian industry standards should be on hand in the drafting room: ANSI Y14.1 Drawing Sheet Size and Format ANSI Y14.2 Line Conventions and Lettering ANSI Y14.3 Multi and Sectional View Drawings ANSI Y14.5-82 Dimensioning and Tolerancing for Engineering Drawings AWS A3.0-85 Welding Terms and Definitions Standards ASTM E380 Standard for Metric Use

2.0.0 DRAFTING EQUIPMENT

To be a proficient draftsman, you must be familiar with the tools of your trade and the proper techniques of using them. You should carefully choose your drafting equipment and accessories. Owning a few good pieces of equipment is much better than having a large selection of undependable and shoddy equipment.

2.1.0 NMCB Standard Draftsman Kit

To ensure that every Naval Mobile Construction Battalion’s (NMCB’s) drafting section is properly outfitted with adequate drafting equipment and accessories, standard draftsman kits are provided in each NMCB’s allowance. The drafting equipment and supplies contained in the draftsman kit #0011 are listed in the NMCB’s TABLE OF ALLOWANCE (Assembly 80011). For this reason, this lesson will make no attempt to list all equipment and supplies currently carried in the standard draftsman kit. One complete NMCB’s draftsman kit is designed for use by three draftsmen. Normally, two complete draftsman kits will be carried in a battalion allowance, available for checkout to the drafting section supervisor or engineering chief. It is each crewleader’s responsibility to make sure that the kits assigned to him are complete. The crewleader continuously reviews and updates the kits according to current battalion requirements. The battalion supply department stocks most of the consumable items contained in the kit, such as pencils, pencil leads, lead holders, masking tape, and ink, for kit replenishment. It also stocks additional drafting equipment and supplies, such as  3-7 pointers and dust brushes, in most battalion drafting rooms to supplement the drafting kits. To avoid losing any equipment and supplies not included in the draftsman kit, do not pack them with the kit when you turn in the kit to the supply department at the end of a deployment or homeport period. The following sections will acquaint you with general drafting equipment and supplies, placing emphasis on items used by Seabee draftsmen.

2.2.0 Drafting Media

Materials on which draftsmen draw are called drafting media. There are three basic types: paper, cloth, and film. As a Seabee draftsman, you will commonly use tracing paper, profile paper, plan/profile paper, and cross-section paper. Although it is not in the draftsman kit, illustration board is used for preparing signs and charts. Seabee draftsmen rarely use tracing cloth and film, hence this lesson will not describe it. Tracing paper (also called tracing vellum) is a high-grade white (or slightly tinted) transparent paper that takes pencil well and erases cleanly. You can make reproductions directly from pencil drawings on tracing paper; however, for better results in reproduction, you will usually ink over a pencil drawing on tracing paper. See Figure 3-3. Profile, plan/profile, and cross-section paper are called gridded media. Each type of gridded media is designed for a specific purpose. Most gridded media engineering techs use are suitable for reproduction. Profile paper is normally available in two grid patterns: 4 by 20 lines (4 lines vertical and 20 lines horizontal) per inch and 4 by 30 lines per inch with the vertical lines accented every 10th line. Horizontal lines on the 4 by 20 are accented medium-weight every 5th line and heavyweight every 50th line. Horizontal lines on the 4 by 30 have heavyweight accent lines every 25th line. Profile paper is generally used for road design profiles. Plan/profile paper has rulings and grid accents similar to those of 4 by 20 and 4 by 30 profile paper, except that the grid patterns occupy only the lower half of the paper. The upper half is plain paper, used to draw the plan view in relation to the profile or to add explanatory notes to the profile. Plan/profile paper is also used for road design. Cross-section paper, also known as graph paper, is available in a variety of grid patterns. Generally, the engineering tech uses graph paper with a grid scale of 10 by 10 lines per square inch for drawing road cross sections, rough design sketching, preparing schedules, plotting graphs, and many other uses. See Figure 3-4. Most drafting media are available in three styles: plain sheets or rolls, preprinted sheets with borders and title blocks, and sheets with non-reproducible grids. For further information on the many varieties of drafting media available, refer to suppliers’ catalogs. Figure 3-3 – Tracing paper. Figure 3-4 – Cross-section paper.  3-8 Illustration board is drawing paper with a high rag content mounted on cardboard backing. See Figure 3-5.The type normally found in a Seabee drafting section has a smooth white drawing surface that takes ink readily. Normally, the board is 30 inches by 40 inches and comes in 50-sheet packages. engineering techs use illustration board for making signs and for large unmounted charts and for mounting maps, photos, and drawings that require a strong backing. They also use a thinner board, called bristol board, for making small signs and charts. The thickness of bristol board is about the same as an ordinary index card. Unlike illustration board, bristol board has two white smooth sides that take ink very well. Bristol board is less expensive than illustration board and you can easily cut, to size with a paper trimmer. It is available in many sizes; the most popular size is 20 inches by 30 inches in 50- or 100- sheet packages.

2.3.0 Drafting Pencils

Two types of pencils are used in drafting: wooden and mechanical. The latter is actually a lead holder and may be used with leads of different hardness or softness. Drafting pencils are graded according to the relative hardness of their graphite lead. A soft pencil is designated by the letter B, a hard pencil by the letter H. Figure 3-6 shows 17 common grades of drafting pencils from 6B (the softest and the one that produces the thickest line) to 9H (the hardest and one that produces a thin, gray line). You will notice that the diameters of the lead vary. This feature adds strength to the softer grades. As a result, softer grades are thicker and produce broader lines, while harder grades are smaller and produce thinner lines. Unfortunately, manufacturers of pencils have not established uniformity in grades. Hence, a 3H may vary in hardness from company to company. With experience and preference, you may select the trade name and grade of pencil that suits your needs.

2.4.0 Erasers and Erasing Accessories

You must be very careful in selecting an eraser to select one that will remove pencil or ink lines without damaging the surface of the drawing sheet. Figure 3-5 − Illustration board. Figure 3-6 − Grades of drafting pencils.  3-9 A vinyl eraser is ideal for erasing lines drawn on tracing cloth and films. An ordinary double-beveled pencil eraser generally comes in red or pink color (sometimes called a pink pearl). A harder eraser (sometimes called a ruby red) is designed for erasing lines in ink. The art gum eraser, made of soft pliable gum, will not mar or scratch surfaces. It is ideally suited for removing pencil or finger marks and smudges. You can also use a kneaded eraser—the type used by artists. It is a rubber dough, kneadable in your hand, and has the advantage of leaving very little debris on the drawing sheet. Slide 5 of Figure 3-7 shows an electric eraser. The control switch is directly under the fingertip; the body of the machine fits comfortably in the palm of the hand, and the rotating eraser can be directed as accurately as a pencil point. Refills for either ink or pencil erasing are available. CAUTION Do not hold the electric eraser steadily in one spot, or you may wear a hole in, or otherwise damage, the surface of the material you are erasing. When there are many lines close together only one of which needs removing or changing, you can protect the desired lines with an erasing shield, as shown in Figure 3-8. Finely pulverized gum eraser particles are available in squeeze bottles or in dry clean pads for keeping a drawing clean while you work on it. If you sprinkle a drawing or tracing occasionally with gum eraser particles, then triangles, T squares, scales, french curves, and other equipment not only tend to stay clean themselves, but tend to clean the drawing or tracing as they move over the surface. Before inking a drawing, you usually prepared it by sprinkling on pounce (a very fine bone dust) and then rubbing in the pounce with a felt pad on the container. Pounce helps to prevent a freshly inked line from spreading. Use a draftsman’s dust brush for brushing dust and erasure particles off a drawing.

2.5.0 Drafting Tables with Boards

Most engineering tech shops are furnished with standard drafting tables with drafting boards, as shown in Figure 3-9. The majority of this furniture is easily adjustable to the users’ needs. The table should be high enough for you to work in a standing position without stooping or holding your arms in a raised position. The drawing board has hinged attachments for adjusting the incline; your line of sight should be approximately perpendicular to the drafting surface. Your drafting stool should be high enough in Figure 3-7 − Common types of erasers Figure 3-8 − Eraser shield.  3-10 relation to the table for you to see the whole drafting board but not so high that you are seated uncomfortably. The drafting boards contained in the draftsman kit are constructed of joined strips of softwood, usually clear white pine or basswood. They are equipped with hinged attachments for securing the board to a table or fabricated base. If suitable bases are not available, table bases may be constructed at the unit carpenter shop. You should consider only the left-hand vertical edge as a working edge for the T square if you are right-handed (the right-hand edge if you are left-handed). You should never use the T square with the head set against the upper or lower edge of the board, as the drafting board may not be perfectly square. The drafting board should be covered. A variety of good drafting board cover materials is available. Available cover materials are cellulose acetate-coated paper, vinyl, and mylar film. Vinyl drafting board covers have the added advantage of being able to close up small holes or cuts, such as those made by drafting compasses or dividers. In general, drafting board covers protect the drafting board surface by preventing the drafting pencil from following the wood grain, by reducing lighting glare, and by providing an excellent drafting surface. Since you will be constantly using your eyes, your working area must be well lighted. Natural light is best, if available and ample; although in the majority of cases acceptable natural light will be the exception rather than the rule. Drafting rooms are usually lighted with overhead fluorescent fixtures. Ordinarily, these fixtures are inadequate in quality and intensity of light. Adjustable lamps will improve the lighting conditions. The most popular type of adjustable lamp is the floating-arm fluorescent fixture that clamps onto the table. Arrange your lighting to come from the front-left, if you are right-handed; from the front right, if you are lefthanded. This minimizes shadows cast by drawing instruments and your hands. Never place your drafting board so that you will be subject to the glare of direct sunlight. North windows are best for admitting daylight in the Northern Hemisphere. Conservation of vision is of the utmost importance. You must make every possible effort to eliminate eyestrain.

2.6.0 T Squares

The T square gets its name from its shape. It consists of a long, straight strip, called the blade, which is mounted at right angles on a short strip called the head. The head is Figure 3-9 − Drafting tables with boards.  3-11 mounted under the blade so that it will fit against the edge of the drawing board while the blade rests on the surface. T squares vary in size from 15 to 72 inches in length, with 36 inches the most common. The T square shown in Figure 3-10 is typical of the ones used by an engineering tech. The head is made of hardwood, the blade usually of maple with a natural or mahogany finish. The edges of the blade are normally transparent plastic strips glued into grooves on both edges of the blade, as shown in the cross section in Figure 3-10. This allows the edge of the T square to ride above the drawing as the blade is moved up or down the board. This arrangement is a great advantage when you are drawing with ink. Since the tip of the ruling pen does not come in contact with the blade, but is below it, ink cannot be drawn under the blade to blot the drawing. The T square is used for drawing horizontal lines only. Always draw lines along the upper edge of the blade. The T square also serves as a base for drawing the vertical and inclined lines of a triangle. Some T squares have adjustable heads to allow angular adjustments of the blade. Handle your T square carefully. If dropped, it may be knocked out of true and become useless. Additionally, to prevent warping, hang the T square by the hole in the end of the blade or lay it on a flat surface so that the blade rests flat. Before beginning a new job, test the top edge of your T square for warp or nicks by drawing a sharp line along the top of the blade. Turn the T square over and redraw the line with the same edge. If the blade is warped, the lines will not coincide. If the blade swings when the head is held firmly against the edge of the drawing board, the blade may be loose where it is joined to the head, or the edge of the T square head may be warped. You can usually tighten a loose blade by adjusting the screws that connect it to the head, but if it is out of square, warped, or in bad condition, select a new T square. Figure 3-10 − Drafting board with T square and drafting paper in place  3-12

2.7.0 Parallel Straightedge

Many draftsmen prefer to use a parallel straightedge (Figure. 3-11) rather than a T square. The primary purpose of the parallel straightedge is the same as the T square. The parallel straightedge is a laminated maple blade with transparent plastic edges similar to those on the T square. The parallel straightedge uses a system of cords and pulleys so that it is supported at both ends by a cord tacked to the drawing board. You can move the straightedge up or down the board with pressure at any point along its length and maintain parallel motion automatically. It comes complete with cord, tacks, cord tension adjuster, and mounting instructions. Some straightedges, like the one shown in Figure 3-11, are equipped with a cord lock on one end of the blade. The straightedge is locked into place by turning the cord lock clockwise. This permits use of the straightedge on an inclined board. It also prevents accidental movement when you are inking or using mechanical lettering devices. The advantages of the parallel straightedge become particularly significant when you are working on large drawings. While the T square works well for small work, it becomes unwieldy and inaccurate when you are working on the far right-hand side of large drawings

2.8.0 Steel Straightedge

When drawing long, straight lines, use a steel straightedge (Figure 3-12) because its heavy weight helps keep the straightedge exactly in position. The steel straightedge is also excellent for trimming blueprints and cutting heavy illustration board. Steel straightedges are usually made of stainless steel and are available in lengths of 15 inches to 72 inches The one included in the draftsman kit is 42 inches long. Some have a beveled edge.

2.9.0 Triangles

Triangles are used in combination with the T square or straightedge to draw vertical and inclined lines. They are usually made of transparent plastic, which allows you to see your work underneath the triangles. Triangles are referred to by the size of their acute angles. Figure 3-13 shows two basic drafting triangles: the 45° (each acute angle Figure 3-12 − Steel straightedge. Figure 3-11 − Parallel straightedge.  3-13 measures 45°, and the 30°/60° (one acute angle measures 30°; the other, 60°). The size of a 45° triangle is designated by the length of the sides that form the right angle (the sides are equal). The size of a 30°/60° triangle is designated by the length of the longest side that forms the right angle. Sizes of both types of triangles range from 4 inches through 18 inches in 2-inch increments. Like all other drafting equipment, triangles must be kept in good condition. If you drop a plastic triangle, you may damage its tip. Also, triangles may warp so that they do not lie flat on the drawing surface, or the edge may deviate from true straightness. To prevent warping or chipping, always lay them flat or hang them up when you are not using them. Since there is seldom enough drawer space available to permit laying triangles flat, develop the habit of hanging them up. If the tips are bent, use a sharp knife to cut off the damaged part. If the triangle is warped, you may be able to bend it back by hand. If this does not straighten it, leave the triangle lying on a flat surface with weights on it or hold the triangle to the opposite curvature with weights. If the triangle becomes permanently warped so that the drawing edges are curved or the angles are no longer true, throw it away and get another. To test the straightness of a triangle, place it against the T square and draw a vertical line, as shown in Figure 3-14. Then reverse the triangle and draw another line along the same edge. If the triangle is straight, the two lines will coincide; if they do not, the error is half the resulting space. Figure 3-13 − 45° and 30°/60° drafting triangles. Figure 3-14 − Testing a triangle for straightness.  3-14

2.10.0 Protractors

Protractors are used for measuring and laying off angles other than those drawn with the triangle or a combination of triangles. Most of the work you will do with a protractor will involve plotting information obtained from field surveys. Like the triangle, most protractors are made of transparent plastic. They are available in 6-, 8-, and 10-inch sizes and are either circular or semicircular in shape, as shown in Figure 3-15. Protractors engineering techs use are usually graduated in increments of 1/2°. By careful estimation, you may obtain angles of 1/4°. Protractor numbering arrangement varies. Semicircular protractors are generally labeled from 0° to 180° in both directions. Circular protractors may be labeled from 0° to 360° (both clockwise and counterclockwise), or they may be labeled from 0° to 90° in four quadrants. Stow and care for protractors in the same manner as triangles.

2.11.0 Adjustable Triangles

The adjustable triangle, shown in Figure 3-16, combines the functions of the triangle and the protractor. When it is used as a right triangle, you can set and lock the hypotenuse at any desired angle to one of the bases. The transparent protractor portion is equivalent to a protractor graduated in 1/2° increments. The upper row of numbers indicates angles from 0° to 45° to the longer base; the lower row indicates angles from 45° to 90° to the shorter base. By holding either base against a T square or straightedge, you can measure or draw any angle between 0° and 90°. The adjustable triangle is especially helpful in drawing Figure 3-15 − Types of protractors. Figure 3-16 − Adjustable triangle.  3-15 building roof pitches. It also allows you to transfer parallel inclined lines by sliding the base along the T square or straightedge.

2.12.0 French Curves

Use irregular curves (called french curves) for drawing smooth curved lines other than arcs or circles, lines such as ellipses, parabolas, and spirals. Transparent plastic french curves come in a variety of shapes and sizes. Figure 3-17 shows an assortment of french curves. In such an assortment, you can find edge segments you can fit to any curved line you need to draw. Stow and care for french curves in the same manner as triangles.

2.13.0 Drawing Instrument Sets

So far we have discussed only those instruments and materials you will need for drawing straight lines (with the exception of french curves). Many drawings you prepare will require circles and circular arcs. Use instruments contained in a drawing instrument set for this purpose. Many types of drawing instrument sets are available; however, it is sometimes difficult to judge the quality of drafting instruments by appearance alone. Often their characteristics become evident only after use. The drawing instrument set shown in Figure 3-18 is typical of sets in the standard draftsman kit. The following sections describe these instruments as well as some special-purpose instruments not found in the set. These special-purpose instruments may be purchased separately or found in other instrument sets. Figure 3-17 − French curves. 

2.13.1 Compasses Circles and circular curves of relatively short radius are drawn with compasses. The large pivot joint compass is satisfactory for drawing circles of 1 inch to about 12 inch diameter without an extension bar. The pivot joint provides enough friction to hold the legs of the compass in a set position. One of the legs has a setscrew for mounting a pen or pencil attachment on the compass. You can insert an extension bar to increase the radius of the circle drawn. The other type of compass in the drawing instrument set is the bow compass. Many experienced draftsmen prefer the bow compass over the pivot joint compass. The bow compass is much sturdier and is capable of taking the heavy pressure necessary to produce opaque pencil lines without losing the radius setting. Figure 3-18 − Drawing instrument set.  3-17 There are two types of bow compasses. The location of the adjustment screw determines the type. The bow pen/pencil in Figure 3-18 is the center adjustment type, whereas the bow drop pen in Figure 3-19 is the side adjustment type. Each type comes in two sizes: large and small. Large bow compasses are usually of the center adjustment type, although the side adjustment type is available. The large bow compasses are usually about 6 inches long, the small compasses approximately 4 inches long. Extension bars are available for large bow compasses. Bow compasses are available as separate instruments, or as combination instruments with pen and pencil attachments. Most compasses have interchangeable needlepoints. Use the conical or plain needlepoint when you use the compass as dividers. Use the shoulder-end needlepoint with pen or pencil attachments. When you draw many circles using the same center, the compass needle may bore an oversized hole in the drawing. To prevent these holes, use a device called a horn center or center disk. Place this disk over the center point. Then place the point of the compass needle into the hole in its center.

2.13.2 Dividers

Dividers are similar to compasses, except that both legs have needlepoints. The instrument set (Figure 3-18) contains two different types and sizes of dividers: large 6- inch hairspring dividers and small center adjustment bow dividers (Figure 3-19). You can also use the large pivot joint compass (Figure 3-19) as dividers. As with compasses, dividers are available in large and small sizes, and in pivot joint, center adjustment bow, and side adjustment bow types. Figure 3-20 shows a small side adjustment bow divider. Use pivot joint dividers for measurements of approximately 1 inch or more. For measurements of less than 1 inch, use bow dividers. You can also use dividers to transfer measurements, step off a series of equal distances, and divide lines into a number of equal parts. Figure 3-19 – Bow instruments: bow pen/pencil; bow divider, bow drop pen drawing instrument set  3-18

2.13.3 Drop Bow Pen

The drop bow pen (Figure 3-21) is not one of the standard instruments, but it is essential for some jobs. Use it to ink small circles with diameters of less than 1/4 inch. As the name indicates, the pen assembly is free to move up and down and to rotate around the main shaft. When using this instrument, hold the pen in the raised position, adjust the setscrew to give the desired radius, and then gently lower the pen to the paper surface and draw the circle by rotating the pen around the shaft. Figure 3-20 – Bow divider. Figure 3-21 – Drop bow pen 

2.13.4 Maintenance of Compasses and Dividers

Figure 3-22 shows the three shapes in which compasses and dividers are made: round, flat, and bevel. Figure 3-23 shows two most common types of pivot joints on compasses and dividers. When you select compasses and dividers, test them for alignment by bending the joints and bringing the points together. New instruments are factory adjusted for correct friction setting. They rarely require adjustment. Use a small jeweler’s screwdriver or the screwdriver found in some instrument sets for adjusting most pivot joint instruments. Skilled instrument repairmen should adjust instruments that require a special tool. Adjust pivot joint compasses and dividers so that they can be set without undue friction. They should not be so rigid that their manipulation is difficult, nor so loose that they will not retain their setting. Divider points should be straight and free from burrs. When the dividers are not in use, protect the points by sticking them into a small piece of soft rubber eraser or cork. When points become dull or minutely uneven in length, make them even by holding the dividers vertically, placing the legs together, and grinding them lightly back and forth against a whetstone. (See Figure 3-24, view A.) Then hold the dividers horizontally and sharpen each point by whetting the outside of it back and forth on the stone, while rolling it from side to side with your fingers (Figure 3-24, view B). The inside of the leg should remain flat and not be ground on the stone. Do not grind the outside of the point so that a flat surface results. In shaping the point, be careful to avoid shortening the leg. Keep needles on compasses and dividers sharpened to a fine taper. When pushed into the drawing, they should leave a small, round hole in the paper no larger than a pinhole. Since the same center is often used for both the compasses and dividers, it is best that Figure 3-22 – Shapes of compasses and dividers. Figure 3-23 – Sections of pivot joints.  3-20 needles on both be the same size. If the compass needle is noticeably larger, grind it until it is the correct size. To make a compass needle smaller, wet one side of the whetstone and place the needle with its shoulder against this edge. Then grind it against the whetstone, twirling it between your thumb and forefinger (Figure 3-25). Test it for size by inserting it in a hole made by another needle of the correct size. When pushed as far as the shoulder, it should not enlarge the hole. The screw threads on bow instruments are delicate. Because of this, take care never to force the adjusting nut. Threads must be kept free from rust or dirt. If possible, keep drawing instruments in a case, since the case protects them from damage by falls or unnecessary pressures. Also, the lining of the case is usually treated with a chemical that helps prevent the instruments from tarnishing or corroding. To protect instruments from rusting when they are not in use, clean them frequently with a soft cloth and apply a light film of oil to their surface with a rag. Do not oil joints on compasses and dividers. When the surface finish of instruments becomes worn or scarred, it is subject to corrosion; therefore, never use a knife edge or an abrasive to clean drafting instruments. Figure 3-24 – Divider maintenance (A) Evening the legs of dividers; (B) Sharpening divider needlepoints. Figure 3-25 – Shaping a compass needle. 

13.5 Beam Compass

 The beam compass (Figure 3-26) is used for drawing circles with radii larger than can be set on a pivot joint or bow compass. Both the needlepoint attachment and the pen or pencil attachment on a beam compass are slide-mounted on a metal bar called a beam. You can lock the slide-mounted attachments in any desired position on the beam. Thus, a beam compass can draw circles of any radius up to the length of the beam. With one or more beam extensions, the length of the radius of a beam compass ranges from about 18 inches to 70 inches.

2.14.0 Proportional Dividers

Proportional dividers (Figure 3-27) are used for transferring measurements from one scale to another. This capability is necessary to make drawings to a larger or smaller scale. Proportional dividers can divide lines or circles into equal parts. Proportional dividers consist of two legs of equal length, pointed at each end, and held together by a movable pivot. By varying the position of the pivot, you can adjust the lengths of the legs on opposite sides of the pivot so that the ratio between them is equal to the ratio between two scales. Therefore, a distance spanned by the points of one set of legs has the same relation to the distance spanned by the points of the other set as one scale has to the other. On the proportional dividers, a thumb nut moves the pivot in a rack-and-gear arrangement. When you reach the desired setting, a thumb-nut clamp on the opposite side of the instrument locks the pivot in place. A scale and vernier on one leg facilitate accurate setting. On less expensive models, the movable pivot is not on a rack and gear, and there is no vernier. Set the dividers by reference to the table of settings that comes with each pair; Figure 3-26 – Beam Compass. Figure 3-27 – Proportional dividers.  3-22 they will accommodate varying ranges of scales from 1:1 to 1:10. However, do not depend entirely on the table of settings. You can check the adjustment by drawing lines representing the desired proportionate lengths, and then applying the points of the instrument to each of them in turn until, by trial and error, you reach the correct adjustment. To divide a line into equal parts, set the divider to a ratio of 1 to the number of parts desired on the scale marked Lines. For instance, to divide a line into three parts, set the scale at 3. Measure off the length with points of the longer end. The span of the points at the opposite ends will be equal to one-third the measured length. To use proportional dividers to transfer measurements from feet to meters, draw a line 1 unit long and another line 3.28 units long and set the dividers by trial and error accordingly. Some proportional dividers have an extra scale for use in getting circular proportions. The scale marked Circle indicates the setting for dividing the circumference into equal parts. The points of the dividers are of hardened steel, and if you handle them carefully, these points will retain their sharpness during long use. If they are damaged, you may sharpen them and the table of settings will still be usable, but the scale on the instrument will no longer be accurate.

2.15.0 Scales

In one sense, the term scale means the succession of graduations on any graduated standard of linear measurement, such as the graduations on a steel tape or a thermometer. In another sense, when we refer to the “scale of a drawing,” the term means the ratio between the dimensions of the graphic representation of an object and the corresponding dimensions of the object itself. Suppose, for example, that the top of a rectangular box measures 6 inches by 12 inches, if you draw a 6-inch by 12-inch rectangle on the paper, the dimensions of the drawing would be the same as those of the object. The drawing would, therefore, be a full-scale drawing. This scale could be expressed fractionally as 1/1, or it could be given as 1 inch = 1 inch. Suppose that instead of making a full-scale drawing, you decided to make a half-scale drawing. You should then draw a 3-inch by 6-inch rectangle on the paper. This scale could be expressed fractionally as 1/2, or it could be given as 1 inch = 2 inches, or as 6 inches = 1 foot. In this case, you made the drawing on a smaller scale than the scale of the original object, the scale of an original object being always 1/1, or unity. The relative size of a scale is indicated by the fractional representation of the scale. A scale whose fractional representation equals less than unity is a less-than-full scale. One whose fractional representation is greater than unity (such as a scale of 200/1) is a larger-thanfull scale. A scale of 1/10,000 is, of course, smaller than a scale of 1/100. Figure 3-28 – Types of scales in cross section.  3-23 A scale expressed as an equation can always be expressed as a fraction. For example, the scale of 1 inch = 100 feet, expressed fractionally, comes to 1 over (100 x 12), or 1/1,200. Obviously, any object larger than the drawing paper on which it is to be represented must be “scaled down” (that is, reduced to less than- full scale) for graphic representation. Conversely, it is often desirable to represent a very small object on a scale larger than full scale for clarity and to show small details. Because the drawings an engineering tech prepares frequently require scaling down, the following discussion refers mostly to that procedure. However, scaling up rather than down simply means selecting a larger-thanfull scale rather than a smaller-than-full scale for your drawing. You could, if necessary, determine the dimensions of your drawing by arithmetical calculation; for example, on a half-scale drawing, you divide each of the actual dimensions of the object by 2. However, this might be a time consuming process if you were drawing a map of a certain area to a scale of 1 inch = 1,000 miles, or 1/6,335,000 feet. Consequently, you will usually scale a drawing up or down by the use of one or another of a variety of scales. This sense of the term scales refers to a graduated, ruler-like instrument on which you can determine scale dimensions for a drawing by inspection. Scales vary in types of material, shapes, style of division, and scale graduations. Good quality scales are made of high-grade boxwood or plastic, while inexpensive scales are sometimes made of yellow hardwood. The boxwood scales have white plastic scale faces permanently bonded to the boxwood. The graduation lines on the boxwood scales are cut by a highly accurate machine. Plastic scales, less expensive than boxwood scales, have clear graduations and are reasonably accurate. Scales are generally available in four different shapes, as shown in Figure 3-28. The numbers in the figure indicate the location of the scale face. The triangular scale provides six scale faces on one rule. The two-bevel flat scale provides two scale faces on one side of the rule only. The opposite-bevel flat scale provides two scale faces, one on each side of the rule. And the four-bevel flat scale provides four scale faces, two on each side of the rule. The most common types of scales are the architect’s, the engineer’s, the mechanical engineer’s, and the metric. All of these scales are found in the engineering tech’s draftsman kit with the exception of the mechanical engineer’s scale, which is primarily used by machine draftsmen. To gain a better understanding of the architect and engineer’s scale, both of which the following sections will describe, having the actual scales at hand as you study may be helpful.

2.15.1 Architect’s Scale

Architect’s scales are usually triangular and are used wherever dimensions are measured in feet and inches. Major divisions on the scale represent feet; those divisions are subdivided into 12ths or 16ths, depending on the individual scale. Figure 3-29 shows the triangular architect’s scale and segments of each of the eleven scales found on this particular type of scale. Notice that all scales except the 16th scale are actually two scales read either from left to right or right to left. When reading a scale numbered from left to right, notice that the numerals are closer to the outside edge. On scales numbered from right to left, notice that the numerals are closer to the inside edge. Architect’s scales are “open” divided (only the main divisions are marked throughout the length), with the only subdivided interval an extra interval below the 0-foot mark. These extra intervals are divided into 12ths. To make a scale measurement in feet and inches,  3-24 lay off the number of feet on the main scale and add the inches on the subdivided extra interval. However, notice that the 16th scale is fully divided with its divisions divided into 16ths. Now let us measure off a distance of 1 foot 3 inches to see how to read each scale and how the scales compare to one another. (Refer to Figure 3-29.) Since the graduations on the 16th scale are subdivided into 16ths, we will have to figure out that 3 inches actually is 3/12 or 1/4 of a foot. Changing this to 16ths, we now see we must measure off 4/16ths to equal the 3-inch measurement. Note carefully the value of the graduations on the extra interval, which varies with different scales. On the 3 inches = 1 foot scale, for example, the space between adjacent graduations represents one-eighth inch. On the 3/32 inches = 1 foot scale, however, each space between adjacent graduations represents 2 inches The scale 3/32 inches = 1 foot, expressed fractionally, comes to 3/32 = 12, or 1/128. This is the smallest scale provided on an architect’s scale. The scales on the architect’s scale, with their fractional equivalents, are as follows: 3 inches = 1 foot ¼ scale 1 ½ inches = 1 foot 1/8 scale 1 inch = 1 foot 1/12 scale ¾ inch = 1 foot 1/16 scale ½ inch = 1 foot 1/24 scale 3/8 inch = 1 foot 1/32 scale ¼ inch = 1 foot 1/48 scale 1/16 inch = 1 foot 1/64 scale 1/8 inch = 1 foot 1/96 scale 3/32 inch = 1 foot 1/128 scale  3-25 2.15.2 Engineer’s Scale The chain or civil engineer’s, scale, commonly called the engineer’s scale, is usually a triangular scale, containing six fully divided scales subdivided decimally, each major interval on a scale being subdivided into 10ths. Figure 3-30 shows the engineer’s scale and segments of each of the six scales. Each of the six scales is designated by a Figure 3-29 – Architect’s scale.  3-26 number representing the number of graduations that particular scale has to the linear inch. On the 10 scale, for example, there are 10 graduations to the inch; on the 50 scale, there are 50. You can see that the 50 scale has 50 graduations in the same space occupied by 10 on the 10 scale. This space is 1 linear inch. To determine the actual number of graduations represented by a numeral on the engineer’s scale, multiply the numeral by 10. On the 50 scale, for instance, the numeral 2 indicates 2 x 10, or 20 graduations from the 0. On the 10 scale, the numeral 11 indicates 11 x 10, or 110 graduations from the 0. Note that the 10 scale is numbered every major graduation, while the 50 scale is numbered every other graduation. Other scales on the engineer’s scale are the 20, 30, 40, and 60. Because it is decimally divided, the engineer’s scale can be used to scale dimensions down to any scale in which the first figure in the ratio is 1 inch and the other is 10 or a multiple of 10. Suppose, for example, that you wanted to scale a dimension of 150 mi down to a scale of 1 inch = 60 miles. You would use the 60 scale, allowing the interval between adjacent graduations to represent 1 mile. To measure off 150 miles to scale on the 60 scale, you would measure off 2.5 inches, which falls on the 15th major graduation. Suppose now that you want to scale a dimension of 6,500 feet down to a scale of 1 inch = 1,000 feet. The second figure in the ratio is a multiple of 10 times a multiple of 10. You would therefore use the 10 scale, allowing the interval between adjacent graduations on the scale to represent 100 feet, in which case the interval between adjacent numerals on the scale would indicate 1,000 feet. To measure off 6,500 feet, you would simply lay off from 0 to 6.5 on the scale. To use the engineer’s scale for scaling to scales expressed fractionally, you must be able to determine the fractional equivalent of each of the scales. For any scale, this equivalent is simply 1 over the total number of graduations on the scale, or 1 over the product of the scale number times 12, which is the same thing. Applying this rule, the fractional expressions of each of the scales is as follows: 10 scale = 1/120 20 scale = 1/240 30 scale = 1/360 40 scale = 1/480 50 scale = 1/600 60 scale = 1/720 Suppose you want to scale 50 feet down to a scale of 1/120. The 10 scale gives you this scale; therefore, use the 10 scale, allowing the space between graduations to represent 1 foot, and measuring off 5 (for 50 feet). The line on your paper would be 5 inches long, representing a line on the object itself that is 120 inches x 5 inches, or 600 inches, or 50 feet long. Similarly, if you want to scale 50 feet down to a scale of 1/600, use the 50 scale and measure off 5 for 50 feet. In this case, the line on your paper would be 1 inch long, representing a line on the object itself that is 1 x 600, or 600 inches, or 50 ft long. When the drawing does not need to be made to a specified scale—that is, when the dimensions of lines on the drawing are not required to bear a specified ratio to the dimensions of lines on the object itself—use the most convenient scale on the engineer’s scale.  3-27 Suppose, for example, that you want to draw the outline of a 360-foot by 800-foot rectangular field on an 8-inch, by 10 1/2-inch sheet of paper with no specific scale prescribed. All you want to do is reduce the representation of the object to one that will fit the dimensions of the paper. You could use the 10 scale, allowing the interval between adjacent graduations to represent 10 feet. In this case, the numerals on the scale, instead of representing 10, 20, and so on, will represent 100, 200, and so on. To measure off 360 feet to scale, measure from 0 to the 6th graduation beyond the numeral 3. For 800 feet, measure from 0 to the numeral 8. Because you allowed the interval between adjacent graduations to represent 10 feet, and because the 10 scale has 10 graduations to the inch, the scale of your drawing would be 1 inch = 100 feet, or 1/1,200.  3-28 Figure 3-30 – Engineer’s scale.  3-29

2.15.3 Metric Scale

Use the metric scale in place of the architect’s and engineer’s scale when measurements and dimensions are in meters and centimeters. Metric scales are available in flat and triangular shapes. The flat 30-cm metric scale is shown in Figure 3- 31. The top scale is calibrated in millimeters and the bottom scale in half millimeters. The triangular metric scale has six fully divided scales, which are 1:20, 1:33 1/3, 1:40, 1:50, 1:80, and 1:100. When using scales on a drawing, do not confuse the engineer’s scale with the metric scale. They are very similar in appearance. Whenever conversions are made between the metric and English system, remember that 2.54 centimeters equals 1 inch.

2.15.4 Triangular Scale Clip

For use with a triangular scale, a scale clip or scale guard, such as the one shown in Figure 3-32, is very helpful. The clip makes it easy for you to identify what scale you are using. Large spring type paper clips will serve the same purpose when scale clips are not available.

2.16.0 Map Measures and Scale Indicators

Map measures are precision instruments for measuring the lengths of roads, pipelines, and other irregular outlines on maps and drawings. Measure distances by first setting the instrument to zero, then tracing the line you are measuring with the small, projecting tracing wheel, like that on the map measures shown in Figure 3-33. In using map measures, do not depend entirely on the indicated numerical scale. Always check it against the graphical scale on the map or drawing. Verify if, for example, 1 inch traversed on the graphical scale really registers 1 inch on the dial; if not, make the proper correction to the distance measured. Actually, a map measure is just another odometer. Odometers are used to measure actual distances, while the map measures are used to measure scaled distances. There are many ways of indicating the scale on a drawing. Among these are the fractional method, the equation method, and the graphic method. Figure 3-31 – Metric scale. Figure 3-32 – Triangular scale clip.  3-30 In the fractional method, the scale is indicated as a fraction or a ratio. A full-size scale is indicated as 1/1; enlarged scale, as 10/1, 4/1, 2/1, etc.; and reduced scale, as 1/2, 1/4, 1/10, etc. Notice that the drawing unit is always given as the numerator of the fraction and the object unit as the denominator. On maps, the reduced scale fraction may be very large (for example, 1/50,000), compared to the typical scales on machine drawings. On maps, the scale is frequently expressed as a ratio, such as 1:50,000. In the equation method, a certain number of inches on the drawing is set equal to a certain length on the object. Symbols are used for feet (') and inches ("). On architectural drawings, a certain number of inches on the drawing is set to equal to 1 foot on the object. A full-size scale is entered as 12" = 1' – 0"; an enlarged scale, as 24" = 1’–0"; and a reduced scale, as 1/8" = 1' – 0". On civil engineering drawings, 1 inch on the drawing is set to equal to a certain measurement on the object: 1" = 5', 1" = 100', 1" = 1 mile. In the graphic method, an actual measuring scale is shown on the drawing. Typical graphic scales are shown in Figure 3-34. Note that in each case, the primary scale lies to the right of the 0; a subdivided primary scale unit lies to the left of the 0.

2.17.0 Drafting Templates

Drafting templates are timesaving devices used for drawing various shapes and standard symbols. They are especially useful when shapes and symbols must appear on the drawing a number of times. Templates are usually made of transparent green or Figure 3-33 – Types of map measures. Figure 3-34 – Typical graphic scales.  3-31 clear plastic. They are available in a wide variety of shapes, including circles, ellipses, hexagons, triangles, rectangles, and arcs. Special templates are available for symbols used on architectural drawings, mechanical drawings, and maps. Templates for almost every purpose are available from the well-known drafting supply companies. Figure 3-35 shows only a few of the more common types of drafting templates.

2.18.0 Freehand Letter Pens

Frequently, you will prepare inked drawings, maps, or charts that require freehand lines and lettering. Many types of freehand pens are available. But here we will be concerned only with those pens the engineering tech uses. Included in the draftsman kit is a reservoir pen set, which you may use either with a penholder, as a freehand pen, or fitted into a mechanical lettering device for template lettering. Use the technical fountain pen (sometimes called a Rapidograph pen or reservoir pen) for ruling straight lines of uniform width with the aid of a T square, triangle, or other straightedge. You may also use it for freehand lettering and drawing and with various drawing and lettering templates. One of the best features of the technical fountain pen is its ink reservoir. The reservoir, depending on the style of pen, is either built into the barrel of the pen or is a translucent plastic ink cartridge attached to the body of the pen. The large ink capacity of the reservoir saves time because you do not have to replenish the ink supply constantly. Therefore, many engineering techs prefer the technical fountain pen to the ruling pen. A typical technical fountain pen is shown in Figure 3-36. Various manufacturers offer variations in pen style and line size. Some pens are labeled by the metric system Figure 3-35 – Drafting Templates. Figure 3-36 – Technical fountain pens.  3-32 according to the line weight they make. Other pens are labeled with a code that indicates line width measured in inches. For instance, a No. 2 pen draws a line .026 inches in width. Most technical fountain pens are color-coded for easy identification of pen size. These pens are available either as individual fountain pen units, resembling a typical fountain pen, or as a set, having a common handle and interchangeable pen units. The pen shown in Figure 3-36 is a part of a set of technical fountain pens. Some reservoir pens for lettering are made so the point section will fit in a Leroy scriber, a system using templates and special scribing tools to create machine-perfect lettering. These pens may also be used for any work that a regular technical fountain pen is used for.

2.18.1 Using the Technical Fountain Pen

You must hold the technical fountain pen so that it is perpendicular to the drawing surface at all times. If you do not hold the pen in the correct manner, the point will bevel or wear unevenly and eventually form an elliptical point. With the point in this condition, the pen will produce lines of inconsistent widths. To fill the reservoir of a fountain pen, use the knob on the barrel opposite the point. When you turn the knob counterclockwise, a plunger is forced down into the barrel forcing out any ink remaining in the reservoir. Place the point end of the pen into the ink and turn the knob clockwise to pull the plunger up. As the knob pulls the plunger up, the plunger draws ink through the point, filling the reservoir. To fill the ink cartridge type of pen shown in Figure 3-37, remove the cartridge from the body and insert the ink bottle dropper all the way into the reservoir cartridge. Place the dropper in contact with the bottom of the reservoir cartridge to prevent the ink from forming air bubbles. Fill the cartridge to approximately three-eighths of an inch from the top, then replace the cartridge and clamp ring.

2.18.2 Care and Cleaning of the Technical Fountain Pen

The feed tube of the pen point is threaded (Figure 3-37). Along this threaded portion is an inclined channel that allows air to enter the ink reservoir. This channel must be free of dried ink or foreign particles to ensure correct ink flow. When cleaning the pen, scrub the threads and channel with a brush, such as a toothbrush, wetted with a cleaning solution of soap and water. A cleaning pin (a tiny weighted needle) is made to fit into the feed tube and point (Figure 3-37). This cleaning pin assures a clear passage of ink from Figure 3-37 – Technical fountain pen.  3-33 the reservoir to the point. Usually, a light shake of the pen will set the cleaning pin in motion, removing any particles that settle in the tube when the pen is not in use. (Do not shake the pen over your drawing board.) If you do not use the pen frequently, the ink will dry, clogging the point and feed tube. When the pen becomes clogged, soak it in pen cleaner or ammonia water until it unscrews with little or no resistance. A better practice is to clean the pen before you put it away if you know in advance that you will not be using it for several days. You must handle the cleaning pin with care, especially the smaller sizes. A bent or damaged cleaning pin will never fit properly into the feed tube and point.

2.19.0 Drawing Ink

A draftsman’s drawing ink is commonly called india ink (Figure 3-38). Drawing ink consists of a pigment (usually powdered carbon) suspended in an ammonia-water solution. Ink thickened by age or evaporation maybe thinned slightly by adding a few drops of a solution of four parts aqua ammonia to one part distilled water. After the ink dries on paper, it is waterproof. Drawing ink is available in many different colors, but for construction and engineering drawings, black ink is preferred for reproduction and clarity. Small 3/4- or 1- oz bottles of black, red, and green ink are found in the standard draftsman kit. Larger bottles are available for refilling the small bottles. The stopper for a small ink bottle is equipped with either a squeeze dropper or a curved pipette for filling pens. When you are working with ink, always keep the stopper on the ink bottle when you are not filling the pen, and keep the bottle far away from your drawing. Nothing is more frustrating for a draftsman than spilling a bottle of ink on a finished drawing. Special bottle holders are available to minimize this hazard. If you do not have a bottle holder, it would be to your advantage to devise your own.

2.20.0 Other Tools

Many tools other than the ones already presented in this lesson are currently used to create technical drawings. A variety of drafting machines (not in the draftsman kit) are available at several shore-based support activities. Depending on the requirements of a particular activity, an engineering tech assigned to staff or independent duty may also be exposed to a more advanced and sophisticated computer-assisted drafting method. The standard drafting machine combines the functions of a parallel ruler, protractor, scales, and triangles. Various drafting operations requiring straight and parallel lines may be performed Figure 3-38 – Drawing Ink. Figure 3-39 – Drafting machine.  3-34 advantageously with a drafting machine. The majority of drafting machines are constructed so that you can move the protractor head over the surface of a drafting table without change in orientation by means of a parallel motion linkage consisting of two sets of double bars. Figure 3-39 shows a rigid metal connecting link or arms, commonly called pin-joint linkage. Another type of drafting machine has two steel bands enclosed in tubes working against one another (Figure 3-39) (although this type may also have the bands without the tubes). If these bands become loose through wear, their tension can be increased. This type of drafting machine is superior to that with pin-point linkage because there is less lost motion. To learn more about other tools and their uses, become loose through wear or expansion, the refer to Chapter 1 of the field manual FM 5-553, tension can be increased on them. This type of General Drafting, published by the Headquarters, drafting machine is superior to that with pin-point Department of the Army, and other civilian linkage because there is less lost motion publications.

Summary

As an engineering technician, you will use a variety of equipment in your day to day duties. Knowing how to use and care for the equipment available to you will contribute to a project’s and a unit’s success.

Review Questions

  1. __________ drafting is used to show the type and proper placement of structural members in a building. A. Illustrative B. Technical C. Graphical D. Freehand 2. In the Seabees, __________ drafting specifically refers to the arrangements of machinery, utility systems, heating, air conditioning, and ventilating systems. A. Illustrative B. Technical C. Freehand D. Mechanical 3. Types of administrative drafting you may be called to perform include creating ___________. A. Technical and display charts, safety and embarkation signs, project completions, and unit readiness graphics B. Architectural, structural, electrical, and mechanical drawings C. Topographical maps, plotted profiles, and cross sections D. Portraits and landscapes 4. Charts and graphs that emphasize numerical values are called___________, while those that emphasize relations are called ___________. A. Mechanical, freehand B. Qualitative, quantitative C. Quantitative, qualitative D. Mechanical, qualitative 5. Any drafting done for or by the Navy must be prepared using the ___________. A. Latest military standard B. Department of Defense standard C. NAVFACENGCOM design manuals D. All of the above 6. ___________ is a high-grade white (or slightly tinted) transparent paper that takes pencil well and erases cleanly. A. Tracing paper B. Profile paper C. Cross-section paper D. Illustration board  3-36 7. Cross-section paper is more commonly known as ___________. A. Profile paper B. Profile/plan paper C. Graph paper D. Illustration board 8. A ___________ grade drafting pencil produces a darker, thicker line, while a ___________ grade drafting pencil produces a lighter, thinner line. A. Wooden, mechanical B. Hard, soft C. Soft, hard D. Mechanical, wooden 9. An ___________ eraser is soft and pliable and used for removing pencil or finger marks and smudges. A. Vinyl B. Art gum C. Electric D. Ruby red 10.  You use a T square with the head set against the upper or lower edge of the drafting board. A. True B. False 11. A _________ consists of a long, straight strip, called the blade, which is mounted at right angles on a short strip, called the head. A. Parallel straightedge B. Steel straightedge C. Map measure D. T square 12. A _________ consists of a laminated blade with transparent plastic edges and uses a series of cords and pulleys to move up and down the drawing board. A. Parallel straightedge B. Steel straightedge C. Map measure D. T square  3-37 13. A __________ is used for drawing long, straight lines because its heavy weight helps keep it in position; it is also excellent for trimming blueprints and cutting heavy illustration board. A. Parallel straightedge B. Steel straightedge C. Map measure D. T square 14. _________ are used in combination with a T square or straightedge to draw vertical and inclined lines. A. Triangles B. Map measures C. Dividers D. Compasses 15. __________ are used for measuring and laying off angles other than those that may be drawn with a triangle or combination of triangles; they are either circular or semicircular in shape. A. Dividers B. Compasses C. Protractors D. Map measures 16. With a T square or a straightedge, you can use this drafting instrument to measure or draw any angle between 0 and 90 degrees and transfer parallel inclined lines. A. Adjustable triangle B. French curve C. Protractor D. Compass 17. ___________ are used for drawing smooth curved lines that are not arcs or circles, such as ellipses, parabolas, and spirals. A. Protractors B. Compasses C. Triangles D. French curves 18. Circles and circular curves of relatively short radius are drawn with _________. A. French curves B. Compasses C. Triangles D. T squares  3-38 19. A _________ is similar to a __________, except that both legs end in needlepoints. A. Protractor, compass B. Compass, divider C. Compass, protractor D. Divider, compass 20. _________ are used for transferring measurements from one scale to another. A. French curves B. Map measures C. Compasses D. Proportional dividers 21. The __________ of a drawing refers to the ratio between the dimensions of the graphic representation of an object and the corresponding dimensions of the object itself. A. Scale B. Topography C. Construction D. Qualitative relationship 22. ___________ scales are used wherever dimensions are measured in feet and inches. A. Engineer's B. Architect's C. Metric D. Mechanical 23. ___________ scales are used wherever dimensions are measured in 10ths. A. Engineer's B. Architect's C. Metric D. Mechanical 24. ___________ scales are used wherever dimensions are measured in meters and centimeters. A. Engineer's B. Architect's C. Metric D. Mechanical  3-39 25. ____________ are precision instruments for measuring the lengths of roads, pipelines, and other irregular outlines on maps and drawings. A. Scales B. Map measures C. Protractors D. Dividers 26. ______________ are time saving devices that are used for drawing common shapes and standard symbols and come in a wide variety of shapes. A. Protractors B. Dividers C. French curves D. Drafting templates 27.  You should hold a technical fountain pen so that it is perpendicular to the drawing surface at all times to avoid uneven point wear. A. True B. False  3-40

Chapter 4 Drafting: Fundamentals and Techniques

When you have completed this lesson, you will be able to:

1. Describe how you should prepare your work area.
2. Identify basic drafting techniques.
3. Identify basic drawing formats.
4. Describe line conventions
5. Identify the proper order of penciling lines.
6. Identify the proper order of inking lines.
7. Describe the proper method of lettering.
8. Describe the proper method of creating inclined lettering.
9. Describe the proper method of composing lettering.
10.Describe the proper method of using mechanical lettering systems.

Contents

1.0.0 Work Preparation

2.0.0 Basic Drafting Techniques

3.0.0 Drawing Formats

4.0.0 Line Conventions

5.0.0 Order of Penciling

6.0.0 Order of Inking

7.0.0 Lettering

8.0.0 Inclined Lettering

9.0.0 Composition of Lettering

10.0.0 Mechanical Lettering

Summary

Review Questions

1.0.0 WORK PREPARATION

Before you begin to work, devote some time and thought to organize your working area. Arrange your drafting furniture so you can work comfortably without fatigue or eyestrain. Be sure to check the lighting before you set up your drafting table. Devise a system of stowing your equipment and supplies so they are handy and in order.

1.1.0 Work Area

Your immediate work area should be large enough to allow sufficient freedom of movement but not so large that you waste time reaching for equipment, supplies, and reference publications. An ideal working area allows each draftsman approximately 90 sq ft of space, although you may actually have more or less depending on the total area of the drafting room and the number of draftsmen who will work there. If you are easily distracted, do not butt your drafting table up against and facing another draftsman’s table. Ensure that you have adequate lighting. The best light for drafting is natural light coming over the left shoulder and from the front left to avoid shadows cast by your hands, T square or parallel ruling straightedge, and triangles. Avoid glaring light as it will cause eyestrain. Use a drafting lamp if necessary. Your drafting table height should be from 36 to 40 inches above floor level. Your drafting chair or stool should be high enough that you can see the whole drawing board, but not so high that you have to lean over uncomfortably to draw. You may adjust your board at an incline or leave it flat according to your preference. A slope of 1 to 8 works well for the inclined position. By shifting your body or head slightly, you should be able to look directly at any point on an average-sized drawing sheet; that is, your line of sight should be approximately perpendicular to the drawing surface. Before you begin to draw, arrange your equipment in an orderly manner. Place each article so that you can reach it easily, and keep it in place when you are not using it. A systematic arrangement is timesaving and efficient. Keeping your tools in order decreases the likelihood of accidentally dropping them or pushing them off the table. You will find it very convenient to have a small worktable adjacent to your drafting board. Placing your drafting tools and reference publications on the worktable leaves you with an uncluttered drawing board surface. When you use the drafting board in the inclined position, a separate worktable becomes a necessity. You will select the drafting equipment and materials according to the needs of each of your drafting assignments. Let your good judgment and common sense guide you in their selection. After some experience, you will automatically select proper equipment and materials as they are required. Until you become proficient, don’t hesitate to seek the advice of your drafting supervisor or an experienced draftsman. You will be exposed to modern drafting equipment, materials, and software as you are assigned to staff and support billets within the Naval Construction Force (NCF).

1.1.1 Drafting Board

As a Seabee draftsman, you will probably not be able to select your drafting board. Unless the board is new, it will probably be marred and full of small pinholes. To obtain a smooth drawing surface, cover the board with a vinyl material or heavy manila paper. Laminated vinyl covering minimizes pencil scoring, reduces glare, and is easily kept clean by wiping with a damp cloth. Heavy manila paper will serve the same purpose, but must be replaced when it becomes soiled or marked with use.

1.1.2 Drafting Paper

You will prepare most of your drawings on tracing paper. You will use tracing paper to copy or trace drawings either in pencil or in ink. You will also prepare most of your original pencil drawings on tracing paper. This type of paper is especially suited for reproduction of blueprints; however, it tears easily and becomes soiled after repeated handling. When making a drawing directly on tracing paper, place a smooth sheet of white paper below it (detail paper works well). The whiteness of this sheet (called a platen sheet) gives better line visibility, and its hard surface enables you to draw good pencil lines without grooving the tracing paper. Do not use gritty erasers on tracing paper, especially if you are going to apply ink later. If you must make erasures, use a green or red ruby eraser, which is only slightly abrasive. Abrasive erasers wear away the surface. Erase carefully so you don’t tear the drawing. A light back-and-forth motion works best. If the surface of the drawing becomes scratched by erasing, it can be partially smoothed by burnishing the damaged area with a hard, smooth object or your thumbnail. Avoid using the electric eraser on tracing paper, as it will quickly “burn” a hole through the paper. To clean up smudges and dust, use a soft art gum eraser or sprinkle pounce on the drawing and rub lightly with your hand or a triangle. Water, perspiration, or graphite from your pencil will ruin drawing paper. In order to keep moist hands or arms from marring the drawing, use a clean sheet of paper as a mask to protect the drawing surface next to the work area. Between drawing sessions, protect unfinished drawings by covering them. Do not fold tracing paper. The crease marks will damage the lines on the drawing and cause blurred prints when the drawing is reproduced. For that matter, you should never fold any drawing. Drawings and tracings should be either stored flat or rolled and placed in cylindrical containers. The exception to this rule is that prints or drawings larger than 8 ½ inches by 11 inches may be folded so that they can be filed in standard filing cabinets. Besides tracing paper, you will select other types of paper for special uses. You will mainly be concerned with the gridded papers. You will use gridded paper of a quality similar to that of tracing paper and should handle it in the same way. As you gain experience, you will learn which type of paper to use for each drafting assignment. Of course, you will be limited by the types of paper available and the guidelines given to you by your drafting supervisor.

1.1.3 Drafting Pencils

For the average drafting assignment, you will use three or four pencils. You should use a hard pencil, 4H or 5H, to lay out the drawing in light construction and projection lines. You will then use a medium pencil, H or F, to darken the required lines and to make arrowheads and lettering. Base your pencil choice on the grade of drawing paper you use. A soft, rough-textured paper usually requires a softer pencil for layout work, since a hard pencil would leave indentations in the paper and thus spoil the appearance of the drawing. One way to find out if you are using the proper pencils on a drawing is to make a blueprint (reproduction) of the drawing. If the reproduced lines do not appear, or appear too light, use a softer pencil. If, on the other hand, lines appear too dark in relation to other lines, use a harder pencil. You may be able to vary the weight of lines by the amount of pressure exerted on the pencil, but do not attempt this without experience. Bearing down on a hard pencil to produce darker lines may cause grooves in the paper.  4-5 Another way to find out if you are using the proper pencil is to hold your drawing up to a light and view it from the back side. Pencil adjustment is the same as in the previous method. Of course, both methods apply only when transparent drawing paper is used. To sharpen a pencil, cut the wood away from the unlettered end (Figure 4-1, View A) with a draftsman’s pencil sharpener or a penknife. The lettered end should be left intact so that the grade of pencil can always be identified. The cut should be started about 1 1/2 inch from the end, leaving half an inch of lead exposed. To produce a conical or needlepoint (Figure 4-1, View B), which is best for general use, rotate the pencil between the fingers at the same time as the exposed lead is rubbed back and forth across the full length of the sandpaper pad (Figure 4-1, View C). Many draftsmen prefer to use a mechanical lead pointer instead of the sandpaper pad. The mechanical pointer quickly produces a uniform conical or needlepoint. However, other types of points still require the sandpaper pad. The resulting needlepoint should be dulled slightly by drawing it lightly across a piece of scrap paper several times. Avoid sharpening pencils near your drawing. Graphite particles will cause smudges that are difficult to erase. Use a cloth or tissue to wipe away graphite particles that cling to the pencil after it is sharpened. A wedge point (Figure 4-1, View D) will aid an experienced draftsman in the extensive drawing of straight lines. This point is produced by sharpening a pencil to the conical point just described, then flattening both sides on the sandpaper pad. For an elliptical point, hold the pencil firmly with thumb and fingers and cut the lead on the sandpaper pad by a back-and-forth motion, keeping the pencil at an angle of about 25 degrees to the pad. Continue until a flat ellipse is formed, as shown in Figure 4-1, View E. A good draftsman never uses a dull pencil. Some draftsmen prefer to use mechanical drafting pencils instead of wooden pencils. The lead of a mechanical pencil is sharpened in the same manner as the lead of a wooden pencil. However, the length of the mechanical pencil is not depleted as the lead is sharpened. This is an advantage over wooden pencils that become difficult to use when they are less than 3 inches long. When changing leads for the mechanical pencil, ensure that the changeable lead grade designator on the mechanical pencil corresponds to that of the lead used.

2.0.0 BASIC DRAFTING TECHNIQUES

Always practice handling and using drafting instruments before attempting complex drawing problems. You will continue to make improvements in the quality of your drawings by developing correct drawing habits. The main purpose of making your first Figure 4-1 – Sharpening pencil points.  4-6 drawings is to learn to use instruments. Each drawing will offer an opportunity for practice. Later on, good form in the use of instruments will become a natural habit. Accurate pencil drawings are of the first importance since all inked drawings and tracings are made from finished pencil drawings. You cannot correct a poor pencil drawing when you make the ink tracing. Any drawing important enough to be inked or traced in ink must be accurate, legible, and neat. Because you will prepare most military and commercial blueprints from pencil drawings, you should work to hone your pencil drawing technique. Good technique and skillful pencil drawing are basic to proficiency in drafting. The following sections will guide you in attaching your drawing paper to the board and in drawing basic lines with the T square, triangles, and pencil.

2.1.0 Attachment of Paper to the Board

Once you are relatively familiar with your equipment and materials, get started by attaching your drafting paper to the board. Place the sheet close to the left edge of the drafting board. Working in this area makes the T square easier to handle and reduces the likelihood of error because of T square “swing.” The drafting sheet should be far enough from the bottom of the board (about 3 inches) to ensure firm support for the head of the T square when you are drawing on the lower part of the sheet. Figure 4-2 shows a drawing sheet properly attached to the board on which a T square is used. After aligning the drawing sheet, smooth out any wrinkles and fasten the four corners with short strips of drafting tape. If you are attaching large sheets, place additional strips of tape at the top and bottom edges of the sheet. Drafting tape has a lighter coating of adhesive than does masking tape and will hold the drawing firmly, yet it can be removed without tearing or marring the drawing. If you use masking tape or transparent tape, leave a large margin in the event you tear the paper when removing the tape. When placed diagonally across the corners of the sheet, as shown in Figure 4- 2, drafting tape offers little obstruction to movement of the T square and triangles. Avoid the use of thumbtacks; they will eventually ruin the drafting board. If you are using a parallel straightedge or drafting machine instead of a T square, the procedure just described is the same with one exception. Instead of placing the paper close to the left edge of the board, place it approximately at the midpoint of the length of the parallel straightedge or in the center of the drawing board surface when you are using a drafting machine. Figure 4-2 – Attaching drafting paper to the board.  4-7

2.2.0 Horizontal Lines

As a draftsman, you will construct a horizontal line by drawing from left to right along the working edge of a T square, as shown in Figure 4-3. This working edge, when true, is perpendicular to the working edge of the drafting board. When you draw horizontal lines, keep the working edge of the T square head in firm contact with the working edge of the drafting board. Incline your pencil to the right at an angle of about 60 degrees with the point close to the junction of the working edge and the paper. Hold the pencil lightly and, if it was sharpened with a conical point, rotate it slowly while drawing the line to achieve a uniform line width and preserve the shape of the point. Normally, when you are drawing a series of horizontal lines, start from the top and work your way down

2.3.0 Vertical Lines

You will create vertical lines parallel to the working edge of the drafting board by using triangles in combination with a T square. Place one leg of a triangle against the working edge of the blade so that the other leg faces the working edge of the board to prevent casting a shadow over your work. Draw lines from the bottom up, as shown in Figure 4-4. Incline your pencil toward the top of the working sheet at an angle of approximately 60 degrees, with the point as close as possible to the junction of the triangle and the drafting paper. When drawing a series of vertical lines, start from the left and work your way to the right. Never use the lower edge of the T square blade as a base for triangles. Figure 4-3 – Construction of a horizontal line. Figure 4-4 – Construction of a vertical line.  4-8

2.4.0 Inclined Lines

Measure the direction or angle of inclination of an inclined line on a drafting sheet in reference to the base line from which it is drawn. Inclined lines at standard angles are constructed with the T square as a base for triangles used either singly, as shown in Figure 4-5 Views A and B, or in combination, as shown in Figure 4-3 View C. In combination with the T square as a base, use the triangles as guides for producing lines at intervals of 15 degrees, as shown in Figure 4-6. You can use the 45-degree triangle to divide a circle into 8 equal parts; you can use the 30°/60° triangle to divide a circle into 12 equal parts. For drawing lines at angles other than those described above, use a protractor. Figure 4-5 – Construction of an inclined line. Figure 4-6 – Using a T square (or parallel straightedge) and triangles to draw lines at different angles to the horizontal. Arrows indicate the direction in which the lines should be drawn.  4-9

2.5.0 Protraction of Angles

To measure an angle, place the center mark of the protractor at the vertex of the angle, with the 0-degree line along one side, then note the degree mark that falls on the side. To lay off an angle, position the protractor as above and use a needlepoint or a sharppointed pencil to mark the desired values, then project lines from the vertex to these marks. Using only the three points on the protractor, as described above, may result in considerable inaccuracy, particularly if you need to extend the lines of an angle for some distance beyond the protractor. Figure 4-7 illustrates a refinement of the procedure. Suppose you need to measure angle BOA. Extend line AO on to C; extend line BO on to D. When you set the center of the protractor at O, make sure that both points c and a are on line AC. Take your reading at point d as well as at point b when you measure the angle. If you are laying off the angle BOA, protract and mark point d as well as point b; this gives you three points (d, O, and b) for establishing line DB. If you are using a semicircular protractor, you can’t, of course, locate point d; but your accuracy will be improved by lining up c, O, and a before you measure or lay off the single angle BOA.

2.6.0 Parallel and Perpendicular Lines

To draw a line parallel to a given line (Figure 4-8), adjust the hypotenuse of a triangle in combination with a straightedge (T square or triangle) to the given line; then, holding the straightedge firmly in position, slip the triangle to the desired position and draw the parallel line along the hypotenuse. Figure 4-7 – Protracting an angle. Figure 4-8 – Drawing parallel lines.  4-10 To construct a line perpendicular to an existing line, use the triangle and straightedge in combination, with the hypotenuse of the triangle resting against the upper edge of the straightedge (Figure 4-9). Adjust one leg of the triangle to a given line. Slide the triangle along the supporting straightedge to the desired position and draw the line along the leg, perpendicular to the leg that was adjusted to the given line. In the same manner, angles with multiples of 15 degrees may be drawn, using the triangle combinations shown in Figure 4-6.

2.7.0 Curved Lines

You will prepare many drawings that require the construction of various curved lines. Basically you will draw types of curved lines: circles and segments of circles, called arcs, which are drawn with a compass; and noncircular curves, which are usually drawn with french curves. We will discuss only techniques for using the compass and the french curve. We will discuss the application of compass techniques in geometric construction later.

2.7.1 Use of the Compass

When you draw circles and arcs, it is important that the lines you produce with the compass are the same weight as corresponding pencil lines. Since you cannot exert as much pressure on the compass as you can with pencils, use a compass lead about one grade softer than the pencil used for corresponding line work. For dim construction lines, use 4H to 6H leads. Avoid using leads that are too short. Sharpen the compass lead with a single elliptical face, as shown in Figure 4-10, View A. A sandpaper pad works best for sharpening compass leads. You will normally place the elliptical face of the lead in the compass so that it faces outward from the other compass leg. Adjust the shoulder-end needlepoint so that the point extends slightly farther than the lead, as shown in Figure 4-10, View B. Pressing the needlepoint lightly in the paper, center the compass vertically when the legs are brought together. Figure 4-9 – Drawing perpendicular lines.  4-11 Use bow compasses and pivot joint compasses in the same manner. To draw a circle with a compass, lightly press the needlepoint into the drawing paper and rotate the marking leg around it. Always rotate the compass clockwise. As you rotate, lean the compass slightly forward. With a little practice, you will find that you can easily draw smooth circles using only the thumb and forefinger of one hand. It is important to use an even pressure as you rotate the compass. You may find it necessary to rotate the compass several times to produce a circle with a uniform dense black line. When you wish to set the compass to draw a circle of a given diameter, use a piece of scratch paper and follow the steps listed below, referring to Figure 4-11. 1. Draw a horizontal line with a straightedge. 2. With the straightedge as a base, use a triangle and draw a vertical line intersecting the horizontal line (Figure 4-11, view A). 3. Measure the radius of the circle with a scale, as shown in Figure 4-11, View B, and draw a second vertical line from this point. 4. Set the needlepoint at the intersection of the first vertical line and the horizontal line (Figure 4-11, View C). This is the center of the circle. 5. Set the marking leg to fall on the intersection of the second vertical line and the horizontal line (Figure 4-11, View D). 6. Draw a half circle with the compass (Figure 4-11, View E). 7. Check your work by measuring the diameter established by this half circle with a scale (Figure 4-11, View F). Once you have set the compass to the exact radius of the circle, handle it very carefully so that you don’t disturb the setting. Set the needlepoint at the center of the circle and carefully rotate the compass to draw a line describing the circumference of the circle. Do not apply too much pressure on the needlepoint or it will bore a hole in the paper and you will lose the accurate center mark. To minimize the diameter of the hole, set the needlepoint of the compass on a small strip of paper or thin cardboard over the drafting sheet at the center of the circle. Figure 4-10 – Sharpening the compass lead and adjusting the point.  4-12 When you are using the pencil leg to draw circles smaller than 1 inch in radius, keep the adjustable pencil and needle legs straight. For larger circles, both legs should be adjusted so that they are perpendicular to the paper. On the other hand, when you are using the compass with the pen leg, you MUST adjust it at the hinge joint to keep it perpendicular to the paper for all size circles. (See Figure 4-12, View A.) If the pen is not perpendicular to the paper, ink will not flow properly. To draw large circles, insert the extension bar in the pen or pencil leg, as shown in Figure 4-12, View B. When the extension bar is used to draw large circles, the process of using the compass with only one hand becomes awkward. You should use both hands, as shown in Figure 4-12, View B.

2.7.2 Use of the French Curve

Use the french curve to draw a smooth line through predetermined points. After plotting the points, sketch a light pencil line to connect the points in a smooth flowing line. To draw the finished line over the freehand line, match the various parts of the french curve to various segments of the freehand curve. Avoid abrupt changes in curvature by placing the short radius of the french curve toward the short radius portion of the line being drawn. Change your position around the drawing board when necessary so that you can work on the side of the french curve that is away from you. Avoid working on the “under” side of the French curve. Place the french curve so that it intersects at least two points of the line. Figure 4-12 – Drawing a circle in ink. Figure 4-11– Drawing a circle of a given radius.  4-13 When drawing the line along the edge of the french curve, stop short of the last point intersected. Then move the french curve along to intersect two or three more points and make sure that the edge of the curve connects smoothly with the line already drawn. When using the irregular curve, you can draw a perfectly smooth curved line by plotting enough points (the sharper the curve, the more points you need) and by drawing in shorts steps. Figure 4-13 shows how a smooth line is drawn through a series of plotted points. The french curve in Figure 4-13 Slide A matches points 1, 2, 3, and 4. Draw a line from 1 to 3 only (not to 4). At Figure 4-13, Slide B, the curve matches points 3 to beyond 4. Draw a line from 3 to 4 only (not to 5). At Figure 4-13, Slide C, the curve matches points 4, 5, and 6. Draw a line from 4 to just short of 6. At Figure 4-13, Slide D, the curve matches a point short of 6 to beyond 7. Draw a line from 6 to 7. At Figure 4-13, Slide E, the curve matches a point short of 7 to beyond 9. Draw a line from 7 to 9. At Figure 4-13, Slide F, the curve matches a point short of 9 to beyond 11. Draw a line from 9 to 11. You will probably notice how the curve is turned over and reversed to find portions that fit the points on the line with increasing or decreasing changes in curvature. When you are drawing a curved line that extends into a straight line, draw the curve first, and join the straight line to it.

2.8.0 Use of Drafting Templates

Use drafting templates only when accuracy can be sacrificed for speed. For example, you can draw circles or arcs more quickly with a template than with a compass. Templates must be used properly to be effective. To draw a circle with the circle template (Figure 4-14), lay Figure 4-13 – Use of the french curve. Figure 4-14 – Use of the circle template.  4-14 out center lines on the drawing where the circle is to be drawn. Then place the correct circle opening over the center line so that the quadrant lines on the template coincide with the center lines on the paper. Draw the circle, using a sharp, conical point on the pencil. Allowance must always be made for the width of the pencil line in placing the template opening in the right position on the drawing. To draw an arc, lay out tangent lines on the drawing. Place the correct size circle of the template on the paper so that the template quadrant lines coincide with the tangent lines, and draw the arc. When using a template, you must hold it down firmly to keep it from slipping out of position. Be sure to draw figures or circles from the template with the correct line weight on the first setting, as it is difficult to reset the template in the exact position.

2.9.0 Use of the Dividers

Use dividers to transfer measurements, to step off a series of equal distances, and to divide lines into a number of equal parts. Manipulate dividers with one hand. In setting dividers (Figure 4-15), hold one leg between the thumb and the first and second fingers, and hold the other leg between the third and fourth fingers. Place the second and third fingers on the inside of the legs; the dividers are opened by spreading these fingers apart. Close the dividers by squeezing the thumb and first finger toward the fourth finger while gradually slipping out the other two fingers. To transfer measurements on a drawing, set the dividers to the correct distance, then transfer the measurements to the drawing by pricking the drawing surface very lightly with the points of the dividers. To measure off a series of equal distances on the line, set the dividers to the given distance. Step off this distance as many times as desired by swinging the dividers from one leg to the other along the line, first swinging clockwise 180 degrees, then counterclockwise 180 degrees, and so on. In dividing either a straight line (Figure 4-16, View A) or a curved line (Figure 4-16, View B) into a given number of equal parts (for example, four) by trial, open the dividers to a rough approximation of the first division (in this case, one quarter of the line length) and step off the distance lightly, holding the dividers by the handle and pivoting the instrument on alternate sides of the line at each step. If the dividers fall short of the end of the line after the fourth step, hold the back leg in place and advance the forward leg, by guess, one quarter of the remaining distance. Repeat the procedure until the last step falls at the end of the line. Be careful during this process not to punch holes in the paper, but just barely mark the surface for future reference. To identify prick marks made with small dividers for future reference, circle the marks lightly with a pencil. Figure 4-15 – Holding a divider.  4-15

2.10.0 Use of the Drafting Scale

Your drawing accuracy depends to a great extent upon correct use of the scale in marking off distances. Place the edge of the scale parallel to the line being measured (Figure 4-17). To eliminate shadows cast by your body or hands, point the desired scale face away from you for horizontal measurements and toward your left for vertical measurements. With a sharp pencil, mark off short dashes at right angles to the scale at the correct distances, aligning the mark carefully with the scale graduation. Have your eye approximately over the point being measured and make light marks to denote the point of measurement. When setting the compass to a given radius or when setting divider points, never place the sharp points of these instruments on the scale. Lay out the desired radius or distance on a straight pencil line by using the scale in the manner described above. Adjust the compass or dividers to the indicated length by using the measured line. A scale surface marred by pinpricks is difficult to read and unsuitable for accurate work. In making successive measurements along the same line, make as many measurements as possible without moving the scale. If a number of distances are to be laid out end to end, hold the scale in one position and add each successive measurement to the preceding one. Moving the scale to a new position each time, may cause slight errors to accumulate. For example, four successive measurements of 1 5/8 Figure 4-16 – Dividing a straight line and a curved line. Figure 4-17 – Use of the drafting scale.  4-16 inch each should give an overall length of 6 1/2 inches, not 6 9/16 inches. Therefore, make as many measurements as you can without changing the reference point. This will avoid cumulative errors in the use of the scale. Note that your pencil touches the scale only for the purpose of marking a point on the paper. Never use a scale as a straightedge for drawing lines. A typical office ruler has a metal edge; it is a scale and straightedge combined. But a draftsman’s measuring scale is for measuring only; it is not a ruler. A scale properly used will last for decades, but a scale used as a straightedge will soon have the graduations worn away.

3.0.0 DRAWING FORMATS

Drawing format refers to the systematic space arrangement of required information within the drafting sheet. This information is used to identify, process, and file drawings methodically. DoD-STD-100C, Engineering Drawing Practices, and MIL-HDBK-1006/1, Policy and Procedures for Project Drawing and Specification Preparation detail the standard sizes and formats for military drawings. With the exception of specific local command requirements, you will use DoD-STD-100C and MIL-HDBK-1006/1 as your guidelines for preparing Sengineering techBEE drawings. Most of the documents applicable to these standards have recently been revised and updated in order to gain like information and to share uniformity of form and language within the Naval Construction Force and among DoD organizations. The current widespread use of conventional and computer-generated, reduced-size copies of drawings and the exchange of microfilm and other media are other influencing factors for standard updates.

3.1.0 Sheet Sizes

Standard drawing sheet sizes facilitate readability, reproduction, handling, and uniform filing. Blueprints produced from standard size drawing sheets are easily assembled in sets for project stick files and can readily be folded for mailing and neatly filed in project letter size or legal size folders. (Filing drawings and folding blueprints will be covered later in this training manual.) Figure 4-18 shows finished format sizes for drawings that are, according to ANSI Y14.1(1980), approved and adopted for use under DoD-STD-100C. Drawings that are relatively small and should be stored or filed flat are referred to as flat size. Drawings that are long in length are filed in rolls and referred to as roll size. Finished format sizes for a drawing refer to the dimensions between trim lines (X and Y in Figure 4-18). The trim line is the outside line of either the vertical or horizontal margin. The inside lines of the margins are called borderlines. Width (X) is always parallel to the working edge of the drawing board; length (Y) is always perpendicular to the working edge of the drawing board.  4-17 FLAT SIZES SIZE DESIGNATION LETTER X (WIDTH) Y (LENGTH) MARGIN H (HORIZ) V (VERT) A (HORIZ) A (VERT) B C D E F 8.5 11.0 11.0 17.0 22.0 34.0 28.0 11.0 8.5 17.0 22.0 34.0 44.0 40.0 0.38 0.25 0.38 0.75 0.50 1.00 0.50 0.25 0.38 0.62 0.50 1.00 0.50 0.50 NOTES: 1. ALL DIMENSIONS ARE IN INCHES Figure 4-18 – Guide for preparing horizontal and vertical margins, sizes, and finished drawing format for flat drawings. Notice, in Figure 4-19, that you should add 2 inches to the left margin and to the right margin for protection of roll-size drawings. The edge of a drawing prepared on tracing paper will tear easily after it is rolled and unrolled several times. ROLL SIZES SIZE DESIGNATION LETTER X (WIDTH) Y (LENGTH) MARGIN MIN MAX H (HORIZ) V (VERT) G H J K 11.0 28.0 34.0 40.0 22.5 44.0 55.0 55.0 90.0 145.0 176.0 143.0 0.38 0.50 0.50 0.50 0.50 0.50 0.50 0.50 NOTES: 1. ADDITIONAL PROTECTION MARGINS FOR ROLL SIZE DRAWINGS ARE NOT INCLUDED IN ABOVE DIMENSIONS 2. ALL DIMENSIONS ARE IN INCHES Figure 4-19 – Guide for preparing horizontal and vertical margins, sizes, and finished drawing format for roll drawings.

3.2.0 Sheet Layout

Sheets of drafting or tracing paper are cut slightly larger than their required finished sizes and are fastened to the drafting board as previously described. Using a hard (4H to 6H) pencil and a T square (or parallel straightedge), draw a horizontal trim line near the lower edge of the paper. Draw a vertical trim line near the left edge of the paper with a T square (or parallel straightedge), pencil, and triangle, as previously described. On the horizontal trim lines, mark off dimensions establishing the finished length of the sheet (distance between vertical trim lines) and the location of the vertical. Use a fullsize scale when you are laying off a series of measurements along a line. On the vertical trim lines, mark off the dimensions establishing the finished width of the sheet (distance between horizontal trim lines) and the location of the horizontal borderlines. Scale the dimensions along the borderlines. After the drawing is completed, give the borderlines the required weight. After removing the completed drawing from the board, cut it to its finished size along the trim line. If blueprints are to be made on paper that is not precut to the standard drawing size, you may find it necessary to leave an extra margin outside the trim lines. By leaving an extra margin, you can darken the trim lines. The darkened trim lines, when reproduced, will provide a visible line for trimming the blueprints to size. The extra margin will also help protect the drawing when it is repeatedly handled or attached to the drawing board later for revisions.

3.3.0 Basic Format

The following discussion deals with the basic drafting format. By basic format, we mean the title block, revision block, list of materials, and other information that must be placed on applicable size drafting sheets. Although you may find slight variations on localcommand-prepared drawings, the basic format specified in MIL-HDBK-1006/1 is required on all NAVFACENGCOM drawings. 3.3.1 Title Block The primary purpose of a drawing title block is to identify a drawing. Title blocks must be uniform in size and easy to read. You may mechanically letter or freehand letter a title block or use commercially available standard size drafting sheets with preprinted title blocks. Generally, place the title block in the lower right-hand corner of the drawing sheet, regardless of the size of the drawing (except for vertical title block). You will use three sizes of title blocks: a block for A-, B-, C-, and G-size drawings (Figure 4-20), a slightly larger block for D-, E-, F-, H-, J-, and K-size drawings (Figure 4-21), and a vertical title block (Figure 4-22). The vertical title block format must be used for all 22-inch by 34- inch (D-size) drawings and is optional for 28-inch by 40-inch (F-size) drawings.  4-19 Figure 4-20 – Preparing title block for A-, B-, C-, and G-size drawings. Figure 4-21 – Preparing title block for D-, E-, F-, H-, J-, and K-size drawings. Figure 4-22 – Example of vertical title block prepared by NAVFACENGCOM.  4-20 In a multiple-sheet drawing, use either the basic title block or a “continuation sheet title block” format (Figure 4-23) for second and subsequent sheets provided all sheets are the same size. Certain information common to all drawings in the basic title block is optional in the continuation sheet title block. Figure 4-20 shows the letter designations used to locate the following title block information. (A) Record of preparation (B) : This information will vary with each command or activity, but will normally include the dates and the surnames of the persons concerned with the preparation of the drawing. You may also place the applicable work request number or locally assigned drawing number in the upper portion of this space. This block is optional for continuation sheets. Drawing title: In the space provided for the drawing title, you will include the general project and the specific features shown on the drawing. Figure 4-23 – Use of continuation sheet title block and multiple sheet numbering.  4-21 Example 1: RESTROOM FACILITIES Sengineering techBEE PARK ARCHITECTURAL PLANS, ELEVATIONS, SECTIONS, DETAILS Example 2: DEFINITIVE DRAWING BERTHING PIER Once you enter the general project (such as RESTROOM FACILITIES, Sengineering techBEE PARK, in example 1) in the title block of sheet 1, do not repeat it on each sheet of a set of multiple-project drawings. Example 2 is the title taken from the title block of a drawing contained in NAVFAC P-272, Definitive Designs for Naval Shore Facilities. In this example the general project or common title, DEFINITIVE DRAWING, appears as the top line title on all drawings in NAVFAC P-272. This block is optional for continuation sheets. (C) Preparing activity The information you place in spaces (D) and (E) (Figure 4-21) varies with each command and with the purpose of the drawing (Figure 4-24). You will usually reserve one space for the signature of (APPROVED BY) your commanding officer or officer in charge and the other space for the signature of the commander of the activity or command requiring the drawing (SATISFACTORY TO). As Figure 4-24 shows in the examples, these two spaces may be used interchangeably. This is acceptable as long as you maintain consistency. It is also acceptable to use only space (E) when a SATISFACTORY TO space is not required for the drawing as shown on the NAVFAC title blocks in Figures 4-25 and 4-26. In this case, you will either extend the (F) space upward or the (A) space downward if you require additional space. If you do not require these blocks, you can combine them into block (A) for continuation sheets or use them for other purposes. : Reserve this space for the name and location of the activity preparing the drawing. In addition, place the words DEPARTMENT OF THE NAVY in this space. This block is optional for continuation sheets.  4-22 Figure 4-24 – Examples of title blocks used on drawings prepared by Naval Construction Battalion and Naval Construction Regiment. Figure 4-25 Example of a title block prepared by an activity not requiring NAVFACENGCOM  4-23 (F) Code identification number (G) : The federal supply code for manufacturers (FSCM) is a five-digit number used to identify the government design activity; that is, the activity having responsibility for the design of an item. For most of your drawings, NAVFAC has the ultimate design responsibility, therefore, you will use the identification number “80091” in the title block of all NAVFACENGCOM drawings. You may choose to use either “FSCM” or “Code 10” (the terms are interchangeable) in the title block. Drawing size (H) : Reserve this space for the letter designating the drawing format size. Drawing number (J) : If the drawing is prepared for or by NAVFACENGCOM, you will use a NAVFAC drawing number. MIL-HDBK 1006/1, Policy and Procedures for Project Drawing and Specification Preparation covers the assignment of NAVFAC drawing numbers. If the drawing does not require a NAVFAC drawing number, leave this space blank and use a local command drawing number in space (A). Occasionally, local title blocks require the drawing number to be in space (H). (Figure 4-24.) Scale (K) : Record the scale used to prepare the drawing in this space. When you use more than one scale in the drawing, use the words AS SHOWN or AS NOTED after the word SCALE in space (J). If the drawing is not to scale, enter the word NONE in this space. Specification number (L) : If you prepared the drawing for NAVFACENGCOM, use this space for the project specification or contract number. If the drawing does not pertain to a particular project specification or contract, you will normally leave this space blank. Sheet number 3.3.2 Satisfactory To Block : On a single construction drawing, you will enter SHEET 1 of 1 in this space. For numbering of second and subsequent sheets in a multiple-sheet drawing (Figure 4-23, View C), similar drawing numbers appear in both basic and continuation sheet title blocks; however, you will enter the total sheet number on sheet 1 and the specific sheet number on each subsequent sheet. In addition to spaces (D) and (E) on the title block, which are provided for approval signatures, you may require a second SATISFACTORY TO block when an outside activity requests a drawing. The extra SATISFACTORY TO block is identical to the SATISFACTORY TO space in the title block but is located adjacent to title block space (F). Figure 4-26 – Example of a title block used on drawing prepared by NAVFACENGCOM.  4-24 3.3.3 Revision Block A REVISION block contains a list of all revisions made to the drawing. On construction drawings, you will place the revision block in the upper right-hand corner. Basically, all revision blocks provide the same information; only the sizes of the blocks differ (Figure 4-27, Slide 1). Enter revision information chronologically starting at the top of the revision block. Use revision letters to identify a change or revision to a drawing. Use uppercase letters in alphabetical sequence, omitting the letters I, O, Q, S, X, and Z. Assign the letter A to the first revision to a drawing. Identify all changes that are incorporated in a drawing at one time by the same revision letter. You may number the changes sequentially to permit ready identification of a specific change. In this case, the appropriate serial number will appear as a suffix to the revision letter (for example, A1, A2, A3, etc.). Whenever possible, place the revision letter near the actual change on the drawing, positioning it so it will not be confused with other symbols on the drawing. Usually, you will place the revision letter inside of a circle or triangle. If you use a circle or triangle on the drawing, you should also use it in the revision block. Make a brief description of each change in the description column, adjacent to its revision letter, in the revision block. Also add the approval signature and date of revision in the appropriate columns. If you are preparing the drawing for Architect/Engineer (A/E) firms, your revision block should include a separate PREPARED BY column (Figure 4- 27, Slide 2). You will normally omit the zone column on the standard revision block on construction drawings but you may use it in reviewing maps. Indicate zones by alphabetical or numerical entries and space them evenly in the margin for locating an object on the drawing or map. DoD-STD-100C describes the use of zoning. Like title blocks, revision blocks may vary with each command, and you will be required to follow command guidelines. DoD-STD-100C covers the procedure for making revisions to drawings. 3.3.4 Bill of Materials When you use a BILL OF MATERIALS block on a construction drawing, place it directly above the title block against the right-hand margin. A bill of materials is a tabulated list of material requirements for a given project. The size of the BILL OF MATERIALS block will depend on the size of the drawing and the number of material items listed. On most Figure 4-27 – Format used in preparing revision blocks.  4-25 construction projects, it is impossible to list all items in a single BILL OF MATERIALS block; therefore, omit it from the drawings; an estimator will prepare a separate list of materials.

4.0.0 LINE CONVENTIONS

When you are preparing drawings, you will use different types of lines to convey information. Line characteristics, such as widths, breaks in the line, and zigzags, have definite meanings. Figure 4-28, taken from DoD-STD-100C, shows the different types of lines you should use on your drawings. The widths of the various lines on a drawing are very important in interpreting the drawing. DoD-STD-100C specifies that three widths of line should be used: thin, medium, and thick. As a general rule, on ink drawings, these three line widths are proportioned 1:2:4, respectively. However, the actual width of each type of line should be governed by the size and type of drawing. The width of lines in format features (that is, title blocks and revision blocks) should be a minimum of 0.015 inches (thin lines) and 0.030 inches (thick lines). To provide contrasting divisions between elements of the format, use thick lines for borderlines, outline of principal blocks, and main divisions of blocks. Use thin lines for minor divisions of title and revision blocks and bill of materials. Use medium line widths for letters and numbers. You cannot control the width of lines drawn with a pencil as well as the width of lines drawn with pen and ink. However, pencil lines should be opaque and of uniform width throughout their length. Cutting plane and viewing plane lines should be the thickest lines on the drawing. Lines used for outlines and other visible lines should be differentiated from hidden, extension, dimension, or center lines. Figure 4-28 – Use of line characteristics and conventions.  4-26

4.1.0 Construction Lines

Usually the first lines that you will draw are construction lines. Use these same lines to lay out your drafting sheet; you will also use them to lay out the rest of your drawing. Line weight for construction lines is not important since they will not appear on your finished drawing. Construction lines should be heavy enough to see, but light enough to erase easily; use a 4H to 6H pencil with a sharp, conical point. With the exception of light lettering guidelines, you must erase or darken all construction lines before a drawing is reproduced.

4.2.0 Center Lines

Use center lines to indicate the center of a circle, arc, or any symmetrical object. (See Figure 4-29.) Compose center lines with long and short dashes, alternately and evenly spaced, with a long dash at each end. Extend center lines at least ¼ inch outside the object. At intersecting points, draw center lines as short dashes. You may draw a very short center line as a single dash if there is no possibility of confusing it with other lines. You can also use center lines to indicate the travel of a moving center, as shown in Figure 4-29.

4.3.0 Visible Lines

Draw the visible edge lines of the view as solid, thick lines. The visible edge lines include not only the outlines of the view, but lines defining edges that are visible within the view. (See Figure 4-30.) Figure 4-29 – Use of center lines. Figure 4-30 – Use of visible edge lines.  4-27

4.4.0 Hidden Lines

Draw hidden edge lines with short dashes and use them to show hidden features of an object. Begin a hidden line with a dash in contact with the line from which it starts, except when it is the continuation of an unbroken line. (See Figure 4-31.) To prevent confusion in the interpretation of hidden edge lines, you must apply certain standard techniques in drawing these lines. A hidden edge line that is supposed to join a visible or another hidden line must actually contact the line, as shown in the upper views of Figure 4-32; the lower views show the incorrect procedure. Figure 4-31 – Use of hidden edge lines. Figure 4-32 – Correct and incorrect procedures for drawing adjoining hidden lines.  4-28 Figure 4-33 shows an intersection between a hidden edge line and a visible edge line. Obviously, on the object itself the hidden edge line must be below the visible edge line. Indicate this face by drawing the hidden edge line as shown in the upper view of Figure 4-33. If you drew it as indicated in the lower view, the hidden edge line would appear to be above, rather than beneath, the visible edge line. Figure 4-34 shows an intersection between two hidden edge lines, one of which is beneath the other on the object itself. Indicate this fact by drawing the lines as indicated in the upper view of Figure 4-34. If you drew them as indicated in the lower view, the wrong line would appear to be uppermost.

4.5.0 Extension Lines

Use extension lines to extend dimensions beyond the outline of a view so that they can be read easily. Start these thin, unbroken lines about one sixteenth of an inch from the outline of the object and extend them about one-eight of an inch beyond the outermost dimension line. Draw extension lines parallel to each other and perpendicular to the distance you are showing. (Figure 4-35) In unusual cases, you may draw the extension lines at other angles as long as their meaning is clear. Figure 4-33 – Correct and incorrect procedures for drawing a hidden edge line that intersects a visible edge line. Figure 4-34 – Correct and incorrect procedures for drawing intersecting hidden edge lines that are on different levels.  4-29 As far as practical, avoid drawing extension lines directly to the outline of an object. When extension lines must cross each other, break them as shown in Figure 4-36.

4.6.0 Dimension Lines

Insert a dimension line, terminating at either end in a long, pointed arrowhead, between each pair of extension lines. You will draw a dimension line as a thin line with a break to provide a space for the dimension numerals (except in architectural and structural drafting). Occasionally, when you need to indicate the radius of an arc, you will draw an arrow only the end of the line that touches the arc. The other end, without an arrow, terminates at the point used as the center in drawing the arc. The arrowhead on a dimension or leader line is an important detail of a drawing. If you draw these arrowheads sloppily and varied in size, your drawing will not look finished and Figure 4-35 – Use of extension lines. Figure 4-36 – Breaking extension lines and leaders at points of intersection.  4-30 professional. The size of the arrowhead used on a drawing may vary with the size of the drawing, but all arrowheads on a single drawing should be the same size, except occasionally when space is very restricted. The arrowheads you will use on Navy drawings are usually solid, or filled in, and are between one eighth and one fourth of an inch long, with the length about three times the spread. (See Figure 4-37.) With a little practice, you can learn to make good arrowheads freehand. Referring to Figure 4-37, first define the length of the arrowhead with a short stroke as shown at A. Then draw the sides of the arrowhead as indicated at B and C. Finally, fill in the area enclosed by the lines, as shown at D.

4.7.0 Leaders

Use leaders to connect numbers, references, or notes to the appropriate surfaces or lines on the drawing. From any suitable portion of the reference, note, or number, draw a short line parallel to the lettering. From this line, draw the remainder of the leader at an angle (dog leg) to an arrowhead or dot. In this way, the leader will not be confused with other lines of the drawing. If the reference is to a line, always terminate the leader at this line with an arrowhead, as shown in Figure 4-38. However, a reference to a surface terminates with a dot within the outline of that surface.

4.8.0 Break Lines

You may reduce the size of an object’s graphic representation (usually for the purpose of economizing on paper space) by using a device called a break. Suppose, for example, you wanted to make a drawing of a rectangle 1 ft wide by 100 ft long to the scale of 1/12, or 1 inch = 1 foot. If you drew the full length of the rectangle, you would need a sheet of paper 100 inches long. By using a break, you can reduce the length of the figure to a feasible length, as shown in Figure 4-39. Figure 4-37 – Method of drawing an arrowhead Figure 4-38 – Use of a leader.  4-31 On the original object, the ratio of width to length is 1:100. You can see that on the drawing, the ratio is much larger (roughly 1:8). However, the break tells you that a considerable amount of the central part of the figure is presumed to be removed. Use thick, wavy lines for a short break, as shown in Figure 4-39, View A. You will usually indicate a short break for rectangular sections with solid, freehand lines. For wooden rectangular sections, you will make the breaks sharper, with a serrated appearance, rather than wavy. For long breaks, you will use full, ruled lines with freehand zigzags, as shown in Figure 4-39, View B. For wider objects, a long break might have more than one pair of zigzag lines. For drawings made to a large scale, use special conventions that apply to drawing breaks in such things as metal rods, tubes, or bars. Figure 4-40 shows the methods of drawing these breaks. Figure 4-40 – Use of special breaks. Figure 4-39 – Use of proper line conventions for (A) short break, and (B) long break.  4-32

4.9.0 Phantom Lines

You will use phantom lines most frequently to indicate a moving part’s alternate position, as shown in the left-hand view of Figure 4-41. Draw the part in one position in full lines and in the alternate position in phantom lines. You will also use phantom lines to indicate a break when the nature of the object makes the use of the conventional type of break unfeasible. The right hand view of Figure 4-41 shows an example of this use of phantom lines.

4.10.0 Section Lines

Sometimes you can best convey the technical information in a drawing by a view that represents the object as it would look if part of it were cut away. A view of this kind is called a section. The upper view of Figure 4-42 shows a plan view of a pipe sleeve. The lower view is a section, showing the pipe sleeve as it would look, viewed from one side, if you cut it exactly in half vertically. The surface of the imaginary cut is crosshatched with lines called section lines. According to DoD-STD-100C, “section lining shall be composed of uniformly spaced lines at an angle of 45 degrees to the baseline of the section. On adjacent parts, the lines shall be drawn in opposite directions. On a third part, adjacent to two other parts, the section lining shall be drawn at an angle of 30 to 60 degrees.” You can use the cross-hatching shown in Figure 4- 42 on any drawing of parts made of only one material (like machine parts, for example, which are generally made of metal). The cross-hatching Figure 4-41 – Use of phantom lines. Figure 4-42 – Drawing of a plan view and a full section.  4-33 is the symbol for metals and may be used for a section drawing of any type of material. A section like the one shown in Figure 4-42, which goes all the way through and divides the object into halves, is called a full section. If the section showed the sleeve as it would look if cut vertically into unequal parts, or cut only part way through, it would be a partial section. If the cut followed one vertical line part of the way down and then was offset to a different line, it would be an offset section.

4.11.0 Viewing or Cutting Plane Lines

Use viewing plane lines to indicate the plane or planes from which a surface or several surfaces are viewed. Use cutting plane lines to indicate a plane or planes in which a sectional view is taken. Use section views to give a clearer view of interior or hidden features of an object that cannot be clearly observed in conventional outside views. Obtain a section view by cutting away part of an object to show the shape and construction at the cutting plane. Notice the CUTTING PLANE LINE AA in Figure 4-43, View A; it shows where the imaginary cut has been made. The single view in Figure 4-43, View B, helps you to visualize the cutting plane. The arrows point in the direction in which you are to look at the sectional view. Figure 4-43, View C is a front view showing how the object looks when cut it in half. The orthographic section view of Figure 4- 43, View D should be used on the drawing instead of the confusing front view in Figure 4-43, View A. Notice how much easier it is to read and understand. Note that hidden lines behind the plane of projection are omitted in the sectional view. These lines are omitted by general custom, because the elimination of hidden lines is the basic reason for making a sectional view. However, lines that would be visible behind the plane projection must be included in the section view. Cutting plane lines, together with arrows and letters, make up the cutting plane indications. Placing arrows at the end of the cutting plane lines indicates the direction to view the sections. The cutting plane may be a single continuous plane, or it may be offset if the detail can be shown to better advantage. On simple views, indicate the Figure 4-43 – Action of a cutting plane.  4-34 cutting plane as shown in Figure 4-43, View A. On large, complex views or when the cutting planes are offset, indicate them as shown as in Figure 4-44 Identify all cutting plane indications with reference letters placed at the arrowhead points. When a change in direction of the cutting plane is not clear, place reference letters at each change of direction. When more than one sectional view appears on a drawing, letter the cutting plane indications alphabetically. Include the letters that are part of the cutting plane indication as part of the title; for example, SECTION A-A, SECTION B-B, if the single alphabet is exhausted, multiples of letters may be used. You may abbreviate the word SECTION, if desired. Place the title directly under the section drawing.

4.12.0 Datum Lines

Use a datum line to indicate a line or plane of reference, such as the plane from which an elevation is measured. Datum lines consist of one long dash and two short dashes equally spaced. Datum lines differ from phantom lines only in the way they are used.

4.13.0 Stitch Lines

Use stitch lines to indicate the stitching or sewing lines on an article. Stitch lines consist of a series of very short dashes (medium thickness), approximately half the length of the dash of hidden lines, evenly spaced. You can indicate long lines of stitching by a series of stitch lines connected by phantom lines.

4.14.0 Match Lines

Use match lines when an object is too large to fit on a single drawing sheet and must be continued on another sheet. Identify the points where the object stops on one sheet and continues on the next sheet with corresponding match lines. Match lines are medium weight lines labeled with the words MATCH LINE and referenced to the sheet that has the corresponding match line. Examples of construction drawings that may require match lines are maps and road plans where the length is much greater than the width and reducing the size of the drawing to fit a single sheet is impractical. Figure 4-44 – Use of an offset section. 

5.0.0 ORDER of PENCILING

With experience, you will find that a drawing can be made far more efficiently and rapidly if all the lines in a particular category are drawn at the same time and if the various categories of lines are drawn in a specific order or succession. Figure 4-45 shows the order in which the lines of the completed drawing (shown in the last view) were drawn. This order followed the recommended step-by-step procedures: 1. Draw all center lines. 2. Draw the principal circles, arcs, fillets, rounds, and other compass-drawn lines. A fillet is a small arc that indicates a rounded concave joint between two surfaces. A round is a small arc that indicates a rounded convex joint between two surfaces. 3. Draw the horizontal and vertical outlines, visible lines, and hidden lines. 4. Draw the non-horizontal and non-vertical outlines, visible lines, and hidden lines. 5. Clean up the drawing, erasing all excess lines and construction lines. A construction line is a light line used only as a drawing guide. 6. Draw extension lines, dimension lines, section lines, and any other lines required. 7. Inscribe the dimensions and lettering. To a limited extent you can vary the thickness of a pencil line by varying the extent to which you bear down on the pencil, but because you can’t bear down very hard without troughing the paper, you can’t get much variety in line weight with a pencil. If you will be inking over a drawing, this doesn’t make any difference. However, if you will not be reproducing a drawing or will be reproducing it directly from the pencil original, you must follow the line conventions as closely as possible. Figure 4-45 – Order of penciling a drawing.

6.0.0 ORDER of INKING

As a novice, you may be intimidated by the prospect of inking a drawing without spoiling it. You can greatly reduce the danger of spoiling a drawing by learning how to use drawing instruments properly and following a definite order of inking. Nowadays, draftsmen prefer the reservoir pen or rapidograph to the ruling pen for inking straight and curved lines and even for lettering. On the other hand, you should NEVER use a ruling pen to ink freehand lines. One good way to avoid smeared ink lines is by using space blocks. These strips of tape or thin pieces of plastic, when fastened to both faces of the triangles, french curves, or templates (Figure 4-46), raise their edges from the surface of the drafting paper and prevent ink from running under the edge. When you use a rapidograph or reservoir pen with a T square or parallel straightedge, make long lines with a whole arm movement and short lines with a finger movement. Draw horizontal lines from left to right, starting at the top of the drawing and working down. (If you are left-handed, you will, of course, draw these lines from right to left, and similarly reverse many of the directions given in this training manual.) Vertical lines are usually drawn in an upward direction, moving from left to right across the drawing. However, when you have to draw a number of vertical lines or lines slanted in the same direction, the way you draw them will be governed by the source of your light and the way you have found that you can draw vertical lines with greatest control. Let the first lines dry before starting to draw any intersecting lines. Watch carefully when you draw one line across another line. You vary the thickness of ink lines by selecting a pen unit that matches your desired application and/or line convention. The order generally recommended for inking is as follows: 1. Start inking from the top of the paper and progress toward the bottom. 2.Start inking all arcs of circles, fillets, rounds, small circles, large circles, and other compass-drawn lines. 3. Ink all irregular curves, using a French curve or a spline as a guide. 4. Ink all thick horizontal lines, then all medium and thin lines. 5.Start at the left edge and ink the thick first, the medium next, and finally the thin vertical lines from left to right. 6. Follow the same procedure described in (4) and (5) for slanting lines. 7. Ink section lines, dimensions, and arrowheads. 8. Ink notes and title, meridian symbol, and graphic scales. 9. Ink borders and check inked drawing for completeness. Figure 4-46 – Use of space blocks.   4-37 10.Use an art gum or a kneaded eraser to erase pencil marks or for final cleanup of the drawing.

7.0.0 LETTERING

You cannot convey all of the information presented in a drawing by graphic shapes and lines alone. To make a drawing informative and complete, you must include lettering in the form of dimensions, notes, legends, and titles. Lettering can either enhance your drawing by making it simple to interpret and pleasant to look at, or it can ruin your drawing by making it difficult to read and unsightly in appearance. Mastering the techniques and skills required for neat, legible lettering is essential.

7.1.0 Freehand Lettering

As you work with experienced draftsmen, you will notice their freehand lettering adds style and individuality to their work. They take great pride in their freehand lettering ability. By learning basic letter forms and practicing constantly, you will soon be able to do a creditable job of lettering and acquire your own style and individuality. Anyone who can write can learn to letter. As you practice, you will steadily improve both your style and the speed with which you can letter neatly. Don’t give up if your first attempts do not produce neat lettering. Don’t be afraid to ask your supervisor for a few pointers. You will gain an understanding of the letter shapes and the ability to visualize them by drawing them until the muscles of your hand are accustomed to the pattern of the strokes that make up the letters. You should be able to draw good letters without consciously thinking of this pattern. Your position and how you hold your pencil will greatly affect your lettering. You should sit up straight and rest your forearm on the drawing board or table. Hold the pencil between the thumb, forefinger, and second finger; the third and fourth fingers and the ball of the palm rest on the drawing sheet. Do not grip the pencil tightly. A tight grip will cramp the muscles in your fingers, causing you to lose control. If you get “writer’s cramp” easily, you are probably holding your pencil too tightly. The pencil should be kept sharpened to produce uniform line weights. A conical-shaped pencil point works best for most lettering. Usually, an F or H pencil is used for lettering. A pencil that is too hard may cut into the paper, or it may produce lettering that will not reproduce easily. A pencil that is too soft will require frequent sharpening, and it will produce lettering that may smear easily on a drawing.

7.2.0 Guidelines

Figure 4-47 shows the use of light pencil lines called guidelines. Guidelines ensure consistency in the size of the letter characters. If your lettering consists of capitals, draw only the cap line and base line. If lowercase letters are included as well, draw the waist line and drop line.   4-38 The waist line indicates the upper limit of the lowercase letters. The ascender is the part of the lowercase letter that extends above the body of the letter; for example, the dot portion of the character i in Figure 4-47. All ascenders are as high as the caps. The drop line indicates the lower limit of the lowercase letters. The descender is the part of the lowercase letter that extends below the body of the letter, an example being the tail of the character g in Figure 4-47. The vertical distance from the drop line to the base line is the same as the vertical distance from the waist line to the cap line. It is about one third of the vertical distance between the base line and the cap line, or about one half of the vertical distance between the base line and the waist line. Figure 4-48 shows an easy way to lay out guidelines for caps and lowercase. Let the height of a capital be 1 1/2 times the distance “a.” Set a compass or dividers to distance “a,” and lay off distance “a” above and below the midline selected for the guidelines. This method locates the cap line and the drop line. Then set the compass or dividers to one half of ’’a,” and lay off this distance above and below the midline. This method locates the waist line and the base line. To help you keep your lettering vertical, construct vertical guidelines, spaced at random along the horizontal guidelines. For inclined lettering, lay off lines inclined at the angle you wish your lettering to be slanted. (See Figure 4-49) Inclined lines are known as direction lines and are normally slanted at a maximum of 68 degrees. Figure 4-47 – Example of laying off guidelines use. Figure 4-48 – Laying off guidelines.   4-39 7.2.1 Ames Lettering Instrument If you have many lines of lettering to do, you will find a lettering instrument, such as the Ames lettering instrument, shown in Figure 4-50, quite useful and timesaving. The top-left section of Figure 4-50, shows how to use this instrument in conjunction with a T square to draw properly spaced horizontal guidelines. Insert the point of your pencil through one of the holes, and the instrument slides along the T square as you move the pencil across the page. The enlarged drawing of the instrument in the lower part of the figure shows the details of how the instrument is used. Notice the three rows of holes in the circular disc of the instrument. The holes in the center row are equally spaced guidelines. Use the two outside rows for drawing both capital and lowercase guidelines. Use the left row to get a proportion of 3 to 5 for lowercase and capital letters, and the right row for a proportion of 2 to 3. Figure 4-49 – Laying off lines for lettering. Figure 4-50 – Using the Ames lettering instrument.  4-40 You can use the Ames lettering instrument to create lettering ranging in height from 1/16 to 5/16 inches. You can attain different letter heights by rotating the circular disc within the outer section of the instrument. Use the numbers along the bottom edge of the disc to set the instrument for a particular letter height. A number aligned with the index line on the outer section of the instrument indicates the height of the lettering in 32nds of an inch. In Figure 4-50, the number 8 is aligned with the index; therefore, the distance between the capital letter guides produced by this setting is 8/32 inch or ¼ inch. By standing the Ames lettering instrument on its greater sloping side, you can use it for drawing guidelines for inclined lettering that slope at an angle of 67 1/2 degrees with the horizontal. (See the upper-right portion of Figure 4-50.) 7.2.2 Spacing between Guidelines The spacing between two lines of capitals may vary from one half of the height to the full height of a capital. Two thirds of the height is customarily used. The spacing commonly used between lines of lowercase letters is shown in Figure 4-51. The space indicated by the letter S equals the vertical distance between the waist line and the cap line. Figure 4-51 – Spacing between lines of lowercase letters.  4-41

7.3.0 Vertical Single-Stroke Gothic Lettering

The generally accepted style of lettering for Sengineering techBEE drawings is the single-stroke Gothic vertical (Figure 4-52) or inclined lettering. The term Gothic refers to the style of letters. Gothic lettering is the simplest style to make and the easiest to read on a drawing. Single-stroke means that each stroke of the letter is made by one stroke of the pencil. Figure 4-53 shows the basic strokes required for single-stroke lettering. Draw vertical strokes from the top down with an even finger movement. (You draw Inclined strokes in the same manner.) Draw horizontal strokes from left to right with a complete hand movement, pivoting at the wrist. Draw curved strokes proceeding from above downward, using a combined finger and wrist motion. Draw lettering strokes; do not sketch them. It is important to use the correct direction and sequence of strokes recommended for each letter. We will discuss and show the required shapes of vertical single-stroke Gothic letters and numerals in the next several figures and paragraphs. To emphasize the proportions of the letters and numerals, each character is shown in a grid, six units high. The grid serves as a reference for comparing the height of the various characters in proportion to their width as well as locating the individual strokes that compose the characters. For learning purposes, the characters are grouped by the type of strokes required to form each character. Figure 4-52 – Vertical single-stroke Gothic capitals and numerals. Figure 4-53 – Basic lettering strokes.

7.3.1 Straight-Line Capitals

The capital letters shown in Figure 4-54 are formed with only straight-line strokes. Z, X, Y, K. Stroke 2 of the Z is longer than stroke 1. The inclined strokes of the X are closer together at their starting than at their finishing points. The three strokes of the Y intersect slightly below the center of the square. Stroke 2 of the K intersects stroke 1 at a point one third of the distance up from the base line. Stroke 3, if extended, would intersect stroke 1 at the top. See Figure 4-54. I, A, L, T. The letter I is the basic vertical stroke. Inclined strokes 1 and 2 of the A intersect just above the cap line; stroke 3 is located one third of the distance up from the base line. Draw the horizontal stroke of the T first; then draw the vertical stroke or stem from the center. With both L and T, the horizontal stroke may be lengthened or shortened to balance the letters in a word. If, for example, L precedes A, reduce its horizontal stroke slightly; if T precedes A, extend its horizontal stroke slightly. See Figure 4-55. E, H, F. In E, H, and F, the central horizontal bar is placed slightly above the center for stability. In both E and F, the cap line stroke is four units long and the central stroke is three fifths of this length. The base line of E is one-half unit longer than its cap line. See Figure 4-56. Figure 4-55 – Basic lettering strokes for I, A, L, and T. Figure 4-54 – Basic lettering strokes for Z, X, Y, and K.  4-43 M, N, W, V

7.3.2 Curved and Straight-Line Combinations

The two inclined strokes of the V intersect just below the base line. The W is 1 1/3 times the width of a normal letter; note that it is wider than M. Strokes 1, 2, 3, and 4 of the W intersect below the base line. Strokes 3 and 4 of the M and 2 and 3 of the N intersect on the base line. Note that the outside strokes of the M and N are drawn first. See Figure 4-57. Figures 4-58 through 4-61 show capital letters formed by either curved line strokes or by a combination of curved- and straight-line strokes. O, Q, C, G. The O and Q are complete circles; C and G are not the full width of the square because they are not full circles. The tail of Q, if extended, would intersect the center of the circle. Stroke 4 of G begins at the center of the circle. See Figure 4-58. U, J, D. Stroke 3 of U is elliptical and connects two parallel vertical lines a third of the distance above the base line. Stroke 2 of J is similar but not so broad. Stroke 4 of D is circular, joining two horizontal segments. See Figure 4-59. P, R, B. The horizontal midstrokes of P and R lie just below the midpoint, and the horizontal midstroke of B lies just above the midpoint. Horizontal stroke 4 in B is slightly longer than strokes 2 and 3, which are the same length. See Figure 4-60. Figure 4-56 – Basic lettering strokes for E, F, and H. Figure 4-57 – Basic lettering strokes for M, N, W, and V.   4-44 S and &. The upper and lower portions of S are ellipses, the upper slightly smaller than the lower. The ampersand (&) is basically similar despite a greater difference in the sizes of the ellipses. See Figure 4-61. Figure 4-58 – Basic lettering strokes for O, Q, C, and G. Figure- 4-59 – Basic lettering strokes for U, J, and D. Figure 4-60 – Basic lettering strokes for P, R, and B.

7.3.3 Numerals and Fractions

It is vitally important for you to take extreme care in drawing numerals, particularly in the preparation of construction drawings. A poorly drawn numeral can cause costly errors and delays. Draw numerals using the same size guidelines as the capital letters on a drawing. Place vertical guidelines at random. Do not make numerals too small or crowded, since this can impair their legibility. Figure 4-62 shows that the vertical stroke of the numeral 4 is placed two units from the right side. The horizontal bar is one quarter the height of the number above the base line. Note that the closed curves of 0, 6, and 9 are elliptical, not circular. The 6 is an inverted 9. The 8 is composed of two ellipses tangent slightly above the center point. The top ellipse also is narrower. The 3 is the same as the 8 with the left portions of the loops cut off. The curved lines of 2 follow the elliptical contours of 8. The top portion of the 5 is slightly narrower than the bottom. The bottom ellipse is two thirds of the height of the figure from the base line. Figure 4-61 – Basic lettering strokes for S and &. Figure 4-62 – Lettering vertical numerals.  4-46 Always draw the division bar between the numerator and denominator of the fractions as parallel to the guidelines, as shown in Figure 4-63. The complete height of a fraction is twice that of a whole number. Center the division bar midway between the base line and cap line. Space the top guideline of the numerator and the bottom guideline of the denominator a full number height from the division bar. The numbers composing a fraction are three quarters of the height of a full number. The clear space on either side of the division bar is one quarter of a full number. Center the numbers in a fraction about a vertical guideline that cuts the fraction bar in half.

7.3.4 Lower Case Letters

Never use lowercase letters on construction drawings, although it is acceptable to use them for notes on maps or similar drawings. NEVER use lowercase letters on drawing title blocks. Figure 4-64 shows lowercase letters along with guidelines and strokes used to form each letter. The crosses of f and t are on the waist line and extend the same distance on either side of stroke 1. The horizontal stroke of e is just above mid height. The bodies of a, b, g, p, and q are circular and vertical strokes of these letters do not increase their width at the points of tangency. The vertical strokes of p and q terminate at the drop line. The vertical strokes of g, j, and y terminate in curves that are tangent to the drop line. Figure 4-63 – Vertical fractions.

8.0.0 INCLINED LETTERING

Inclined single-stroke Gothic lettering is also acceptable on Sengineering techBEE drawings, although it is not recommended for the beginner and should not be attempted until you have mastered vertical lettering techniques. Inclined and vertical lettering should never appear on the same drawing. The lettering style used must always be consistent. Figures 4-65 and 4-66 show the required formation of inclined letters. The angle of inclination is 67 1/2 degrees from the horizontal. Inclined guidelines may be drawn with the lettering triangle as described, or a line at the proper angle may be laid off with the protractor and parallel lines constructed from it. Horizontal guidelines and sequence of strokes are the same as for vertical letters. Rules of stability, proportion, and balance are similar. The circles and circular arcs used in vertical letters become elliptical in inclined letters, their major axes making angles of 45 degrees with the horizontal. Letters such as A, M, V, and Y should be made symmetrically about a guideline. Inclined lowercase letters follow the same principles as inclined capitals. Figure 4-64 – Lettering vertical lowercase letters.   4-48

9.0.0 COMPOSITION of LETTERING

Once you have learned the proper shapes and strokes required to form each letter and numeral, concentrate on practicing the composition of words and sentences. Proper spacing of letters and words does more for the appearance of a block of lettering than the forms of the letters themselves. This does not mean, however, that you should discontinue further practice of correctly forming each letter.

9.1.0 Letter Spacing

In straight-line lettering, determine the spacing between letters by eye after making the first letter and before making each succeeding letter. To give a word the appearance of having uniformly spaced letters, make the areas between the letters nearly equal, as shown in Figure 4-67. The areas between adjacent letters in a word vary with respect to whether the letters have straight sides (H, I, M, N) or slanted sides (A, V, W) and whether the letters are round (O, Q, C, G) or open (L, J). You will draw adjacent straight-sided letters farther apart than adjacent round letters. You will draw adjacent slant-sided and open letters nearer together than adjacent round letters. Where letters L and T, L and V, A and V, and other pairs of like shape come together in a word, you may have to draw the top of one above the bottom of the other to avoid having the word Figure 4-66 – Inclined letter formation. Figure 4-65 – Inclined single-stroke Gothic.   4-49 appear as two or more words. In letter spacing, the six problems listed below are the hardest to solve. You will solve the first five problems by moving the letters closer together, the sixth by moving the letters farther apart. 1. Round next to round. (Increase the area at top and bottom where letters curve away from each other, as in Figure 4-68A.) 2. Round next to slant. (Increase the area at top or bottom where letters move away from each other, as in Figure 4-68B.) 3. Vertical next to slant. (Increase the area at top or bottom where one letter slants away from the other, as in Figure 4-68C.) 4. Slant next to slant. (Increase the area at top or bottom where letters slant in opposite directions, as in Figure 4-68D.) 5. Round next to vertical. (Increase the area at top and bottom where round letter curves away, as in Figure 4-68E.) 6. Vertical next to vertical. (Decrease the area at top and bottom where stems move together, as in Figure 4-68F.) Figure 4-67 – Letter spacing. Figure 4-68 – Common spacing problems.  4-50 A good way to evaluate the spacing of letters is to hold the lettering away from you and squint your eyes, observing the gray tone throughout the lettering. If the tone appears spotty or varies too much, the letters are poorly spaced.

9.2.0 Word Spacing

Proper spacing between words is an important factor in making them easy to read. Allow enough space between words and sentences to keep them from running together, but not so much as to cause words to be read one at a time. A good practice to follow is making spaces between words equal to the space that the letter O occupies as shown in Figure 4-69. If you prefer, you can use the letter N or a correctly spaced letter I instead. Naturally, the design of the last letter of a word and of the first letter of the following word must be considered in determining the amount of space you leave between words. You should leave a space equal to a capital O between two full-height straight-stemmed letters, such as H and E or D and B. Of course, if one or both of the letters are curved, the space should be appropriately reduced. If the two letters involved are lowercase, use the lowercase o to determine the width of the space. If one letter is full height and the other is lowercase height, such as the words bid now or on him, the space is equal to half a capital O and half a lowercase o.

9.3.0 Line Spacing

In addition to the spacing between letters and words, the spacing between lines of lettering adds to the readability of the lettering. Again your eye and your artistic ability must be your guide. Except when you are trying for a special effect, you should have enough space between the lines to make it easy for the reader to see what he is reading. The distance you leave between lines may vary from 1/2 to 1 1/2 times the height of the letter. For the sake of appearance, do not use the same distance as the letter height. As a general rule, two-thirds of the letter height is a good distance between lines. This spacing allows room for descenders of lowercase letters and still maintains a clear space of one third of the letter height between the descenders and capital letters, or ascenders of lowercase letters of the following line. Figure 4-69 shows proper word and line spacing. Figure 4-69 – Spacing between words and lines.

9.4.0 Centering

Since the letters of the alphabet vary in width, you may find it difficult to center a line of lettering. Figure 4-70 shows one way of solving this problem. First, take a piece of scratch paper and letter in the required line. Then, place this lettering above the area in which your lettering is to go and center it. Finally, use the sample as a guide to lettering the desired line. Ending a line of lettering at a given point is equally difficult. As in centering, first, letter the line on a piece of scratch paper in order to achieve the proper line length. To make lines of lettering come out to a specified length, you must adjust the word and/or letter spacing. This adjustment in spacing is called justifying. A good example of justifying is found in the columns of this manual. Notice how all full lines start and stop on the right- and left-hand margins. Usually, you will only find justified lettering typeset or typewritten by mechanical means. However, if you do have an occasion to justify your lettering, you should try to keep the spacing between the words as uniform as possible. Uneven spacing detracts from the appearance of the job. When it is impossible to divide the spacing evenly, insert wider spacing at points where one word ends and the next begins with tall letters, like d, b, and l. If you use too much space between the words, the paragraph will tend to fall apart because it is filled with rivers of white space that will disturb the eye. When a line is so short that it calls for an undue amount of space between words to lengthen the line, allow more space between the letters in each word. This is known as letterspacing. When words are letterspaced, always allow extra space between words so that they will not seem to run together when they are read. Letter spacing makes short words in titles or headings appear longer. Though it frequently improves the appearance of words in caps, letter spacing reduces the legibility of words in lowercase. Use this process with caution. Figure 4-70 – Centering with trial spacing paper.   4-52

10.0.0 MECHANICAL LETTERING

At times you will be tasked with preparing drawings, charts, maps, or signs that require the use of mechanical lettering. When we refer to mechanical lettering, we mean standard uniform characters that are executed with a special pen held in a scriber and guided by a template. Mechanical lettering does not normally require the use of lettering guidelines. You will use mechanical lettering principally for title blocks and notes on drawings, marginal data for special maps, briefing charts, display charts, graphs, titles on photographs, signs, and any other time that clear, legible, standardized lettering is required. Note that freehand lettering is the required lettering on most of your drawings; reserve mechanical lettering for special uses similar to those described above. The availability of mechanical lettering devices should not deter you from the daily practice required to execute freehand lettering. With continuous practice, you will become proficient in both mechanical and freehand lettering. One of the most popular types of mechanical lettering sets is the LEROY lettering set. A standard Leroy lettering set consists of a set of templates, a scriber, and a set of pens. (See Figure 4-71.)

10.1.0 Templates

Templates are made of laminated plastic with the characters engraved in the face so that the lines serve as guide grooves for the scriber. The height of the characters, in thousandths of an inch, is given by a number on the upper right-hand side of the template. For example, 3240-500CL indicates a No. 500 template. The entire number and letter designation identifies the template in the manufacturer’s catalog. A standard set of templates offers character heights from 80 (0.08 inch or 5/64 inch) to 500 (0.5 inch or 1/2 inch). The scale at the bottom of each template has the zero in the center and is arranged for proper spacing in relation to character heights. The distance between each scale division represents the center-to-center distance of normal-width letters.

10.2.0 Pens

A standard set of pens for producing various line weights consists of 11 sizes ranging from 000, the finest, to 8. Each pen is composed of two parts: the ink reservoir and the cleaning pin. The reservoir is a series of connected tubes of decreasing diameters, the smallest establishing line thickness. The cleaning pin acts as a valve, protruding beyond the edge of the bottom tube when the pen is not touching the drawing surface. In this position, no ink flows. When the pen is resting on a drawing surface, the cleaning pin is pushed up, allowing the ink to flow. The action of the pin in the tube minimizes ink clogging. Figure 4-71 – Leroy lettering set.   4-53 NOTE As stated earlier, some reservoir pens are made so the point section will fit in a Leroy scriber. They are popular with the Sengineering techBEEs (and widely used over the standard pens contained in the Leroy, especially for long hours of lettering. A SCRIBER holds the pen in alignment and controls its motion as the tracing pin is guided through the character grooves of the template. Two types of scribes are available: adjustable and fixed. An adjustable scriber produces letters with any slant from vertical to 22 1/2 degrees forward from a single template; a fixed scriber produces only vertical letters. Both scribers consist of a tracing pin, pen socket, socket screw, and tail pin. Figure 4-72 shows a fixed scriber. The tracing pin on most Leroy scribers is reversible. One point is used with fine groove templates (Nos. 060, 080, and 100), and the other point is for wider groove templates (No. 120 to No. 500). 10.3.0 Line Weights The table below shows the recommended combinations of template and pen for the best proportion between line thickness and letter size. Figure 4-72 – Leroy scriber and template.   4-54 Template No. Pen No. 060 000 080 000 or 00 100 00 120 0 140 1 175 2 200 3 240 3 290 4 350 4 425 5 500 6 This list is also found inside the lid of the Leroy lettering set case. 10.4.0 Operating Procedures You will require a certain technique to manipulate the Leroy scriber with the template and, at the same time, hold the template against the working edge of the T square or straightedge without slipping. Hold the T square or straightedge in position with the ball of your left hand resting on the blade while using the fingers of your left hand to hold the template against the working edge and changing the position of the template when necessary. Hold the scriber between your thumb and first three fingers of your right hand. The little finger of the right hand presses the right side of the template against the working edge, preventing the tracing pin from slipping out of the character grooves of the template. Take care to keep the tail pin in the straight-guide groove at the bottom of each template. When you are making long lines of large lettering, you may find it helpful to secure the T square or straightedge at both ends of the drawing board with drafting tape. Using the above techniques to manipulate the scriber and template, follow the steps listed below to form uniform letters, words, and sentences. As you follow the steps, refer to Figure 4-72. 1.Select the template with letters of the desired height. The distance between each graduation at the bottom of the template is equal to the height of the letter that can be made with the template. The numbers in a fraction are made by using a template one size smaller than that used for whole numbers. 2. Lay the template along the top edge of a T square or straightedge.  4-55 3. Using the table of recommended template and pen sizes previously mentioned, select the proper pen to give a well-proportioned letter. NOTE On drawings with a great deal of lettering, the recommended combinations may be altered by one pen size, either under or over the recommended size, for variation and appearance. Never use a pen size more than two over the recommended size. 4. Insert the selected pen into the socket of the scriber arm until the shoulder of the pen rests on the scriber arm. 5. Tighten the screw on the side of the scriber arm. 6. Loosen the locknut on the adjusting screw in the scriber arm. 7. Set the tail pin of the scriber in the straight-guide groove of the template. 8. Set the tracer pin of the scriber in the groove of a character. 9. Lower the pen gently to the drawing surface. 10.Raise or lower the scriber arm by turning the adjusting screw until the tip of the cleaning pin within the pen just touches the drawing surface. Tighten the locknut when the desired height is reached. To prevent blotting, make this rough adjustment before putting ink into the pen. 11. Remove the scriber from the template. 12.Remove the cleaning pin from the pen. NOTE To prevent the ink from flowing straight through the pen, you should not remove the cleaning pin of a Leroy pen No. 4 or larger from the pen. 13.Fill the reservoir of the pen with drawing ink. You should fill the Leroy pen with ink in the same manner as any common drafting inking instrument. Keep the reservoir from one-fourth to three-fourths full; too low an ink level results in irregular lines. 14.If you removed the cleaning pin, reinsert it into the pen. 15.Wipe the lower tip of the pen with a cloth to remove any excess ink that may have been pushed through by the cleaning pin. 16.Draw a test line on a piece of scratch paper to ensure that the ink will flow smoothly. 17.Gently lower the pen to the drawing surface after inserting the tail and tracer pins in their proper grooves. 18.Proceed with the lettering by moving the tracer pin in the grooves of the characters, keeping the tail pin in the straight-guide groove. If the ink does not flow properly, turn the cleaning pin inside the pen and wipe the tip with a cloth; also, make any necessary minor adjustments to the adjusting screw to allow the ink to flow properly. Tighten the locknut. When you will not be lettering for short periods of time, place the tip of the pen, still in the socket of the scriber arm, on a piece of moist cotton. This will prevent the ink from drying around the opening of the pen and will help the ink to flow properly when you begin lettering again.  4-56 10.5.0 Spacing and Centering The rules for freehand letterspacing and word spacing also apply to mechanical lettering. Guidelines are not necessary for mechanical lettering; however, when you are making more than one line of lettering, you may draw horizontal base lines at intervals to help you maintain the proper spacing between the lines. Spacing between lines of mechanical lettering is the same as for freehand lettering. When centering lettering above a certain part of a drawing, or within a certain space, use the scales along the bottom edges of the templates. Each space on the scale represents the center-to-center distance of normal-width letters. For example, to center the words LEROY LETTERING about a certain line, proceed as follows: 1. Count the letters in each word and the spaces between words. Result: 15. 2. Considering the letter I and the space between the words as half value for each, reduce the total by one. Result: 14. 3. Divide the result of No. 2 above by two. Result: 7. NOTE If there had been an odd number of half values, you would use the next lower number and allow more space between words than normally required. 4.Set the zero of the scale at the vertical line about which the lettering is to be centered and mark off seven spaces to the left and right of zero. 5.Start the L of the word LEROY in the title at the left mark and continue to the end. The right edge of the G should fall on the mark to the right. 10.6.0 Maintenance of Mechanical Lettering Equipment Thoroughly clean your pens with water after each use and store them properly in the lettering set case. Never wash your pens under running water in a sink; you may accidently lose the pens and cleaning pins down the drain. If you cannot clean a pen satisfactorily with water, use a diluted solution of ammonia or available commercial pen cleaning solutions and pen cleaning kits. You can remove caked or dried ink by soaking the pens overnight in a cleaning solution. Be aware, however, the pens may corrode if soaked excessively. Handle cleaning pins with care because they are fragile and easily bent, especially the smaller ones. Avoid excessively tightening the screw that holds the pen in the scriber because the fine threads tend to strip very easily. Clean your templates after every use, because dirt and dried-on ink are very easily transferred onto an otherwise clean drawing. Ensure that the template grooves are kept free from all foreign matter and that the tracer pin does not cut into the sides of the grooves. In order to form perfect letters every time, you must make sure that the tracer pin slides along the grooves smoothly. When you use small templates, insert a small sharp tracing pin in the scriber. If you are using a larger template, avoid using a sharp tracing pin because it can damage the grooves of the template.

Summary

As an engineering technician, you will use a variety of drafting equipment and accessories in performing your day to day duties. Familiarity with fundamental techniques and standards will help you perform your tasks successfully.

Review Questions

  1.  The best light for drafting is natural light coming over the left shoulder and from the front left to avoid shadows cast by your hands. A. True B. False 2. To obtain a smooth drawing surface, cover your drafting board with __________. A. Vinyl or heavy manila paper B. Tracing paper or gridded paper C. Cloth D. Nothing 3.  To clean up smudges on a tracing paper drawing, use an electric eraser. A. True B. False 4. Use a __________ pencil to lay out the drawing in light construction and projection lines and a __________ pencil to darken the required lines and to make arrowheads and lettering. A. Soft, hard B. Hard, soft C. Medium, soft D. Hard, medium 5.  You can correct a poor pencil drawing when you trace it in ink. A. True B. False 6. When using a T square with a drawing board, align your paper to the __________ of the board. A. Top B. Bottom C. Left D. Right 7.  You should draw horizontal lines from right to left. A. True B. False  4-59 8.  You should draw vertical lines from the bottom up. A. True B. False 9. How is the direction or angle of inclination of an incline line measured? A. In reference to the left side of the drawing board B. In reference to the right side of the drawing board C. In reference to the base line from which it is drawn D. In reference to the triangle used 10.  Using three points on the protractor to draw an angle will result in extremely accurate measurements. A. True B. False 11.  Parallel and perpendicular lines are drawn with a combination of straightedges and triangles. A. True B. False 12. Noncircular curves are usually drawn __________. A. With protractors B. With curves C. With compasses D. Freehand 13. Always rotate the compass __________. A. Counterclockwise B. Clockwise and then counterclockwise C. Counterclockwise and then clockwise D. Clockwise 14.  When you are drawing a curved line that extends into a straight line, draw the straight line first, and join the curve line to it. A. True B. False 15. Use drafting templates __________. A. Whenever you're in a hurry B. When speed can be sacrificed for accuracy C. When accuracy can be sacrificed for speed D. When you can't find a compass  4-60 16. __________ are used to transfer measurements, to step off a series of equal distances, and to divide lines into a number of equal parts. A. Protractors B. Scales C. Dividers D. Straightedges 17.  Scales are suitable for drawing lines. A. True B. False 18. __________ refers to the systematic space arrangement of required information within the drafting sheet used to identify, process, and file drawings methodically. A. Drawing format B. Sheet size C. Roll size D. Title block 19. The __________ is the outside line of either the vertical or horizontal margin. A. Borderline B. Trim line C. Hidden line D. Extension line 20. The inside lines of the margins are called _________. A. Borderlines B. Trim lines C. Hidden lines D. Extension lines 21. Sheets of drafting or tracing paper are cut __________ their required finished size and fastened to the drafting board. A. Exactly to B. Slightly smaller than C. Slightly larger than D. Double the size of 22. The title block, revision block, and list of materials are part of the __________. A. Drawing number B. Record of preparation C. Sheet size D. Basic format  4-61 23. The primary purpose of the __________ is to identify a drawing. A. Bill of Materials B. Satisfactory To C. Revision block D. Title block 24. The __________ is an additional approval signature block provided when an outside activity requests a drawing. A. Bill of Materials B. Satisfactory To C. Revision block D. Title block 25. The ___________ contains a list of all changes made to the drawing. A. Bill of Materials B. Satisfactory To C. Revision block D. Title block 26. The __________ is a tabulated list of material requirements for a given project. A. Bill of Materials B. Satisfactory To C. Revision block D. Title block 27. DoD-STD-100C specifies that __________ widths of line should be used in drafting drawings. A. 2 B. 3 C. 4 D. 5 28. The first lines you will draw are __________, and they are used to lay out the rest of your drawing. A. Hidden lines B. Visible lines C. Center lines D. Construction lines  4-62 29. Use __________ to indicate the center line of a circle, arc, or any symmetrical object. A. A solid, thick line B. A thin unbroken line C. Long and short dashes, alternately and evenly spaced, with a long dash at each end D. Short dashes 30. Visible lines are drawn as __________. A. A solid, thick line B. A thin unbroken line C. Long and short dashes, alternately and evenly spaced, with a long dash at each end D. Short dashes 31. Hidden edge lines are drawn with __________. A. A solid, thick line B. A thin unbroken line C. Long and short dashes, alternately and evenly spaced, with a long dash at each end D. Short dashes 32. Extension lines are drawn with ___________. A. A solid, thick line B. A thin unbroken line C. Long and short dashes, alternately and evenly spaced, with a long dash at each end D. Short dashes 33. __________ lines are terminated at each end with arrows and inserted between each pair of extension lines. A. Center B. Visible C. Hidden edge D. Dimension 34. __________ are used to connect numbers, references, or notes to the appropriate surfaces or lines on the drawing. A. Phantom lines B. Dimension lines C. Leaders D. Break lines  4-63 35. This device is used to reduce the size of an object's graphic representation (usually for the purpose of economizing on paper space). A. Phantom lines B. Dimension lines C. Leaders D. Break lines 36. ___________ are used frequently to indicate a moving part's alternate position. A. Phantom lines B. Dimension lines C. Leaders D. Break lines 37. Cutaway views are called __________. A. Leaders B. Sections C. Dimensions D. Crosshatching 38. __________ lines indicate the plane or planes from which a surface or several surfaces are viewed. A. Cutting plane B. Viewing plane C. Dimension D. Crosshatching 39. A __________ line consists of one long dash and two short dashes equally spaced. A. Phantom B. Dimension C. Datum D. Break 40. Stitch lines consist of __________. A. A series of very short dashes of medium thickness, approximately have the length of the dash of hidden lines, evenly spaced B. A solid, thick line C. A thin unbroken line D. Long and short dashes, alternately and evenly spaced, with a long dash at each end  4-64 41. __________ lines are used when an object is too large to fit on a single drawing sheet and must be continued on another sheet. A. Break B. Dimension C. Datum D. Match 42. When penciling a drawing, __________ lines should be drawn first. A. Horizontal and vertical outlines B. Circles and arcs C. Center D. Nonhorizontal and nonvertical outlines 43. __________ are strips of tape or thin pieces of plastic which are fastened to faces of triangles, curves and templates to raise their edges from the surface of the drafting paper and prevent ink from running under the edge. A. Space blocks B. Drafting tape C. Masking tape D. Duct tape 44.  When freehand lettering, you should grip the pencil tightly. A. True B. False 45. __________ ensure consistency in the size of the letter characters. A. Trim lines B. Guidelines C. Phantom lines D. Center lines 46. The generally accepted style of lettering for Seabee drawings in the __________. A. Arial Bold B. Single-stroke Gothic vertical or inclined C. Times Roman D. Comic Sans 47. Z, X, Y, K are formed with only __________. A. Horizontal strokes B. Curved and straight-line combinations C. Curved strokes D. Straight-line strokes   4-65 48. O, Q, C, G are formed with only __________. A. Horizontal strokes B. Curved and straight-line combinations C. Curved strokes D. Straight-line strokes 49.  Drawing numerals requires a different set of guidelines than capital letters. A. True B. False 50.  It is acceptable to use lowercase letters on construction drawings. A. True B. False 51.  Inclined lettering uses the same horizontal guidelines and sequence of strokes as vertical lettering. A. True B. False 52.  The spacing between adjacent letters in a word is always the same. A. True B. False 53. A good practice is to make the spaces between words equal to the space that the letter __________ occupies. A. l B. j C. O D. i 54. The recommended distance you leave between lines is __________ the height of the letter. A. Triple B. Double C. Equal D. Varies from 1/2 to 1 1/2 times   4-66 55. __________ is adjusting word and/or letter spacing to make lines of lettering come out to a specified length. A. Composition B. Centering C. Justifying D. Formation 56. __________ refers to standard uniform characters that are executed with a special pen held in a scriber and guided by a template. A. Freehand lettering B. Mechanical lettering C. Drafting templates D. Cursive lettering 57. __________ are made of laminated plastic with the characters engraved in the face so that the lines serve as guide grooves for a scriber. A. Templates B. Protractors C. Compasses D. Straightedges 58. A standard set of pens for producing various line weights consists of 11 sizes ranging from 000, the __________, to 8. A. Finest B. Widest C. Thickest D. Darkest 59.  When using a Leroy scriber to draw long lines of large lettering, you may find it helpful to secure the T square or straightedge at both ends of the drawing board with drafting tape. A. True B. False 60.  Spacing between lines of mechanical lettering is different than freehand lettering. A. True B. False 61.  You should wash your pens under running water in a sink. A. True B. False

 

Chapter 5 Drafting: Geometric Construction

 

As an engineering technician, you will find it essential to know the principles and application of geometric construction. You must be able to draw many types of lines. In a line drawing, a line may be straight line, a circle, an arc of a circle or a fillet, a circular curve, a noncircular curve, or a combination of these basic line types. You must also be able to construct line drawings at specified angles to each other, various plane figures, and other graphic representations consisting exclusively of lines. This lesson provides information that will aid you in drawing different types of geometric constructions.

When you have completed this lesson, you will be able to:

1. Describe different methods of drawing straight lines.
2. Describe how to transfer and bisect an angle.
3. Describe how to construct plane figures.
4. Describe how to construct circular curves.
5. Describe how to construct an ellipse.

Contents

1.0.0 Straight Lines

2.0.0 Angles

3.0.0 Plane Figures

4.0.0 Circular Curves

5.0.0 Noncircular Curves

Summary

Review Questions


 

1.0.0 STRAIGHT LINES

You can draw horizontal and vertical lines, perpendicular and parallel lines, and inclined lines by either using a straightedge (or a T square) with a triangle or by employing a drafting compass. In this section, we will describe how to use a drafting compass to draw straight lines. Figure 5-1 shows how to draw a line parallel to another line. Here, the line is to be drawn through given point C. To draw a line through C parallel to AB, place the needlepoint of the compass on any point D on AB and strike arc CE. Shift the needlepoint to E, maintaining the same radius, and strike arc DF. Set a compass to a chord of arc CE and lay off the chord DF from D, thus locating point F. The line running through F and C is parallel to AB. Figure 5-2 shows another method of drawing one line parallel to another. Use this method when you need to draw the second line at a given distance from the first. To draw a line parallel to AB at a distance from AB equal to CD, set a compass to the length of CD, and, from any points E and F on AB, strike two arcs. A line A’B’ drawn tangent to (barely touching) the arcs is parallel to AB, and located CD distance from AB. Figure 5-1 – Drawing a line through a given point, parallel to another line. Figure 5-2 – Drawing a line through a given point, parallel to another line.  5-4 In the preceding lesson, you learned how to draw a line perpendicular to another by using a straightedge and a triangle. Two other methods of solving this problem are explained below. Figure 5-3 shows a method of dropping a perpendicular from a given point to a line, using a compass. To drop a perpendicular from point P to AB, set the needlepoint of the compass at P and strike an arc intersecting AB at C and D. With C and D as centers and any radius larger than one-half of CD, strike arcs intersecting at E. A line from P through E is perpendicular to AB. Figure 5-4 shows a method of erecting a perpendicular from a given point on a line. To erect a perpendicular from point P on AB, set a compass to any convenient radius, and, with P as a center, strike arcs intersecting AB at C and D. With C and D as centers and any radius larger than one-half of CD, strike arcs intersecting at E. A line from P through E is perpendicular to AB.

1.1.0 Bisection of a Line

You can bisect a line by trial and error with dividers; that is, by setting the dividers to various spreads until you find one that correctly measures one-half the length of the line. Figure 5-5 shows the geometric construction for bisecting a line. To bisect the line AB, use the ends of the line, A and B, as centers; set a compass to a radius greater than one-half the length of AB, and strike arcs intersecting at C and D. A line drawn from C through D bisects AB. Figure 5-3 – Dropping a perpendicular from a given point to a line. Figure 5-4 – Erecting a perpendicular from a given point on a line.  5-5

1.2.0 Division into Any Number of Parts

You can divide a line into more than two equal parts by trial and error with the divider. Figure 5-6 shows the geometric construction for dividing a line into any number of equal parts. To divide AB into 10 equal parts, draw a ray line CB from B at a convenient acute angle to AB. Set a compass to spread less than one-tenth of the length of CB, and lay off this interval 10 times from B on CB. Draw a line from the 10th interval to A, and project the other points of intersection from CB to AB by lines parallel to the first one. The projected points of intersection divide AB into 10 equal parts. Figure 5-6 – Dividing a line into any number of equal parts. Figure 5-5 – Bisecting a line.  5-6 Figure 5-7 shows how you can use a scale to lay off equal intervals on the ray line.

1.3.0 Division Into Proportional Parts

Figure 5-8 shows a method of dividing a line into given proportional parts. The problem here is to divide the line AB into parts that have proportions of 2:3:4. Lay off ray line CB from B at a convenient acute angle to AB. Set a compass to a convenient spread, and lay off this interval from B on CB the number of times that is equal to the sum of the figures in the proportion (2 + 3 + 4 = 9). Draw a line from the point of intersection of the last interval to A, and use a straightedge and triangle to project the second and fifth intercepts on CB to AB by lines parallel to the first one. The projected intercepts divide AB into segments that have proportions of 2:3:4. Here again, you could use a scale to lay off nine equal intervals on CB.

1.4.0 Division According to a Given Ratio

You may be required to divide a line into parts so that the ratio between the whole line and one of the parts is the same as that between two other lines. Figure 5-9 shows one method of doing this. In this case, you divide AB so that the ratio between AB and a part of AB is the same as the ratio between CD and EF. From A, draw a ray line AG at a Figure 5-7 – Using a scale to lay off equal intervals on a random line. Figure 5-8 – Dividing a line into proportional parts.  5-7 convenient acute angle from AB. On AG, lay off AH equal to EF and AI equal to CD. Draw a line from I to B, and use a straightedge and triangle to project H to J on a line parallel to IB. The ratio of AB to AJ is the same as that of CD to EF.

2.0.0 ANGLES

You already know how to lay off an angle of given size with a protractor, or trigonometrically by the use of the tangent or the chord method.

2.1.0 Transfer of an Angle

Using geometric construction, you can lay off an angle equal in size to one that is already drawn on another part of the same drawing or on a different drawing. Figure 5-10 shows this procedure, called transferring an angle. Here, the draftsman desired to lay off from O´ a line that would make an angle with B´O´ equal to angle BOA. Figure 5-10, View A shows the first step, drawing an arc through OB and OA, with O as a center. Figure 5-10, View B shows the second step, drawing an arc of the same radius from B´O´, with O´ as a center. Next, Figure 5-10, View C shows measuring the length of the chord of the arc between OB and OA and laying off the same length on the arc from B´O´. Figure 5- 10, View D shows a line drawn from O´ through A´, making an angle with B´O´ equal to angle BOA.

2.2.0 Bisection of an Angle

To bisect an angle means to divide it in half. If you know the size of the angle, you can bisect it by simply dividing the size by 2 and laying off the result with a protractor. Geometric construction for bisecting an angle is shown in Figure 5-11. To bisect the angle AOB, first lay off equal intervals from O on OA and OB. With the ends of these intervals as centers, strike intersecting arcs of equal radius at P. Draw a line from O through the point of intersection of the arcs, P. The line OP bisects angle AOB. Figure 5-10 – Transferring an angle. Figure 5-9 – Dividing a line into parts according to a given ratio.  5-8

3.0.0 PLANE FIGURES

This section explains how to construct certain plane figures, such as the triangle, rectangle, square, and regular polygon. You must understand the geometrical construction of plane figures because they appear in engineering drawings. 3.1.0 Triangle: Three Sides Given To draw a triangle with three sides given, first draw a straight line AB, equal in length to one of the given sides (Figure 5-12). With A as a center, strike an arc with a radius equal to the given length of the second side. With B as a center, strike an intersecting arc with a radius equal to the length of the third side. Draw lines from A and B to the point of intersection of the arcs. 3.2.0 Right Triangle: Hypotenuse and One Side Given Figure 5-13 shows a method of drawing a right triangle when the hypotenuse and one side are given. The line H is the given hypotenuse; the line S is the given side. Draw AB equal to H. Locate the center of AB (by bisection), and, with the midpoint as a center and a radius equal to one half of AB, draw the semicircle from A to B as shown. Set a compass or dividers to the length of S, and, with A as a center, strike an arc intersecting the semicircle at C. Draw AC and BC. Figure 5-12 – Constructing a triangle with three sides given. Figure 5-11 – Bisecting an angle.  5-9

3.3.0 Equilateral Triangle: Length of Side Given

To construct an equilateral triangle when the length of a side is given, follow the method previously described for constructing a triangle when the length of each side is given. The sides of an equilateral triangle are equal in length. Each angle in an equilateral triangle measures 60°. You can apply this fact in constructing an equilateral triangle with given length of side, such as the one shown in Figure 5-14. Simply use a 30°/60° triangle and a T square or straightedge to erect lines from A and B at 60° to AB. Figure 5-14 – Equilateral triangle with a given length of side AB. Figure 5-13 – Constructing a triangle with hypotenuse and one side given.  5-10

3.4.0 Equilateral Triangle in a Given Circumscribed Circle

A circumscribed plane figure is one that encloses another figure, the circumscribed figure being tangent to the extremities of the enclosed figure. An inscribed plane figure is one that is enclosed by a circumscribed figure. Figure 5-15 shows you how to inscribe an equilateral triangle within a given circumscribed circle. Draw a vertical center line intersecting the given circle at A and B. With B as a center and a radius equal to the radius of the circle, strike arcs intersecting the circle at C and D. Lines connecting A, C, and D form an equilateral triangle.

3.5.0 Equilateral Triangle on a Given Inscribed Circle

Figure 5-16 shows one method of circumscribing an equilateral triangle on a given inscribed circle. Draw AB parallel to the horizontal center line of the circle and tangent to the circumference. Then use a 30°/60° triangle to draw AC and BC at 60° to AB and tangent to the circle. Figure 5-15 – Equilateral triangle in a given circumscribed circle. Figure 5-16 – One method: Equilateral triangle on a given inscribed circle.  5-11 Figure 5-17 shows another method of accomplishing this construction. Draw radii at 30° to the horizontal center line of the circle, intersecting the circumference at C and B. There is a third point of intersection at A, so you now have three radii: OA, OB, and OC. Draw the sides of the triangle at A, B, and C, tangent to the circle and perpendicular to the relevant radius.

3.6.0 Rectangle: Given length and Width

To construct a rectangle with a given length and width, draw a horizontal line AB, equal to the given length. With a straightedge and triangle, erect perpendiculars from A and B, each equal to the given width. Connect the ends of the perpendiculars.

3.7.0 Square: Given Length of Side

You can construct a square with a given length of side by the method described for constructing a rectangle. Another method is shown in Figure 5-18. With a T square, draw horizontal line AB equal to the given length of side. With a T square and a 45° triangle, draw diagonals from A and B at 45° to AB. Erect perpendiculars from A and B, intersecting the diagonals, then connect the points of intersection. Figure 5-18 – Square with a given length of side. Figure 5-17 – Another method: Equilateral triangle on a given inscribed circle.  5-12

3.8.0 Square: Given Length of Diagonal

Figure 5-19 shows a method of constructing a square with a given length of diagonal. Draw horizontal line AB, equal to the given length of the diagonal. Locate O at the center of AB, and lay off CD through O, perpendicular to and slightly longer than AB. Use a T square and a 45° triangle to draw AF and EB at 45° to AB and CD, then connect AE and FB.

3.9.0 Square in a Given Circumscribed Circle

Figure 5-20 shows a method of drawing a square in a given circumscribed circle. Draw the diameters AB and CD at right angles to each other and connect the points where the diameters intersect the circumference of the circle. Figure 5-19 – Square with a given length of diagonal. Figure 5-20 – Square in a given circumscribed circle.  5-13

3.10.0 Square Circumscribed on a Given Inscribed Circle

Figure 5-21 shows a method of circumscribing a square on a given inscribed circle. Draw diameters AB and CD at right angles to each other. Then draw each side of the square tangent to the point where a diameter intersects the circumference of the circle and perpendicular to the diameter.

3.11.0 Any Regular Polygon in a Given Circumscribed Circle

You can construct any regular polygon in a given circumscribed circle by trial and error with a drafting compass or dividers as shown in Figure 5-22. To draw a nine-sided regular polygon in the circle shown, divide the circumference by trial and error with a compass or dividers into nine equal segments and connect the points of intersection. To get a trial spread for a compass or dividers, divide the central angle subtended by the entire circle (360) by the number of sides of the polygon, in this case, by nine. Then, lay off the central angle Figure 5-22 – Regular polygon in a given circumscribed circle. Figure 5-21 – Square on a given inscribed circle.  5-14 quotient from the center of the circle to the circumference with a protractor.

3.12.0 Any Regular Polygon on a Given Inscribed Circle

The same method (dividing the circumference into equal segments) can be used to construct a regular polygon on a given inscribed circle. In this case, however, instead of connecting the points of intersection on the circumference, draw each side tangent to the circumference and perpendicular to the radius at each point of intersection, as shown in Figure 5-23.

3.13.0 Any Regular Polygon with a Given Length of Side

Figure 5-24 shows a method of drawing any regular polygon with a given length of side. To draw a nine-sided regular polygon with length of side equal to AB, first extend AB to C, making CA equal to AB. With A as a center and AB (or CA) as a radius, draw a semicircle as shown. Divide the semicircle into nine equal segments from C to B, and draw radii from A to the points of intersection. The radius A2 is always the second side of the polygon. Draw a circle through points A, B, and D. To do this, first erect perpendicular bisectors from DA and AB. The point of intersection of the bisectors is the center of the circle. The circle is the circumscribed circle of the polygon. To draw the remaining sides, extend the radii from the semicircle as shown, and connect the points where they intersect the circumscribed circle. Besides the methods described for constructing any regular Figure 5-23 – Regular polygon on a given inscribed circle. Figure 5-24 – Any regular polygon with a given length of side.  5-15 polygon, there are particular methods for constructing a regular pentagon, hexagon, or octagon.

3.14.0 Regular Pentagon in a Given Circumscribed Circle

Figure 5-25 shows a method of constructing a regular pentagon in a given circumscribed circle. Draw a horizontal diameter AB and a vertical diameter CD. Locate E, the midpoint of the radius OB. Set a compass to the spread between E and C, and, with E as a center, strike the arc CF. Set a compass to the spread between C and F, and, with C as a center, strike the arc GF. A line from G to C forms one side of the pentagon. Set a compass to GC and lay off this interval from C around the circle. Connect the points of intersection.

3.15.0 Regular Pentagon on a Given Inscribed Circle

To construct a regular pentagon on a given inscribed circle, determine the five equal intervals on the circle in the same manner. However, instead of connecting these points, draw each side of the figure tangent to the circle at a point of intersection.

3.16.0 Regular Hexagon in a Given Circumscribed Circle

Many bolt heads and nuts are hexagonal (six-sided) in shape. Figure 5-26 shows a method of constructing a regular hexagon in a given circumscribed circle. The diameter of the circumscribed circle has the same length as the long diameter of the hexagon. The radius of the circumscribed circle (which equals onehalf the long diameter of the hexagon) is equal in length to the length of a side. Lay off the horizontal diameter AB and vertical diameter CD. OB is the radius of the circle. From C, draw a line CE equal to OB; then lay off this interval around the circle, and connect the points of intersection. Figure 5-27 shows another method of constructing a regular hexagon in a given circumscribed circle. Draw vertical diameter AB, and use a T square and a 30°/60° triangle to draw BC from B at 30° to the horizontal. Set a compass to BC, lay off this interval around the circumference, and connect the points of intersection. Figure 5-25 – Regular pentagon in a given circumscribed circle. Figure 5-26 – One method: Regular hexagon in a given circumscribed circle.  5-16

3.17.0 Regular Hexagon on a Given Inscribed Circle

Figure 5-28 shows a method of constructing a regular hexagon on a given inscribed circle. Draw horizontal diameter AB and vertical center line. Draw lines tangent to the circle and perpendicular to AB at A and B. Use a T square and a 30°/60° triangle to draw the remaining sides of the figure tangent to the circle and at 30° to the horizontal. Figure 5-28 – Regular hexagon on a given inscribed circle. Figure 5-27 – Another method: Regular hexagon in a given circumscribed circle.  5-17

3.18.0 Regular Octagon in a Given Circumscribed Circle

Figure 5-29 shows a method of constructing a regular octagon in a given circumscribed circle. Draw horizontal diameter AB and vertical diameter CD. Use a T square and a 45° triangle to draw additional diameters EF and GH at 45° to the horizontal. Connect the points where the diameters intersect the circle.

3.19.0 Regular Octagon Around a Given Inscribed Circle

Figure 5-30 shows a method of constructing a regular octagon around a given inscribed circle. Draw horizontal diameter AB and vertical diameter CD. Draw tangents at A, B, C, and D perpendicular to the diameters. Draw the remaining sides of the figure tangent to the circle at 45° to the horizontal.

4.0.0 CIRCULAR CURVES

Many of the common geometrical constructions occurring in the drafting room are those involving circular curves. This section explains how to construct circular curves that may be required to satisfy varying conditions. Figure 5-29 – Regular octagon in a given circumscribed circle. Figure 5-30 – Regular octagon around a given inscribed circle.  5-18

4.1.0 Circle Through Three Points

In Figure 5-31 the problem is to draw a circle (or a circular arc) that passes through points A, B, and C. Connect the points by lines and erect perpendicular bisectors as shown. The point of intersection of the perpendicular bisectors (O) is the center of the circle or arc passing through all three points.

4.2.0 Line Tangent to a Circle at a Given Point

A line that is tangent to a circle at a given point is perpendicular to the radius that intersects the point. It follows that one method of drawing a line tangent to a circle at a given point is to draw the radius that intersects the point and then draw the line tangent at the point of intersection and perpendicular to the radius. Another method is shown in Figure 5-32. To draw a line tangent to the circle at P, set a compass to the radius of the circle, and, with P as a center, strike an arc that intersects the circle at A. With the compass still set to the radius of the circle, use A as a center and strike an arc that intersects the first arc at B. With B as a center and the compass still set to the radius of the circle, strike another arc. A line through the point of intersection (0) of the last drawn arc and through P is tangent to the circle at P. Figure 5-32 – Line tangent to a given point on a circle. Figure 5-31 – Circle or arc through three points.  5-19

4.3.0 Circular Arc of a Given Radius Tangent to Two Straight Lines

Drawing a fillet or round presents the problem of drawing a circular arc of a given radius tangent to two nonparallel lines. Figure 5-33 shows a method that can be used when the two nonparallel lines form a right angle. AB is the given radius of the arc. Set a compass to this radius, and, with the point of intersection of the lines as a center, strike an arc intersecting the lines at C and D. With C and D as centers and the same radius, strike intersecting arcs as shown. The point of intersection of these arcs (0) is the center of the circle of which an arc of the given radius is tangent to the lines. Figure 5-34 shows a method that can be used regardless of the size of the angle formed by the lines. Again AB equals the given radius of the arc, and the problem is to draw an arc with radius equal to AB, tangent to CD and EF. Draw GH parallel to CD and at a distance from CD equal to the given radius of the arc. Draw IJ parallel to EF and also at a distance equal to the given radius of the arc. The point of intersection between GH and IJ (P) is the center of the circle of which an arc of the given radius is tangent to CD and EF. Figure 5-34 – Circular arc tangent to two lines that form any angle. Figure 5-33 – Circular arc tangent to two lines that form a right angle.  5-20

4.4.0 Circular Arc of a Given Radius Tangent to a Straight Line and to Another Circular Arc

The problem in Figure 5-35 is to draw a circular arc with a radius equal to AB, tangent to the circular arc CD and to the straight line EF. Set a compass to a radius equal to the radius of the circular arc CD plus the given radius AB (which is indicated by the dashed line shown), and, with O as a center, strike the arc GH. Draw a line IJ parallel to EF at a distance from EF equal to AB. The point of intersection (P) between GH and IJ is the center of the circle of which an arc of the given radius is tangent to CD and EF. Figure 5-35 – Circular arc tangent to a straight line and another circular arc.  5-21

4.5.0 Circular Arc of a Given Radius Tangent to Two Other Circular Arcs

The problem in Figure 5-36 is to draw an arc with a radius equal to AB, tangent to the circular arcs CD and EF. Set a compass to a spread equal to the radius of arc CD plus AB (indicated by the left-hand dashed line), and, with O as a center, strike an arc. Set the compass to a spread equal to the radius of arc EF plus AB (indicated by the righthand dashed line), and, with O´ as a center, strike an intersecting arc. The point of intersection between the two arcs (P) is the center of the circle of which an arc of given radius is tangent to arcs CD and EF. In Figure 5-36 the circular arcs CD and EF curve in opposite directions. In Figure 5-37 the problem is to draw an arc with radius equal to AB, tangent to two circular arcs, CD and EF, that curve in the same direction. Set a compass to a radius equal to the radius of EF less AB, and, with O´ as a center, strike an arc. Then, set a compass to a radius equal to the radius of arc CD plus line AB, and, with O as center, strike an intersecting arc at P. The point of intersection of these two arcs is the center of the circle of which an arc of the given radius is tangent to CD and EF. When one circular arc is tangent to another, the two arcs usually curve in opposite directions. However, an arc may be drawn tangent to another with both curving in the same direction. In a case of this kind, the tangent arc is said to enclose the other. An arc tangent to two others may enclose both, or it may enclose only one and not the other. In Figure 5-38 the problem Figure 5-36 – Circular arc tangent to two other circular arcs. Figure 5-37 – Circular arc tangent to arcs that curve in the same direction.  5-22 is to draw a circular arc with a radius equal to AB, tangent to and enclosing both arcs CD and EF. Set a compass to a radius equal to AB less the radius of CD (indicated by the dashed line from O), and, with O as a center, strike an arc. Set the compass to a radius equal to AB less the radius of EF (indicated by the dashed line from O´), and, with O´ as a center, strike an intersecting arc at P. The point of intersection of these two arcs is the center of a circle of which an arc of given radius is tangent to, and encloses, both arcs CD and EF. In Figure 5-39 the problem is to draw a circular arc with a radius equal to AB, tangent to, and enclosing, CD, and tangent to, but NOT enclosing, EF. Set a compass to a radius equal to AB less the radius of arc CD (indicated by the dashed line from 0), and, with O as a center, strike an arc, Set the compass to AB plus the radius of EF (as indicated by the dashed line from O´), and, with O´ as a center, strike an intersecting arc at P. The point of intersection of the two arcs is the center of a circle of which an arc of the given radius is tangent to and encloses arc CD and also is tangent to, but does not enclose, arc EF. Figure 5-39 – Circular arc tangent to and enclosing one arc and tangent to, but not enclosing, another arc. Figure 5-38 – Circular arc tangent to and enclosing two other circular arcs.  5-23

4.6.0 Compound Curves

A compound curve is a curve that is made up of a series of successive tangent circular arcs. In Figure 5-40 the problem is to construct a compound curve passing through given points A, B, C, D, and E. First, connect the points by straight lines. The straight line between each pair of points constitutes the chord of the arc through the points. Erect a perpendicular bisector from AB. Select an appropriate point O1 on the bisector as a center, and draw the arc AB. From O1, draw the radius O1B. From BC, erect a perpendicular bisector. The point of intersection O2 between this bisector and the radius O1B is the center for the arc BC. Draw the radius O2C, and erect a perpendicular bisector from CD. The point of intersection O3 of this bisector and the extension of O2C is the center for the arc CD. To continue the curve from D to E, you must reverse the direction of curvature. Draw the radius O3D, and erect a perpendicular bisector from DE on the opposite side of the curve from those previously erected. The point of intersection of this bisector and the extension of O3D is the center of the arc DE.

4.7.0 Reverse, or Ogee, Curve

A reverse, or ogee, curve is composed of two consecutive tangent circular arcs that curve in opposite directions. Figure 5-41 shows a method of connecting two parallel lines by a reverse curve tangent to the lines. The problem is to construct a reverse curve tangent to the upper line at A and to the lower line at B. Figure 5-40 – Curve composed of a series of consecutive tangent circular arcs.  5-24 Connect A and B by a straight line AB. Select point C on AB where you want to have the reverse curve change direction. Erect perpendicular bisectors from BC and CA, and erect perpendiculars from B and A. The points of intersection between the perpendiculars and are the centers for the arcs BC and CA. Figure 5-42 shows a method of constructing a reverse curve tangent to three intersecting straight lines. The problem is to draw a reverse curve tangent to the three lines that intersect at points A and B. Select point C on AB where you want the reverse curve to change direction. Lay off from A a distance equal to AC to establish point D. Erect a perpendicular from D and another from C. The point of intersection of these perpendiculars is the center of the arc DC. Lay off from B a distance equal to CB to establish point E. Erect a perpendicular from E, and extend to intersect it. The point of intersection is the center of the arc CE.

5.0.0 NONCIRCULAR CURVES

The basic uniform noncircular curves are the ellipse, the parabola, and the hyperbola. These curves are derived from conic sections as shown in Figure 5-43. The circle itself (not shown, but a curve formed by a plane passed through a cone perpendicular to the vertical axis) is also derived from a conic section. Figure 5-41 – Reverse curve connecting and tangent to two parallel lines. Figure 5-42 – Reverse curve tangent to three intersecting straight lines.  5-25 This section describes methods of constructing the ellipse only. Methods of constructing the hyperbola are given in Engineering Drawing by French and Vierck and in Architectural Graphic Standards. Of the many different ways to construct an ellipse, the three most common are the pinand-string method, the fourcenter method, and the concentric-circle method. The method you should use will depend on the size of the ellipse and where you will use it.

5.1.0 Ellipse by Pin-And-String Method

The dimensions of an ellipse are given in terms of the lengths of the major (longer) and minor (shorter) axes. Figure 5-44 shows a method called the pin-and-string method of constructing an ellipse. The problem is to construct an ellipse with a major axis, AB, and a minor axis, CD. Set a compass to one-half the length of AB, and, with C as a center, strike arcs intersecting AB at F and F’. The points F and F’ are called the foci of ellipse. Set a pin at point C, another at F, and a third at F’. Tie the end of a piece of string to the pin at F, pass the string around the pin at C, draw it taut, and fasten it to the pin at F’. Remove the pin at C, place the pencil point in the bight of the string, and draw the ellipse as shown in view C, keeping the string taut all the way around. Figure 5-43 – Conic sections: ellipse, parabola, and hyperbola (left to right). Figure 5-44 – Ellipse by pin-and-string method.  5-26

5.2.0 Ellipse by Four-Center Method

The four-center method is used for small ellipses. Given major axis, AB, and minor axis, CD, mutually perpendicular at their midpoint, O, as shown in Figure 5-45, draw AD, connecting the end points of the two axes. With the dividers set to DO, measure DO along AO and reset the dividers on the remaining distance to O. With the difference of semiaxes thus set on the dividers, mark off DE equal to AO minus DO. Draw perpendicular bisector AE, and extend it to intersect the major axis at K and the minor axis extended at H. With the dividers, mark off OM equal to OK, and OL equal to OH. With H as a center and radius R1 equal to HD, draw the bottom arc. With L as a center and the same radius as R1, draw the top arc. With M as a center and the radius R2 equal to MB draw the end arc. With K as a center and the same radius, R2, draw the end arc. The four circular arcs thus drawn meet, in common points of tangency, P, at the ends of their radii in their lines of centers.

5.3.0 Ellipse by Concentric-Circle Method

Figure 5-46 shows the concentric-circle method of drawing an ellipse. With the point of intersection between the axes as a center, draw two concentric circles (circles with a common center), one with a diameter equal to the major axis and the other with a diameter equal to the minor axis, as shown in Figure 5-46, View A. Draw a number of diameters as shown in Figure 5-46, View B. From the point of intersection of each diameter with the larger circle, draw a vertical line; and from the Figure 5-45 – Ellipse by four-center method. Figure 5-46 – Ellipse by Concentric-Circle Method.  5-27 point of intersection of each diameter with the smaller circle, draw an intersecting horizontal line, as shown in Figure 5-46, View C. Use a French curve to draw the ellipse through the points of intersection, as shown in Figure 5-46, View D.

Summary

 As an engineering technician in the field, you may not have access to a computer and drafting software. You should know basic geometric construction principles and how to apply them to create accurate drawings by hand.

Review Questions

  1. To __________ line AB, use the ends of the line, A and B, as centers; set a compass to a radius greater than one-half the length of AB; and strike arcs above and below line AB, intersecting at C and D. Draw a line from C to D. A. create a line parallel to B. bisect C. create a line tangent to D. create a line skewed to 2. You can divide a line into more than two equal parts by trial and error with a __________. A. triangle B. protractor C. divider D. piece of string 3. The figure above shows _________. A. dividing a line into proportional parts B. bisecting a line C. creating a line perpendicular to another line D. creating a line parallel to another line  5-29 4. The figure to the right shows _________. A. dividing a line into parts so that the ratio between the whole line and one of the parts is the same as that between two other lines. B. dividing a line into proportional parts perpendicular to C. another line creating a line D. creating a line parallel to another line 5. Using geometric construction, you can lay off an angle equal in size to one that is already drawn on another part of the same drawing or on a different drawing; this is called __________. A. division according to a given ratio B. bisecting an angle C. bisecting a line D. transferring an angle. 6. If you know the size of an angle, you can __________ it simply by dividing the size by 2 and laying off the result with a protractor. A. bisect B. transfer C. circumscribe D. inscribe  5-30 7. The figure to the right shows _________. A. constructing an equilateral triangle with a given length of side AB B. constructing a triangle with hypotenuse and one side given C. constructing a triangle with three sides given D. constructing equilateral triangle in a given circumscribed circle 8. The figure below shows _________. A. constructing an equilateral triangle with a given length of side AB B. constructing a triangle with hypotenuse and one side given C. constructing a triangle with three sides given D. constructing equilateral triangle in a given circumscribed circle  5-31 9. Each angle in an equilateral triangle measures ___________ degrees. A. 180 B. 45 C. 90 D. 60 10. A(n) __________ plane figure is one that encloses another figure and is tangent to the extremities of the enclosed figure. A. inscribed B. circumscribed C. ogee D. compound 11. A(n) __________ plane figure is one that is enclosed by a circumscribed figure. A. inscribed B. circumscribed C. ogee D. compound 12. The figure below shows _________. A. constructing an equilateral triangle with a given length of side AB B. constructing a triangle with hypotenuse and one side given C. constructing an equilateral triangle on a given inscribed triangle D. constructing equilateral triangle in a given circumscribed circle  5-32 13. To construct a __________ with a given length and width, draw a horizontal line AB, equal to the given length. With a straightedge and triangle, erect perpendiculars from A and B, each equal to the given width. Connect the ends of the perpendiculars. A. octagon B. pentagon C. rectangle D. hexagon 14. The figure to the right shows _________. A. drawing a square with a given length of side B. drawing a octagon with a given length of side C. drawing a regular pentagon with a given length of side D. drawing a regular hexagon with a given length of side 15. The figure to the right shows _________. A. drawing a square with a given length of side B. drawing a octagon with a given length of side C. drawing a square with a given length of diagonal D. drawing a regular hexagon with a given length of side  5-33 16. The figure to the right shows _________. A. drawing a square around a given inscribed circle B. drawing a square in a given circumscribed circle C. drawing a regular pentagon on a given inscribed circle D. drawing a regular pentagon in a given circumscribed circle 17. The figure above shows _________. A. drawing a square around a given inscribed circle B. drawing a square in a given circumscribed circle C. drawing a regular pentagon on a given inscribed circle D. drawing a regular pentagon in a given circumscribed circle  5-34 18. The figure to the right shows _________. A. drawing a square with a given length of side B. drawing a octagon with a given length of side C. drawing a regular polygon on a given inscribed circle D. drawing a regular polygon in a given circumscribed circle 19. The figure to the right shows _________. A. drawing a square with a given length of side B. drawing a octagon with a given length of side C. drawing a regular polygon on a given inscribed circle D. drawing a regular polygon in a given circumscribed circle  5-35 20. The figure to the right shows _________. A. drawing a square with a given length of side B. drawing any regular polygon with a given length of side C. drawing a regular polygon on a given inscribed circle D. drawing a regular polygon in a given circumscribed circle 21. The figure to the right shows _________. A. drawing a regular octagon around a given inscribed circle B. drawing a regular octagon in a given circumscribed circle C. drawing a regular pentagon on a given inscribed circle D. drawing a regular pentagon in a given circumscribed circle  5-36 22. The figure to the right shows _________. A. drawing a regular octagon around a given inscribed circle B. drawing a regular octagon in a given circumscribed circle C. drawing a regular hexagon on a given inscribed circle D. drawing a regular hexagon in a given circumscribed circle 23. The figure to the right shows _________. A. drawing a regular octagon around a given inscribed circle B. drawing a regular octagon in a given circumscribed circle C. drawing a regular hexagon on a given inscribed circle D. drawing a regular hexagon in a given circumscribed circle  5-37 24. The figure to the right shows _________. A. drawing a regular octagon around a given inscribed circle B. drawing a regular octagon in a given circumscribed circle C. drawing a regular hexagon on a given inscribed circle D. drawing a regular hexagon in a given circumscribed circle 25. The figure to the right shows _________. A. drawing a regular octagon around a given inscribed circle B. drawing a regular octagon in a given circumscribed circle C. drawing a regular hexagon on a given inscribed circle D. drawing a regular hexagon in a given circumscribed circle  5-38 26. The figure to the right shows _________. A. drawing a circular arc tangent to a straight line and another circular arc B. drawing a circle or arc through three points C. drawing a line tangent to a given point on a circle D. drawing a curve composed of a series of consecutive tangent circular arcs 27. A line that is tangent to a circle at a given point is __________ to the radius that intersects the point. A. skewed B. curved C. parallel D. perpendicular 28. The figure to the right shows _________. A. drawing a circular arc tangent to a straight line and another circular arc B. drawing a circular arc tangent to and enclosing two other circular arcs C. drawing a circular arc tangent to two lines that form a right angle D. drawing a curve composed of a series of consecutive tangent circular arcs  5-39 29. The figure to the right shows _________. A. drawing a circular arc tangent to a straight line and another circular arc B. drawing a circular arc tangent to and enclosing two other circular arcs C. drawing a circular arc tangent to and enclosing one arc and tangent to, but enclosing, another arc D. drawing a curve composed of a series of consecutive tangent circular arcs 30. The figure to the right shows _________. A. drawing a reverse curve connecting and tangent to two parallel lines B. drawing a circular arc tangent to and enclosing two other circular arcs C. drawing a circular arc tangent to and enclosing one arc and tangent to, but not enclosing another arc D. drawing a curve composed of a series of consecutive tangent circular arcs  5-40 31. A curve that is made up of a series of successive tangent circular arcs is called a(n) __________ curve. A. ogee B. elliptical C. circumscribed D. compound 32. A(n) __________ curve is composed to two consecutive tangent circular arcs that curve in opposite directions. A. ogee B. elliptical C. circumscribed D. compound 33. The basic uniform __________ are the ellipse, the parabola, and the hyperbola. A. lines B. polygons C. noncircular curves D. circular curves 34. The figure above shows __________. A. drawing an ellipse freehand B. drawing an ellipse by pin-and-string method C. drawing an ellipse by four-center method D. drawing an ellipse by concentric-circle method 35. The four-center method is used to draw __________. A. concentric circles B. small ellipses C. parallel lines D. perpendicular lines  5-41 36. The figure to the right shows __________. A. drawing an ellipse freehand B. drawing an ellipse by pin-and-string method C. drawing an ellipse by fourcenter method D. drawing an ellipse by concentric-circle method  

 

Chapter 6 Drafting: Projections and Sketching

This lesson deals with projection theory and methods of preparing projection drawings. You should be able to clearly represent any given object or structure on paper by applying basic geometric construction to the various projection methods. Although the methods discussed here are basic to all drawings, you can easily adapt them for construction drawings. This lesson also covers various techniques of freehand sketching. You will learn how to prepare quick sketches to convey or develop your ideas. Every object or structure you draw has length, width, and depth, regardless of its size. Your goal, however, is to draw the object or structure on paper, which is a flat two-dimensional plane. To show the three dimensions by lines alone, you must use either a system of related views or a single pictorial projection. You must be able to show clearly the shape of the object, give the exact size of each part, and provide necessary information for constructing the object. In theory, projection is done by extending lines of sight (called projection lines) from the eye of the observer, through lines and points of an object being viewed, to the plane of projection.

When you have completed this lesson, you will be able to:

1. Describe the different types of parallel projection.
2. Describe the different types of perspective projection and perspective drawing.
3. Describe the different techniques used in sketching.

Contents

1.0.0 Parallel Projection

2.0.0 Perspective Projection and Perspective Drawing

3.0.0 Sketching

Summary

Review Questions


 

1.0.0 PARALLEL PROJECTION

To satisfy requirements for preparing single or multi-view drawings, there are two main types of projection: parallel and perspective (Figure 6-1). Parallel projection (Figure 6- 2) is further classified into subtypes according to the direction of its projection lines relative to the plane of projection. If the projection lines are not only parallel to each other but are also perpendicular (normal) to the plane of projection, the result is an orthographic projection. If they are parallel to each other but oblique to the plane of projection, the result is an oblique projection. To better understand the theory of projection, you must become familiar with certain elements common to each type of projection. Some of these elements are defined below. The point of sight (or station point) is the position of the observer in relation to the object and the plane of projection (Figure 6-2). It is from this observation point that the view of the object is taken. Since changing the point of view gives different views of the same object, there must be a different point of sight for each view. Imagine yourself looking first at the front of an object, then down at the top, and then at the right or left side, as the case may be. Each additional view requires a new point of sight. Figure 6-1 − Classification of major projections.  6-4 The observer views the features of the object through an imaginary plane of projection (or image plane). In parallel projection, you place this theoretical transparent plane between the point of sight and the object, as shown in Figure 6-2. For perspective pictorials, you normally place the image plane between the point of sight and the object. For the purpose of studying any type of projection, assume the planes of projection are in fixed positions. Once you place the object in a definite imagined position, never change it. If you want a different view of the object, change the location of the point of sight. The projection lines (or lines of sight) are the imaginary lines from the eye of the viewer (point of sight) to points on the object (Figure 6-2). By the use of projection lines, points on the object are projected on the image plane. These points are the points at which the projection lines appear to pierce the image plane. By the projection of the prominent points, lines, and surfaces of an object, a complete view of that object can be projected on the plane of projection. The following sections will discuss the relationship between the point of sight (station point), the plane of projection (image plane), the projection lines (lines of sight), and the manner in which to use them for each individual type of projection.

1.1.0 Orthographic Projection

When called upon to draw a three-dimensional object or figure, you are expected to represent the parts and forms on the flat plane of the drafting paper so that all features are shown in their true dimensions and in their true relationship with other features on that part of the object. To do this, you must draw a number of views of the object from different angles. Orthographic projection consists of projecting these essential views into a single plane. The term orthographic is derived from the word orthos meaning perpendicular or right-angular. Figure 6-2 − Types of projections.

1.1.1 Multi-View Projection

When you view an object through a plane of projection from a point at infinity, you obtain an accurate outline of the visible face of the object (Figure 6-3). However, the projection of one face usually will not provide an overall description of the object; you must use other planes of projection. Establishing an object’s true height, width, and depth requires front, top, and side views, which are called the principal planes of projection. Figure 6-4 shows the three principal (or primary) planes of projection, known as the vertical, horizontal, and profile planes. The angles formed between the horizontal and the vertical planes are called the first, second, third, and fourth angles, as indicated in the figure. Currently, however, for technical reasons, only the use of firstand third-angle projection is practical. Figure 6-3 − Basic orthographic projection.

1.1.1.1 First-Angle Projection

Figure 6-5 is a fine example of first-angle projection using a cube. The front of the cube is facing toward the vertical plane of projection. As you can see, you get a front view on the vertical plane, a left side view on the profile plane, and a top view on the horizontal plane. Now, to put these views on a sheet of drafting paper, put them all into the same plane. Presume that the vertical plane of projection is already in the plane of the paper. To get the other two views into the same plane, rotate the profile plane counterclockwise and the horizontal plane clockwise. The projection now appears as shown in Figure 6-6. Figure 6-4 − Primary (principal) planes of projections. Figure 6-5 − Example of a firstangle projection. Figure 6-6 − First-angle projection brought into a single plane.  6-7 In common European drafting practice, this first-angle projection arrangement of views is considered satisfactory. In the United States, it is considered illogical because the top view is below the front view; because the right side of the object, as shown in the front view, is toward the left side view of the object; and because the bottom of the object, as shown in the front view, is toward the top view of the object. For these and other reasons, first-angle projection is not commonly used in the United States.

1.1.1.2 Third-Angle Projection

Figure 6-7 shows a third-angle projection of a cube. As you can see, you get a front view on the vertical plane, a top view on the horizontal plane, and a right side view on the profile plane. Assume that the vertical plane is already in the plane of your drawing paper. To get the other two views onto the same plane, rotate them both clockwise. Figure 6-8 shows a third-angle projection of an object brought into a single plane. The top view is above the front view; the right side of the object, as shown in the front view, is toward the right side view; and the top, as shown in the front view, is toward the top view. Figure 6-9 shows the basic principles of the method used to make the projection shown in Figure 6-8. Draw a horizontal line AB and a vertical line CD, intersecting at O. AB represents the joint between the horizontal and the vertical plane; CD represents the joint between these two and the profile plane. You could draw any of the three views first and the other two projected from it. Assume that the front view is drawn first on the basis of given dimensions of the front face. Draw the front view, and project it upward with vertical projection lines to draw the top view. Project the top view to CD with horizontal projection lines. With O as a center, use a compass to extend these projection lines to AB. Draw the right side view by extending the projection lines from AB vertically downward and by projecting the right side of the front view horizontally to the right. Figure 6-7 − Example of a third-angle projection.  6-8 Figure 6- 9 − Method of making a third-angle projection. Figure 6-8 − A third-angle projection brought into a single plane. 

1.1.1.3 Use of a Miter Line

Using a miter line (Figure 6-10), you can lay out a third view while you are in the process of drawing two other views. Place the miter line (Figure 6-10, View B) to the right of the top view at a convenient distance, keeping the appearance of a balanced drawing. Draw light projection lines from the top view to the miter line (Figure 6-10, View C), then vertically downward (Figure 6-10, View D). Using the front view, draw horizontal projection lines (Figure 6-10, View E) to the right, intersecting the vertical projection lines. This process results in the outline and placement of the right side view (Figure 6-10, View F). Some engineering techs prefer to extend the top view projection lines to the right side view.

1.1.1.4 Arrangement of Views

You should arrange the six principal views of an object drawn in a third-angle projection in accordance with the American standard arrangement of views. This arrangement (practiced since the late 1800s) depicts the relative position of the six principal views and their relationship to each other on a drafting plane. As shown in Figure 6-11, all views (except the front view) are rotated toward the observer as though they are hinged. REMEMBER, the front view always lies in the plane of the drafting surface and does not require any rotation. Notice that the front, right side, left side, and rear views line up in direct horizontal projection. Figure 6-10 − A third-angle projection brought into a single plane.  6-10 Use the minimum number of views necessary to show an item. The three principal views are top, front, and right-side. Project and draw the top view (also called a “plan” in architectural drawings) on an image plane above the front view of the object. The front view (elevation) should show the most characteristic shape of the object or its most natural appearance when observed in its permanent or fixed position. Place the rightside view (elevation) at a right angle to the front and top views, making all the views mutually perpendicular. Figure 6-11 − A third-angle projection brought into a single plane. 

1.1.1.5 Spacing of Views

Space the views as necessary on the paper to give the appearance of a balanced drawing. Figure 6-12, View A shows an easy way to locate horizontally aligned views on a standard size drawing sheet. With a compass or scale, lay off the length plus the width of the object (A + B) from one end of the horizontal margin. Divide the remaining distance, C, into three equal parts (C/3). The result will be the approximate distance from either view to the vertical margin. The two views should be equidistant from the vertical margin. Adjust the spacing between views so that the apparent area is close to the apparent area between either view and the vertical margin. Basically, the shape of the object will determine the space between views. Generally, the distance from the views to the vertical margins and the distance between views (X) will be approximately equal. To locate the views vertically on the paper, lay off the depth of the object (D) on the vertical margin. Divide the remaining distance (E) into two equal parts (E/2). This will be the approximate distance from the top or bottom of the view to the horizontal margins. Figure 6-12, View B shows how the same method also applies to vertically aligned views on a standard size drawing sheet. Figure 6-13 shows the proper spacing of a three-view drawing. As you can see, the same principle is applied as in spacing a two-view drawing. Distances are again equal as indicated, with distance B equal to, or slightly less than, distance A, and distance D equal to, or slightly less than, distance C. Figure 6-12 − Proper spacing of views. Figure 6-13 − Proper spacing of views on a three-view projection.  6-12 While the spacing of views in Figure 6-13 is technically correct, the drawing appears unbalanced because of the large empty space in the upper right corner and the right side view crowding the title block. If the drawing will contain a sizeable bill of materials in the upper right corner, this spacing will be satisfactory. If not, it should be improved, if possible. If the object allows an arbitrary choice in designating the surfaces as top, front, and so on, you can improve the spacing by changing the designation shown in Figure 6-13 and projecting the object as shown in Figure 6-14. The surface appearing as the top in Figure 6-13 is now called the front; it follows that the surface which appears as the front in Figure 6-13 appears as the bottom in Figure 6-14. Again the right side view appears, but it now appears in the upper, rather than the lower, right corner and vertically rather than horizontally. Spacing views in a drawing of a circular object is like spacing letters; try to equalize the areas of the spaces around and between the views. Figure 6-15 shows properly spaced two-view drawings of a perforated disk. For the views that are horizontally in line, locate the horizontal center line midway between the horizontal margins; for the views that are vertically in line, locate it midway between the vertical margins. The other spacing is as indicated. To determine the lengths of distances A and 2/3 A, set a compass to the diameter plus the thickness of the disk, and lay off this distance on the margin. Then divide the remaining segment of the margin into three intervals, two of them being equal, and the third one being 1 1/2 times as long as each of the others. Figure 6-14 − Improved spacing for threeview projection of object shown in Figure 6- Figure 6-15 − Spacing of views of a circular object.

1.1.1.6 View Analysis

In order to analyze a multi-view projection, you must be able to determine what each line in a particular view represents. Remember, in a third-angle projection, always presume the plane of projection is between the object and the observer, regardless of which view you are considering. In a third-angle projection, each view of an object’s surface is depicted as it would appear to an observer looking directly at it. Figure 6-16 shows a six-view, multi-view, third-angle projection of the block shown in a single-view projection in the upper left corner of the figure. You should not have any trouble analyzing the front view; you know that the top is up, the bottom is down, the left side is to the left, and the right side is to the right. In the top and bottom views, it’s easy to see that the right-hand vertical line represents the right side and the left-hand vertical line, the left side. But you might have to think a minute to realize that the upper horizontal line in the top view represents the back face of the block, while the upper horizontal line in the bottom view represents the front face of the block. Note, also, that a line appears as a visible line in the top view and as a hidden line in the bottom view. Figure 6-16 − Multi-view analysis of a third-angle orthographic projection.  6-14 In the right side and left side views, you can readily see that the upper horizontal line represents the top of the block and the lower horizontal line, the bottom. But you may have to think a minute to realize that the left-hand vertical line in the right side view represents the front face of the block, while the left-hand vertical line in the left side view represents the back face. Again, there is a line that appears as a visible line in the right side view and as a hidden line in the left side view. The back view shows the block reversed, so that the cutaway part, which appears to the right in the front view, appears to the left in the back view. Similarly, the right-hand vertical line in the front view represents the right side of the block, while the right-hand vertical line in the back view represents the left side. Note that in the top, bottom, and side views, the line that represents the front face of the block faces toward the front view of the block. Similarly, in the back view, the line that represents the left side faces toward the left side view of the block. This applies to third-angle projection only. A point that constitutes a corner on an object is sometimes numbered for purposes of identification in various views of the object. Figure 6-17 shows how a corner point number may be visible or hidden in a particular view of an object. In the upper left corner of the figure, an oblique projection of a block has a corner numbered 2. You can see that this corner is visible in top, back, and left side views, but hidden in bottom, front, and right side views. The rule for numbering is that for a hidden corner point, place the number within the outline, and for a visible corner point, outside the outline. You can see how the rule has been followed in Figure 6-17. A multi-view projection should contain only as many views as required to describe the object fully. If you refer back to Figure 6-16, you can see at once that the back view does not convey any information that is not available in the front view; the back view is therefore superfluous and should be omitted. The same applies to the bottom view; the top view already conveys the same information. Likewise, the left side view does not convey any information not available in the right side view. Figure 6-17 − Procedure for numbering hidden and visible corner points.  6-15 You have the choice of omitting either the top or bottom view and either the right side or left side view. Some general rules to consider: a top view is preferable to a bottom view and a right side view, to a left side view. Also, a view with a visible line is preferable to a view with the same line shown as a hidden line. Both rules apply here to eliminate the bottom and the left side views. All you need here is a three-view projection showing the top, front, and right side views. Sometimes you only require a two-view projection. The view at the top of Figure 6-18 shows a single-view projection of an object. A top view of this object tells you everything you need to know except the thickness; a right side view tells you everything you need to know except the length, and a front view tells you everything you need to know except the width. Select a particular view and couple it with another view that gives you the dimension missing in the first view. The object shown in A, B, and C has three possible two-dimensional projections. In selecting one of these three, everything else being equal, the balance of the drawing would be the deciding factor. Either A or B appears better balanced than C, and between A and B, A would look better on a long oblong sheet of paper, and B, better on a shorter oblong sheet. The object shown in Figure 6-18 has a definitely designated top and front; it follows that the right and left sides are also definitely designated. This is the case with many objects; you have no choice, for example, with regard to the top, bottom, front, and back of a house. Many objects, however, have no definite top, bottom, front, or back as many types of machine parts, for example. With an object of this kind, you can select a surface and call it the front, and select another and call it the top, according to convenience. As a general rule, you should show an object in the position it customarily occupies. You can use one-view drawings for objects which can be completely defined with one view and dimensions or notes of features, such as thickness or length. Figure 6-18 − Two-view multi-view projections.

1.1.1.7 Normal and Non-Normal Lines

In a multi-view orthographic projection, a normal line is parallel to two of the planes of projection and perpendicular to the third. A line that is parallel to a plane of projection will appear on that plane in its true length (to the scale of the drawing). A line that is perpendicular to a plane of projection will appear on that plane as a point. A line that is perpendicular to one plane of projection must of necessity be parallel to the other two. But a line that is parallel to one plane of projection may be oblique (neither parallel nor perpendicular) to one or both of the others. A line that is oblique to one or more of the planes of projection is called a non-normal line. If a non-normal line is parallel to a plane of projection, it will appear on that plane in its true length. However, it will appear foreshortened in a view on a plane to which it is oblique. A non-normal line may, of course, be oblique to all three planes of projection, in which case it will appear foreshortened in all regular views of the object. A regular view is a view on one of the three regular planes of projection (horizontal, vertical, or profile). Views on planes other than the regular planes are called auxiliary views. Auxiliary views will be discussed later in this lesson. The upper left corner of Figure 6-19A shows a single-view projection of a block. This block is placed for multi-view projection with the front parallel to the vertical plane, the bottom parallel to the horizontal plane, and the right side parallel to the profile plane. The line AB, then, is parallel to the vertical plane, but oblique to both the horizontal and the profile planes. In the multi-view projections, you can see that it is only in the views on the vertical plane (the front and back views) that the line AB appears in its true length. In the views on the horizontal plane (top and bottom views) and in the views on the profile plane (right and left side views), the line appears foreshortened. Note, however, that you don’t need to calculate the amount of the foreshortening, since it works itself out as you project the various views. Figure 6-19 − Foreshortening of a line in a multi-view projection.

1.1.1.8 Circles in Multi-View Orthographic Projection

A circle on a surface parallel to the plane of projection will project as a circle. Figure 6- 20 shows that a circle on a surface oblique to the plane of projection will project as an ellipse. The upper view in this figure is a top view of a wedge; the wedge has a hole bored through it perpendicular to the inclined face. The outline of this hole on the front face of the wedge projects as an ellipse in the front view. You get the minor axis of the ellipse by projecting downward as shown. The length of the major axis is equal to the diameter of the hole. The front view shows another ellipse. This is the partly hidden and partly visible outline of the hole as it emerges through the back of the wedge. The back of the wedge is parallel to the front view plane of projection; therefore, this ellipse is the true outline of the hole on the back of the wedge. The outline is elliptical because the hole, though it is circular, is bored obliquely to the back face of the wedge. To draw these ellipses, use any of the methods of drawing an accurate ellipse covered in the previous lesson or use an ellipse template.

1.1.1.9 Auxiliary Views

In theory, there are only three regular planes of projection: the vertical, the horizontal, and the profile. Actually, presume that each of these views are doubled; there is, for example, one vertical plane for a front view and another for a back view. Assume, then, a total of six regular planes of projection. A projection on any one of the six is a regular view. A projection NOT on one of the regular six is an auxiliary view. The basic rule of dimensioning requires that you dimension a line only in the view in which its true length is projected and that you dimension a plane with its details only in the view in which its true shape is represented. To satisfy this rule, create an imaginary plane that is parallel with the line or surface we want to project in its true shape. A plane of this kind that is not one of the regular planes is called an auxiliary plane. Figure 6-20 − A circle on a surface oblique to the plan of projection projected as an ellipse.  6-18 In the upper left of Figure 6-21, the base of the single-view projection of a triangular block is a rectangle. Presume this block is placed for multi-view projection with the right side parallel to the profile plane. Draw the block using all six views of multi-view projection. Carefully examine Figure 6-21; the lines AB, AE, BD and BC and the surfaces ABC, ABE, and BDE are oblique to three regular planes of projection. The lines are foreshortened and the surfaces are not shown in their true shape in any of the six normal views. Figure 6-21 − A line oblique to all planes of projection is foreshortened in all views.  6-19 The first step in drawing any auxiliary view is to draw the object in normal multi-view projection, as shown in Figure 6-22. A minimum of two orthographic views is necessary. The space between these views is generally greater than normal. The reason for this will become apparent. Notice in the front view of Figure 6- 22, that A is the end point of line AE (top view) and C is the end point of CD. The second step is to decide which line or surface to show in an auxiliary view and which orthographic view it will be projected from. Consider the following facts when making this decision: 1. Always project front or rear auxiliary views from a side view. 2. Always project right or left auxiliary views from a front view. 3. Always project an elevation auxiliary view from the top view. The third step is to select the auxiliary and reference planes. The auxiliary plane is simply a plane parallel to the desired line or lines representing an edge view of the desired surface. In Figure 6-23, the goal is to depict the true length of line AB and the true shape of surface ABE. You need a left side auxiliary view. Draw the auxiliary plane parallel to line AB in the front view. Line AB actually represents an edge view of surface ABE. The reference plane (top view) represents an edge view of the orthographic view (front view) from which the auxiliary view will be projected. Therefore, when you want the front, rear, or side auxiliary views, the reference plane will always be in the top view. When you draw elevation auxiliary views, the reference plane may be in any view in which the top view is represented by a straight line. The reference plane in Figure 6-23 is the edge of the top view that represents the front view. Remember that although these planes are represented by lines, they are actually planes running perpendicular to the views. Step four is to project and locate the points describing the desired line or surface. Draw the projection lines from the orthographic view perpendicular to the auxiliary plane. By scaling or with a compass, take the distances from the reference plane. The distances are the perpendicular distances from the reference plane to the desired point. Figure 6- 23 shows the projection lines drawn from points A, B, and C in the front view, perpendicular to the auxiliary plane. The projection line from point A indicates the line on which point E will also be located. The projection line from point C designates the line of both C and D, and that from B locates B only. To transfer the appropriate distances, first look for any points lying on the reference plane. These points will also lie on the auxiliary plane where their projection lines intersect it (points A and C). To locate points B, D, and E, measure their perpendicular distances from the reference plane in the top view and transfer these distances along their respective projection lines in the Figure 6-22 − Normal multi-view projection.  6-20 auxiliary view. The points are equidistant from both the reference and auxiliary planes. Therefore, any line parallel to the reference plane is also parallel to the auxiliary plane and equidistant from it. The fifth step is to connect these points. When the total auxiliary view is drawn, it is sometimes hard to discern which lines should be indicated as hidden lines. A rule to remember is as follows: Those points and lines lying furthest away from the auxiliary plane in the orthographic view being projected are always beneath any point or line that is closer. In Figure 6-23, point C (representing line CD) in the front view is further from the auxiliary plane than any line or surface it will cross in the auxiliary view. Therefore, it will appear as a hidden line. The final step is to label and dimension the auxiliary view. The labeling must include an adequate description. The term AUXILIARY must be included along with the location of the view in relation to the normal orthographic views (LEFT SIDE AUXILIARY VIEW, Rengineering techR ELEVATION AUXILIARY VIEW, and so forth). Dimensions are given only to those lines appearing in their true length. In Figure 6-23, only lines AB, AE, and BE on the auxiliary view should be dimensioned. Using the procedures previously described, follow the steps taken to project and draw the rear auxiliary view in Figure 6-24. Figure 6-23 − Projection of left side auxiliary view.  6-21 Sometimes you will not need the total auxiliary view. Such a view could possibly even make the drawing confusing. In this case, use a partial auxiliary view. Use only the points or lines needed to project the line or surface desired. This reduces the number of projection lines and greatly enhances the clarity of the view. If you use a partial auxiliary view, label it PARTIAL to avoid confusion. In Figure 6-23, if you desire only the true length of line AB, project and connect the points A and B. The view would be complete after being labeled and dimensioned. In some cases the shape of an object will be such that neither the normal orthographic view nor the auxiliary views will show the true size and shape of a surface. When this occurs, a secondary auxiliary view is necessary to describe the surface. The procedures for projecting and drawing a secondary auxiliary view are the same as those for a normal (or primary) auxiliary view. The reference plane for a secondary auxiliary view is located in the orthographic view from which the primary auxiliary view is projected. Usually, the primary auxiliary plane becomes the secondary reference plane. The secondary auxiliary plane is in the primary auxiliary view, and its location is determined in the same manner as the primary auxiliary plane. Figure 6-24 − Projection of rear auxiliary view.

1.1.1.10 Auxiliary Section

An auxiliary view may be a sectional rather than a surface view. In the upper left part of Figure 6-25, there is a single-view projection of a block. The goal is to show the right side of the block as it would appear if the block were cut away on the plane indicated by the dotted line, the angle of observation to be perpendicular to this plane. The desired view of the right side is shown in the auxiliary section, which is projected from a front view as shown. Because the auxiliary plane of projection is parallel to the cutaway surfaces, these surfaces appear in true dimensions in the auxiliary section. A regular multi-view of an orthographic drawing is a view projected on one of the regular planes of projection. An auxiliary view is a view projected on a plane other than one of the regular planes. A rectangular object is in normal position for regular multi-view orthographic projection when each of its faces is parallel to one regular plane of projection and perpendicular to the other two. This is the case with the object shown in Figure 6-26, View A. Figure 6-26 − (A) Multi-view view of block in normal position (B) Multi-view view of block revolved 30 degrees on axis perpendicular to vertical plane. Figure 6-25 − Use of an auxiliary section.

1.1.1.11 Use of Revolutions

In a revolution, you project the object on one or more of the regular planes of projection. However, instead of placing the object in a normal position, rotate it on an axis perpendicular to one of the regular planes. Figure 6-26, View B, depicts a three-view multi-view projection showing the block in Figure 6-26, View A, as it appears when revolved 30 degrees on an axis perpendicular to the profile plane of projection. Figure 6-27, View A, shows how the block looks when it is revolved 30 degrees on an axis perpendicular to the horizontal plane. Figure 6-27, view B, shows the block as it appears when revolved 30 degrees on an axis perpendicular to the vertical plane.

1.1.1.12 Revolved Sections

A common use of the revolution is the revolved section, shown in Figure 6-28. At the top of this figure is a single projection of a triangular block. You can show all the required information about this block in a two-view projection by including a revolved section in the front view as shown. First, assume that the block is cut by a plane perpendicular to the longitudinal axis. Then revolve the resulting section 90 degrees on axis perpendicular to the horizontal plane of projection. Figure 6-28 − Use of revolved section (A-A). Figure 6-27 − Use of revolution on axis perpendicular to (A) horizontal plane and (B) vertical plane. 

1.1.1.13 Sectioning Techniques

Use a sectional view when it will better show the object’s internal structure than using hidden lines. The upper part of Figure 6-29 shows a single-view projection of a pulley. The lower part of Figure 6-29 shows the same object in a two-view multiview projection. The hidden lines in the top view show the internal structure of the pulley. The sectional view In Figure 6- 30 shows the internal structure of the pulley more clearly. Note that the sectional view omits the hidden lines behind the plane of projection of the section. Customarily, you should omit these lines because eliminating hidden lines is the fundamental reason for making a sectional view. However, in the sectional view include any lines that would be visible behind the sectional plane of projection. The section shown in Figure 6- 30 is called a full section. Also, the object shown in Figure 6-30 is a symmetrical object, meaning, in general, that the shape of one half is identical to the shape of the other. This being the case, you could have used a half section like the one shown in Figure 6-31. This half section constitutes one half of the full section. Because the other half of the full section would be identical with the half shown, it need not be drawn. Note that a center line, rather than a visible line, is used to indicate the division between the sectioned and the unsectioned part of the sectional view. A visible line would imply a line that is Figure 6-30 − Internal structure of an object more clearly shown by sectional view. Figure 6-29 − Internal structure of an object shown by hidden lines.  6-25 actually nonexistent on the object. Another term used in place of center line is line of symmetry. A section consisting of less than half a section is called a partial section. (See Figure 6-32.) Note that here you use a break line to indicate the division between the sectioned and unsectioned part. For this reason, a partial section is often called a broken section. The section lines drawn on a sectional surface always serve the basic purpose of indicating the limits of the sectional or cutaway surface. They may also indicate the type of material of which the sectioned surface consists. For example, Figure 6- 33, View A, shows section lining for an object made of cast iron. View B shows two matching parts made of steel, and View C shows three adjacent parts made of brass, bronze, or copper. For other symbolic section lining symbols, refer to ANSI Standard Y14.2. Figure 6-32 − Use of partial or broken section. Figure 6-31 − Use of half section.  6-26 Drawings must always identify materials by lettered form, such as notes. In view of the vast number of different materials, it is desirable (and common practice), to use a general purpose symbol for section lining. The general purpose symbol is the cast iron symbol shown in Figure 6-33, View A. The use of other symbols should be limited to those situations when it is truly desirable, or conventional, to graphically differentiate between materials. For example, in an assembly drawing (a drawing showing different parts fitted together), it is often desirable to differentiate materials. On a regular multi-view section, draw section lining (sometimes called diagonal hatching or crosshatching) at 45° to the horizontal, as shown in Figure 6-33, View A. However, if section liners drawn at 45° to the horizontal would be parallel or perpendicular (or nearly so) to a prominent visible outline, change the angle to 30°, 60°, or some other angle. If two adjacent sectioned surfaces are shown, draw the hatching in opposite directions, as shown in Figure 6-33, View B. If you include a third surface, hatch it at another suitable angle to make the surface clearly stand out separately from the other surfaces (Figure 6-33, View C). Note that the hatching lines on one surface are not permitted to meet those on an adjacent surface. In drawing section lining, use a sharp, medium-grade pencil (H or 2H). Space the lines as uniformly as possible by eye. As a rule, space your lines as generously as possible, yet close enough to distinguish the sectioned surface clearly. For average drawings, space the lines about 3/32 in. or more Figure 6-33 − Diagonal hatching on separate sectional surfaces shown in normal positions. Figure 6-34 − Diagonal hatching on an auxiliary section.  6-27 apart. Draw diagonal hatching on an auxiliary section at 45 degrees to the horizontal with respect to the section. Figure 6-34 shows this rule. In a revolution or other view of an object in other than the normal position, draw the diagonal hatching on a section at 45 degrees to the horizontal or vertical axis of the object as it appears in the revolution. Figure 6-35 shows this rule.

1.1.2 Axonometric Projection

Axonometric single-plane projection is another way of showing an object in all three dimensions in a single view. Theoretically, axonometric projection is orthographic projection in that only one plane is used and the projection lines are perpendicular to the plane of projections. It is the object itself, rather than the projection lines, that is inclined to the plane of projection.

1.1.2.1 Isometric Projection and Isometric Drawing

Figure 6-36 shows a cube projected by isometric projection, the most frequently used type of axonometric projection. The cube is inclined so that all of its surfaces make the same angle (35°16’) with the plane of projection. As a result of this inclination, the length of each of the edges shown in the projection is somewhat shorter than the actual length of the edge on the object itself. This reduction is called foreshortening. The degree of reduction amounts to the ratio of 1 to the cosine of 35°16’, or 1/0.8165. This means that if an edge on the cube is 1 in, long, the projected edge will be 0.8165 in. Figure 6-35 − Diagonal hatching on revolution. Figure 6-36 − Isometric projection of a cube.  6-28 long. As all of the surfaces make the same angle with the plane of projection, the edges all foreshorten in the same ratio. Therefore, one scale can be used for the entire layout; hence the term isometric, which literally means “one-scale.” Figure 6-37 shows how an isometric projection would look to an observer whose line of sight was perpendicular to the plane of projection. Note that the figure has a central axis, formed by the lines OA, OB, and OC; this property is the origin of the term axonometric projection. In an isometric projection, each line in the axis forms a 120° angle with the adjacent line, as shown. A quick way to draw the axis is to draw the perpendicular OC, then use a T square and a 30°/60° triangle to draw OA and OB at 30 degrees to the horizontal. Since the projections of parallel lines are parallel, the projections of the other edges of the cube will be, respectively, parallel to these axes. You can easily draw a rectangular object in isometric by the procedure known as box construction. The upper part of Figure 6-38 shows a two-view normal multi-view projection of a rectangular block; the lower part shows an isometric drawing of the block. You can see how you build the figure on the isometric axis and how you lay out the dimensions of the object on the isometric drawing. Because you lay out the identical dimensions, it is an isometric drawing rather than an isometric projection. Figure 6-37 − Use of an isometric axis. Figure 6-38 − Use of “box construction” in isometric drawing. 

1.1.2.2 Non-Isometric Lines

Examining the isometric drawing shown in Figure 6-38, you will note that each line in the drawing is parallel to one or another of the legs of the isometric axis. You will also notice that each line is a normal line in the multi-view projection. Recall that a normal line, in a normal multi-view projection, is parallel to two of the planes of projection and perpendicular to the third. Thus, a non-isometric lines is not parallel to any one of the three legs of the isometric axis. It is not a normal line in a normal multi-view projection of the object. The upper part of Figure 6-39 shows a two-view normal multiview projection of a block. Though the line AB is parallel to the horizontal plane of projection, it is oblique to both the vertical and the profile planes. It is therefore not a normal, but an oblique, line in the multi-view projection, and it will be a non-isometric line in an isometric projection or drawing of the same object. The line AB appears in its true length in the top multi-view view because it is parallel to the plane of the view (the horizontal plane), but it will appear as a non-isometric line, and therefore not in its true length, in an isometric drawing, as shown in the bottom part of Figure 6-39. It follows that you cannot transfer AB directly from the multi-view projection to the isometric drawing. You can, however, transfer directly all the normal lines in the multiview projection, which will be isometric lines appearing in their true lengths in the isometric drawing. When you have done this, you will have constructed the entire isometric drawing, exclusive of line AB and of its counterpart on the bottom face of the block. The end points of AB and of its counterpart will be located, however, and it will only be necessary to connect them by straight lines. Figure 6-39 − A non-isometric line (AB) in an isometric projection.

1.1.2.3 Angles in Isometric

In a normal multi-view view of an object, an angle will appear in its true size. In an isometric projection or drawing, an angle never appears in its true size, Even an angle formed by normal lines, such as each of the 90-degree corner angles of the block shown in the bottom part of Figure 6-40, appears distorted in isometric. The same principle used in transferring a non-isometric line is used to transfer an angle in isometric. The upper part of Figure 6-40 shows a two-view multi-view projection of a block. On the top face of the block, the line AB makes a 40-degree angle with the front edge. The line AB is an oblique (that is, not normal) line, which will appear as a non-isometric line in the isometric drawing. Locate the end points of AB on the isometric drawing by measuring distances along normal lines on the multiview projection and laying them off along the corresponding isometric lines on the isometric drawing. The angle that measures 40 degrees on the top multi-view view measures only about 32 degrees on the isometric drawing. Note, however, that it is labeled 40 degrees on the isometric drawing. This is because it actually is a 40-degree angle as it would look on a surface plane at the isometric angle of inclination.

1.1.2.4 Circles in Isometric

A circle in a normal multiview view will appear as an ellipse in an isometric drawing. This is shown in Figure 6-41, View A. Figure 6-40 − Drawing an angle in isometric. Figure 6-41 − A circle on a normal multi-view view appears as an ellipse in an  isometric drawing. 6-31 A procedure that maybe used to construct an isometric circle is shown in Figure 6-41, View B. The steps of that procedure are as follows: 1. Draw the isometric center lines of the circle. Then, using those center lines, lay off an isometric square with sides equal to the diameter of the circle. 2. From the near corners of the box, draw bisectors to the opposite intersections of the center lines and the box. The bisectors will intersect at four points (A, A’, B, B’), which will be the centers of four circular arcs. 3. Draw two large arcs with radius R, using Points A and A’ as centers. Draw the two smaller arcs with radius r, using Points B and B’ as centers. The above discussion should seem familiar, since it is simply an approximation of the fourpoint method you studied in the previous lesson. However, you can use it only when drawing isometric circles on an isometric drawing.

1.1.2.5 Non-Circular Curves in Isometric

A line that appears as a noncircular curve in a normal multi-view view of an object appears as a non-isometric line in an isometric drawing. To transfer such a line to an isometric drawing, plot a series of points by measuring along normal lines in the multi-view view and transferring these measurements to corresponding isometric lines in the isometric drawing. The upper part of Figure 6-42 shows a two-view multi-view projection of a block with an elliptical edge. To make an isometric drawing of this block, draw the circumscribing rectangle on the top multi-view view; lay off equal intervals as shown, and draw perpendiculars at these intervals from the upper horizontal edge of the rectangle to the ellipse. Then draw the rectangle in isometric, as shown below, and plot a series of points along the elliptical edge by laying off the same perpendiculars shown in the top multi-view view. Draw the line of the ellipse through these points with a french curve.

1.1.2.6 Alternate Positions of Isometric Axis

Up to this point, the isometric axis has been used with the lower leg vertical. The axis may, however, be used in any position, provided the angle between adjacent legs is always 120 degrees. Figure 6-43 shows how varying the position of the axis varies the view of the object. Figure 6-42 − Method of drawing a noncircular curve in isometric.

1.1.2.7 Diagonal Hatching in Isometric

Diagonal hatching on a sectional surface shown in isometric should have the appearance of making a 45-degree angle with the horizontal or vertical axis of the surface. If the surface is an isometric surface (one that makes an angle of 35°16’ with the plane of projection), lines drawn at an angle of 60 degrees to the horizontal margin of the paper, as shown in Figure 6-44, present the required appearance. To show diagonal hatching on a non-isometric surface, you must experiment to determine the angle that presents the required appearance.

1.1.2.8 Dimetric and Trimetric Projections

Two other sub-classifications of the axonometric projection category are dimetric and trimetric projections; however, these types are used less frequently than isometric projections and will not be discussed further in this training manual.

1.2.0 Oblique Single-Plane Projection

We have seen that you can draw an object showing length and width on a single plane. You can also show depth on this single plane by constructing the receding projection lines of the object at an angle other than perpendicular to the plane of projection. Figure 6-43 − Various positions of isometric axes. Figure 6-44 − An example of diagonal hatching in isometric.  6-33 Figure 6-45 shows the same object by both orthographic and oblique projection. The block is placed so that its front surface (the surface toward the plane of projection) is parallel to the plane of projection. The orthographic projection shows only this surface of the block. The oblique projection, on the other hand, shows the front surface and the top and side surfaces. The orthographic projection shows only two dimensions: length and width. The oblique projection shows three: length, width, and thickness. Oblique projection, then, is one method by which an object can be shown, in a single view, in all three dimensions. There are two types of oblique single-plane projections: cavalier and cabinet.

1.2.1 Cavalier Projection

Cavalier projection is a form of oblique projection in which the projection lines are presumed to make a 45-degree vertical and a 45-degree horizontal angle with the plane of projection. Assume that in Figure 6-46 the line XX' represents a side-edge view of the plane of projection, and that the square ABCD represents a side of a cube placed with its front face parallel to, and its top face perpendicular to, the plane of projection. The projected lengths of AB and AD are the same as the actual lengths. Now assume that the line XX' in Figure 6-46 represents a topedge view of the plane of projection, and that the square ABCD represents the top of the cube. You can see again that the projected lengths of AB and AD are the same as the actual Figure 6-45 Oblique and orthographic projections of the same object Figure 6-46 − Angle of projection lines in a cavalier projection.  6-34 lengths of AB and AD. In a cavalier projection, any line parallel or perpendicular to the plane of projection is projected in its true length. Figure 6-47 shows a cavalier projection of the cube shown in Figure 6-46. Start by drawing the axis, which consists of the front axes OA and OB and the receding axis OC. The front axes are always perpendicular to each other; the receding axis may be drawn from O at any convenient angle. All three are equal in length, the length being the length of an edge of the original cube (which may be scaled down or up if the drawing is made other than full scale). After you draw the axis, complete the projection by drawing the required parallel lines. All the edges shown in the projection are, like the edges on the original cube, equal in length.

1.2.2 Cabinet Projection

The first thing you notice about the cube shown in Figure 6-47 is the that it doesn’t look like a cube because the depth dimension appears to be longer than the height and width dimensions. The reason is that a cavalier projection corrects a human optical illusion--the one that causes an object to appear to become smaller as its distance from the eye increases. This illusion, in turn, causes receding parallel lines to appear to the eye to be shorter than they really are, and to be converging toward a point in the distance. But receding parallel lines on a cavalier projection appear in their true lengths, and they remain constantly parallel. Also, the far edges of the cube shown in Figure 6-47 are equal in length to the near edges. The distortion in Figure 6-47 is only apparent. It is sometimes desirable to reduce this appearance of distortion. This can be done by reducing the length of the receding axis (OC in Figure 6-38). This axis can be reduced by any desired amount, but it is customary to reduce it by one half. When the receding axis is reduced by one half, the projection is called a cabinet projection. Figure 6-48 shows a cabinet projection of a cube. The length of the receding axis OC has been reduced by one half. As you can see, this representation looks more like a cube. Cavalier and cabinet projections are compared in Figures 6-49 and 6-50. Figure 6-48 − Cabinet projection of a cube. Figure 6-47 − Cavalier projection of a cube.  6-35 Figure 6-49 − Cavalier projection; Distances along front axis and along receding axis are all true. Figure 6-50 − Cabinet projection: Distances along front axis are true; distances along receding axis are reduced by one half.

1.2.3 Oblique Drawing Techniques

In an oblique projection drawing of a rectangular object, one face (usually the most prominent or most important) is parallel to the plane of projection. All features appearing on this plane, such as circles or oblique lines, are in their true dimension. However, in the side or top views, these same features are somewhat distorted because of the receding axis angle. When drawing these features, you can use various techniques to aid you in their construction. For convenience, the angle chosen for the receding axis is 30 degrees, 45 degrees, or 60 degrees because those angles are easily constructed with triangles (Figure 6-51).

1.2.3.1 Irregular Lines

An irregular line in an oblique drawing is a line that would be an oblique line in a normal multi-view projection. In the upper part of Figure 6-52, is a two-view multi-view projection of a block; the line AB is an irregular line and will not appear in its true length in an oblique projection. To transfer the line, draw the projection by transferring measurements taken along regular lines; these measurements locate the end points of the irregular line. Figure 6-52 shows the cavalier projection of an irregular line. The procedure for cabinet projection is the same except that all measurements along the receding axis are reduced by one half. Figure 6-51 − Angles of 30 degrees, 45 degrees, and 60 degrees are normally chosen for the receding access in oblique projection because they are easily drawn with triangles. Figure 6-52 − Cavalier projection of an object with irregular lines. 

1.2.3.2 Angles in Oblique

In an oblique projection, an angle on the surface that is parallel to the plane of projection will appear in its true size; an angle on any other surface will not. The upper part of Figure 6-53 shows a twoview multi-view projection of a block. It has a 30-degree angle on the top face and another on the front face. In the cavalier projection below, the angle on the front face still measures 30 degrees; that on the top face measures only about 9 degrees. Transfer the top face angle by locating the end points of the line by measurements along regular lines.

1.2.3.3 Circles in Oblique

In an oblique projection, a circle on the surface parallel to the plane of projection will appear as a circle. A circle on any other surface will appear as an ellipse, as shown in Figure 6-54. The upper part of this figure shows a two-view multi-view projection of a block with a circle on its upper face. The lower part of this figure shows a cavalier projection in which the circle appears as an ellipse. Each of the conjugate (joined together) diameters of the ellipse is equal to the diameter of the circle. Figure 6-53 − Transferring an angle in oblique projection. Figure 6-54 − Cavalier projection of a circle on a receding surface.  6-38

2.0.0 PERSPECTIVE PROJECTION and PERSPECTIVE DRAWING

Perspective projection is achieved when the projection lines converge to a point that is at a finite distance from the plane of projection. Each projection line forms a different angle with the plane of projection, giving the viewer a three-dimensional picture of the object. This type of projection, however, cannot accurately convey the structural features of a building; hence, it is not adequate for working drawings. On the other hand, of all the three-dimensional single-plane drawings, perspective drawings are the ones that look the most natural. At the same time, they are also the ones that contain the most errors. Lines that have the same length on the object have different lengths on the drawing. No single line or angle on the drawing has a length or size that has any known relationship to its true length or size when projected through perspective projections. Perspective drawing is used only in drawings of an illustrative nature, in which an object is deliberately made to appear the way it looks to the human eye. Most of the drawings you prepare will be drawings in which accuracy, rather than eye appearance, is the chief consideration. Consequently, you will not be concerned much with perspective drawing. If you are required to prepare perspective drawings, refer to Illustrator Draftsman, NAVEDTRA 10472, or civilian publications, such as Architectural Drawing and Light Construction and Architectural Graphic Standards.

3.0.0 SKETCHING

The ability to make quick, accurate sketches is a valuable asset in conveying technical information or ideas. Without this ability, you are handicapped in many of your day-today situations. Almost every drawing or graphic problem originates with a sketch. The sketch becomes an important thinking instrument, as well as a means of conversing effectively with technically trained people. Sketching is not just another trick of the trade; it is an essential skill and an important part of your training. Sketch at every opportunity to develop your skills; your skills will improve with experience. A sketch is usually thought of as being made freehand, although in practice you may use graph paper or a small triangle for a straightedge. A sketch may be of an object or an idea or a combination of both. Sketches are used to solve graphic problems before an object or structure is put in final form on a drawing. Preliminary sketches are used to plan and organize intelligently the sheet layout of a complete set of drawings for a construction project, which often includes many views and details. There are no set standards for technical freehand sketching; however, you should use standard line conventions for clarity. A sketch may be drawn pictorially so that it actually looks like the object, or it can be an orthographic sketch of the object showing different views. The degree of perfection required for any sketch will depend upon its intended use. 

3.1.0 Sketching Materials

Sketching requires few materials; basically, you only need pencil and paper. The type of sketch prepared and your personal preferences determine the materials used. Use a soft pencil in the grade range from F to 3H, H being a good grade for most sketching. The pencil should be long enough to permit a relaxed but stable grip. As you gain experience, you may even prefer to use fine tip felt pens. (Dark- or bright-colored pens should be used.) Felt tip pens work very well on overlay sketches (discussed later). Figure 6-55 − Use of cross-sectional paper in technical sketching. Figure 6-56 − Use of specially ruled isometric paper in technical sketching. Most of your sketches will be done on scratch paper, which can be any type or size of paper. An experienced draftsman will keep a pad of 3 in. by 5 in. or 5 in. by 8 in. scratch paper handy at all times. Tracing paper is convenient for planning the layout of a drawing. The advantage of sketching on tracing paper is the ease with which sketches can be modified or redeveloped simply by placing transparent paper over previous sketches or existing drawings. Sketches prepared in this manner are referred to as overlay sketches. You can use cross-section or graph paper to save time when you are required to draw sketches to scale. (See Figure 6-55.) You can easily draw isometric sketches on specially ruled isometric paper. (See Figure 6-56.) While you may use an eraser, you will probably do very little erasing. Sketches usually can be redrawn more quickly than mistakes can be erased. For making dimensioned sketches in the field, you will need some sort of measuring tape--either a pocket rule or a surveyor’s tape, depending on the extent of the measurements taken. If you are required to collect extensive field data, maintain a sketch notebook. A surveyor’s field notebook works well for this purpose. 

3.2.0 Techniques of Sketching

Your sketches should conform to one of the standard types of projection discussed in this lesson. Apply correct proportion whenever possible. When you use cross-section paper, its grid will provide a ready scale that will aid you in sketching proportionally. Do this by counting the squares within the object to be drawn. The size of your sketch depends upon the complexity of the object and the size of paper you are using.

3.2.1 Sketching Straight Lines

In sketching lines, place a dot where you want a line to begin and one where you want it to end. In sketching long lines, place one or more dots between the end dots. Swing your hand in the direction your line should go, and back again a couple of times before you touch your pencil to the paper in order to get the feel of the line. When ready, use the dots to guide your eye and your hand as you draw the line. Draw each line with a series of short strokes instead of with one stroke. Using short strokes, you can better control the direction of your line and the pressure of your pencil on the paper. Hold the pencil about three quarters of an inch to an inch from the point so that you can see what you are doing. Strive for a free and easy movement rather than a cramped finger and wrist movement. Another useful technique in drawing straight lines is to use the side of the paper, pad, or table as a guide for your hand. Hold the pencil at the desired starting point of the line and place the heel of your hand and one finger on the guide, as shown in Figure 6-57. Move the pencil, in this case, with one uniform stroke to complete the line. Try drawing several light horizontal lines and, after each one is drawn, examine it for straightness, weight, and neatness. If it is too light, use either a softer pencil or a little more pressure. Vertical lines are usually sketched downward on the paper. The same suggestions for using locator dots, free movement of the entire arm, and guides apply to vertical lines as to horizontal lines. Slanting lines may be drawn from either end toward the other. For better control, you might find it helpful to rotate the paper, thus placing the desired slanting line in either the horizontal or vertical position. Figure 6-57 − Use of paper, pad, or table as a guide when drawing straight lines.  6-41 To keep your sketch neat, first sketch your lines lightly. Lines not essential to the drawing can be sketched so lightly that you need not erase them. Darken essential lines by running your pencil over them with more pressure. Figure 6-58 shows line conventions drawn with various types of pencil points.

3.2.2 Dividing Lines and Areas Equally

Your ability to divide lines and areas into equal parts is necessary to arrive at many of the common geometric forms required in sketching. The simplest method of bisecting lines is by visual comparison, as shown in Figure 6-59. First, observe the entire line and weigh it optically to determine its fulcrum or point of balance. Compare each half visually before placing the bisecting point. This procedure can be repeated any number of times to divide a line into any number of equal divisions, merely by dividing and re-dividing its line segments. Figure 6-58 − Line conventions drawn with various types of pencil points. Figure 6-59 − Bisecting a line by visual comparison.  6-42 You can easily determine centers of rectangular areas drawing their diagonals. If necessary divide the halves with diagonals for smaller divisions, as shown in Figure 6-60.

3.2.3 Sketching Angles

You will be sketching 90-degree angles in the majority of your sketches. Learn to sketch right angles accurately, even if you have to check them with a triangle occasionally. You can frequently use the perpendicular edges of your paper as a visual guide for comparison. Try turning your sketch upside down; nonperpendicular tendencies of horizontal and vertical lines will become evident. Shaping right angles correctly will give your sketch visual stability and increase its effectiveness. Make a 45-degree angle by dividing a right angle by visual comparison and a 30-degree or 60-degree angle by dividing the right angle into three equal parts. The 30-degree or 45-degree angle may be divided into equal parts in the same manner. (See Figure 6- 61.) Always start with the right angle for the most accurate estimation of angle shape.

3.2.4 Sketching Circles and Arcs

Perfectly round circles are the most difficult to draw freehand. Figure 6-62 shows methods of drawing circles and curves using straight lines as construction lines. First, draw two straight lines crossing each other at right angles, as in Figure 6-62, View A. The point at which they cross will serve as the center of the circle. The four lines radiating from this center will serve as the radii of the circle. You can use a piece of marked scrap paper to measure an equal distance on each radius from the center. Sketch a square, with the center of each side passing through the mark defining a radius. (See Figure 6-62, View B.) Now sketch in your circle, using the angles of the Figure 6-61 − Sketching angles by visual comparison. Figure 5-60 − Locating centers by sketching diagonals.  6-43 square as a guide for each arc. When larger circles are required, you can add 45- degree angles to the square to form an octagon. This will provide four additional points of tangency for the inscribed circle. In Figure 6-62, View C and View D, four lines, instead of two, are sketched crossing each other. The radii are measured as in constructing the other circle, but a square is not drawn. For this method, you will find it helpful to rotate the paper and sketch the circle in one direction. For drawing large circles, you can make a substitute for a compass with a pencil, a piece of string, and a thumbtack. Tie one end of the string to your pencil near the tip. Measure the radius of the circle you are drawing on the string, and insert your tack at this point. Now swing your pencil in a circle, taking care to keep it vertical to the paper. Another technique for drawing circles is shown in Figure 6-63. In Figure 6-63, View A, observe how the pencil is held beneath the four fingers with the thumb. This grip tends to produce a soft or easy motion for sketching large circles or curves and also makes it possible to sketch small circles, as shown in Figure 6-63, Views B and C. Notice in Figure 6-63, View B, that the second finger rests at the center of the circle and forms the pivot about which the pencil lead can swing. The distance from the fingertip to the pencil lead determines the radius of the circle. To draw smaller circles, you need to Figure 6-62 − Methods of sketching circles. Figure 6-63 − Proper pencil grip in sketching circles and arcs.  6-44 assume a somewhat different grip on the pencil, as shown in Figure 6-63, View C, but the principle is the same. As shown in Figure 6-64, View A, the first step in sketching either large or small circles with the grips shown in the previous figure is placing the second finger on the paper at the center of the proposed circle. Then, with the pencil lightly touching the paper, use the other hand to rotate the paper to give you a circle that may look like the one in Figure 6-64, View B. To correct the slight error of closure shown in View C, erase a substantial section of the circle and correct it by eye, as shown at the right. You now have a complete and round circle, but with only a very light line, which must be made heavier. Do this as shown in View B. Notice that you DO NOT PIVOT on the second finger during this step. Rest your hand on its side and, keeping it within the circle, trace over the light line with your hand pivoting naturally at the wrist. As you work around the circle in this way, rotate the paper counterclockwise so that your hand can work in its most natural and easy position. Of course with smaller circles you cannot work with your hand within the circle, but you can successfully use the same general approach. Probably one of the best methods to sketch curves connected to straight lines is the sixstep method illustrated and explained below. 1. Intersect a vertical and horizontal line, lightly. 2. Mark off on the horizontal and vertical lines the same distance from the intersection. 3. Draw a light diagonal line through the two points marked. 4. Place an x or a dot in the exact center of the triangle formed. 5. Start your curve from one point of the triangle (preferably on the vertical line) touching the x or dot and ending at the other point of the triangle. 6. Erase all unnecessary guidelines and darken the curve and necessary adjoining straight lines. With a little practice of this method, your ability to sketch curves properly should improve. Figure 6-64 − Steps in sketching a circle. Figure 6-65 − Steps in sketching a curved line.  6-45 Figure 6-66 shows a convenient way to sketch arcs and curves by lightly drawing construction boxes (or blocks). Figure 6-66 − Sketching curves using construction boxes.

 

3.2.5 Construction Lines

When you are sketching an object, such as that shown in Figure 6-67, don’t start at one corner and draw it detail by detail and expect it come out with the various elements in correct proportion. It is better to block in the overall size of the object first, (See Figure 6-67, View A.) Then draw light guidelines at the correct angles for the various outlines of the object. (See Figure 6-67, Views B and C.) Finish the sketch by first making an outline of the object and then drawing in the details, as shown in Figure 6-67, View D. Figure 6-67 − The use of construction lines in sketching an object. 

3.2.6 Order of Sketching

To make a working sketch, first choose a clean sheet of paper, either plain or ruled. Estimate the size the sketch should be, and select the views that will give the best picture of the object. Then draw the orthographic projections of these views, leaving adequate space between them for dimensions. (Refer to the working sketch in Figure 6- 68.) In sketching, progress as follows: 1. Draw the center lines, as shown in Figure 6-68, View A. 2. Block the views. 3. Draw the outlines, aligning them as in Figure 6-68, View A. 4. Add the details on the surface of the views 5. Darken the lines of the finished sketch. 6. Use an art gum or a kneaded eraser to erase the construction lines, which are no longer needed. If necessary, touch up the lines you may have inadvertently erased. 7. Draw all necessary extension and dimension lines. 8. Letter in the dimensions. (See Figure 6-68, View C) Figure 6-68 − Progress of a working sketch.  6-47 You can see that a working sketch such as the one shown in Figure 6-68 could easily be followed in preparing a finished drawing of the object. The sketch provides you with all the necessary information needed on the finished drawing.

3.2.7 Pictorial Sketches

Often it will be more convenient, or even necessary, to prepare isometric or oblique pictorial sketches instead of multi-view orthographic sketches. Pictorial sketches provide a quick method of examining tentative construction details. A quick pictorial sketch will also help you in the layout of isometric and oblique drawings. The principles of pictorial and orthographic sketching are similar, except that in pictorial sketching you will be dealing with volumes rather than flat planes. Pictorial sketches and pictorial drawings are practically the same except for the drawing materials used in their development and the fact that pictorial sketches are not normally drawn to scale. By following a few simple steps, based on pictorial drawing construction principles, you should be able to prepare meaningful pictorial sketches.

3.2.7.1 Isometric Sketches

Select a position (view) that will show the object to the best advantage. You will know what you want included in your sketch, so move either the object or yourself until you can actually see everything you want to show. If the object is something you have in mind or if you intend to sketch an isometric view from an orthographic drawing, you will have to visualize the object and assume a viewing position. In making your isometric sketch, remember that you start by sketching three isometric axes 120 degrees apart, using two angles of 30 degrees and a vertical axis of 90 degrees. Figure 6-69, View A, shows a step-by-step procedure you can use to make an isometric sketch of a wooden rectangular block measuring 1 1/2 inch. by 2 inches by 4 inches. The first step is to sketch the three isometric axes, as mentioned earlier. The second step is to mark off the 1 ½ inch for height on the vertical axis, the 2 inch width along the left axis, and the 4 inch length along the right axis. The thrid step is to draw two vertical lines 1 ½ inches high(starting with the marks on the right and left axis), then sketch parallel lines from each of the marks on the sketch. Not that the lines that are parallel on the object are parallel on the sketch. The fourth step is to dimension the sketch. The dimensions on an isometric sketch are placed parallel to the ends or edges. The final step is to check the sketch for completeness and accuracy.

3.2.7.2 Oblique Sketches

Draw the front face or view of an oblique sketch in the same way as an orthographic front view. Using the same wooden block that was sketched isometrically for a model, draw an oblique sketch following the basic steps shown in Figure 6-69, View B. First, draw a rectangle of the front view (using light lines). Second, draw an oblique base line at a 45-degree angle starting at the corner (intersection) of the horizontal and vertical base lines. Third, sketch the remaining horizontal and vertical lines parallel to the other base lines. Fourth, erase any unnecessary lines, and, fifth, dimension and darken the completed drawing for easier reading. Remember, place the dimensions so they are parallel to the axis lines. The final step is to check the sketch for completeness and accuracy.  6-48 In the above procedures for development of pictorial sketches, a simple rectangular form was used. All objects may be simplified to their basic geometric forms. These forms are the first consideration in the pictorial sketch. Basic volumetric forms are shown in Figure 6-70. By carefully analyzing any object you sketch, you will see one or more of the forms shown in Figure 6-70. However, at times only a part of a form is present. Before attempting detailed sketches, practice sketching the basic forms. Then look for these forms in the object you are about to sketch and concentrate on the basic form representation. Enclose the object in a basic form, or build it up with a series of different forms, depending on the nature of the object. Details are added or “carved” from these forms after shape and proportion have been determined. Figure 6-69 −Sketching a regular block: (A) Isometric; (B) Oblique.

3.2.8 Overlay Sketches

To make overlay sketches, sketch freehand on transparent paper placed over existing drawings or other sketches. Sometimes when you make overlay sketches, you merely trace, freehand, objects or lines from another drawing or sketch. But more often you will prepare overlay sketches by tracing and then adding supplementary sketched lines or objects. Usually, when this type of sketch is prepared, only the prominent or desired features are traced. Overlay sketches are primarily used for planning purposes. A suggested procedure for using overlay sketches as a tool for planning is explained in the following example: The drafting room is being relocated. You are tasked with developing a proposed furniture and equipment layout. You have the latest prints of the floor plan and an electrical plan, and you know what furniture and equipment will be moved to the new area. The steps you take to develop the proposed layout are as follows: 1. Check the floor plan and electrical plan against the actual room layout. If necessary, check the dimensions. Correct any discrepancies with a dark-colored fine tip felt pen or colored pencil. Figure 6-70 − Basic isometric forms.  6-50 2. Place a piece of tracing paper over the floor plan on the print and secure it with small strips of drafting tape. 3. Trace the outline of the walls with single freehand lines (preferably with a dark colored felt tip pen). Terminate the lines, where applicable, to indicate windows and door openings. 4. Remove the tracing paper from the floor plan and place it over the electrical plan, lining the traced wall outlines up with the corresponding walls on the electrical plan. Using appropriate symbols, locate, on the traced floor plan, all electrical outlet locations. 5. You now have a clear overlay sketch of the existing floor plan without the unnecessary dimensions and information on the original print of the floor plan. This is your basic planning overlay. Check your overlay with the original prints to make sure you did not omit relevant lines. 6. Place another sheet of tracing paper over the basic planning overlay. This becomes your second overlay. On this second overlay, sketch in your desired location of all the furniture and equipment. Use simple shapes for each and estimate sizes. Use letters or symbols for identification. Repeating the outline of the walls is not necessary because you can still see the outline from the basic planning overlay. 7. If this first location sketch on the second overlay does not suit you or does not provide an adequate layout, lay another piece of tracing paper over the second layout and sketch another one. Repeat this procedure with additional overlays until you have developed a good layout. 8. Once you have a good layout, trace the wall outlines from the basic planning overlay. This final overlay sketch is your proposed furniture and equipment layout for the new location of the drafting room. Summary As an engineering tech, you should be able to clearly represent any given object or structure on paper by applying basic geometric construction to the various projection methods. To show an object’s three dimensions by lines alone, you must use either a system of related views or a single pictorial projection. You must be able to show clearly the shape of the object, give the exact size of each part, and provide necessary information for constructing the object. In the field, freehand sketching is an invaluable tool in preparing quick sketches to convey or develop your ideas.  6-51

Review Questions

  1. Parallel projection is divided into two main types of projection: __________ and __________. A. orthographic, oblique B perspective, orthographic C. perspective, oblique D. perspective, first angle 2. A parallel projection in which the lines of projection are perpendicular to the plane of projection is called a(n) __________ projection. A. perspective B. orthographic C. oblique D. first angle 3. The position of the observer in relation to the object and the plane of projection is called the __________. A. point of sight B. parallel point C. oblique point D. orthographic point 4. The observer views the features of the object through an imaginary __________. A. station point B. point of site C. plane of projection D. plane of perspective 5. __________ are the imaginary lines from the eye of the viewer to points on the object. A. Images lines B. Parallel lines C. Planes of projection D. Lines of sight 6. __________ projection consists of drawing the essential views of the same object from different angles and projecting the views on a single plane A. Perspective B. Oblique C. Orthographic D. Profile  6-52 7. Establishing an object's true height, width, and depth requires front, top, and side views, which are called the __________. A. image planes B. principal planes of projection C. station points D. lines of sight 8.  First-angle projection is commonly used in the United States. A. True B. False 9. A __________ projection of a cube will result with a front view on the vertical plane, a top view on the horizontal plane, and a right side view on the profile plane. A. first-angle B. second-angle C. third-Angle D. fourth-angle 10. Using a ___________ offers a convenient method of laying out a third view while you are in the process of drawing two views. A. projection line B. mitre line C. line of sight D. projection plane 11. In the American standard arrangement of views, all views are rotated toward the view as though they are hinged; the __________ view always lies in the plane of the drafting surface and does not require any rotation. A. back B. front C. left side D. right side 12. When creating a balanced drawing, remember that the __________ of the object will determine the space between the views. A. color B. position C. size D. shape  6-53 13. In a third-angle projection, you always presume the plane of projection is __________ the object and the observer, regardless of which view you are considering. A. in front of B. behind C. between D. in the same place as 14. When numbering a hidden corner point, the number is __________, and for a visible corner point, __________. A. placed within the outline, outside the outline B. placed outside the outline, inside the outline C. circled, not circled D. not circled, circled 15. A multi-view projection should contain __________. A. four views B. only front, side, and back views C. all possible views D. only as many views as required to describe the object fully 16. In a multi-view orthographic projection, a __________ is parallel to two of the planes of projection and perpendicular to the third. A. non-normal line B. non-normal plane C. normal line D. normal plane 17. Views on planes other than the regular planes are called __________ views. A. auxiliary B. regular C. multiD. normal 18. A __________ view is a view on one of the three regular planes of projection (horizontal, vertical, or profile). A. auxiliary B. regular C. multiD. normal  6-54 19. A __________ on a surface that is parallel to the plane of projection will project as a __________. A. circle, circle B. ellipse, circle C. circle, ellipse D. circle, hidden line 20. An imaginary plane that is parallel with the line or surface we want to project in its true shape that is NOT one of the regular planes is called a(n) __________. A. non-normal plane B. normal plane C. auxiliary plane D. regular plane 21.  An auxiliary view is one that is projected on a plane other than one of the regular planes. A. True B. False 22. In a __________, the object is projected on one or more of the regular planes of projection, but instead of being placed in normal position, the object is rotated on an axis perpendicular to one of the regular planes. A. revolution B. auxiliary C. rotation D. normal plane 23. Use a __________ view when it will better show the object's internal structure than using hidden lines. A. regular B. auxiliary C. revolution D. sectional 24. When a cutting plane passes entirely through a symmetrical object and divides it into two equal parts, this view is called a __________ section. A. revolved B. full C. broken D. partial  6-55 25. A section consisting of less than half a section is called a __________ section. A. revolved B. full C. normal D. partial 26. In __________ projection only one plane is used and the projection lines are perpendicular to the plane of projections, but the object is inclined to the plane of projection. A. regular B. sectional C. axonometric D. partial 27.  Isometric projection is the most frequently used type of axonomic projection. A. True B. False 28.  A foreshortened line in a projection is somewhat longer than the actual length of the edge on the object itself. A. True B. False 29. A __________ line is a line that is not parallel to any one of the three legs of the isometric axis. It is not a normal line in a normal multi-view projection of the object. A. regular B. partial C. isometric D. non-isometric 30.  In a normal multi-view view of an object, an angle never appears in its true size, A. True B. False 31.  A circle in a normal multiview view will appear as an ellipse in an isometric drawing. A. True B. False  6-56 32.  A line that appears as a noncircular curve in a normal multi-view view of an object appears as a non-isometric line in an isometric drawing. A. True B. False 33. The isometric axis is commonly used with the lower leg vertical. The axis may, however, be used in any position, provided the angle between adjacent legs is always __________ degrees. A. 120 B. 90 C. 45 D. 60 34.  Diagonal hatching on a sectional surface shown in isometric should have the appearance of making a 90-degree angle with the horizontal or vertical axis of the surface. A. True B. False 35. There are two types of __________ single-plane projections: cavalier and cabinet. A. abstract B. orthographic C. oblique D. isometric 36. __________ projection is a form of oblique projection in which the projection lines are presumed to make a 45-degree vertical and a 45-degree horizontal angle with the plane of projection. A. diametric B. cavalier C. cabinet D. trimetric 37. In a __________ projection, then, any line parallel to or perpendicular to the plane of projection is projected in its true length. A. diametric B. cavalier C. cabinet D. trimetric  6-57 38. When the receding axis is reduced by one half, the projection is called a ___________ projection. A. dimetric B. cavalier C. cabinet D. trimetric 39.  In an oblique projection drawing, the angle chosen for the receding axis is either 30 degrees, 45 degrees, or 60 degrees because those angles are easily constructed with triangles. A. True B. False 40.  A regular line in an oblique drawing is a line that would be an oblique line in a normal multi-view projection. A. True B. False 41.  In an oblique projection, an angle on the surface that is parallel to the plane of projection will appear in its true size; an angle on any other surface will not. A. True B. False 42. In an oblique projection, a circle on the surface parallel to the plane of projection will appear as a(n) ______. A circle on any other surface will appear as a(n) __________. A. ellipse, ellipse B. circle, circle C. ellipse, circle D. circle, ellipse 43. __________ projection is obtained when the projection lines converge to a point that is at a finite distance from the plane of projection. A. Cavalier B. Cabinet C. Perspective D. Oblique 44.  Of all the three-dimensional single-plane drawings, perspective drawings are the ones that look the most natural. A. True B. False  6-58 45.  Sketching is not an important skill for an engineering tech to have. A. True B. False 46. Sketching requires __________. A. many specialized tools B. only pencil and paper C. drafting board and a T square D. a ball point pen 47. Sketches drawn on transparent paper over existing drawings are known as __________ sketches. A. overlay B. perspective C. isometric D. cabinet 48.  Your sketches do not have to conform to any kind of standard projection types. A. True B. False 49.  Draw each line with a series of short strokes instead of with one stroke. A. True B. False 50.  Vertical lines are usually sketched upward on the paper. A. True B. False 51. The simplest method of bisecting a line when freehand sketching is __________. A. using a ruler B. using a protractor C. using a compass D. using visual comparison 52. A 30-degree or 60-degree angle can be made by dividing the right angle into __________ equal parts. A. 2 B 3 C. 4 D. 5  6-59 53. One convenient way to sketch arcs and curves is by lightly drawing __________. A. dotted lines B. construction lines C. dots D. construction boxes 54.  When sketching an object, it is best to start at one corner and draw it detail by detail. A. True B. False 55.  You should draw the center lines of the object first. A. True B. False 56.  Pictorial sketches deal with planes and are drawn to scale. A. True B. False 57. In making an isometric sketch, remember that you start by sketching three isometric axes __________ degrees apart, using two angles of 30 degrees and a vertical axis of 90 degrees. A. 90 B. 120 C. 60 D. 30 58. The front face or view of an oblique sketch is drawn the same way as a(n) __________ front view. A. oblique B. orthographic C. auxiliary D. non-normal 59. To make __________ sketches, sketch freehand on transparent paper placed over existing drawings or other sketches. A. cavalier B. cabinet C. perspective D. overlay

Chapter 7 Wood and Light Frame Structures

Engineering techs prepare drawings, and regardless of the type of drawing you need to prepare, you must apply your knowledge of materials and construction methods. Light frame structures using wood are some of the most common structures for both civilian and military application. This lesson covers wood; its uses, kinds, sizes, grades, and classifications. It also describes how builders use wood to frame and finish a structure with appropriate hardware and fasteners. A familiarity with this type of structure and its materials will help you prepare your drawings.

When you have completed this lesson, you will be able to:

1. Describe the different types of wood engineering techs utilize.
2. Describe the different types of wood frame structures.
3. Describe the different types of building finishes.
4. Identify the different types of hardware.
5. Identify the different types of fasteners

Contents

1.0.0 Wood

2.0.0 Wood Frame Structures

3.0.0 Building Finish

4.0.0 Hardware

5.0.0 Fasteners

Summary

Review Questions


1.0.0 WOOD

Wood is probably the most often used and perhaps the most important construction material. Seabees build very few construction projects, permanent or temporary, without using wood. In addition to wood for the structure itself, Seabees make temporary use of wood for scaffolding, shoring, bracing, and miscellaneous concrete forms. There are several types, or species, of wood; the variety is practically unlimited. Each has its own characteristics and recommended uses. For most large projects, the specifications will indicate the required types and classifications. For smaller projects that do not have written specifications, the drawings include the project’s types and classifications of wood. Figure 7-1 provides the types, sources, uses, and characteristics of some common woods. In addition, the Architectural Graphic Standards found in your unit’s technical library lists the species, size classification, and design values of common structural woods. Figure 7-1 — Common woods.

1.1.0 Lumber In construction, the terms wood, lumber, and timber have distinct, separate meanings.

• Wood--the hard, fibrous substance that forms the major part of the trunk and branches of a tree

• Lumber--wood that has been cut and surfaced

• Timber--lumber whose smallest dimension is not less than 5 inches.  7-4

• Millwork--manufactured lumber products, such as doors, window frames, window casings, shutters, interior trim, cabinets, and moldings 1.1.1 Sizes In the United States, to permit uniformity in planning and ordering materials, the construction industry uses standardized lumber sizes. You identify Lumber by nominal size, which is larger than the actual dressed dimension. Dressed lumber is surfaced (planed smooth) on two or more sides and designated according to the number of sides or edges surfaced. For example, S2S (surfaced 2 sides) identifies lumber surfaced on two sides; S4S (surfaced 4 sides) is lumber surfaced on all four sides and S2S2E is lumber surfaced on two sides and two edges. When you develop your drawings or order materials from suppliers, designate lumber by nominal size rather than dressed dimensions. Figure 7-2 shows common dimensions for nominal and dressed lumber. Figure 7-2 — Nominal and dressed sizes of lumber. 1.1.2 Classification Use, size, and extent of manufacture determine lumber classification. Lumber classified according to use falls into three categories:

• Yard Lumber—grades, sizes, and patterns generally intended for ordinary construction and general building purposes

• Structural Lumber—2 inches or more in thickness and width for use to meet any project requiring working stresses

• Factory and Shop Lumber— produced or selected mainly for manufacture of furniture, doors, cabinets, and other millwork Lumber classified according to size has three general classifications:

• Boards—less than 2 inches thick and 1 inch or more wide. If less than 6 inches wide, they may be classified as strips

• Dimension—at least 2 inches thick, but less than 5 inches thick and 2 inches or more wide. It may be classified as framing, joists, planks, rafters, studs, and small timbers  7-5

• Timbers—smallest dimension is 5 inches and may be classified as beams, stringers, posts, caps, sills, girders, and purlins Lumber classified by extent of manufacture consists of three types:

• Rough Lumber—not dressed (surfaced) but sawed, edged, and trimmed to the extent that saw marks show in the wood on the four longitudinal surfaces

• Dressed Lumber—surfaced by a planing machine to attain a smooth surface and uniform size

• Worked Lumber—dressed and matched, shiplapped, or patterned 1.1.3 Grading The National Bureau of Standards, part of U.S. Department of Commerce, established the American Lumber Standards to grade lumber for quality. Yard Lumber---There are two major grades. In descending quality, they are select lumber and common lumber. These grades have further subdivisions, also in descending order of quality.

• Select Lumber—good appearance and good qualities for finishing o Grade A—nearly free of defects and blemishes o Grade B---contains a few minor blemishes o Grade C---more numerous and significant blemishes than Grade B o Grade D---more blemishes than Grade C A and B are suitable for natural finishes; C and D are satisfactory when painted.

• Common Lumber—suitable for general construction and utility purposes o No. 1---sound, tight-knotted stock, containing only a few minor defects, suitable for use as watertight lumber o No. 2---limited number of significant defects but no knotholes or other serious defects, must be suitable for use as grain-tight lumber o No. 3---contains a few defects, larger and coarser than those in No. 2; for example, occasional knotholes o No. 4---low-quality material, contains serious defects like knotholes, checks, shakes, and decay o No. 5---holds together only under ordinary handling Structural Lumber---Allowable stresses determine the grade according to its safe loadcarrying capacity. Various factors, such as species of the wood, density, moisture content, and other characteristics, affect the capacity of these allowable stresses and determine the grade. Factory and Shop Lumber---generally determined by intended use, and the grades very greatly from use to use. 1.1.4 Board Measure Board foot is the basic unit of quantity for lumber. The definition of a board foot is the volume of a board 1 foot long by 1 foot wide by 1 inch thick. You usually measure the length of lumber in feet, the width in inches, and the thickness in inches, so the formula for the quantity of lumber in board feet becomes the following:  7-6 )( 12 )()()( Board Measure board feet Thickness inches widthx inches lengthx feet = Example: Calculate the board measure of a 14-ft length of a 2 by 4. Applying the formula, you get bm xx 3 1 9 12 1442 = For board measure purposes, presume lumber less than 1 inch thick to be 1 inch thick. Calculate board measure using the nominal, not the dressed, dimensions of lumber. The symbol for board feet is bm, and the symbol for a unit of 1,000 is M. If you needed 10,000 board feet of lumber for example, you would indicate the quantity as 10Mbm.

1.2.0 Laminated Lumber Laminated lumber is a solution when a design requires wood with increased loadcarrying capacity and rigidity. It is usually made of several pieces of 1 1/2-inch -thick lumber, called laminations, that are nailed, bolted, or glued together with the grain of all pieces running parallel (Figure 7-3 A). When necessary, manufacturers can achieve extra length by splicing additional pieces so that no two adjacent laminations splice at the same point. Built-up beams and girders are examples of laminated lumber. Figure 7-3 — Examples of laminated lumber and manufactured truss. Designers can incorporate laminations independently or with other materials in the construction of a structural unit. They may design trusses made with laminations for the chords and sawed lumber for the web members (Figure 7-3 B). Special beams (Figure 7-4 A) may have laminations for the flanges and sawed lumber for the webs.  7-7 Figure 7-4 — Examples of laminated beam and scarf techniques. Probably the most common use of laminations is in the fabrication of large beams and arches. Builders have erected beams with spans larger than 100 ft and depths of 8 1/2 ft with laminated beams manufactured with 2-inch boards. Laminations this large are factory-produced, glued together under pressure, and spliced using scarf joints (Figure 7-4 B). Then the entire piece is dressed to ensure uniform thickness and width.

1.3.0 Plywood Plywood is a panel product made from thin sheets of wood called veneers. Manufacturers generally use an odd number of veneers, such as three, five, or seven, so the grains on the face and back of the panel run in the same direction. Crosslamination distributes the grain strength in both directions, creating a panel that resists splitting and, pound for pound, is one of the strongest building materials. Dry from the mill, plywood is never "green." From oven-dry to complete moisture saturation, a plywood panel swells across or along the grain only about 0.2 % and considerably less with normal exposures. No other building material is as versatile as plywood. Builders use it for concrete forms, wall and roof sheathing, flooring, box beams, soffits, stressed-skin panels, paneling, partitions, doors, furniture, shelving, cabinets, crates, signs, and many other purposes. Figure 7-5 — Typical plywood grain direction.  7-8 1.3.1 Sizes Plywood is generally available in panel widths of 36, 48, and 60 inches and in panel lengths ranging from 60 to 144 inches in 12-inch increments. Other sizes are also available on special order. Panels 48 inches wide by 96 inches long (4 by 8 feet), and 48 inches wide by 120 inches long (4 by 10 feet), are the most commonly available sizes. The 4 by 8 feet and larger sizes simplify construction, saving time and labor. Sanded panels range from 1/4 to 1 1/4 inch or greater nominal thickness, generally in 1/8-inch increments. Unsanded panels range from 5/16 inch to 1 1/4 inch or greater in nominal thickness, in increments of 1/8 inch for thicknesses over 3/8 inch, and increments of 1/16-inch for thicknesses under 3/8 inch. 1.3.2 Types Exterior and interior are the two plywood classifications.

• Exterior plywood has high-quality veneers and more durable adhesives enabling it to better withstand exposure to the elements.

• Interior plywood can withstand an occasional wetting but not permanent exposure to the elements. 1.3.3 Grades There are several grades within each type of plywood. Knotholes, pitch pockets, splits, discolorations, and patches, all affect the grade of the facing veneer, and the grade of veneer, along with the kind of glue used, will determine the grade of the panel (N, A, B, C, or D).

• N---Special order natural finish veneer. Select all heartwood or all sapwood. Free of open defects. Allows some repairs.

• A---Smooth and paintable. Neatly made repairs permissible. Also used for natural finish in less demanding applications.

• B---Solid surface veneer. Circular repair plugs and tight knots permitted.

• C---Knotholes to 1 inch. Occasional knotholes to ½ inch. Larger knotholes permitted providing total width of all knots and knotholes within a specified section does not exceed certain limits. Limited splits permitted. Minimum veneer permitted in exterior-type.

• C---Improved C (plugged) veneer with splits limited to 1/8 inch in width and knotholes and borer holes limited to ¼ inch by ½ inch.

• D---Permits knots and knotholes to 2 ½ inch width and ½ inch larger under certain specified limits. Limited splits permitted.  7-9 1.3.4 Identification Stamps Each sheet of plywood has stamps on the edges and back for identification. It shows all the information needed about the sheet, except its actual size. Figure 7-6 — Typical plywood identification stamps. Sheathing panels, structural and standard, have stamps that very somewhat from the standard stamps. Figure 7-7 — Typical sheathing identification stamps.  7-10 Sheathing identification stamps do not provide the grade or species group, but they provide index numbers, 48/24 and 32/16, for the maximum spacing (in inches) of supports.

• 48/24, 32/16---Left of the slash is the maximum O.C. (on-center) spacing of supports for roof decking.

• 48/24, 32/16---Right of the slash is the maximum O.C. spacing of supports for subfloors.

• 48/0, 32/0---A number 0 on the right of the slash indicates that the panel is not appropriate for subflooring. For wall sheathing, you do not need to refer to the index number. You can find detailed information on specific types, grades, and uses for plywood in the commercial standards for plywood manufacture established by the U.S. Department of Commerce. You can find further information on general plywood characteristics and architectural usage in the National Lumber Manufacturing Association, or the Architectural Graphic Standards. The latter is a standard requirement in your unit’s technical library.

1.4.0 Special-Purpose Plywood There are other types of plywood available for specific purposes besides structural and sheathing. These include overlaid panels, decorative panels, and concrete form panels. Table 7-1 lists some of the various types of plywood with their suggested uses.

• Structural plywood o for heavy-load application when strength properties are of great importance. o for box beams, gusset plates, and stressed-skin panels o typically unsanded grades of C-D plywood

• Standard plywood sheathing o for subfloors, roof decks, and wall sheathing o for use in spaces that may be exposed to moisture during construction, but will be covered when construction is complete

• Overlaid panels o for use in furniture, cabinets, millwork, and exterior trims o exterior or interior types with a resin-treated fiber-surfacing material, on one or both sides, to hold paint and finishes more readily

• Decorative panels o for exterior and interior wall sheathing o manufactured in a multitude of designs and patterns o can be painted, stained, or left to weather naturally

• Concrete form panel o for multiple use as a concrete form  7-11 o has a coating over its exterior face to make it moisture-resistant and nonadhesive to concrete o exterior coating reduces the number of times the form must be oiled SOFTWOOD PLYWOOD GRADES FOR EXTERIOR USE GRADE (Exterior) FACE BACK INNER PLYS USES A-A A A C Outdoor where appearance of both sides is important. A-B A A C Alternative for A-A, where appearance of one side is less important A-C A C C Siding, soffits, fences. Face is finish grade. B-C B C C For utility uses such as farm buildings, some kind of fences, etc. C-C (Plugged) C C C Excellent base for tile and linoleum, backing for wall coverings. C-C C C C Unsanded, for backing and rough construction exposed to weather. B-B Concrete forms B C Concrete forms. Re-use until wood literally wears out. MDO B B C or C Plugged Medium Density Overlay. Ideal for base for paint, siding, built-ins, signs, displays. HDO A or B A or B High Density Overlay. Hard surface, no paint needed. For concrete forms, cabinets, counter tops, tanks.  7-12 SOFTWOOD PLYWOOD GRADES FOR INTERIOR USE GRADE (Interior) FACE BACK INNER PLYS USES A-A A A D Cabinet doors, built-ins, furniture where both sides show. A-B A B D Alternative of A-A. Face is finish grade, back is solid and smooth. A-D A D D Finish grade face for paneling, built-ins, backing. B-D B D D Utility grade. One paintable side. For backing, cabinet sides, etc. STANDARD C D D Unsanded. Sheathing and structural uses such as temporary enclosures, subfloor.

1.5.0 Common Wood Substitutes Many common substitutes for wood or plywood are available for use as construction material. Some are significantly less expensive than plywood; others are more suitable because of their decorative appearance and weather-resistant qualities. 1.5.1 Particleboard

• Commonly referred to as chip-board or flakeboard

• Produced by mixing a resin-bonding agent with wood particles and bonding them together with heat and pressure

• Limited to nonstructural use because of its low strength qualities

• Most common size sheets are 4 feet by 8 feet and vary from 1/4 to 1 1/2 inches thick. 1.5.2 Hardboard

• Made of compressed wood fibers subjected to heat and heavy pressure

• Obtainable in a plain, smooth surface or in any number of glossy finishes, some of which imitate tile or stone

• Strength is about equal in all directions, and it can be bent into various shapes

• Available in thicknesses from 1/8 inch to 3/8 inch.

• Most common size sheets are 4 feet by 8 feet. 1.5.3 Fiberboard

• Made of wood or vegetable fiber compressed to form sheets or boards

• Comparatively soft and provides good insulation and sound-absorbing qualities

• Available in sizes from 1/2 inch to 1 inch thick, 2 feet to 4 feet wide, and 8 feet to 12 feet long. Table 7-1 — Softwood plywood grades for interior and exterior use.  7-13 1.5.4 Gypsum Wallboard

• Composed of gypsum (widely available natural mineral) between two layers of heavy paper

• Some types have unfinished surfaces, others have finishes representing wood grain or tile

• Most common thickness is 1/2 inch, width is usually 4 feet, and length varies from 4 to 14 feet. Another type of gypsum wallboard has depressed or tapered edges. Finishers fill the joints with a compound (commonly called mud) and tape so the joints do not show, making the wallboard paintable. They may also use the compound (mud) to provide a texture to the smooth wall. This wallboard, commonly known as dry wall, is particularly useful in areas and spaces where the design calls for sound-deadening and fireresistant materials.

1.6.0 Treatment Decay, fungi, boring insects, weathering, or fire can destroy wood if it is not properly treated and installed. Treatment varies from project to project and more importantly, from one geographical area to another. Project specifications will usually provide information on any required type and quantity of treatment, but if not, the drawings should indicate any needed wood treatment. Manufacturers’ commercial standards contain information on wood pretreated by the manufacturer. NAVFAC publications and specifications provide technical information and design requirements for the treatment of wood used in buildings and structures under NAVFAC’s cognizance.

 

Test Your Knowledge

1. Lumber is initially classified by _______.

A. Yard, Dressed, Timbers
B. Use, Size, Extent of Manufacture
 C. Structural, Factory, Rough
D. Worked, Dressed, Boards

 

2.0.0 WOOD-FRAME STRUCTURES

In a wood frame building or structure, the framework consists mostly of wood loadbearing members joined together to form an internal supporting structure, much like the skeleton of a human body. A complete set of drawings for a building will include large-scale details for any typical sections, joints, and other unusual construction features. Understanding the functions of the structural members of a frame building will enable you to make these drawings correctly and promptly.

2.1.0 Theory of Framing

Generally, a building has two main parts: the foundation and the superstructure, i.e., that part above the foundation. Commonly called the framing, the framework of a wooden superstructure has three subdivisions.

• Floor Framing — consists mostly of horizontal structural members called joists.  7-14

• Wall Framing — utilizes vertical members called studs.

• Roof Framing — consists of both horizontal and vertical structural members. Sections

2.3.0,

2.4.0, and

2.5.0 will present more information on these subdivisions. Platform framing (Figure 7-8) (also called Western and Story-by-Story) and balloon framing (Figure 7-9) are the most common framing and construction methods in the United States and Canada. However, balloon framing has diminished in practical use because it requires longer materials. The striking difference between these two methods: Platform framing uses separate studs for each floor. These studs are anchored on a soleplate and attached to the floor below. Figure 7-8 — Typical platform framing.  7-15 Balloon framing extends the wall studs from the sill of the first floor to the top of the soleplate or end rafter of the second floor and the second floor joists sit upon a ledger. Figure 7-9 — Typical balloon framing.

2.2.0 Sill Framing and Layout The first element of the superstructure and the lowest horizontal wood frame member is the sill, a piece of dimensional lumber laid flat and bolted down to the top of the foundation pier or wall. It is the first part of the frame to be set in place and provides a nailing base for the other adjoining members. It may extend all around the building, joined at the corners and spliced when necessary. The type of sill assembly selected depends upon the general type of construction methods used in the framework. Sill assembly is the term for the connection framing the studs to the sill, and they differ for platform and balloon framing. Figure 7-10 — Box-sill assembly for platform framing.  7-16 Platform frame construction most frequently uses the box-sill assembly (Figure 7-10). In this type, the ends of joists butt against a header joist, which sits flush with the outer edge of the sill. Figure 7-11 — Box-sill assembly for platform framing with brick veneer. For platform framing with a brick veneer as exterior siding, the box sill is similar, except the sill, joist header, and joists recess to allow the brick to rest directly on the foundation wall. This may require a wider foundation wall. Balloon-frame construction uses the T-sill and Eastern assemblies. Here, the studs anchor on the sill and are continuous in one piece from sill to roof line. Figure 7-12 — T-sill assembly for balloon framing.  7-17 In a T-sill assembly for balloon framing, the header joist frames to the inside face of the studs with the joists sitting on the lip of the sill. (Figure 7-12) Figure 7-13 — Eastern sill assembly for balloon framing. In an Eastern sill assembly for balloon framing, the joists sit with full bearing on the sill, flush with the outside face of the studs. The joists nail directly to the studs and the header is now a fire-stop header, cut to fit between the joists. (Figure 7-13)

2.3.0 Floor Framing You must be familiar with a number of floor framing terms. (Figure 7-14)

• Joists or Beams---horizontal members that support the floors, depending upon the length of the SPAN (distance between the end supports). Joists are members less than 4 ft apart and beams are members 4 ft or more apart. The usual spacing for wood frame floor members is either 16 inches or 24 inches. O.C. Joists are usually 2 by 8, 2 by 10, or 2 by 12. Laminated joists or beams may be appropriate depending on the floor loading.

• Common Joist---a full-length joist that spans from wall to wall or from wall to girder

• Cripple Joist---similar to a common joist but does not extend the full span. Floor openings usually determine the number of cripples.

• Girder---horizontal member that supports joists at points other than along the outer wall lines. When the span is longer than a single joist can cover, a girder must provide intermediate support for joist ends. Concrete or masonry pillars and pilasters commonly support ground floor girders.

• Pillar---a girder support that is clear of the foundation walls.

• Pilaster---a girder support set against a foundation wall supporting the end of a girder. Pillars and pilasters are themselves supported by concrete footings with pilasters sometimes formed as part of the foundation wall.

• Girts---horizontal framing members that support the outer-wall ends of upperfloor joists in balloon framing.  7-18 Figure 7-14 — Framing terms and floor openings. 2.3.1 Framing around Floor Openings For any floor openings such as stairs, builders must cut the common joists and reinforce the opening with headers (at ends of joists) and trimmers (parallel to joists). See Figure 7-14. Specifications usually require headers and trimmers to be doubled— sometimes tripled. Headers up to 6 ft in length can be nailed; those longer than 6 ft are fastened with joist hangers.  7-19 2.3.2 Bridging Bridging is the system of bracing joists to each other to hold them plumb and aligned. It also serves to distribute part of a concentrated load over several joists. There are two types of bridging: Cross Bridging (Figure 7-15 A) Solid Bridging (Figure 7-15 B). Cross bridging consists of pairs of struts set diagonally between the joists. Strut stock comes in sizes of 1 by 3, 1 by 4, 2 by 2, and 2 by 4. Solid bridging consists of pieces of joist-size stock set at right angles between the joists. They can be staggered for easier installation. Builders use cross bridging more frequently, but solid bridging is more rigid. All spans greater than 6 feet should be bridged Figure 7-15 — Bridging. 2.3.3 Subflooring Subflooring is the next layer (or double layer) installed in platform framing. Typically it will be either boards (square-edge or tongue-and-grooved), or plywood 1/2 to 3/4 inch thick. (Figure 7-16).  7-20 Figure 7-16 — Typical floor framing with subflooring. Subflooring serves as a working platform, a base for wall soleplates, and additional strength/stability for finish flooring. Builders may install subflooring either diagonally (most common) or at right angles to the joists. Diagonal subflooring lets the builder lay finish flooring either parallel to, or, more commonly, at right angles to, the joists. Changes of direction add rigidity to the building. For parquet finish flooring or finish flooring laid parallel to the joists, joist spacing should not exceed 16 inches. on center.

2.4.0 Wall Framing Wall framing details will depend on whether the builder is using platform or balloon construction. Builders employ the platform framing method more often due to its simplicity. However, the terminology remains the same for both methods. (Figure 7-17) Studs, cripples, trimmers, headers, fire blocks (fire stops), top plates, and soleplates compose a typical wall frame. The wall-framing members used in conventional construction are generally nominal 2 by 4 inches but may be 2 by 6 inches depending on local insulation thickness requirements. The requirements for either are good stiffness, good nail-holding ability, freedom from warp, reasonable dryness (about 15- percent moisture content), and ease of working.  7-21 Figure 7-17 — Typical wall frame for platform framing.

• Studs---closely spaced vertical members of the wall framing. They support the top plates and provide the framework to install the exterior wall sheathing and the interior lath and plaster, or dry wall, and insulation.

• Cripple Studs---shorter versions of studs where openings interrupted the full height studs.

• Top Plates (or Caps) ---horizontal wood framing members nailed to the tops of the wall or partition studs.

• Soleplates---horizontal wood framing members that serve as nailing bases for studs in platform-framing construction.

• Headers---upper members of a rough doorframe or rough window frame. Also, similar members that form the ends of a rough floor or roof opening (as a skylight).

• Subsill---lower members of a rough window frame.

• Fire Block---blocking used at the mid span of a wood framed area to inhibit the advance of fire within a concealed space. 2.4.1 Partition Partition walls divide the interior space of a building. In most cases, builders form them as part of the building, but remodeling efforts often include changes in partition walls. There are two types of partition walls:

• Bearing Wall---supports the ceiling joists and any other loads

• Nonbearing Wall---supports only itself and is usually installed after the load bearing framework is in place Framing for partition walls, including headers and trimmers for openings and doors is the same as for outside walls. However, there are additional elements required to accommodate interior finish.

• Corner Posts or T-Posts---used at corners and where one partition wall joins another. They provide nailing surfaces for the inside wall finish (Figure 7-18)  7-22 Figure 7-18 — Typical Corner Posts and T-Posts for interior finish. 2.4.2 Braces Braces stiffen framed construction and help buildings resist the twisting or straining effects of wind or storm. Good bracing keeps corners square and plumb. It also helps prevent warping, sagging, and shifts resulting from lateral and external forces that would otherwise tend to distort the frame. Figure 7-19 — Typical types of bracing.  7-23 Diagonal bracing is most effective when installed at a 45° to 60° angle and it can be done after the wall has been squared and is still lying on the subfloor. There are three common methods of bracing frame structures: (Figure 7-19)

• Let-In Bracing—notched studs with a 1 by 4 inch board nailed to each stud flush with the exterior surface. This is the most widely used system.

• Cut-In Bracing---2 by 4 inch pieces cut at an angle and toenailed between studs at a diagonal from the top of a corner post down to the soleplate.

• Diagonal Bracing---each board or panel of the exterior sheathing acts as the brace. Builders typically use let-in or cut-in bracing to minimize any additional damage to exterior sheathing from this bracing method.

2.5.0 Roof Framing To shed water, all roofs must slope. There are a multitude roof styles and designs to meet a designer’s and an owner’s interest. The four most common are also the simplest to build. (Figure 7- 20)

• Intersecting Roof---a gable and valley or hip and valley intersecting each other at right angles.

• Shed Roof---a single surface that slopes downward from a ridge on one side of the structure.

• Gable Roof---two surfaces sloping downward from a ridge located between the sides of the structure, usually, but not always, midway between them.

• Hip Roof---pitched on the sides like a gable roof and pitched on one or both ends. Figure 7-20 — Most common types of pitched roofs.  7-24 2.5.1 Roof Pitch To calculate roof pitch you must be familiar with the following terms. (Figure 7-21)

• Unit of Rise ---the distance the rafter rises per foot of run (unit of run).

• Total Rise---the vertical distance from the top plate to the top of the ridge, or the altitude of the right triangle.

• Unit of Run---a fixed unit of measure, always 12 inches for the common rafter, always measured on a level plane.

• Total Run---equal to half the total span, or the base of one of the right triangles.

• Unit of Span---a fixed unit, twice the unit of run, or 24 inches.

• Total Span---the horizontal distance from outside one top plate to another

• Line Length---the hypotenuse of the triangle whose base equals the total run and whose altitude equals the total rise.

• Pitch---the ratio of unit of rise to the unit of span. It describes the slope of a roof. Figure 7-21 — Roof framing terms. The pitch (amount of slope) of a roof is expressed as a fraction in which the numerator is the unit rise and the denominator is the unit span. By common practice, unit run is always 12 inches so unit span is always 24 inches (unit run x 2). Expressed in equation form, x Unit Run Unit Rise Unit Span Unit Rise Pitch 2 = = Suppose a roof rises 8 units for every 12 units of run—meaning that unit rise is 8 and unit run is 12. Since the unit span is 24, (unit run x 2) the pitch of the roof is 8/24, or 1/3. Figure 7-21 provides a visual expression with a framing square. Construction drawings indicate the pitch of a roof by a small roof triangle. The triangle is drawn to scale so that the length of the horizontal side equals the unit run (which is  7-25 always 12), and the length of the vertical side equals the unit rise. With those two figures, the builder will know the pitch. 2.5.2 Rafter Layout Rafters are framing members that support a roof. They do for the roof what joists do for the floor and what the studs do for the wall. They are generally inclined members spaced from 16 to 48 inches apart that vary in material size, depending on their intended length and spacing apart. The type of roof and the intended span will determine the fastening method for the top of the rafters. The bottoms of the rafters rest on the wall top plates, which provides a connecting link between the wall and the roof and is really a functional part of both. The structural relationship between the rafters and the wall is the same for all types of roofs. Rafters are NOT framed into the top plate. They are simply nailed to it, or in some instances, cut to fit the plate. In hasty construction, builders merely lay the rafters on the top plate and nail them in place. Rafters may extend a short distance beyond the wall to form eaves and protect the sides of the building. Refer to Figure 7-22 for a typical roof framing plan and relate the figure to the following rafter terms. Figure 7-22 — Typical roof framing plan.

• Common Rafters—extend from the top plates to the ridgeboard at right angles to both.

• Hip Rafters—extend diagonally from the corners formed by perpendicular plates to the ridgeboard.

• Valley Rafters—extend from the top plates to the ridgeboard along the lines where two roofs intersect.

• Hip Jacks—lower ends rest on the top plate and upper ends rest against the hip rafter.

• Valley Jacks—lower ends rest against the valley rafters and upper ends rest against the ridgeboard.

• Cripple Jacks—nailed between hip and valley rafters.  7-26

• Jack Rafters—Hip jacks, valley jacks, or cripple jacks.

• Top or Plumb Cut—cut made at the end of the rafter to be placed against the ridgeboard or, if the ridgeboard is omitted, against the opposite rafters.

• Seat, Bottom, or Heel Cut—cut made at the end of the rafter that is to rest on the plate.

• Side, or Cheek, Cut—bevel cut on the side of a rafter to fit against another frame member.

• Eave or Tail—portion of the rafter extending beyond the outer edge of the plate. A Bird’s-Mouth Cut is often notched into a rafter with a projection (or eave). The plumb cut of the bird’s-mouth that bears against the side of the rafter plate is called the heel cut, whereas the seat cut bears on top of the bird’s-mouth. Figure 7-23 — Bird’s-mouth cut. Collar ties are horizontal members used as reinforcement in gable or double-pitch roof rafters. In a finished attic, these ties may function as ceiling joists. Figure 7-24 — Typical collar ties.  7-27 Purlins serve as nailing or connecting members when rafter spacing is far apart. Primarily used with metal buildings, purlins may also apply to light wood frame structures when the entire roof framing design incorporates appropriate sheathing and nailing for rigidity. Figure 7-25 — Typical roof purlins. There are several roof designs that call for a variety of framing methods and an even greater variety of rafter arrangements. Figures 7-26 through 7-33 present only a few of the simplest and most common. Look to see how many of the examples include bird’smouth cuts. Figure 7-26 — Flat and shed roof framings.  7-28 Figure 7-27 — Gable roof framing. Figure 7-28 — Equal-pitch roof framing.  7-29 Figure 7-29 — Addition roof framing. Figure 7-30 — Gable dormer framing without sidewalls.  7-30 Figure 7-31 — Gable dormer framing with sidewalls. Figure 7-32 — Types of jack rafters.  7-31 Figure 7-33 — Typical cripple jacks. 2.5.3 Roof Trusses When a roof span is too great, or the anticipated roof load (the roof itself, wind, ice, snow) will exceed the capabilities of a simple rafter roof, builders use a truss, an engineered structural frame. Truss designs to accommodate spanning distances and desired roof design are almost limitless. Figure 7-34 shows a number of roof truss designs. Figure 7-34 — Variety of roof trusses. The King Post-truss is the simplest type of truss with an upper and lower chord and a vertical center post The W-truss is perhaps the most widely used. It uses four web members assembled in the shape of the letter W instead of a center post. For structures  7-32 with an interior sloped ceiling, such as a vaulted ceiling, the Scissors-truss is appropriate. Figure 7-35 — Sample engineered truss In engineered trusses, gusset plates (metal plates or plywood pieces) connect chords and webs with glue, nails, or bolts. Engineered truss manufacturers usually use specially designed and manufactured gussets. (Figure 7-35) Test Your Knowledge  2. In a wood frame building or structure, wood load-bearing members join together to form a supporting structure. Generally, a building has ___ main parts called_____. A. 3, Floor Frame, Wall Frame, Roof Frame B. 2, Platform Frame, Balloon Frame C. 2, Foundation, Superstructure

3.0.0 BUILDING FINISH

Building finish is that part of a project that typically completes the project but has nothing to do with the structural elements of the building. General practice divides the finish work into exterior (outside) and interior (inside) finish. Builders refer to this stage of construction to as finish carpentry. Other trade disciplines have a “Finish” stage to their contributions also. Both the electricians and plumbers have a “Rough-in” (nonstructural) and “Finish” element to their work. Figure 7-36 provides typical terminology for exterior finish carpentry.   7-33 Figure 7-36 — Typical terms for exterior finish carpentry. 3.1.0 Exterior Finish The principal exterior finish items are the roof sheathing and covering, the wall sheathing and/or siding, and the exterior trim. Builders may install the roof sheathing and wall sheathing at the same time, but standard practice dictates that the roof sheathing installation occur first to allow interior work to proceed during inclement weather. In many cases, the exterior wall will already have paneling as part of the structural element of a building, and sheathing the roof provides the next stage to “drying-in” the building. The exterior finish for the walls in this case will consist only of the siding. 3.1.1 Roof Sheathing and Roof Covering Roof sheathing is the covering over the rafters or trusses and usually consists of boards, plywood, or oriented strand board (OSB). Local codes will determine the required thickness of the roof sheathing, but 1/2 to 3/4 inch is typical for plywood and OSB, with 3/4 to 1 inch typical for board lumber. Sheathing should be thick enough to span the supports and provide a solid base for fastening the roofing materials. If the design requires boards for roof sheathing, generally, it will be third grade species of lumber, such as pines, redwoods, and hemlocks. In damp climates when the finish roof consists of wood shingles or shakes, spaced roof boards provide the sheathing. When using asphalt shingles, metal sheet roofing, or other roofing materials that require continuous support, builders should lay the roof sheathing closed (without spacing). When plywood or OSB roof sheathing is used, the grain should run perpendicular to the rafters. (Figure 7-37)   7-34 Figure 7-37 — Typical roof sheathing. Pitched-roof covering can be a variety of materials: wood, asphalt shingles, tile, slate, galvanized iron (GI) sheets, or one of several other sheet materials. However, in all cases an asphalt-saturated felt underpayment called roofing felt goes down over the roof sheathing before the roof covering installation. The roofing felt serves three basic purposes:

• It keeps the roof sheathing dry until shingles are installed.

• It acts as a secondary barrier against wind-driven rain and snow.

• It protects the shingles from any resinous substance released from the sheathing. Figure 7-38 shows the typical method of laying an asphalt-shingle roof with metal edge flashing to protect gable ends. Roofing rolls are usually 36 inches wide with a 2 inch to 4 inch overlap. The completed roof typically leaves 5 inches of each shingle exposed to the weather Figure 7-38 — Typical asphalt-shingle roof.  7-35 Figure 7-39 shows typical installation of wood shingles. Wood shingles are available in three standard lengths: 16, 18, and 24 inches with the18-inch length perhaps the most popular. Wood shakes are applied the same as wood shingles. The primary difference between shakes and other types of shingles is that shakes are split while most shingles are sawn on all sides. Figure 7-39 — Typical wood shingle/shake installation. On flat or low-pitched roofs, the roof covering is usually built-up. Built-up roofing consists of several layers (plies) of felt, set in a hot binder of melted pitch or asphalt. The number of plies they contain always designates built-up roofs. Figure 7-40 — Typical built-up roof installation. Figure 7-40 shows a five-ply built-up roof. Note that the building paper is in addition to the number of designated plies, and the spacing varies for paper, nailer, and hot mop layers. Notice also the use of aggregate surfacing materials, such as gravel, slag, marble, or other suitable materials, to provide a good weathering surface and protect the bitumen from sunlight and external heat. 3.1.2 Flashing Flashing is specially constructed pieces of corrosion-resistant metal or other materials used to protect buildings from water seepage. Its purpose is to prevent moisture (rain or  7-36 melted snow) from penetrating the junctions where materials change. Builders should install flashing at roof ridges, chimneys, roof-wall intersections, over exposed windows and doors, and at changes of material or direction on sidings. Figures 7-41 through 7-43 demonstrate flashing applications. Figure 7-41 — Typical flashing at roofing edge and build-up. Flashing materials used on roofs may be asphalt-saturated felt, metal, or plastic. Felt flashing is generally used at ridges, hips, and valleys. However, when available, metal flashing, either aluminum, galvanized steel, or copper, is superior to felt. Figure 7-42 — Typical flashing at roofing valley and material change.  7-37 Figure 7-43 — Typical flashing at siding change of materials and direction. 3.1.3 Wall Sheathing The exterior wall sheathing is often part of the structural element of a building. For the exterior finish work, the wall covering term is wall siding or just siding. Many local building codes require “house wrap” over the wall sheathing before the installation of exterior siding. The house wrap may be building paper (think tar/felt paper) or commercially available spun-bonded synthetic fiber material. It provides a second layer of weather and wind protection between your wall sheathing and your wall siding. Exterior wall siding can be stone, brick, stucco, masonry, vinyl, aluminum, plastic ,fibercement, plywood, fiberboard, veneers, hardboard, paneling, wood shingles, numerous other materials, or any combination of materials. There are too many options to cover in this lesson, as the only limit is the imagination of the designer, be it the owner or an architect. However, for wooden board siding here are two main general types: Drop Siding and Common Siding. Drop siding joins edge to edge (rather than overlapping). Common siding consists of boards that overlap each other like shingles. (Figure 7-44) Figure 7-44 —Typical drop and common siding.   7-38 Clapboards are boards not more than 4 feet long. Boards in longer lengths but not more than 8 inches wide are called bevel siding. Builders may install some sidings in either a horizontal or vertical direction if adequate nailing areas were considered in the design. Figure 7-45 shows three different styles of vertical siding application. Figure 7-45 — Vertical board siding styles. 3.1.4 Exterior Trim When installing the roof sheathing to “dry-in” a structure, the builder must consider the exterior finish at and just below the eaves of the roof, called the cornice. The practical purpose of a cornice is to seal the joint between wall and roof against weather penetration. Cornices may be simple, open, flat boxed or slope boxed. Figure 7-46 shows a simple type of cornice, used on a roof with no rafter overhang. Figure 7-46 — Simple cornice.  7-39 Figure 7-47 shows an open cornice. Note that in the simple and open cornices, the sheathing and frieze go to the underneath side of the roof sheathing. This requires a backing between the rafters above the top plate. However, the builder must allow for ventilation similar to closed cornices. Note in the closed cornices, boxed or sloped, that the frieze board goes to the underneath side of the rafters. Figure 7-48 Figure 7-47 — Typical open cornice. Figure 7-48 — Typical closed cornices, boxed and sloped.  7-40 A Cornice Return is a short extension of a cornice along the gable-end wall. (Figure 7-49). Eaves are the rafter-end edges of a roof. Rakes are the gable-end edges of a roof. A hip roof has eaves all the way around. A gable roof has two eaves and two rakes. Just as the frieze trims the eave side at the roof, rake molding and fascia trim the gable side at the roof. Figure 7-49 — Cornice return, gable fascia and rake molding. 3.1.5 Gutters and Downspouts Gutters and downspouts keep rainwater away from the foundation of the building and need to be part of the building design. (Figure 7-50). They may be made of galvanized metal, copper, aluminum, or plastic. Some metal types have a factoryapplied enamel finish. Figure 7-50 — Typical gutter and downspout.   7-41 Some gutters are built into the cornice design and connected to the downspouts (Figure 7-51) The run off should flow into a “wet line” that caries the water away from the structure into a drain or storm sewer. Figure 7-51 — Typical gutter as part of the cornice. 3.2.0 Interior Finish The interior finish consists mainly of the coverings applied to the rough inside walls, ceiling, and subfloors. Other interior finish items are ceiling and wall coverings, doorframes and window frames, stairs, floor covering, and wood trims. When required, installation of kitchen and built-in cabinets are considered part of the interior finish. 3.2.1 Ceiling and Wall Covering Ceiling and wall covering is broadly divided into plaster and drywall covering. Though some builders still use “lath-and-plaster” finish in construction today, drywall finish has become the most popular. A plaster covering requires a "plaster base" and a "plaster ground" before installation. The plaster base provides the plane-surface base to which the plaster is applied. The plaster grounds, thin wooden strips on end, serve as a depth guides for the plasterers to ensure uniform plaster thickness around door frames, window frames, and behind casings. In addition to the preparation required, application itself involves water and a drying period of 2-3 weeks between layers with the typical application in 3 layers (Scratch, brown, and finish). Drywall covering is a general term applied to sheets or panels of wood, plywood, fiberboard, and the most accepted and understood term, gypsum wallboard, or “sheetrock”. Drywall finish requires only short drying time since application requires little, if any, water. However, a gypsum drywall demands a moderately low moisture content in the framing members to prevent “nail-pops.” Nail-pops result when frame members dry out to moisture equilibrium, causing the nail head to form small “humps” on the surface of the board. Stud alignment is also important for single-layer gypsum finish to prevent a wavy, uneven appearance. Thus, there are advantages and disadvantages to both plaster and gypsum drywall finishes. The choice should consider initial cost as well as maintenance.  7-42 Thin sheet materials, such as gypsum board or plywood, require that studs and ceiling joists have good alignment to provide a smooth, even surface. The wood sheathing on exterior walls often corrects any misaligned studs. For interior partitions and ceilings, depending on the alignment of the studs and joists, a “strongback” (Figure 7-52) may be necessary for proper alignment. Figure 7-52 — Typical ceiling “strongback.” Gypsum wallboard is the most commonly used wall and ceiling covering in construction today. Because gypsum is nonflammable and durable, it is appropriate for application in most building types. Sheets of drywall are nailed or screwed into place, and nail indentions or “dimples” are filled with joint compound (mud). Joints between adjoining sheets are built up with special tape and several layers (usually three) of joint compound. Drywall is easily installed, though joint work can be tedious. (Figure 7-53) Figure 7-53 — Typical drywall installation. Drywall varies in composition, thickness, and edge shape. The most common sizes with tapered edges are 1/2 inch or 5/8 inch in 4 feet by 8 feet and by 4 feet by 12 feet sheets. Type X gypsum board has special additives that make it fire resistant Figure 7-54 shows typical application of other types of drywall finishes, vertical wood paneling, and tongue and groove horizontal paneling.   7-43 Figure 7-54 — Additional drywall applications. A variety of ceiling systems are available to change the appearance of a room, lower a ceiling, finish off exposed joints, or provide acoustical control. Suspended acoustical ceiling systems can integrate the functions of lighting, air distribution, and fire protection. (Figure 7-55) Acoustical tiles are available in 12-to 30-inch widths, 12- to 60- inch lengths, and 3/16- to 3/4- inch thicknesses, for use with the other grid system components. (Figure 7-56, View A) Figure 7-55 — Typical suspended acoustical ceiling. As an alternative to a suspended acoustical ceiling, depending on the type of ceiling or roof construction, builders may install tiles directly in various ways, such as with wood strips nailed across the ceiling joists, roof trusses, or drywall. (Figure 7-56, View B).  7-44 Figure 7-56 — Typical grid system components and alternative installation. 3.2.2 Insulation and Vapor Barriers Heating (or air conditioning) has important effects upon the occupants of a building. Insulation improves both functions for comfort conditions and fuel savings. Materials commonly used for insulation fall into these classifications: blanket, batt, loose-fill, reflective, and rigid. Manufactured in a variety of forms and types, their insulating values vary with the type of construction, kinds of construction materials used, and thickness. Figure 7-57 shows different types of insulation commonly used in construction. Figure 7-57 — Typical types of insulation. Vapor barriers help keep moisture from seeping through wall, floor, and ceiling materials. Among the effective vapor-barrier materials are asphalt laminated papers, aluminum foil, and plastic film. Most blanket and batt insulations have paper-backed aluminum foil on one side to serve as a vapor barrier. Foil-backed gypsum lath or gypsum boards are also available and serve as excellent vapor barriers.  7-45 Most climates in the United States recommend barrier placement on the inside face of the exterior wall, but some climatic conditions recommend the reverse. For the deep-south, the U.S. Department of Energy recommends vapor barrier placement on the exterior side of walls (Figure 7-58). Where other types of membrane vapor barriers were not installed during construction, several coats of paint provide some protection. Aluminum primer with several coats of flat wall (latex) or oil paint is minimally effective in retarding vapor transmission. Figure 7-58 — Vapor Barrier Placement By Geographical Location. (U.S. Dept. of Energy) Condensation and moisture facilitate decay, attracting termites or carpenter ants depending on the geographical location. Even where vapor barriers are used, condensation of moisture vapor may occur in the attic, roof spaces, or crawl spaces, if any, under the building or porch. Ventilation is the most practical method of removing condensation that may encourage decay. Common practice is to install ventilators. They can be part of the exterior design or placed in the eave soffits. For a building with a foundation wall, vents are part of the initial concrete pour. Figures 7-59 and 7-60 show several types of venting. Figure 7-59 — Typical building ventilation at attics and foundations.  7-46 Figure 7-60 — Typical building ventilation at soffits. 3.2.3 Stairs Treads, which people walk on, and stringers, which support the treads, are the two principal elements in a stairway. The simplest type of stairway consists of these two elements alone. Figure 7-61 — Typical stair terms.  7-47 Figure 7-61 shows commonly used terms for an interior finished stairway. The stairway has three stringers, each of which is cut out of a single timber. Cutout or sawed stringer is the common term for this type of stairs. On some stairways, the treads and risers nail to triangular stair blocks attached to straight-edged stringers. A stairway that continues in the same straight line from one floor to the next is a Straight-Flight stairway. (Figure 7-61). A Change stairway is one that changes direction one or more times between floors when space does not permit a straight-flight. A change stairway in which there are platforms between sections is a Platform stairway. A building may have principal stairs and service stairs. Principal stairs are those extending between floors above the basement and below the attic floor. Service stairs just provide access to a room such as porch, basement, or attic. The lower ends of the stringers on porch, basement, and other stairs that anchor on concrete use a kickplate (Figure 7-62). Figure 7-62 — Typical kickplate. 3.2.4 Finish Flooring Wood finish flooring and resilient finish flooring are the two main categories for flooring. Most wood finish flooring comes in tongueand-groove for edge-joining; some are end-matched as well. Usually recessed on the lower face, wood flooring strips typically toenail through the subflooring (usually plywood) into joists. (Figure 7-63) Figure 7-63 — Typical toenailing wood finish flooring.   7-48 In Navy structures, for maintenance and durability, resilient flooring has supplanted wood finish flooring. Most of it in the form of 6 by 6, 9 by 9, or 12 by 12 floor tiles. Materials commonly used are asphalt, linoleum, cork, rubber, and vinyl. With each type of tile, the manufacturer recommends an appropriate type of adhesive for attaching the tile to the subflooring. On other areas subject to a high degree of dampness, ceramic or glazed interior tile is commonly used. Ceramic tiles are used to cover all or part of bathrooms, shower rooms, and some kitchen floors. 3.2.5 Doors Standard doors and combination doors (storm and screen) are millwork items usually fully assembled at the factory and ready for use. All wood components are treated with a water-repellent preservative to provide protection against the elements. Manufacturers offer interior and exterior doors in a multitude of different designs to fit the style of almost any building. They may be solid or hollow core. (Figure 7-64) Panel doors are the traditional pattern type, consisting of stiles (solid vertical members), rails (solid cross members), and filler panels in a number of designs. Flush doors consist of thin plywood faces over a framework of wood with a wood block or particleboard core. Exterior flush doors use a solid-core rather than hollow-core type to minimize warping caused by a difference in moisture content on the exposed and unexposed faces of the door. Exterior doors require weatherstripping to reduce both air infiltration and frosting of the glass on the storm door during cold weather. Exterior doors are usually 1 3/4 inch thick and not less than 6 feet 8 inches high. The main entrance door is 3 feet wide, and the side or rear door is normally 2 feet 8 inches wide. The exterior trim can vary from a simple casing (the trim used around the interior edges of door openings and windows) to a molded or plain pilaster. Figure 7-64 — Typical exterior and interior door styles. Interior panel doors (colonial and five-cross type) are similar to the exterior doors. Novelty doors, such as the folding door unit, are commonly used for closets because they provide ventilation and take less swing room.   7-49 Interior flush doors are usually a hollow core of light framework covered with thin plywood or hardboard. Most standard interior doors are 1 3/8 inch thick. Hinged doors should open or swing in the direction of natural entry, against a blank wall, and should not be obstructed by other swinging doors. Doors should NEVER be hinged to swing into a hallway. Figure 7-65 shows the principal parts of the interior finish of an exterior doorframe (note the sill). Figure 7-65 — Principal parts of a finish doorframe. On an inside door, the frame consists only of the side and head jambs (and no sill). The casings are part of the interior trim. Figure 7-66 — Typical exterior door and frame details. On an outside door, the frame includes the side and head casings. Figure 7-66 shows section detail drawings of an exterior combination doorframe.  7-50 3.2.6 Windows While windows have a surface on the exterior of the building, they are part of the interior finish. Windows, like doors, come in a large variety of options, and you need to be familiar with the terminology.

• Sash---the part of a window that forms a frame for the glass, considered part of the interior finish.

• Casement---a window with a sash hinged at the side, single casement if there is only one sash, double casement if there are two

• Transom---a window hinged at the top or bottom

• Jalousie---a window with a number of horizontally hinged sashes that open and close together like a venetian blind

• Double Hung---a window with two sashes that slide vertically past each other Figure 7-67 shows a typical casement window from an exterior view’ Figure 7-67 — Out-swinging casement window cross sections: A. Head jamb; B. Meeting stiles; C. Side jambs; D. Sill. Finish frames for all of these windows are similar. Like a finish doorframe, they consist of side jambs, head jamb, sill, and outside casing (the inside casing being considered part of the inside-wall covering). However, a double-hung window frame contains some items that are NOT used on frames for other types of windows. Figure 7-68 shows section drawing details for a double-hung window.  7-51 Figure 7-68 — Double-hung windows cross sections: A. Head jamb; B. Meeting rails; C. Side jambs; D. Sill. Construction drawing schedules give the dimensions, type, and number of lights (panes of glass) for each window in the structure. For example, No. 3, DH, 2 feet 4 inches by 3 feet 10 inches 12 LTS means window No. 3 (it will have this number on any drawing in which it appears) is a double-hung window with a finished opening, of 2 feet 4 inches by 3 feet 10 inches with 12 lights of glass. Arrangement of the lights will show in any view in which the window appears. On one of the lights, a figure such as 8/10 will appear, meaning each light of glass has nominal dimensions of 8 by 10 inches. Figure 7-69 shows a double-hung window sash and the names of its parts. Figure 7-69 — Parts of a double-hung window sash.   7-52 3.2.7 Wood Trims Depending on the selection (plain or ornate), the interior wood trims can be the most prominent features of the interior. The inside door and the window casings are at constant eye level, but baseboards are another feature designed to finish off the interior. Baseboards cover the joint between the inside walls and the finish floors which are usually dissimilar materials. Crown (ceiling) molding is not as common since often the wall and ceiling are the same material. Bur crown molding can complete a project with a professional look. Base and crown moldings are available in several widths and forms. Figure 7-70 shows a typical base molding configuration; Figure 7-71 a typical crown molding.

Figure 7-70 — Typical base molding configuration.

Figure 7-71 — Typical crown molding. 

Test Your Knowledge

3. Finish carpentry involves completing the___________.

A. Exterior structural elements only
B. Interior structural elements only
C. Exterior and Interior structural elements
D. Exterior and interior non-structural elements

 

4.0.0 HARDWARE

Hardware is a general term covering a wide variety of accessories, usually made of metal or plastic and ordinarily used in building construction. Hardware includes both finishing and rough hardware.

• Finishing Hardware--- o items made in attractive shapes and finishes o usually visible as an integral part of the finished structure o includes locks, hinges, door pulls, cabinet hardware, window fastenings, door closers and checks, door holders, automatic exit devices, lockoperating trim, knobs and handles, escutcheon plates, strike plates, knob rosettes. push plates, push bars, kickplates, doorstops, flush bolts.

• Rough Hardware--- o items NOT usually finished for attractive appearance o includes casement and special window hardware, sliding and folding door supports, fastenings for screens, storm windows, shades, venetian blinds, awnings Other items may be considered hardware. If you are not sure whether an item is hardware or what its function is, refer to a commercial text, such as the Architectural Graphic Standards in your engineering technical library.

5.0.0 FASTENERS

The devices used in fastening or connecting members together to form structures depend on the material the members are made of. The most common fastening devices are nails, screws, and bolts.

5.1.0 Nails There are many types of nails. Their intended use and form determines their classification. The standard nail is made of steel wire. The wire nail is round-shafted, straight, pointed, and may vary in size, weight, head size and shape, type of point, and finish. The holding power of nails is less than that of screws or bolts. Common wire nail and box nail (Figure 7-72) are the same, except that box nail wire sizes are one or two numbers smaller for a given length than those of the common nail.

• Finishing nail — made from finer wire and has a smaller head than the common nail or box nail. Its head may be driven below the surface of the wood, which leaves only a small hole that is easily puttied.  7-54

• Duplex nail — appears to have two heads. Actually one serves as a shoulder to give maximum holding power while the other projects above the surface of the wood to make withdrawal simple.

• Roofing nail — round-shafted and galvanized. It has a relatively short body and comparatively large head. Like the common wire, finishing, or duplex nail, it has a diamond point. Figure 7-72 — Common wire nails. Besides the general-purpose nails, there are special-purpose nails. Examples include wire brads, plasterboard nails, concrete nails, and masonry nails. The wire brad has a needlepoint; the plasterboard nail has a large-diameter flathead. The concrete nail is hardened for driving in concrete. So is the masonry nail, although its body is usually grooved or spiraled. Lengths of wire nails NOT more than 6 inches long are designated by the penny system, in which the letter d is the symbol for a penny. Thus, a 6d nail means a sixpenny nail. The number expresses the wire thickness, which relates to standard wire gauge; the larger the number, the thicker the wire. Figure 7-72 gives nail sizes (penny and length in inches), gauges, and approximate number of nails per pound. The penny does not designate any nails over 6 in; those are called spikes.

5.2.0 Screws A wood screw is a fastener that threads into wood. Type of head and material from which they are made designates their description; for example, flathead brass or roundhead steel. Figure 7-73 shows some common types of screws.  7-55 Its length in inches and a number relating to its body diameter (the unthreaded part) designate the size of a wood screw. This number runs from 0 (about 1/15-inch diameter) to 24 (about 3/8-inch diameter) Lag screws (lag bolts) are often required where ordinary wood screws are too short or too light, or where spikes do not hold securely. They are available in lengths of 1 to 16 inches and in body diameters of 1/4 to 1 inch Their heads are either square or hexagonal allowing for more torque advantage for installation. Sheet metal screws and thread-cutting screws assemble sheet metal, sheet aluminum, and other thin metal parts. Sheet metal screws are selftapping. They can fasten metals up to about 28 gauge. Thread-cutting screws can fasten metals that are 1/4 inchc thick or less. Figure 7-73 — Common types of screws.

5.3.0 Bolts and Drift Bolts A bolt is a fastener having a head at one end and threads at the other, as shown in Figure 7-74. Instead of threading into wood like a screw, it goes through a bored hole and is held by a nut.

• Stove Bolts — range in length from 3/8 to 4 inches and in body diameter from 1/8 to 3/8 inch. Not especially strong, they are used only for fastening light pieces.

• Carriage and Machine Bolts — strong enough to fasten load-bearing members, such as trusses. In length, they range from 3/4 to 20 inches; in diameter, from 3/16 to 3/4 inch. The carriage bolt has a square section below its head, which embeds in the wood as the nut is set up, keeping the bolt from turning.

• Expansion Bolts — in conjunction with an expansion shield, provide anchorage in a material or position when a threaded fastener will not function. Expansion bolts often have a concrete application for anchorage.  7-56

• Drift Bolts (driftpins) — long, heavy, threadless bolts used to hold heavy pieces of timber together such as piers, wharves, and jetties.

• Corrugated Fasteners (Figure 7-75) — used in a number of ways; for example, to fasten joints (miter) and splices together and as a substitute for nails where nails may split the timber. Figure 7-74 — Common bolts and Drift bolts (Driftpins). Figure 7-75 — Corrugated fasteners.

5.4.0 Structural Connectors and Fastening Systems

Many modern NCF projects will utilize commercially available metal structural connectors and fastening systems designed and fabricated by the Simpson StrongTie® Company. These are structural products that help engineers design and build safer and stronger projects and buildings and will be called out in plans as what and where they are to be used in construction. While there are hundreds of different connector products you should be familiar with the major categories for fastening/connecting wood structural members to wood and concrete. These include Structural Connectors used in trusses, Joist Hangers used in floors, Straps and Ties for securely connecting frame walls to rafters and window and door headers. Anchor Bolts or Embedded Holddowns for single and multi-story buildings. All structural connectors or anchor tiedown systems are made from hot-dip galvanized (HDG) or stainless steel to address corrosion resistance requirements. See Figure 7-76 for just a few examples of possible Structural Connector applications.

5.4.1 Wood to Wood and Wood to Concrete

The use of connectors is designed to form a continuous load path from foundation to the roof system. This load path is critical because it helps hold a structure together when high winds try to pull it apart. Building codes require structures to be built with a continuous load path and the designs vary with code. Straps are designed to transfer tension loads and resist uplift rafter to wall, while the holddown will resist uplift wall to foundation. Figure 7-76 — Structural connector applications.  7-58 When a building is not built on a slab, you will need to utilize some sort of floor joist hanger. Depending on what type of wall you have will determine the type of hanger you must use. See Figure 7-77 for a couple of examples. If your building calls for some sort of post construction, you will be faced with the proper method for installing posts. The proper type of post cap and base (Figure 7-78) is important, and in some cases local code may call for a particular type. Figure 7-77 — Joist hangers. Figure 7-78 — Examples of post caps and bases.  7-59 When you are attaching horizontal and vertical lumber, you will be required to make a good bond between the two or more pieces. Utilizing a tie (Figure 7-79) is a good method, and will make it easier to calculate the angles and nail placement.

 

Figure 7-79 — Examples of ties.

5.4.2 Connector Fastening

Many Simpson Strong-Tie connectors have been designed and tested for use with specific types and sizes of nails. Some of these nails are built by the Simpson StrongTie® Company as in the N54A ring shank nail in Figure 7-80. The specified quantity, type and size of nail must be installed in the correct holes on the connector to achieve published loads. Other factors such as nail material and finish are also important. Incorrect fastener selection or installation can compromise connector performance and could lead to failure. On projects where specific structural connectors are required, the types of nails to be used during construction will also be specified.

5.5.0 Glue

Glue, one of the oldest materials for fastening, if applied properly, will form a joint that is stronger than the wood itself. Probably one of the best types of glue for joint work and furniture construction is animal glue, made from hides. Other types of glue are extracted from fish, vegetables, casein, plastic resin, and blood albumin. Glue can be obtained commercially in a variety of forms—liquid, ground, chipped, flaked, powdered, or formed into sticks.

Summary

The construction trades use terminology and stages of construction for wood and light frame structures that may be unfamiliar to you. They are well-established terms that provide a common language for all stages and personnel on a project. The more familiar and comfortable with the language of construction you become the more confident and valuable you will become to your unit, to the Navy and to yourself. Figure 7-80 — Structural connector nails.

Review Questions

  1. Which of the following construction materials is considered the most often used and the most important? A. Wood B. Steel C. Concrete D. Plastic 2. For small construction projects that do NOT have written specifications included, where should you be able to find the type and classification of wood? A. In the sheets attached to the drawings B. In the drawings themselves C. In the bill of materials D. In the special standards 3. In construction, the terms “wood,” “lumber” and “timber” have distinct and separate meanings. Which of the following definitions is an accurate description? A. Wood is a soft, fibrous substance B. Timber is lumber with a dimension of not less than 5 inches C. Lumber is trees that have not been cut D. Wood is lumber that has been made into manufactured products 4. Which of the following descriptions best defines “Millwork”? A. Wood selected for sawmill work B. Timber made into lumber C. Lumber made into manufactured products D. Wood after it has been through the sawmill 5. In what way, if any, can the nominal size of lumber be compared to its dressed size? A. It is larger B. It is the same C. It is smaller D. It cannot be compared 6. What designation applies to wood surfaced on two sides only? A. S2S B. S2E C. SS2 D. 2SS  7-62 7. In which of the following ways is lumber designated on drawings and purchase orders? A. Dressed only B. Nominal only C. Dressed or nominal, whichever you chose 8. When classified according to use, manufactured lumber falls into what three categories? A. Boards, dimension, and timbers B. Rough, dressed, and worked C. Yard, structural, and factory D. Boards, shop, and yard 9. When classified according to size, manufactured lumber falls into what three categories? A. Boards, dimension, and timbers B. Rough, dressed, and worked C. Yard, structural, and factory D. Boards, shop, and yard 10. When classified according to extent of manufacture, manufactured lumber falls into what three categories? A. Boards, dimension, and timbers B. Rough, dressed, and worked C. Yard, structural, and factory D. Boards, shop, and yard 11. What are the two major grades for yard lumber? A. Finish and Common B. Select and Common C. Finish and Utility D. Select and Utility 12. Which type of lumber is primarily graded by its allowable stresses? A. Factory B. Structural C. Shop D. Yard 13. What lumber grade is considered suitable as watertight lumber? A. No. 1 common B. No. 2 common C. Grade A select D. Grade B select  7-63 14. What is the minimum grade that lumber must meet to be considered grain-tight? A. No. 1 common B. No. 2 common C. Grade A select D. Grade B select 15. What formula should you use to find the board foot measurement of lumber? A. Thickness (inches) x Width (inches) x Length (inches) 12 B. Thickness (inches) x Width (inches) x Length (yards) 36 C. Thickness (inches) x Width (inches) x Length (feet) 12 D. Thickness (feet) x Width (feet) x Length (feet) 12 16. Which of the following dimensions should you use to compute the amount of board feet in a dressed 2- by 4-inch board? A. 1 3/4 by 3/4 in B. 2 by 4 in C. 1 5/8 by 3 5/8 in D. 1 7/8 by 3 5/8 in 17. How are the laminations (pieces) fastened together when you laminate lumber? A. Nailed and glued together, with the grain of all pieces running perpendicular B. Nailed or glued together, with the grain of all pieces running parallel C. Nailed, bolted, or glued together, with the grain of all pieces running perpendicular D. Nailed, bolted, or glued together, with the grain of all pieces running parallel 18. Plywood is generally made with an ___number of plies with grains running ______. A. even, parallel B. even, perpendicular C. odd, parallel D. odd, perpendicular  7-64 19. For which of the following purposes is plywood used? A. Formwork B. Sheathing C. Furniture D. Each of the above 20. What are the two most common sizes of plywood sheets? A. 3 by 6 ft and 4 by 8 ft B. 4 by 8 ft and 4 by 10 ft C. 4 by 8 ft and 4 by 12 ft D. 4 by 10 ft and 4 by 12 ft 21. How are plywood panel grades generally designated? A. By the grade of veneer on the face only B. By the kind of glue only C. By the grade of veneer on the face and back only D. By the kind of glue and the grade of veneer on the face and back 22. What does the number 24 represent when index numbers 48/24 appear on a grading identification stamp? A. Minimum on-center spacing of supports for subfloors B. Maximum on-center spacing of supports for roof decking C. Maximum on-center spacing of supports for subfloors D. Maximum on-center spacing of supports for wall studs 23. Which type of plywood is recommended for use in box beams, gusset plates, and stressed-skin panels? A. Standard B. Decorative C. Overlaid D. Structural 24. Which of the following types of wood substitute provides good fire resistance? A. Fiberboard B. Gypsum wallboard C. Particleboard D. Hardboard 25. The type and amount of wood treatment is normally given in the project specifications. When no written specifications exist, where should you be able to find the wood treatment required? A. Bill of materials B. Commercial standards C. Drawings D. American Plywood Association  7-65 26. The framework of a wooden superstructure has three distinct framing subdivisions. They are the ________. A. platform, balloon, and roof B. platform, wall, and roof C. floor, wall, and roof D. floor, wall, and balloon 27. What is the first wood superstructure member to be set in place? A. Header B. Joist C. Soleplate D. Sill 28. What is the striking difference between platform framing and balloon framing? A. --studs go from soleplate to top plate Platform—separate studs go from floor to floor, Balloon B. --studs go from soleplate to top plate Balloon—separate studs go from floor to floor, Platform C. Platform--joists support the floor, Balloon--beams support the floor D. Balloon--joists support the floor, Platform--beams support the floor 29. What is the difference between a common joist and a cripple joist? A. A cripple joist extends the full span, but a common joist does not. B. A common joist extends the full span, but a cripple joist does not. C. A cripple joist may be supported by a girder, but a common joist is never supported by a girder. D. Common joists are supported by pilasters, while cripple joists are not. 30. At a door opening in an exterior wood-framed wall, the names of the horizontal members that connect at the (a) top and (b) bottom of the cripple studs are_________. A. (a) header (b) soleplate B. (a) top plates (b) soleplate C. (a) top plates (b) header D. (a) header (b) subsill 31. Bridging is a bracing system to keep the _____ plumb and aligned. A. studs B. rafters C. joists D. headers  7-66 32. Which of the following method(s) is/are commonly used to brace wood frame structures? A. Diagonal bracing B. Let-in bracing C. Cut-in bracing D. All of the above 33. What is the rise per unit of run for a 1/4 pitch roof? A. 12 in B. 6 in C. 8 in D. 4 in 34. A ___________ rafter extends from top plates to the ridgeboard at right angles to the plates. A. Common B. Valley C. Hip D. Cripple 35. _______ are rafters that are nailed between hip and valley rafters. A. Common jacks B. Cripple jacks C. Valley jacks D. Hip jacks 36. What is the purpose of purlins in wood frame construction? A. To serve as a nailer for roofing B. To act as a diagonal brace C. To support align joists D. To serve as trimmer for openings 37. What type of roof covering is generally used on flat or nearly flat roofs? A. Galvanized iron sheets B. Asphalt shingles C. Tile D. Built-up 38. What material provides the weathering surface on a built-up roof? A. Asphalt shingles B. Aggregate C. Roofing felt D. Asphalt binder  7-67 39. What is the exterior finish called at and just below the eaves? A. Rake B. Return C. Cornice D. Bed 40. What type of common siding comes in lengths of more than 4 feet and widths of 8 inches or less? A. Bevel B. Drop C. Clapboard 41. What elements are the two principal parts of a stairway? A. Stringers and risers B. Treads and risers C. Treads and stringers D. Stringers and nosing 42. What type of stairway continues in a straight line from one floor to the next? A. Change B. Cleat (open-riser) C. Platform D. Straight-flight 43. What are the two categories of stairs? A. Principal and service B. Main and porch C. Basement and attic D. Front and rear 44. What stairs extend between floors above the basement and below the attic? A. Basement B. Porch C. Attic D. Principal 45. Which of the following types of stairs is a service stair? A. Porch B. Principal C. Personnel D. Equipment  7-68 46. Finish flooring is broadly divided into _______types. A. Resilient and carpet B. Wood and concrete C. Resilient and wood D. Carpet and asphalt tile 47. What is the primary difference between exterior and interior flush doors? A. An exterior flush door always swings to the outside of a building. B. Exterior flush doors have a solid core. C. Plywood is never used as the outside face of an exterior flush door. D. Interior flush doors may be fabricated on the construction site, but exterior flush doors are always factory-assembled. 48. What are the principal parts of the frame of an inside door? A. Head jamb and side jambs only B. Head and side jams and head and side casings C. Sill, head jamb, and side casings D. Sill, side jambs, and head casing 49. What part of a window forms a frame for the glass? A. Casement B. Sash C. Frame D. Finish 50. What type of window contains several horizontal hinged sashes that open and close together? A. Casement B. Louver C. Jalousie D. Double-hung 51. What type of information does the window schedule provide on construction drawings? A. Type of windows B. Size of windows C. Number of panes of glass for each window D. Each of the above 52. When the figure 6/12 appears on one of the lights in the window schedule, the dimensions of the glass are _____dimensions A. Nominal B. Rough C. Actual D. Finish  7-69 53. Which of the following items is/are considered to be the most prominent interior trim? A. Inside door casing only B. Window casing only C. Inside door and window casings D. Crown molding 54. Which of the following items are considered to be hardware? A. Sliding door supports B. Fastenings for screens C. Strike plates D. All of the above 55. Which of the following materials are considered to be finishing hardware? A. Fastenings for screens B. Sliding door supports C. Folding door supports D. Hinges 56. Which of the following material is considered rough hardware? A. Special window hardware B. Strike plates C. Push plates D. Escutcheon plates 57. Nails are classified according to __________. A. Use and form B. Length and thickness C. Composition D. Holding power 58. What type of nail is made from finer wire and has a smaller head than the common nail? A. Box B. Finishing C. Plasterboard D. Roofing 59. What type of nail has two functions: maximum holding power and easy withdrawal? A. Roofing B. Finishing C. Box D. Duplex  7-70 60. Which of the following characteristics should be included in a description of a roofing nail? A. Round shafted, galvanized, short body, large head B. Square shafted, galvanized steel, long body, medium-sized head C. Specially hardened steel, noncorrosive D. Triangular shafted, nongalvanized 61. What type of nail usually has a grooved or spiraled body? A. Plasterboard B. Concrete C. Masonry D. Roofing 62. What symbol indicated a penny when used to describe the length of wire nails? A. a B. b C. c D. d 63. What designation(s) expresses the thickness of a wire nail? A. Number only B. Letter only C. Both number and letter D. Size 64. What designation expresses a nail longer than 6 inches? A. Roofing B. Spike C. Concrete D. Plasterboard 65. What factors designate the description of a wood screw? A. Type of head and material B. Length and pitch C. Type of thread and body diameter D. Length and body diameter 66. What factors designate the size of a wood screw? A. Type of head and material B. Length and pitch C. Type of thread and body diameter D. Length and body diameter  7-71 67. What type of screw should be used when ordinary wood screws are too short or too light, or where spikes do NOT hold securely? A. Lag bolt B. Special purpose C. General purpose D. Thread-cutting 68. What type of screw is self-tapping? A. Wood B. Sheet metal C. Lag D. Brass 69. Sheet metal screws can fasten metal up to _______ thickness. A. 28 gauge B. 30 gauge C. 32 gauge D. 34 gauge 70. What type of screws are used to fasten metals up to one-fourth inch thick? A. Sheet metal B. Thread-cutting C. Lag D. Flathead brass 71. What type of bolts, because of their lack of strength, are used only for fastening light pieces? A. Carriage B. Machine C. Stove D. Expansion 72. Which of the following types of bolts should be used to fasten load-bearing members? A. Lag B. Expansion C. Stove D. Carriage 73. What type of bolt has a square section below the head that embeds into the wood to keep the bolt from turning? A. Carriage B. Expansion C. Machine D. Stove  7-72 74. What type of bolt is used to provide anchorage in a material or position when a threaded fastener will not function? A. Carriage B. Expansion C. Machine D. Stove

 

Chapter 8 Concrete and Masonry

As an engineering technician, your contributions to a project will span across the various trade disciplines. You may be creating the drawings, estimating materials for a segment of the project, doing material takeoffs, or any of a number of other tasks that make a project move forward successfully. As you advance in experience and rank, you may work closely with the Quality Control division to provide project oversight. To be a success, you need to be familiar with the terms and language of those different aspects of construction. This segment will introduce you to one of the most commonly used and permanent elements: concrete and masonry.

When you have completed this lesson, you will be able to:

1. Describe the different types and requirements of concrete.
2. Describe the different types and requirements of masonry.

Contents

1.0.0 Concrete

2.0.0 Masonry

Summary

Review Questions


1.0.0 CONCRETE

To quote the Portland Cement Association, an industry organization, “In its simplest form, concrete is a mixture of paste and aggregates. The paste, composed of portland cement and water, coats the surface of the fine and coarse aggregates. Through a chemical reaction called hydration, the paste hardens and gains strength to form the rock-like mass known as concrete.” The known use of cement goes back as far as the Roman period where “Roman Cement” helped build some of the great architecture and public systems, many of which are still in place. Roman cement used the local natural resources found around the volcanic activity in Italy. (Figure 8-1) Figure 8-1 – Aqueduct built with Roman Cement. Portland cement is the most common cement used in today’s concrete mixtures, and its composition is very similar to that of Roman cement. Portland cement was the creation of Joseph Aspdin, a bricklayer from Leeds, England. Receiving a patent in 1824, he named this first effort for its resemblance to Portland stone, a highly valued building stone quarried on the Isle of Portland in southern England and used in many public buildings. His first effort was useful mainly for mortar and stucco, but his son William improved both the chemical ingredients and the manufacturing process to arrive at the precursor to modern portland cement. Figure 8-2 – Composition of concrete.  8-4 Concrete, as shown in Figure 8-2, is a mixture in proper proportions of cement (usually portland), fine aggregate (usually sand), coarse aggregate (usually gravel or crushed stone), and water; the product is not concrete unless it contains all four of these ingredients. A mixture of cement, sand, lime, and water, without coarse aggregate, is not concrete. It is mortar or grout.

• Mortar---used mainly for bonding masonry units together

• Grout---a water/cement mixture (called neat-cement grout) or water-sand-cement mixture (called sand-cement grout) used to plug holes or cracks in concrete, to seal joints, and for similar plugging or sealing purposes In concrete, the fine and coarse aggregates are inert, that is, they have no chemical properties and do not react with other chemicals. The cement and water are the active ingredients. To make concrete, you mix the aggregates (inert) and the cement (active) thoroughly together first, then add the water. As soon as you add the water, you have started a chemical reaction between the water and the cement. This chemical reaction, called hydration, causes the concrete to harden. Always remember: Hydration (the chemical reaction between the cement and water) causes the hardening process! Hardening is not a matter of drying out the mix. Instead, you must keep the concrete as moist as possible during the initial hydration process. Drying out causes a drop in water content below the amount required for satisfactory hydration. The fact that concrete will harden just as well under water as it will in the air demonstrates that drying out is not the hardening factor. You can cast concrete into bricks, blocks, and other relatively small building units (composed of various but specific ingredients) for assembly with mortar. This is concrete masonry construction. The proportion of concrete to other materials used in building construction has increased in recent years to the point that designers and builders construct large, multistory modern buildings entirely of reinforced concrete cast in place, or precast.

1.1.0 Requirements for Good Concrete A good concrete mix must have:

• a supply of good cement (a type suitable for the work at hand)

• a supply of fine aggregate (satisfactory sand)

• a supply of coarse aggregate

• water Workers must weigh and measure the proportions carefully to meet the mix designed for the current concrete pour. Everything else being equal, the mix with the best graded, best shaped, strongest, and cleanest aggregate will make the strongest and most durable concrete. However, the best designed, best graded, highest quality mix in the world will NOT make a good concrete pour if it is not workable enough to flow and thoroughly fill the spaces of a form. The concrete must be fluid (plastic) enough to flow into the forms and reach any corners without creating voids (rock pockets). On the other hand, too much water will decrease the concrete’s strength. Modern concrete mixes often use additives called plasticizers to increase the fluidity of the concrete pour without adding more  8-5 water. In addition, improper handling during the whole concrete making process (from the initial aggregate handling, to the mixing, to the final placement of the mix) can cause segregation of aggregate particles by size, resulting in non-uniform, poor concrete. Finally, if not properly cured, the best designed, best graded, highest quality, and bestplaced mix in the world will not produce good concrete. During the early stages of this chemical process, called hydration, concrete needs protection against loss of moisture. Concrete placers or finishers achieve this with a variety of methods from spray mists, to burlap bags, to plastic sheets, to leaving the forms in place for a given period. Strength, durability, and watertightness are the important properties of good concrete, and the water-cement ratio controls these factors. Generally, using less water produces a higher quality concrete provided the concrete is properly placed, consolidated, and cured. 1.1.1 Strength Concrete’s compressive strength is very high, but its tensile strength is relatively low. Concrete that must only resist compression may not require reinforcement. However, concrete that must resist stretching, bending, or twisting, (tensile forces) such as concrete in beams, girders, walls, columns, and the like, must be reinforced with steel commonly referred to as rebar. (Figure 8-3) Figure 8-3 – Examples of stress nomenclature. 1.1.2 Durability Along with strength, Figure 8-4 shows other properties of good concrete. Concrete’s durability is the extent to which it is capable of resisting deterioration caused by exposure to its intended service conditions. Ordinary structural concrete intended for exposure to the elements must be watertight and weather resistant. Concrete subject to wear, such as floor slabs and pavements, must be capable of resisting abrasion. The major factor controlling durability is strength—in other words, the stronger the concrete, the more durable it will be. As mentioned previously, the chief factor controlling strength is the water-cement ratio,  8-6 but the character, size, and grading of the aggregate also has important effects on both strength and durability. Even with a water-cement ratio that produces maximum strength consistent with workability requirements, the concrete will not attain that maximum strength and durability unless the fine (sand) and coarse aggregates are well-graded, clean, hard, and durable particles, free from undesirable substances. Figure 8-4 – Properties of good concrete. 1.1.3 Watertightness The ideal concrete mix would be one made with just the right amount of water required for complete hydration of the cement; however, this would be too dry a mix that is, too stiff to pour in the forms. A concrete mix fluid (plastic) enough to pour into forms always contains a certain amount of water over and above the amount needed for complete hydration, and this extra water will eventually evaporate, leaving voids or pores in the concrete. The concrete would be watertight if these voids were not interconnected. They are, however, interconnected by the slight sinking of solid particles in the mix during the hardening period. The mix starts after all, as a fluid mix that flows; and as the aggregate particles sink before complete hardening, they leave water-filled channels, which become voids when the water evaporates. The larger and more numerous the voids, the more compromised the watertightness of the concrete. Since the size and number of the voids vary directly with the amount of water used in excess of the amount required to hydrate the cement, it follows that to keep the  8-7 concrete as watertight as possible, you must not use more water than the minimum amount required to attain the necessary degree of workability.

1.2.0 Plain Concrete Plain concrete has no reinforcement and is most often used where strength is not essential and stresses are minimal, such as in sidewalks or driveways and floors without any anticipated heavy loading. There are exceptions though, such as the concrete block section pours so famous on the construction of Boulder Dam, now Hoover Dam. These segments were unreinforced, but the dam’s design capitalized on concrete’s compressive strength while tensile strength was not a factor for those particular elements of the dam.

1.3.0 Reinforced Concrete Reinforced concrete is concrete containing steel (bars, rods, strands, wire-mesh) as reinforcement and designed to absorb tensile and shearing stresses. Concrete structural members, such as footings, columns, beams, floor slabs, and walls, must contain reinforcement to attain the necessary strength in tension. 1.3.1 Reinforced Concrete Structural Members A reinforced concrete structure includes many types of reinforced structural members to attain the needed tension and shear strengths. These members are examined below. The builder may cast (pour) the members in place, precast them, or use a combination of both. 1.3.1.1 Footing and Footing Reinforcement Footings support the entire structure and distribute the structure’s load to the ground. The size and shape of a footing depends on the design of the structure and the load the footing must distribute across the ground. For small individual footings (spread footings), the rebar installers can preassemble (prefab) “steel mats” and place them after excavation or after the forms are set. (Figure 8-5) Figure 8-5 – Typical spread footing.  8-8 For large, continuous footings or grade beams, such as those found under bearing walls, installers will need to assemble the rebar in place. (Figure 8-6) Figure 8-6 – Typical continuous footing. 1.3.1.2 Column and Column Reinforcement A column is a slender, vertical member that carries a superimposed load. Concrete columns, especially those subjected to bending stresses, must always have steel reinforcement. Vertical reinforcement is the principal reinforcement, but a column under loaded stress tends to shorten vertically and expand laterally. Lateral ties serve to counteract those forces and restrain the expansion. Columns reinforced in this manner are tied columns. If the restraining reinforcement is a continuous winding spiral that encircles the core and longitudinal steel, the column is a spiral column. A spiral column placed below ground level as part of the foundation is a caisson. (Figure 8-7) Figure 8-7 – Typical tied and spiral column; typical caisson.  8-9 Like a column, a pier or pedestal (Figure 8-8) is also a member under compression stress but it is short (usually the height is less than three times the shortest lateral dimension) in relation to its cross-sectional area and carries no shear or torsion stress. Consequently, it may or may not need reinforcement. Figure 8-8 – Typical concrete pedestal. 1.3.1.3 Beam and Beam Reinforcement Beams are the principal load-carrying horizontal members. They take the loading stresses directly from the floor above and distribute them to the columns supporting the beams. As an engineering principle, the greatest reinforcement is always placed on the opposite (or far side) of the loading/lifting forces (Figure 8-9). To place the rebar opposite the forces, engineers may design both straight and truss bars to resist the bending tension in the bottom at the central portion of the span between the supports for the beam. Since fewer bars are necessary on the bottom near the ends of the span where the bending moment is small, some bars may be truss bars to serve as additional bars for the bottom central span and serve as additional bars for the top ends of the span as well. Figure 8-9 – Typical beam with truss bars. 1.3.1.4 Slab and Slab Reinforcement Concrete slabs come in a variety of forms depending on their location. Ground slabs (also called slabs on grade) take the load directly to the ground or to beams called grade beams placed below ground level. Plain slabs (similar in shape to ground slabs but on a formed surface) take the load directly from the floor and transmit it to beams. In other cases, joists, poured as part of plain slabs, carry the loads to the beams. Joists, similar to but lighter and smaller than beams, strengthen the middle portion of the slab.  8-10 Truss slabs using bars with a shape similar to that of truss bars used for beams are of particular interest since the truss bars must serve as lower reinforcement in the central part of the span and as upper reinforcement where supported from below. Note in Figure 8-10 the placing sequence required for placing reinforcing steel in a floor truss slab. Rebar installers need to follow a placing sequence to avoid additional labor and possible project delay. Figure 8-10 – Typical truss slab assembly. Installers can use a variety of devices to achieve proper concrete coverage around the rebar from the ground or form. They can support the rebar with individual plastic or heavy gauge wire supports called chairs or continuous strips called bolsters. They often use concrete blocks called dobies (sand-cement mortar) on the ground or with formed pours when use of those dobies does not affect the final appearance of the structure. Figure 8-11 – Typical rebar supports for clearance. The required concrete coverage determines the height of the chair, bolster, or dobie in Figure 8-11. Project specifications usually provide the minimum clearances necessary for the regional codes and project conditions i.e., Is the project near salt water? If not,  8-11 the American Concrete Institute provides standards in ACI 318 "Building Code Requirements for Reinforced Concrete." Typically, concrete surfaces in contact with the ground require 3 in. clearance and exposure to weathering requires 1/12- 2 in. If no rebar supports are available, wire ties and/or wood blocks may hold the rebar in position on a temporary basis (Figure 8-12) and be removed before the concrete sets. You should not use wood block without removal unless the structure is temporary. Figure 8-12 – Beam reinforcement with and without support. 1.3.1.5 Wall Reinforcement Rebar placement for load-bearing walls is the same as columns except that installers usually do it “in-place,” that is not preassembled. Vertical and horizontal members need a minimum of three ties in any length. If installers use wood blocks as temporary spacers (Figure 8-13), they must ensure the blocks do not fall into the wall during the pour and must remove them as the concrete nears the top of the pour height. Figure 8-13 – Wall reinforcement with temporary spacers. 1.3.2 Reinforcing Steel Steel is the best material for reinforcing concrete; their coefficients of expansion are almost the same, i.e., at a normal temperature, steel and concrete will expand and  8-12 contract at a nearly equal rate. Under extraordinary circumstances at very high temperatures, the steel will expand more rapidly than the concrete, and the two materials will separate. Steel is also the best because it makes a good bond with the concrete. This bond strength is in direct proportion to the amount of steel-concrete contact. In other words, the greater the surface of steel exposed to the adherence of the concrete, the stronger the bond. Concrete adherence depends on the roughness of the steel surface: the rougher the steel, the better the adherence. Thus, steel with a light, firm layer of rust is superior to clean steel, but steel with loose or scaly rust is inferior. Installers can remove loose or scaly rust by rubbing the bars with burlap or using a wire brush. Reinforcing steel must be strong in tension and, at the same time, ductile enough for shaping or cold bending. Reinforcing steel includes:

• Plain round bars

• Deformed bars

• Expanded metal

• Welded wire fabric (wire mesh) Each type is useful for a different purpose, and engineers design structures with these purposes in mind. Plain reinforcing bars are usually round in cross section. They are the least used of the rod type of reinforcement because they offer only smooth, even surfaces for the adherence of concrete. Deformed reinforcing bars are better than plain round bars. In fact, when using plain bars of a given diameter instead of deformed bars, you must increase the quantity by approximately 40 percent. The United States uses deformed bars almost exclusively, while Europe uses both deformed and plain bars. Deformed bars are like plain bars except that they have indentations, or ridges, or both in a regular pattern. Earlier versions of deformed rebar were available as square or with a spiral twist and workers may still encounter them during demolition or on remodeling projects of older structures. Current rebar suppliers deform the bars at the mill with patterns and markings (Figure 8-14) unique to their mill and to the tensile strength of the material.  8-13 Figure 8-14 – Sample mill patterns and tensile strength markings. There are 11 standard sizes of reinforcing bars (Figure 8-15). Bars No. 3 through No. 18 inclusive, are deformed bars. Bar numbers correspond to bar sizes to the nearest 1/8 in. (3. 175 mm) measured at the nominal diameter but not including any deformations. Note: At 13.6 pounds per foot, a #18 bar of any functional length quickly becomes too heavy for personnel handling and requires mechanical lifting equipment. Figure 8-15 – Reinforcing steel sizes and their tensile strength markings.  8-14 1.3.2.1 Bends Often, reinforcing bars need bending (fabrication) into various shapes to accommodate the stresses in the project’s design. Remember the reason for using reinforcing steel in concrete—to increase the tensile strength of concrete. Compare the hidden action within a beam to breaking a stick over your knee. As you apply force (compression) and your knee pushes toward the middle on one side of the stick, the splinters on the opposite side pull away (tension) from the middle. This is similar to what happens inside the beam. For instance, take a simple beam (a beam resting freely on two supports near its ends as in (Figure 8-16). The dead load (weight of the beam itself) causes the beam to bend or sag. Any additional nonpermanent load (live load) increases the loading stress (compression) at the top of the beam. Now, from the center of the beam to the bottom of the beam, the forces tend to stretch or lengthen laterally. This part is in tension, and that is where the beam needs the greatest reinforcement. Figure 8-16 – Compression and tension forces. With the combination of concrete and steel, the tensile strength in the beam resists the force of the loads and keeps the beam from breaking apart. At the exact center of the beam’s depth, between the compressive stress and the tensile stress, there is no stress at all—it is neutral. In the case of a continuous beam, it is a little different. The top of the beam may be in compression (between columns) along part of its length and in tension along another part (at columns). This is because a continuous beam rests on more than two supports. Thus, the bending of the beam is NOT all in one direction but reversed as it goes over intermediate supports. To help the concrete resist these stresses, engineers design the bends of reinforcing steel so installers will maximize the placement of additional rebar where the tensile stresses take place. That is why some rebar bends are in an almost zigzag (truss) pattern. Figure 8-17 shows some typical rebar bends you will encounter.  8-15 Figure 8-17 – Typical rebar bends. When bending reinforcing bars, benders in the field or fabricators in the shop must exercise caution to ensure the bends are not too sharp. Rebar may crack or weaken if bent too sharply. The American Concrete Institute (ACI 318 Building Code Requirements for Structural Concrete) has established minimum bend diameters for the different bar sizes and for the various types of hooks. There are many different types of bends, depending on where the rods are destined to be used. For example, there are hooks for the ends of heavy beams and girders, offset bends for vertical column splices at or near floor levels, beam stirrups, column ties, slab reinforcement, and spiral for round columns or foundation caissons. These bending details are shown in Figure 8-18  8-16 Figure 8-18 – Typical rebar bender and bending schedule. 1.3.2.2 Splices A lap splice of proper length can transmit tension stress through the concrete into the adjoining spliced bar. When engineers do not dimension rebar splices on the drawings, installers should lap bars 30 times their diameter, or not less than 12 in. The number of bar diameters expresses “lap.” For example, the 30-diameter lap for a #8 (1-in.) bar would be 30 in., and for a #4 (1/2 in.) bar it would be 15 in. If using a #3 bar, make the lap at least 12 in. 1.3.2.3 Expanded Metal and Welded Wire Fabric Builders also use expanded metal to reinforce concrete where there is only a minimal need for tensile strength. Manufacturers make expanded metal by partially shearing a sheet of steel in parallel lines, as shown in Figure 8-19, and then pulling it out and expanding it. Expanded metal comes in a variety of gauges and shapes, and plastering operations frequently use it to build the base (scratch) coat. Figure 8-19 – Expanded metal reinforcement. Welded wire fabric (WWF or wire mesh) is available in rolls of lighter gauge wire for light building construction and in sheets of heavier gauge wire for highways and buildings when roll gauge sizes will not give sufficient reinforcement (Figure 8-20). WWF is available in square and rectangular patterns in a wide variety of wire gauges welded at each intersection.  8-17 Figure 8-20 – Welded wire fabric (mesh). When ordering welded wire fabric in either the old or the new designations, the wire spacing (in each direction) comes first followed by the wire gauge (in each direction). The old designation used number (in inches) for spacing and number (in wire gauge) for the size of the WWF. The new designation uses number (in inches) for spacing but a letter and a number (in wire cross-section) for size. For example, in the old designation, 6x6 — 4x4 mesh would be 6-in. squares with 4- gauge wire in each direction whereas, 4x4 — 6x6 mesh would be 4-in. squares with 6- gauge wire in each direction. In the new designation, these would be 6x6 — W4xW4, and 4x4 — W2.9xW2.9 respectively. Figure 8-21 provides some typical WWF designations used for structural concrete. Figure 8-21 – Designations for welded wire fabric. When using WWF, specifications and designs usually indicate the minimum lap. As a practical matter, although a minimum lap of 2 in. may be sufficient for nonstructural concrete, for placement purposes a 1-square lap, regardless of the mesh spacing, is common to facilitate the installer’s ability to tie the laps together at intersections.  8-18 Installers use a number of different ties to join rebar together and hold it in the proper spacing and in place as the concrete pours. (Figure 8-22) The tie wire may come in large rolls (shoulder coils) where installers cut smaller sections off and roll it around the neck and shoulders as they use the wire. However, in today’s civilian industry where Ironworkers place the rebar, tie wire reels affixed to belts are the common method of distributing the wire. On small projects when only snap ties are necessary, another alternative is looped end tie wires. Figure 8-22 – Types of tie wire available. Figure 8-23 shows typical types of wire ties used by Ironworkers in the commercial industry. They use the ties with the “round turn” periodically for wall installation because as a horizontal bar tends to sag from its own weight or from personnel climbing, the tie tightens up with the round turn around the vertical bar. Figure 8-23 – Typical reinforcement placing ties.

1.4.0 Precast Concrete Known as cast-in-place, most concrete structural members are poured in their final position. Precasting is the fabrication of a structural member at a place other than its final position of use. It is best adapted to a factory or yard but jobsite precasting is not uncommon for large projects that require a large number of exact or similar pieces. Precast concrete can produce several different shapes and sizes, including piles, girders, and roof members.  8-19 Prestressed concrete is especially well adapted to precasting techniques. Fabricators make prestressed units by casting concrete around already tensioned tendons or bars. Prestressed concrete pours require stout anchoring points between which the heavy wire tendons (or bars) stretch under tension, usually in a straight line. The cured concrete adheres and bonds to the tendons (or bars). When the fabricators release the tension, it transfers to the concrete as compression by static friction. Generally, concrete structural members such as standard highway girders, poles, electric poles, masts, and some building members are precast by factory methods unless transportation difficulty makes jobsite casting more desirable. 1.4.1 Precast Concrete Floors, Roof Slabs, Walls, and Partitions Channel and double-T type precast slabs (Figure. 8-24, views A and B.) are the most commonly used panels for floor and roof decks. Channel slabs can vary in size from 9 to 12 in. deep, 2 to 5 ft. wide, 1 to 2 in. thick and to 50 ft. in length. If desired or needed, the concrete casters may extend the legs of the channels across the ends and, if used in combination with top slabs, can stiffen the channel with occasional cross ribs. Wire mesh may be the reinforcement in a top slab. Double-T slabs can vary in size from 9 to 16 ft deep, and 4 to 6 ft wide, and as long as 50 ft. When a top slab size ranges from 1 1/2 to 2 in. in thickness, it should be reinforced with wire mesh. Tongue-and-groove panels (Figure. 8-24 view C) can vary extensively in size, according to the design requirement. They sit in position much like tongue-and-groove lumber; that is, the tongue of one panel fits inside the groove of an adjacent panel. Large pier construction projects often use them as decking panels. Figure 8-24 – Typical precast panels. Welders ordinarily connect the floor and roof panels to supporting members with the matching plates built into the precast units. Builders can also precast vertical panels in a horizontal position in a casting yard or on the floor of the building. Cranes then set the precast units in their final position. (Figure 8-25)  8-20 Figure 8-25 – Crane with spreader bars erecting precast wall panel. Usually, these panels are solid, reinforced slabs, 5 to 8 in. thick, with the width varying according to the distances between columns or other supporting members. As it is with wood frame construction, when there are windows and door openings, extra reinforcements is required around the openings. A concrete floor slab with a smooth, regular surface can be the “casting surface.” When used for casting, builders should cover this smooth surface with a liquid or sheet material that prevents bonding between the slab surface and the vertical panel. The upper surface of the panel may be finished in the same way as regular concrete: by trowel, float, or broom. Sandwich panels are panels that consist of two thin, dense, reinforced concrete-face slabs separated by a core of insulating material, such as lightweight concrete, cellular glass, plastic foam, or some rigid insulating material. Designers sometimes specify these panels for exterior walls to provide additional heat insulation. The thickness of the sandwich panels varies from 5 to 8 in. and the faces are tied together with wire, small rods, or in some other manner. Matching plates also connect the wall panels to the building frame top and bottom by either welds or bolts. Caulking on the outside and grouting on the inside should make the points between the wall panels watertight. 1.4.2 Precast Concrete Joists, Beams, Girders, and Columns Joists are small, closely spaced beams used in floor construction. Small, closely spaced beams used in roof construction are purlins. Their shape in cross section is like a T or  8-21 an I. The ones with the inverted T-sections are usually used in composite construction where they support cast-in-place floor or roof slabs. The terms beam and girder usually apply to the same type of member but the one with the longer span is the girder. Beams and girders may be conventional precast design or prestressed. Most beams will be I-shaped unless the ends are rectangular but T-shaped ones are also usable. Precast concrete columns may be solid or hollow. If the designer specifies the hollow type, heavy cardboard tubing forms part of the column’s core. A looped rod previously cast in the column footing and projecting upward into the hollow core helps hold the column upright. An opening left in the side of the column allows the core to be filled with grout, which causes the embedded looped rod to become an anchor. The final step is dry packing the opening. 1.4.3 Advantages of Precast Concrete Precasting concrete has its greatest advantage when a project requires many identical members because the same forms are reusable several times. Some other advantages are:

• Control of concrete quality

• Smoother surfaces

• Less storage space required

• Weather conditions may not affect casting

• Better protection for curing

• Weather conditions do not affect erection

• Faster erection time

1.5.0 Prestressed Concrete A prestressed concrete unit is one in which engineered stresses have been placed by either pre-tensioning or post-tensioning before it has been subjected to a load. Pre-tensioning involves high-tensile strength steel strands as reinforcement (as well as other reinforcement) stretched in a straight line through a form between two end abutments or anchors. The steel strands receive a predetermined amount of stress and the concrete pour encases the reinforcement. As the concrete sets, it bonds to the pretensioned steel. When the concrete reaches a specified strength, the tension on the reinforcement is released. This pre-stresses the concrete, putting it under compression, thus creating a built-in tensile strength. Post-tensioning also involves high-tensile strength steel strands as well as other reinforcement, but in this method, workers place the strands under stress with hydraulic equipment after the concrete reaches a predetermined strength. One method involves hollow tubing placed within the concrete pour through which the workers later add the strands. Another method involves individual strands encased in grease-filled plastic casings. In both methods, unlike pre-tensioning’s straight pull, posttension cables must follow an engineered profile of highs and lows that provides tension at specific locations. Post-tensioning individual units at a precast location is an option, but common practice  8-22 has most post-tensioning operations done at the job-site on the cast-in-place concrete pour. In general, post-tensioning is used if the unit is over 45 ft long or over 7 tons in weight. Members that are relatively small or can be readily precast are normally pre-tensioned. These include precast roof slabs, T-slabs, floor slabs, and roof joists. However, some types of pre-tensioned roof slabs may be considerably longer and heavier than this. When a beam is prestressed, (Figure 8-26) by either pretensioning or post-tensioning, the tensioned steel produces a high compression in the lower part of the beam. This compression creates an upward bow, or camber, in the beam. When a load is placed on the beam, the camber is forced out, creating a level beam with no deflection. Figure 8-26 – Results of prestressing concrete beams.

1.6.0 Special Types of Concrete Special types of concrete are those with unique physical properties or those produced with unusual techniques and/or reproduction processes. Portland cement is the binding medium for many special types of concrete but some special cements use other binders. 1.6.1 Lightweight Concrete Lightweight concrete is usually classified according to its weight per cubic foot. Conventional concrete weighs approximately 150 lb per cubic foot. Lightweight concrete ranges from 20 to 130 lb per cubic foot, depending on its intended use. Concrete mix designers can use gas-generating chemicals or lightweight aggregates, such as expanded shale, clay, or slag, to make lightweight concrete. Insulating lightweight concrete has a unit weight ranging from 20 to 70 lb per cubic foot, and its compressive strength seldom exceeds 1,000 psi. This type of concrete is generally used for insulating applications, such as fireproofing. Concrete using perlite or vermiculite as aggregate is very light and used primarily as insulating material. Both perlite, (a volcanic glass) and vermiculite (a natural mineral) expand when exposed to the heat from the hydration process of cement and water.  8-23 Structural lightweight concrete has a unit weight of 90 to 115 lb per cubic foot and a 28- day compressive strength in excess of 2,000 psi. This type is used primarily to reduce the dead-load weight in concrete structural members, such as floors, walls, and the roof section in high-rise structures, thus reducing the foundation support requirements as well. Semi-lightweight concrete has a unit weight of 115 to 130 lb per cubic foot and an ultimate compressive strength comparable to normal concrete. In this mix, normal weight sand of is substituted partially or completely for the lightweight fine aggregate. 1.6.2 Heavyweight Concrete Heavyweight concrete uses special heavy aggregates and has a density of up to 400 lb per cubic foot. This type is principally for radiation shielding, counterweights, and other applications where higher density is desired. Except for density, the physical properties of heavyweight concrete are similar to those of normal- or conventional-weight concrete.

1.7.0 Tilt-Up Construction Tilt-up concrete construction is a special form of precast concrete building. This method consists of jobsite prefabrication in which the builder casts the wall as a horizontal slab, tilts it to a vertical position, and secures it in place. Tilt-up construction is best suited for large one-story buildings, but multistory structures can also be “tilt-ups.” Usually, multistory structures use platform construction by setting the walls for the first story, placing the floor above, then repeating the procedure for each succeeding floor. An alternate tilt-up method is to cast two- to four-story panels, similar to the balloon framing of wood structures. Because tilt-up walls are usually cast on the ground floor slab of the structure, builders must ensure the slab is smooth and level, temporarily plug all openings for pipes and other utilities, and treat the casting area with a good bond-breaking agent to ensure the panel does not adhere to the slab when lifted. 1.7.1 Reinforcement of Tilt-Up Panels The steel in a tilt-up panel is set in the same manner as it is in a floor slab. Placers set mats of rebar on chairs and tie it as needed. If it is a single mat, the reinforcement should be as near the center depth of the panel as possible. The reinforcing bars may run through holes provided in the side forms of the panel for future connection with the vertical supports (usually pilasters). When welded wire fabric or expanded wire mesh is the main reinforcing, reinforcing steel called dowels protrude through the holes to serve that function. Any openings need additional reinforcement. Mechanical lifting devices (usually a crane) pick up and tilt the panel to a vertical position using pickup inserts, specially designed tilt-up hardware. (Figure 8-27) Placers tie these inserts to the reinforcement at specific, designated locations to accommodate the maximum stress that occurs during the lifting process. Additional reinforcement may be necessary at these pickup locations. Some engineering manuals provide information on inserts, their locations, and capacities.  8-24 Figure 8-27 – Typical pick up insert for a tilt up panel. 1.7.2 Tilt-Up Panel Foundations An economical and widely used method to support tilt-up panels is a simple pad footing. (Figure 8-28) The floor slab, though constructed first, is NOT poured to the perimeter of the building. This permits later excavation and pouring of the footings as the tilt-up panels are curing. In this method, again like balloon framing, the panel sits on the footing below the slab level. Placers then complete the perimeter section of slab. It may connect directly to the outside wall panel via dowels placed in the panel before pouring, or the design may call for a trench to run mechanical, electrical, or plumbing lines. Another commonly used method is to set the panels on a perimeter grade beam or foundation wall at floor level. Regardless of the type of footing, the panel should be set into a mortar bed to ensure a good bond between the foundation wall and the panel. Figure 8-28 – Tilt-up panel set on a footing beam. 1.7.3 Panel Connections Designers can use a variety of ways to make tilt-up connections. The strongest method is a cast-in-place pilaster incorporating the doweled out panel rebar. However, this does not allow for expansion and contraction so the designer may prefer to tie only the corner panels into pilasters and allow the remaining panels to move.  8-25 Other methods are an option:

• Butted connection---using grout or a gasket if the wall does NOT contribute any structural strength to the structure

• Steel columns---welded to steel angles or plates secured in the wall panel

• Precast columns---steel angles or plates secured in both the columns and plate and welded together to secure the panel When the design calls for panel-to-panel connections that do not actually hold the panels in place, a typical method is to weld them to the foundation and to the roof by using steel angles or plates. Regardless of the type of connection, they must all be waterproof. This is usually accomplished with expansion joint material placed between panels not closed by any of the other designed connections. 1.7.4 Finishes Tilt-up panel finish is similar to any other concrete floor or wall. While some unique finish may require an exterior face-up pour, most will require the typical exterior facedown pour. A face-up pour will affect the panel hoisting and the pick up insert locations.

1.8.0 Concrete Construction Joints and Connections Construction joints (Figure 8-29) are divisions between concrete pours done at intervals spaced widely enough to allow partial hardening. Some are at natural stages of construction, others are necessary due to the capability or availability of the concrete itself depending on the size of the pour. Construction joint locations must be where they will cause the minimum amount of weakness to the structure; for example, where the shearing stresses and bending moments are relatively small or where other structural members will support the joints. For horizontal work, such as floor slabs, construction joints should be in a vertical plane, whereas for vertical work, such as columns, the joints should lie in a horizontal plane. Figure 8-29 – Typical location of construction joints. Foundation walls bond to footings with vertical dowels which extend from the footings  8-26 high enough beyond the construction joint to achieve the required lap for the next wall pour (Figure 8-30). A wedge-shaped through, called a keyway, is built into the footing to strengthen the bond between footings and walls. In areas where water seepage at construction joints may be a concern, a variety of water stop products is available. Figure 8-30 – Typical construction joint with keyway, water stop, and dowels. 1.8.1 Contraction Joints Contraction joints control cracking caused by temperature changes incident to concrete shrinkage. Cutting to a depth of one-fourth to one-third the thickness of the section typical serves as a dummy contraction joint. Some contraction joints are made with a filler and a thin coat of paraffin, asphalt, and/or other materials to break the bond. Local temperatures may require contraction joints in reinforced concrete slabs at 15-to 25-ft intervals in each direction (Figure 8-31). Figure 8-31 – Typical contraction joint.  8-27 1.8.2 Expansion Joints Expansion joints (also called isolation joints) are necessary wherever expansion might cause concrete to buckle because of temperature change. An expansion joint may be a pre-molded cork or mastic filler to separate sections from each other, thus allowing room for expansion if local conditions anticipate elongation or closing of the joint. Figures 8-32 shows expansion joints for a variety of locations. Figure 8-32 – Typical expansion joints.

1.9.0 Concrete Forms Builders place (cast) most structural concrete by pouring plastic (flowing) concrete into spaces enclosed by previously constructed forms. Once the concrete hardens into the shape outlined by the forms and reaches any required strength, workers remove (strip) the forms. Forms for concrete structures must be tight, rigid, and strong. If the forms are NOT tight, loss of water and paste may cause sand streaking, rock pockets, and weakness to the concrete. The forms must be strong enough to resist the high pressure exerted by the concrete during its plastic state. 1.9.1 Form Materials Builders often use undisturbed soil or clay, if sufficiently rigid and excavated to proper dimensions, as earth forms for foundation elements. However, design, specifications, and construction methods dictate what form materials are necessary for specific structures above grade. Commonly used form materials are wood, plywood of various grades, steel, and fiberglass. Forms for concrete pavement and curves should be metal. Surfaces exposed to view in the finished structure and those requiring special finishes need additional attention to detail. 1.9.2 Foundation Forms Foundation forms (Figure 8-33) may include forms or parts of forms for column footings, pier footings, grade beams, and wall footings. Whenever possible, builders excavate the soil to the proper dimensional depth and use the earth to form the base and sometimes the sides of the foundation pour. In most cases, footings are cast directly upon the earth with appropriate rebar clearances, and only the sides are molded in forms when necessary.  8-28 Figure 8-33 – Typical footing form for piers and columns.  8-29 1.9.3 Wall Forms Builders often prefabricate wall forms but they can build them in place as well, depending on the shape and the desirability for reuse. Wall forms have five basic parts: (Figure 8-34)

• Sheathing---shapes and retains the concrete until it sets

• Studs---form a framework and support the sheathing

• Wales---keep the form aligned and support the studs

• Braces---hold the forms erect under lateral pressure

• Ties and spreaders or tie-spreader units---hold the sides of the forms at the correct spacing Figure 8-34 – Typical wall form.  8-30 Wall forms must maintain their dimensional measurement during the pour. To achieve this on simple walls, builders often use a combination of wood blocks cut to the wall depth as spreaders and wire passed around the studs and wales for compression. (Figure 8-35) This requires periodic holes in the forms through which to pass the wire, which is cut off after the forms are removed. When using this method, workers must be sure to remove the spreaders as the concrete approaches and not let them fall into the pour. Figure 8-35 – Wire ties and wood spreaders for wall form. For larger walls and projects with sufficient wall pours to justify the material purchase, two alternative methods (metal snap ties and tie rods) have replaced the wire and block spreader. (Figure 8-36) Both systems perform the spreading and compression function simultaneously. An inner section holds the wall forms apart with washers or cones while an outer section on both sides holds the forms together. The ties come in a variety of standard inner dimensions to accommodate a structure’s design. Both systems may require grouting to fill the small holes created, depending on the desired finish.  8-31 Figure 8-36 – Typical snap tie wall form. The use of prefabricated (prefab) panels for formwork is on the increase. The panels are reusable many times, thus reducing the time and labor required for erecting forms piecemeal on the site. A potential downside in using prefabbed panels is the cumulative weight of the panel. Careful consideration needs to go into the prefab planning for handling the panels and if necessary make provisions for mechanical handling. There are many types of prefabricated forms to select. Contractors sometimes build their own panels from wood framing covered with plywood sheathing. Metal frame with plywood sheathing panels are also in common use and available in a variety of sizes. Special sections provide form for inside corners, pilasters, and so forth. Patented panel clamps hold panels together and flat bar ties lock into place between panels, eliminating the need for spreaders. Forms are aligned by the use of one or more doubled rows of 2 by 4's secured to the forms by a special device attached to the bar ties. Panels made completely of steel are also available. Inside and outside corner sections are standard, and insert angles allow the contractor to make up odd-sized panels.  8-32 Large placement projects requiring mass concrete often use giant panels or ganged panels. Crews assemble these large forms on the ground, and cranes are necessary to hoist and place them, so equipment availability is the only limit to their size. (Figure 8-37) Figure 8-37 – Typical ganged wall form system. With all wall forms, whether built in place or prefabbed, builders must give special attention to corners. (Figure 8-38) These are weak points because the continuity of sheathing and wales is broken, particularly at the inside corner. Forms must pull together tightly at these points to prevent leakage of concrete. Figure 8-38 – Typical wall form at corners. 1.9.4 Column Forms In Figure 8-39, yokes brace a typical concrete column form to hold the sheathing together against the plastic concrete’s bursting pressure, which is created by the height of the pour. The pressure is greater at the bottom than the top, so yokes are closer  8-33 together at the bottom. Notice that yokes on two sides of the panel extend beyond the panel and have bolts running through drilled holes. These hold the sheathing to size in one direction. In the other direction, the yokes fit between the first yokes with wedges driven between the yokes and bolts to tighten the form. Figure 8-39 – Typical column form. 1.9.5 Beam and Girder Forms The type of construction a builder will use for girder and beam forms will depend on the pour schedule and the concrete curing time. The schedule may allow removal in one piece, but the more common method is to leave the bottom (soffit) of the girder/beam in place and shored to allow additional curing as the project progresses. Usually, if the schedule requires the bottom form of the beam for another area of the project, the builder must reshore the beam immediately after stripping and maintain the reshoring until the concrete achieves its strength. Figure 8-40 shows a typical girder and beam form designed for stripping while leaving their soffits in place for longer shoring. In these examples, the slab will pour monolithically with the girders/beams. Notice how the sides come down to the bottom of the soffit rather than sitting on the soffit. This allows workers easier access to remove the sides without removing the soffit.  8-34 Figure 8-40 – Typical girder and beam forms. Figure 8-41 – Typical components of beam formwork with slab framing. Beam forms are not usually subject to bursting pressure, but builders must shore them up at frequent intervals to prevent sagging under the weight of the fresh concrete. Figure 8-41 shows the elevated view of a monolithic slab/beam pour (notice the absence of a construction joint in the beams at the bottom of the slab). This drawing indicates that the beam sides are 3/4-in. plywood, the beam soffit is a solid piece of 2-in. dimensioned lumber, with the whole form supported on the bottom by 4x4-in. T-head shores. It is a typical interior beam form with the slab forms supported by the blocking and ledgers on the beam sides. They are transmitting the slab loads down to the supporting shores. 

 

Test Your Knowledge

1. The important properties of good concrete are_______.

A. grade, mix, and water
B. shape, flow, and cement
C. wear, aggregate, and hardness
D. strength, durability, and watertightness

 

 

2.0.0 MASONRY

Masonry is the building of structures from individual units laid in and bound together by mortar. The common materials of masonry construction include brick, concrete block, stone, limestone, glass block, and tile. They are all available in a variety of styles although some come in standard manufactured sizes.

2.1.0 Concrete Masonry Concrete masonry has become increasingly important as a construction material following manufacturers’ rapid increase in technological developments. Properly designed and constructed concrete masonry walls satisfy various building requirements including fire, safety, durability, economy, appearance, utility, comfort, and good acoustics. Concrete Block is the most common concrete masonry unit (CMU) and there are three classifications: heavyweight, middleweight and lightweight. The differences are much like the differences in conventional concrete and lightweight concrete, they are in the aggregate. The heavyweight block is cement, water, and an aggregate such as sand, gravel, and/or crushed limestone. The lightweight block is cement, water, and a lightweight aggregate such as cinders, pumice, expanded shale, or vermiculite. Middleweight block, of course, is a combination of heavy and light aggregate. Lightweight units weigh about 30 percent less than heavyweight. In the United States, loadbearing concrete masonry units of any weight must meet American Society for Testing and Materials (ASTM) C 90 standards to be acceptable. Among those are:

• Compressive strength---provides a measure of the blocks’ ability to carry loads and withstand structural stresses

• Absorption---provides a measure of the density of the concrete

• Moisture content---indicates if the unit is sufficiently dry for use in wall construction.  8-36 2.1.1 Block Sizes and Shapes Manufacturers offer concrete block units in sizes and shapes to fit different construction needs. (Figure 8-42) Units are available in full- and half-length sizes, as well as specialty units such as headers, jambs, and pilasters. Figure 8-42 – Typical sizes and shapes of concrete masonry units. Like lumber, you refer to concrete units by their nominal dimensions. A unit measuring 7 5/8 in. wide, 7 5/8 in. high, and 15 5/8 in. long is referred to as an 8- by 8- by 16-in. unit (8x8x16). When laid in a wall with 3/8-in. mortar joints, the unit will occupy a space 8 in. deep, 8 in. high, and 16 in. long. Besides the basic 8x8x16 concrete masonry units, there are smaller partition units and units that masons use similar to brick in brick masonry. Besides the shapes shown in Figure 8-42, a number of smaller shapes for various special purposes are available. Units may be cut (Figure 8-43) to the desired shapes with a bolster (a wide brick chisel available in various sizes) or, more conveniently and accurately, with a power-driven masonry saw with a saw tooth configuration specifically designed for masonry. Figure 8-43 – Typical bolsters and masonry saw blade.  8-37 The standard 8x8x16 CMU has specific names for the various parts of its structure: (Figure 8-44)

• Face Shell---the long sides

• End shell---the recessed ends

• Web---the material that forms the partitions between the cores

• Cores---the holes between the webs

• Edges---the vertical ends of the face shell on either side of the end shell Figure 8-44 – Concrete block terms. 2.1.2 Wall Patterns The large number of shapes and sizes of concrete blocks lend themselves to a great many uses. Figure 8-45 shows only a few of the wall patterns possible using various pattern bonds and block sizes. Figure 8-45 – Wall patterns with concrete masonry units.  8-38 In addition, the recent technological developments have created multiple opportunities for architectural relief patterns on the face of the blocks. (Figure 8-46) Commercial publications from the Portland Cement Association show many more. Figure 8-46 – Samples of architectural block. Figure 8-47 shows some of the styles of screen blocks (blocks with patterned holes) masons use to make a decorative wall called a pierced or screen wall. Other architectural effects are achievable by laying some block in relief, that is, by having some block faces more prominent, or by varying the type of mortar joint. Figure 8-47– Screen block designs. 2.1.3 Modular Planning Experienced masons lay out concrete masonry walls to make maximum use of full- and half-length units, thus minimizing cutting and fitting on the job.  8-39 Figure 8-48 – Modular dimensions in concrete masonry wall openings. Assuming that the project’s window and doorframes are of modular dimensions that will fit, all layouts should be in increments of 8 inches (Figure 8-48). This allows the best use of full-size and half-size units, aligns the cells for both, and expedites job progress. Layout should consider:

• Length and height of walls

• Width and height of openings

• Wall areas between doors, windows, and corners

• Horizontal dimensions should be in multiples of full-length masonry units, 2 2 x 8 =16 inches. or half-length units of 8 inches.

• Vertical dimensions should be in multiples of full-height masonry units, 8 inches. When units 8 inches by 4 inches by 16 inches are used, the horizontal dimension should still be planned in multiples of 8 inches (half-length units), but the vertical dimensions, should be in multiples of 4 inches, the height of the block. Keep in mind how blocks interlace at corners when changing direction, if the thickness of the wall is greater or less than the length of a half unit (8 inches), a special length unit is required at each corner in each course, again creating additional cutting.

2.2.0 Structural Clay Tile Masonry Another masonry product available is a hollow masonry unit made of burned clay or shale. It has various names: structural tiles, hollow tiles, structural clay tiles, structural clay hollow tiles, structural clay hollow building tiles, but the most common term is building tile. Manufacturers create building tile by pushing plastic clay through a die in a predetermined shape and cutting it off into units. The units are sent to a kiln and burned in much the same manner as bricks. The structure of building tile is referred to much the same as concrete block:

• Cell---the apertures in a building tile

• Shell---the solid sides of a tile  8-40

• Web---the perforated material enclosed by the shell A tile laid on one of its shell faces is a side-construction tile; one laid on one of its web faces is an end-construction tile. Figure 8-49 shows sizes and shapes of basic side- and end-construction building units. Special shapes are also available for use at corners, at openings, and as closures. Figure 8-49 – Standard shapes of structural clay tile. 2.2.1 Physical Characteristics The qualities by which to judge good structural clay tile are the same as characteristics for good concrete, compressive and tensile strengths, and durability (abrasion resistance). The compressive strength of the individual tile depends upon the thickness of the shell and web, the materials used, and the method of manufacture. A minimum compressive strength of 300 lb per square inch may be expected. The tensile strength of structural clay tile masonry is small. In most cases, it is less than 10 percent of the compressive strength. The abrasion resistance of clay tile depends primarily upon its compressive strength; the stronger the tile, the greater the resistance to wear. The abrasion resistance decreases as the amount of water absorbed increases. Structural clay facing-tile has excellent resistance to weathering. Freezing and thawing action produces almost no deterioration. Tile that absorbs no more than 16 percent of its weight of water has always given satisfactory performance in resisting the effect of freezing and thawing. Masons should only use portland cement-lime mortar or mortar prepared from masonry cement if the tile is exposed to the weather. Walls containing structural clay tile have better heat-insulating qualities than walls composed of solid concrete masonry units because of the dead air space that exists in clay tile walls. The resistance to sound penetration compares favorably with solid masonry walls, but is somewhat less. The fire resistance of tile walls is considerably less than the fire resistance of solid masonry walls but can improve with the application of a coat of plaster. Structural clay tile partition walls 6 inches thick will resist a fire for 1 hour provided the fire produces a temperature of not more than 1700°F. The solid material in structural clay tile weighs about 125 pounds per cubic foot. Since  8-41 the tile contains hollow cells of various sizes, the weight of the tile varies depending upon the manufacturer and type. A 6-inch tile wall weighs approximately 30 pounds per square foot, while a 12-inch tile weighs approximately 45 pounds per square foot. 2.2.2 Uses for Structural Clay Tile One of the more obvious differences between a concrete masonry unit (CMU) and a structural clay tile is the direction of the cells upon installation. CMU cells orient vertically and are often filled with concrete and reinforcing iron to provide a solid wall. Structural clay tile installation orients the cells horizontally, and the tiles are never filled, providing a dead air space of insulation. Structural clay tile is appropriate for use as exterior walls of either the loadbearing or non-loadbearing type. It is suitable for both below-grade and above-grade construction. Structural loadbearing tile is made in thicknesses from 4-inches to 12-inches with various face dimensions, but building codes and specifications restrict the use of these tiles, so consult the project specification before using them. Non-loadbearing partition walls, with the 4-inch to 12-inch thicknesses, are frequently made of structural clay tile. These walls are easy to build, light in weight, and have good heat and sound insulating properties. Figure 8-50 shows the use of structural clay tile as a back unit for a brick wall and a structural tile wall using 8-inch, by 5-inch, by 12-inch. tile. The open-end exposure of the horizontal celled tile is closed by applying a thin tile called a soap at the corner. Figure 8-50 – Structural tile as a backing for bricks and as an eight-in. wall.

2.3.0 Stone Masonry Stone masonry is masonry in which the units consist of natural stone. In rubble stone masonry, the stones remain in their natural state without any kind of shaping. In ashlar masonry, the mason squares the face of the stones so the surface of the finished structure will be more or less on a continuous plane. Both rubble and ashlar may be random or coursed (Figure 8-51). Random rubble is the crudest or most natural looking, of all types of stonework. It appears as though little attention was paid to laying the stones, but experienced masons will offer that the “natural” look may be the most difficult to create. Coursed rubble consists of roughly squared stones assembled in such a manner as to produce approximately continuous horizontal bed joints.  8-42 Figure 8-51 – Examples of rubble and ashlar stone masonry. Each layer of a masonry wall must contain bonding stones that extend through the wall, as shown in Figure 8-52. This produces a wall that is tied together to the depth of the wall. The bed joints should be horizontal for stability, but the “builds” or head joints may run in any direction. Figure 8-52 – Bond stones in random stone masonry. The stone for stone masonry should be strong, durable, and cheap. Durability and strength depend upon the chemical composition and physical structure of the stone. Some of the more commonly found suitable stones are limestone, sandstone, granite, and slate. To minimize costs and reduce transportation, masons may use unsquared stones obtained from nearby ledges, quarries, or even fieldstones. The size of the stone should be such that two people can easily handle it. A variety of sizes is  8-43 necessary to avoid using large quantities of mortar. Stone masonry mortar may consist of portland cement and sand in proportions of one part cement to three parts sand by volume. However, such mortar shrinks excessively and does not trowel well. A better mortar for this application is a portland cement-lime mortar mix. Lime does not usually stain the stone. Also, ordinary portland cement mortar will stain most types of stone. If staining is an issue, masons should use nonstaining white portland cement for the mortar mix.

2.4.0 Brick Masonry In brick masonry, masons lay units of baked clay or shale of uniform size in courses with mortar joints to form walls of virtually unlimited length and height. The units may form the wall itself or be the facade to an existing structural wall. These units are small enough for placing with one hand. The chemical and physical characteristics of the ingredients vary considerably. In some regions, excavators open pits that yield raw material that, when ground and moistened, forms and bakes into durable brick. In other regions, manufacturers must mix clays or shales from several pits to produce bricks. Those varying ingredients, along with kiln temperatures, combine to produce brick in a variety of colors and harnesses. The nominal dimensions of a U.S. standard building brick are 2 1/4 by 3 3/4 by 8. The actual dimensions may vary a little because of shrinkage during burning. 2.4.1 Brick Nomenclature Frequently, the mason must cut the brick into various shapes. The most common shapes are shown in Figure 8-53. They are: half or bat, three-quarter closure, quarter closure, king closure, queen closure, and split. They are used to fill in spaces at corners and other places where a full brick will not fit. The six surfaces of a brick are: cull, end, beds, side, and face. Figure 8-53 – Nomenclature of cut brick and brick surfaces. 2.4.2 Brick Classification There are three general classifications of brick: common, face, and backup. Unless the brick is a façade against a structural wall, a finished brick structure contains face brick (placed on the exposed face of the structure) and backup brick (placed behind the face brick). The face brick is usually of higher quality than the backup brick. However, the mason may use common brick to build the entire wall. Common brick is  8-44 made from pit-run clay, that is, with no attempt at color control and no special surface treatment like glazing or enameling. Most common brick is red. Although any surface brick is a face brick by virtue of its placement, the term face brick also distinguishes high-quality brick from brick that is of common-brick quality or less. Applying this criterion, the color of face brick is uniformly more even than that of common brick, and locally may be obtainable in a variety of colors as well. Face brick surface finish has a better appearance than common brick. It may also be more durable, due to the use of select clays and other materials, or from special manufacturing methods. Backup brick may consist of brick that is inferior in quality even to common brick. Brick that was underburned, overburned, made with inferior clay, or made by inferior methods is often incorporated into the structure as backup brick and may be used as a cost saving measure. Still another type of classification divides brick into grades according to its probable exposure to climatic conditions. These are as follows:

• GRADE SW---brick designed to withstand exposure to below-freezing temperatures in a moist climate like that of the northern regions of the United States.

• GRADE MW---brick designed to withstand exposure to below-freezing temperatures in a drier climate than Grade SW.

• GRADE NW---brick primarily intended for interior or backup brick; may be used exposed in a region where no frost action occurs or in a region where frost action occurs but the annual rainfall is less than 15 in. 2.4.3 Types of Bricks There are many types of brick. Some are different in formation and composition while others vary according to their use. Some commonly used types of brick are:

• COMMON brick---made of ordinary clays or shales o burned in the usual manner in the kilns o no special scorings or markings o no special color or surface texture o known as hard- and kiln-run brick o generally used for backing courses in solid or cavity brick walls

• FACE brick---used in the exposed face of a wall o higher quality units than backup brick o better durability and appearance o most common colors are various shades of brown, red, gray, yellow, and white  8-45

• CLINKER brick---have been overburned in the kilns o usually hard and durable o may be irregular in shape o describable as rough-hard

• PRESS brick---made by the dry press process o regular smooth faces, sharp edges, and perfectly square corners o usually used as face brick

• GLAZED brick---one surface of each brick glazed in white or other color o ceramic glazing consists of mineral ingredients that fuse together in a glasslike coating during burning o particularly suited for walls or partitions in hospitals, dairies, laboratories, or other buildings where cleanliness and ease of cleaning are necessary

• FIREBRICK---special type of fire clay o will withstand the high temperatures of fireplaces, boilers, and similar usages without cracking or decomposing o larger than regular structural brick and often hand molded

• CORED brick---holes extending through the beds to reduce weight o no significant difference between the strength of cored brick walls compared to solid brick walls o resistance to moisture penetration about the same for both types of walls o most easily available brick meeting requirements, cored or solid, can be used

• SAND-LIME brick---made from a lean mixture of slaked lime and fine siliceous sand o under steam pressure molded under mechanical pressure o hardened 2.4.4 Masonry Terms Specific terms identify various positions of masonry units, bricks, or groups of bricks and mortar joints in a wall. (Figure 8-54) These are as follows:

• Course---continuous horizontal layer (or row) of masonry that, bonded together, form the masonry structure

• Stretcher---masonry unit laid flat with its longest dimension parallel to the face of the wall

• Header---masonry unit laid flat with its longest dimension perpendicular to the face of the wall; generally used to tie two wythes of masonry together

• Wythe---continuous single vertical wall of brick

• Rowlock---brick laid on its edge (face).

• Bull-Stretcher---rowlock brick laid with its longest dimension parallel to the face of  8-46 the wall

• Bull-Header---rowlock brick laid with its longest dimension perpendicular to the face of the wall

• Soldier---brick laid on its end with its longest dimension parallel to the vertical axis face of the wall Figure 8-54 – Terms for positions of bricks. 2.4.5 Types of Bonds In masonry, the word bond has three different references and one (pattern) can have a large number of additional meanings.

• STRUCTURAL BOND---a method of interlocking or tying individual masonry units together in one of three ways so that the entire assembly acts as a single structural unit o overlapping (interlocking) the masonry units o metal ties embedded in connecting joints o adhesion of grout to adjacent wythes of masonry

• MORTAR BOND---the adhesion of the joint mortar to the masonry units or to the reinforcing steel

• PATTERN BOND---pattern formed by the masonry units and the mortar joints on the face of a wall; may result from the type of structural bond or be purely decorative The following five pattern bonds are the most commonly used today, but there are many combinations and variations available. (Figure 8-55)

• RUNNING BOND---the simplest of the basic pattern bonds o consists of all stretchers, no headers; uses metal ties o used largely in cavity and veneered walls o also used as facing for tile wall  8-47

• COMMON or AMERICAN BOND---a variation of running bond with a course of full length headers at regular intervals o headers provide structural bonding as well as pattern o header courses usually appear every fifth, sixth, or seventh course, depending on the structural bonding requirements o a three-quarter brick must start each header course at the corner o may be varied by using a Flemish header course

• STACK BOND---purely a pattern bond o no overlapping of units, all vertical joints aligned o usually bonded to backing with rigid steel ties, may use 8-in. thick stretchers o needs steel pencil rod reinforcement in horizontal mortar joints for large area and loadbearing walls o requires dimensionally accurate or carefully matched units for alignment o pattern variety possible with numerous combinations

• FLEMISH BOND---made of alternate stretchers and headers with headers in alternate courses centered over stretchers in intervening courses o if headers not used for structural bond, half-bricks (blind-headers) used o a three-quarter brick starts each header course at the corner for a Flemish Corner o a one-quarter brick starts each header course at the corner for an English Corner

• ENGLISH BOND---alternate courses of headers and stretchers o headers are centered on the stretchers and joints between stretchers o vertical (head) joints between stretchers in all courses line up vertically o blind headers used in courses that are not structural bonding o headers alternate between RUNNING BOND courses

• ENGLISH CROSS BOND is a variation---headers alternate between STACK BOND courses  8-48 Figure 8-55 – Samples of brick masonry bonds.

Summary

Concrete and masonry are a common factor in many Seabee projects from reinforcing and pouring slab foundations for aircraft parking aprons to building new schoolhouses with concrete masonry units and mortar. A good understanding of their principles will help you support the project successfully with original drawings, sectional sketches, material testing, quality control, or any other task assigned to you.  8-49

Review Questions

1. What are the ingredients for mixing concrete? A. Water and cement only B. Water, cement, and fine aggregates only C. Water, cement, and coarse aggregates only D. Water, cement, fine aggregates, and course aggregates 2. What chemical reaction occurs to harden concrete? A. Dehydration B. Hydration C. Oxidation D. Deoxidation 3. Which two ingredients react to harden concrete? A. Cement and fine aggregates B. Cement and course aggregates C. Cement and water D. Course aggregates and fine aggregates 4. Concrete is high in ______strength but relatively weak in ______strength. A. tensile, compressive B. compressive, tensile C. shear, tensile D. tensile, shear 5. __________ is concrete’s resistance to deterioration caused by exposure to service conditions. A. Strength B. Compressibility C. Flexibility D. Durability 6. During a concrete pour, _______ settle(s) leaving voids filled by __________. A. solid particles, cement B. cement, water C. solid particles, water D. cement, solid particles  8-50 7. Which of the following actions should you take to ensure concrete is as watertight as possible? A. Add more water. B. Add less water. C. Use only the amount of water required to attain the necessary workability. D. Add more sand to fill any voids. 8. Which of the following materials can be placed in concrete to reinforce it? A. Steel bars B. Steel rods C. Steel strands, wire, and welded wire fabric D. All of the above 9. What reinforced concrete structural member supports and distributes building loads to the ground? A. Plain slab B. Footing C. Beam D. Column 10. ________ reinforcement is (are) the principle reinforcement(s) in a column. A. Lateral ties B. Vertical C. Spiral D. Caisson 11. Engineers may design both straight and _____ bars to resist the bending tension in the bottom of a beam. A. spiral B. truss C. lateral D. caisson 12. Steel is the best material for reinforcing concrete because their coefficients of ______ are almost the same. A. compression B. tension C. shear D. expansion  8-51 13. The bond strength of steel-concrete is in direct proportion to the amount of ___________. A. cement B. contact C. fine aggregate D. water 14 Reinforcing bars increase in diameter from one size to the next by _____ increments. A. 1/16 inch B. 1/8 inch C. 1/4 inch D. 3/8 inch 15. What might occur if a reinforcing bar is bent too sharply? A. The bar could crack or be weakened. B. The bar will not adhere to the concrete. C. Concrete strength would be reduced. D. Hydration would not occur. 16. What is the minimum length of a lap splice for (a) No. 3 bars and (b) No. 6 bars when not dimensioned on the drawings? A. (a) 11.25 in (b) 22.50 in B. (a) 12.00 in (b) 22.50 in C. (a) 22.50 in (b) 12.00 in D. (a) 22.50 in (b) 11.25 in 17. A concrete structural member fabricated at a location other than its final position of use is known as ______? A. preconstructed B. cast-in-place C. prefabricated D. precast 18. A concrete structural member cast in its final position of use is known as______. A. preconstructed B. cast-in-place C. prefabricated D. precast  8-52 19. Small, closely spaced beams used in (a) floor and (b) roof construction are known as ____ and _____. A. (a) joists (b) purlins B. (a) joists (b) joists C. (a) purlins (b) purlins D. (a) purlins (b) joists 20. What primary difference, if any, exists between precast beams and girders? A. Beams are wider than girders B. Beams are used for different purposes than girders C. Beams are made of different material than girders D. Beams are shorter than girders 21. If not rectangular or T shaped, what cross-sectional shape will the ends of most precast beams have? A. W B. D C. I D. C 22. Which of the following is considered the most important advantage to precasting? A. Less required storage space B. Faster erection time C. Reusable forms D. Quality-controlled concrete 23. Which of the following descriptions most accurately describes pre-tensioning of concrete members? A. After the concrete has been placed and has reached a specified strength, reinforcement strands are pulled through formed channels, and a predetermined amount of stress is applied. B. Reinforcement strands are pulled through tubes and stressed after placement of the concrete. C. Reinforcement strands are stressed to a predetermined point before placement of the concrete and are released just before the concrete has set. D. Reinforcement strands are placed in the forms and are stressed to a predetermined point before the concrete is placed; the strands are then released after the concrete has reached a specified strength.  8-53 24. In what part of a prestressed beam does the tensioned steel produce high compression? A. Upper B. Lower C. Exact center D. Approximate center 25. What condition occurs when a load (force) is placed on a prestressed beam? A. The camber is forced out, leaving a beam with positive deflection. B. The upward bow is increased. C. The camber is forced out, leaving a level beam with no deflection. D. The upward bow is forced out, creating deflection in the beam. 26. Conventional concrete’s approximate weight is _________. A. 175 lb/cu ft B. 150 lb/cu ft C. 130 lb/cu ft D. 115 lb/cu ft For questions 8-27 to 8-30, select the type of concrete from the following list that best matches the characteristic given. 1. Hengineering techVYWEIGHT CONCRETE 2. SEMI-LIGHTWEIGHT CONCRETE 3. INSULATING LIGHTWEIGHT CONCRETE 4. STRUCTURAL LIGHTWEIGHT CONCRETE 27. Weighs 115 to 130 lb/cu ft and has a compressive strength comparable to conventional concrete. A. 1 B. 2 C. 3 D. 4 28. Weighs 20 to 70 lb/cu ft and is used for fireproofing. A. 1 B. 2 C. 3 D. 4 29. Weighs up to 400 lb/cu ft and is used for radiation shielding. A. 1 B. 2 C. 3 D. 4  8-54 30. Weighs up to 115 lb/cu ft and is used to decrease the dead-load weight of structural members. A. 1 B. 2 C. 3 D. 4 31. In tilt-up panel construction, where are the wall panels usually cast? A. On the ground B. Precast off site C. Cast-in-place D. On the ground floor slab 32. In tilt-up panel construction, where is additional reinforcement generally needed? A. Around any openings B. At the bottom C. Around the edges D. At the top 33. In a tilt-up panel construction, in what manner are pickup inserts installed? A. Independently of the reinforcement B. Tied to reinforcement C. Welded to reinforcement D. Tied to the panel forms 34. What is the strongest method of connecting tilt-up panels together? A. A butted connection using grout or gasket B. A cast-in-place column with the panel-reinforcing steel tied into the pilaster C. Steel columns welded to steel angles or plates secured in the panel D. Precast columns tied with the panel 35. Construction joints must be located where _______________. A. the builder finds it most convenient B. it causes the minimum amount of weakness C. the beam meets the column D. the slab meets the wall  8-55 36. What is the purpose of contraction joints? A. To prevent buckling due to expansion of the reinforcing steel caused by temperature changes B. To prevent buckling due to expansion of the concrete caused by temperature changes C. To prevent cracking due to shrinkage of the reinforcing steel caused by temperature changes D. To prevent cracking due to shrinkage of the concrete caused by temperature changes 37. Expansion joints are also known as ______ joints. A. Construction B. Shrinkage C. Contraction D. Isolation 38. ______ is placing plastic concrete into spaces enclosed by forms. A. Casting B. Reeling C. Molding D. Premolding 39.  Builders must always use forms for molding the sides of footings and only pour against the soil for the bottom of the footings. A. True B. False 40. What part of a wall form shapes and retains the concrete until it sets? A. Brace B. Wale C. Stud D. Sheathing 41. What do builders often use on simple walls to maintain wall depth dimensions during a pour? A. Sheathing and stakes B. Wales and battens C. Ties and wood spreaders D. Cleats and yokes  8-56 42. Which of the following devices combines the functions of wire ties and wooden spreaders? A. Tie holder B. Snap tie C. Tie spreader D. Bar tie 43. _____ are the column form members that brace against bursting pressure. A. Yokes B. Battens C. Walers D. Studs 44. Where is the bursting pressure greatest in pouring column forms? A. Middle B. Top C. Bottom D. Beam side 45. Typically, girder and beam form _____ need to remain in place longer for additional curing. A. sides B. soffits C. cleats D. chamfers 46. What is the most commonly used unit in concrete masonry? A. Concrete block B. Clay tile C. Stone D. Brick 47. Which of the following measures a concrete block’s ability to carry loads and withstand structural stresses? A. Absorption B. Moisture content C. Density D. Compressive strength 48. What is the actual size, in inches, of an 8- by 8- by 16-inch CMU? A. 7 l/2 by 7 1/2 by 15 1/2 B. 7 5/8 by 7 5/8 by 15 5/8 C. 8 by 8 by 16 D. 8 1/4 by 8 1/4 by 16 1/4  8-57 49. A concrete masonry unit’s face shell is the _______________. A. partitions between the cores B. hole between the webs C. long side of the block unit D. recessed end of the block 50. Modular planning minimizes cutting and fitting by using _____________. A. full-size units only B. half-size units only C. full-size and quarter-size units D. full-size and half-size units 51. In addition to the thickness of the shell and webs, the compressive strength of structural clay tile depends upon the _______________. A. materials used and method of manufacture B. the opening and cell size C. its resistance to abrasion D. its resistance to deterioration 52. When structural clay building tiles are used in construction that will be exposed to the weather, masons should prepare mortar from which of the following materials? A. Portland cement-lime or waterproofed cement B. Portland cement-lime or masonry cement C. Masonry cement or waterproofed cement D. Masonry cement or straight lime 53. Walls containing structural clay tile have better ______ qualities than solid concrete masonry units. A. soundproofing B. weather resistant C. abrasion D. heat insulating 54. Which of the following factors restricts the use of structural clay tile? A. Above or below grade level B. Weight and sizes of the tiles C. Availability of the material D. Building codes and specifications  8-58 55. Which of the following stone masonry descriptions best describes the term “rubble”? A. The faces of stone are square and placed in position so the finished surfaces will present a continuous plane surface appearance. B. The stones used are left in their natural state without any kind of shaping. C. The stones are laid in courses without consideration of size or weight. D. The stones are roughly squared and laid in such a manner to produce approximately continuous horizontal bed joints. 56. Which of the following is considered to be the crudest of stone masonry? A. Coursed ashlar B. Coursed rubble C. Random ashlar D. Random rubble 57. Stone for stone masonry should be strong, durable and ______. A. absorbent B. cheap C. resistant D. weathered 58. What are the nominal dimensions in inches of a standard U.S building brick? A. 1 1/4 by 3 3/4 by 8 B. 1 1/2 by 3 3/4 by 8 C. 1 3/4 by 3 3/4 by 8 D. 2 1/4 by 3 3/4 by 8 59. Common brick is best described as _________________. A. unglazed, uniform in color, and made from select clay B. unglazed, variable in color, and made from inferior clay C. unglazed, variable in color, and made from pit-run clay D. glazed, uniform in color, and made from select clay 60. _____ brick is the classification designed to withstand exposure to below-freezing temperatures in a moist climate. A. SW B. MW C. NW D. MC  8-59 61. Which of the following types of brick is commonly used as the backing course for a cavity wall? A. Face B. Common C. Glazed D. Fire 62. What type of brick is made of special clay and is designed to withstand high temperatures? A. Press B. Clinker C. Glazed D. Fire 63. A _______ is a continuous single vertical wall of brick. A. rowlock B. stretcher C. soldier D. wythe 64. Which of the following statements best describes the term rowlock A. A brick laid flat with its longest dimension perpendicular to the wall. B. A brick laid on its edge (face). C. A brick laid with its longest dimension parallel to the face of the wall. D. A brick laid on its end with its longest dimension parallel to the vertical axis face of the wall. 65. Structural bonding of brick walls causes the entire assembly to act as a single unit. Which of the following methods accomplishes this bond? A. Adhesion of grout to adjacent wythes of masonry B. Embedding metal ties in connecting joints C. Interlocking of the masonry units D. All of the above 66. What is the name of the simplest pattern bond made up entirely of stretchers? A. Running B. American C. Flemish D. Common  8-60 67 Which of the following pattern bonds begins with a three-quarter brick at the corner of each header course? A. Stack B. Flemish C. Block D. Common 68. An English bond pattern wall is composed of alternate courses of ________. A. Three-quarter and blind headers B. Stretchers and bull-headers C. Headers and stretchers D. Headers and rigid steel ties

Trade Terms Introduced In this Chapter

Bending moment A moment of force (often just moment); a synonym for torque, an important basic concept in physics, civil engineering, and mechanical engineering. Compressive strength Resistance of a material to fracture under compression. Dowel A solid cylindrical rod, usually made of wood, plastic or metal. Dry packing Placing of zero slump, or near zero slump, concrete, mortar, or grout by ramming into a confined space. Facade Any side of a building facing a public way or space and finished accordingly. Fieldstone A stone occurring naturally in fields, often used as a building material. Hydration A chemical reaction in which water takes part with the formation of a single product. Lap splice When two pieces of rebar are overlapped to create a continuous line of rebar. The length of the lap varies depend on concrete strength, the rebar grade, size, and spacing. Ledges A level of rock-bearing ore; a vein. Monolithically Constituting or acting as a single, often rigid, uniform whole; in this usage, pouring concrete for slab and beam units at the same time. Pattern bond Pattern formed by the masonry units and the mortar joints on the face of a wall. The pattern may result from the type of structural bond used or may be purely a decorative one unrelated to the structural bonding. Perlite A formless volcanic glass that has a relatively high water content; occurs naturally and has the property of greatly expanding when heated sufficiently; useful for its light weight after processing. Quarries An excavation or pit, usually open to the air, from which building stone, slate, or the like, is obtained by cutting, blasting. Siliceous Containing, consisting of, or resembling silica, the major ingredient in sand; used to manufacture a variety of materials, especially glass and concrete.  8-62 Slaked lime A soft, white, crystalline, very slightly water-soluble powder: used chiefly in mortars, plasters, and cements. Soffit The underside of a structural component, such as a beam, arch, staircase, or cornice. Load Any type of force exerted on an object, which may be in the form of a ‘weight’ (gravitational force), a pressure, or anything which affects the object in question; includes dead load (weights of material, equipment, or components that are relatively constant throughout the structure’s life) and live load (all the forces that are variable within the object’s normal operation cycle). Tensile strength Resistance of a material to a force tending to tear it apart. Trowel Any of various tools having a flat blade with a handle, used for depositing and working mortar, plaster, etc. Vermiculite A natural mineral that expands with the application of heat. Wythe A continuous single vertical wall of brick.

Chapter 9 Mechanical Systems and Plans

Engineering techs are often called upon to develop drawings for projects. To be able to perform that task successfully, you need to be familiar with the various systems a structure may incorporate to meet the use for which the structure is designed. Each trade discipline has its own unique requirements, constraints, routings, materials, and methods. Each trade discipline also has its own unique symbols for communicating the information to drawings for common understanding by all involved in a project. Your accurate drawings could support a project at a number of stages: planning, cost analysis, installation, quality control, or final inspection. This lesson will acquaint you with the water distribution and drainage aspects of mechanical systems, otherwise known as plumbing.

When you have completed this lesson, you will be able to:

1. Describe the different types of mechanical plumbing systems.
2. Interpret different types of mechanical plans.

Contents

1.0.0 Mechanical Systems (Plumbing)

2.0.0 Mechanical Plans

 

1.0.0 MECHANICAL SYSTEMS (PLUMBING)

In general, mechanical systems include heating, ventilating, and air conditioning (HVAC), piping, refrigeration, and air filtration as well as plumbing. Plumbing itself is the system of pipes, fixtures, and other appurtenances that supply water to a structure from a source such as a water main, and remove it with any associated waterborne wastes to a destination such as a sewer main, septic tank, or cesspool. An appropriately functioning plumbing system brings a supply of safe water into a structure and distributes it for drinking, cooking, washing, industrial application, or any other use required to meet the structure’s design needs. It then carries the water away, along with any waste materials combined with the water, without posing a health hazard to the users. The National Plumbing Code is widely accepted as a guideline for plumbing design minimum requirements. However, additional codes, regulations, and trade practices vary from one location, or even place of application to another, and define the plumbing specifications for an individual project. Therefore, you must also be familiar with applicable local codes, especially when working with mechanical drawings and plans.

1.1.0 Water Distribution System The purpose of a water distribution system is to carry potable cold and hot water throughout a building for domestic or industrial use. A typical water supply system (Figure 9-1) consists of:

• service pipe

• distribution pipe

• connecting pipe

• fittings

• control valves The water service pipe begins at the water main. The water distribution pipe starts at the end of the service pipe and supplies the water throughout the building. Figure 9-1 — Typical water supply system. 1.1.1 Piping Materials Several types of pipe are available for water distribution systems, but Seabees commonly use copper, plastic, galvanized steel, or cast iron. Of those, plastic is  9-4 becoming the most common for both civilian and military use due to the lower cost of materials and ease of installation with its associated lower labor costs. 1.1.1.1 Copper Pipe and Tubing Traditionally, copper has been one of the most widely used materials for tubing. It does not rust and is highly resistant to accumulation of scale particles in the pipe. Copper pipe is manufactured in six grades and thicknesses, three of which are appropriate for water distribution systems from water main to tap; types K, L, and M.

• Type K — thickest wall pipe; used primarily underground between water mains and the water meter o Rigid (hard temper): 12- and 20-ft straight lengths o Flexible (soft temper): 40-, 60-, 100-ft coils, the latter in smaller diameters

• Type L — thinner wall pipe, used outside for water services from water meter, but also widely used in water distribution systems: soft temper tubing is often used as replacement plumbing due to the tube’s flexibility allowing easier installation. o Rigid: 12- and 20-ft straight lengths o Flexible: 40-, 60-, 100-ft coils, the latter in smaller diameters

• Type M — thin wall pipe used mainly inside homes for branch supplies where water pressure is low: some city codes may not allow type M o Rigid only: 12- and 20- ft lengths

• Type DWV — drainage, waste and vent o Rigid only: 20-ft. lengths

• Type ACR — air conditioning, refrigeration, natural and petroleum gas o Rigid: 20-ft. lengths o Flexible: 50-ft. coils

• Type OXY, MED, OXY/MED, OXY/ACR, ACR/MED — Medical Gas, Compressed Medical Air, Vacuum o Rigid only: 20-ft. lengths Figure 9-2 shows some typical fittings for copper tubing. The connections between the fittings are made with solder. Soldering allows all the tubing and fittings to be measured, cut, and set in place before the joints are finished. Generally, this allows faster assembly and completion.  9-5 Figure 9-2 — Typical copper fittings. Copper is durable and connects well to valves. However, copper should not be installed if the water has a low-pH (high acidic) level, common to many private well systems. (Figure 9-3) Figure 9-3 — pH scale.  9-6 Per Washington State University Department of Ecology: “The pH scale measures acidic and alkaline materials in water. On this scale, 7.0 is the neural point, indicating a perfect balance between the two. Acidic pH values are below 7.0, and alkaline pH values are above 7.0. In areas where groundwater trickles through limestone, carbonic acid and limestone form soluble bicarbonates, neutralizing the acid. The result is alkaline water that is usually hard, has low carbon dioxide concentrations, and pH values between 7 and 8. Where underground strata do not contain limestone, groundwater retains acidity, has pH values between 6 to 7, (sic) and corrodes metals used in plumbing.” To quote the Environmental Protection Agency: “There are two types of copper corrosion: uniform and nonuniform. Both types are caused by certain characteristics of water chemistry…” Uniform corrosion is identified by the presence of a relatively uniform deposition of copper corrosion by-products across the inner surface of a pipe wall and is typically associated with elevated copper levels at our taps. Nonuniform corrosion, or pitting, is the isolated development of corrosion cells across the inner surface of a pipe wall. Although pitting (Figure 9-4) corrosion is seldom associated with elevated levels of copper at our taps, excessive pitting corrosion can lead to “pinhole” leaks in the pipe, which could result in water damage and mold growth. Water below PH 6.5 is considered acidic and may begin to pit the copper and create pinhole leaks. The majority of public utilities supply water at a PH between 7.2 and 8.0. Figure 9-4 — Example of copper pitting. 1.1.1.2 Plastic Pipe Plastic pipe is rapidly replacing copper as the material of choice in both civilian and military applications. (Figure 9-5) It has a number of advantages over both copper and steel piping:

• lighter

• flexible

• available in different lengths and sizes

• no special tools required

• superior resistance to rupture from freezing

• complete resistance to corrosion

• can be installed above- or belowground Polyvinyl chloride (PVC) is one of the most versatile plastic and polyvinyl resin pipes. Made of tough, strong, thermoplastic material, PVC has an excellent combination of physical strength and chemical resistance properties.  9-7 Chlorinated polyvinyl chloride (CPVC) is a stiffer design for greater resistance to impact and to temperature extremes. You can use CPVC for cold-water systems and hot-water systems with temperatures up to 210°F. The principal mechanical difference between CPVC and PVC is that CPVC is significantly more malleable, allowing greater flexibility and crush resistance. CPVC also requires a special solvent cement application. For water supply, distribution, and sewer drainage systems, plastic pipe is becoming increasingly popular for its economy, ease of installation, and lack of maintenance requirements. Figure 9-5 — Typical plastic pipe fittings. 1.1.1.3 Galvanized Pipe Still used but less often, galvanized (coated with zinc) pipe (Figure 9-6) can provide the water service and distribution inside a building for hot and cold fixtures. Manufactured in 21-ft lengths, it is galvanized both inside and outside at the factory to resist corrosion. However, galvanized pipes still have a tendency over time to build up enough scale inside the pipe to reduce water flow in gallons per minute. Galvanized pipe sizes are based on nominal inside diameters, which vary with the thickness of the pipe. Galvanized pipes require threaded connections so outside diameters remain constant for standard fittings. Figure 9-6 — Standard galvanized pipe fittings.  9-8 1.1.1.4 Cast-Iron Water Pipe Frequently used for water mains and service pipe up to a building, cast-iron pipe (Figure 9-7) is sometimes called castiron pressure pipe. Unlike castiron soil pipe, cast-iron water pipe is manufactured in 20-ft lengths rather than 5-ft lengths. Besides bell-and spigot joints, cast-iron water pipes and fittings are made with either flanged, mechanical, or screwed joints. The screwed joints are used only on small diameter pipe. 1.1.2 Fittings The size of the pipe connection to the openings identifies fittings. For example, a 3- by 3- by 1 1/2-in. tee is one that has two openings for a 3-in. run of pipe and a 1 1/2-in. reduced outlet. If all openings are the same size, only one nominal diameter is designated. For example, a 3-in. tee is one that has three 3-in. openings. Fittings vary according to the type of piping material used, along with the appropriate joint sealing/connecting material, but the general shapes for each are typical. There are: elbows, tees, unions, couplings, caps, plugs, nipples, reducers, and adapters. Some plastic pipes can also be adapted to metal pipe fittings. There are two types of malleable iron or cast iron pipe fittings used for steel pipe or wrought iron: the pressure type and the recessed type (Figure 9-8). Figure 9-8 — Pressure fitting and Recessed fitting. Figure 9-7 — Standard cast-iron pipe fittings.  9-9 A pressure fitting is the standard fitting used on water pipe. A recessed fitting, also known as a cast-iron drainage or Durham fitting, is generally required on all drainage lines. With its smooth joint fitting, it reduces the probability of grease or foreign material remaining in the joint to build up and cause a stoppage. As drainage lines, recessed fittings are designed so that horizontal lines entering will have a slope of ¼ in. per ft. 1.1.2.1 Elbows (or Ells) 90° and 45° Elbows (Figure 9-9) change the direction of the pipe either 90 or 45 degrees. Regular elbows have female threads at both outlets. Figure 9-9 — Copper 45º elbow. Street elbows (Figure 9-10) change the direction of a pipe in a close space where it would be impossible or impractical to use an elbow and nipple. Both 45- and 90-degree street elbows are available with one female and one male threaded end. Figure 9-10 — CPVC 90º street elbow. Figure 9-11 — Galvanized 90º reducing elbow. The reducing elbow (Figure 9-11) is similar to the 90-degree elbow except that one opening is smaller than the other. 1.1.2.2 Tees A tee (Figure 9-12) connects pipes to change the direction of a pipe run. They may be of different diameters. A straight tee has a straight-through portion and a 90- degree takeoff on one side. All three openings of the straight tee are the same size. Figure 9-12 — Cast iron tee with flanges.  9-10 A reducing tee (Figure 9-13) is similar to the straight tee except that one of the openings is of a different size than the other. Figure 9-13 — Copper reducing tee. 1.1.2.3 Unions There are two types of pipe unions. Both join two pipes together but are designed for easy disconnection. A ground Joint Union (Figure 9-14) consists of three pieces. Figure 9-14 — Galvanized ground joint union. A flange union (Figure 9-15) has two parts. Figure 9-15 — Cast-iron flange union. 1.1.2.4 Couplings There are three common types of couplings. The straight coupling (Figure 9-16) is for joining two lengths of pipe in a straight run. A run is that portion of a pipe or fitting continuing in a straight line in the direction of flow. Figure 9-16 — CPVC straight coupler.  9-11 A reducer (Figure 9-17) joins two pipes of different sizes. Figure 9-17 — Copper straight reducing coupler. The eccentric reducer (Figure 9-18) joins pipes of different sizes so the two pieces of pipe will not be in line with each other. It provides optimum drainage of the line. Figure 9-18 — Cast-iron eccentric coupler with flanges. 1.1.2.5 Caps Used like a plug, a cap (Figure 9-19) is a fitting with a female (inside) sizing to fit over the pipe diameter. For some pipe materials, caps are threaded. Figure 9-19 — A-Galvanized cap. B-Copper cap. 1.1.2.6 Plugs Plugs (Figure 9-20) are fittings with male (outside) threads. They screw into other fittings to close openings. Plugs have various types of heads, such as square, slotted, and hexagonal sockets Figure 9-20 — A-CPVC octagonal head plug. B-Galvanized square head plug.  9-12 1.1.2.7 Nipples A nipple (Figure 9-21) is a length of pipe with a male thread on each end. It is used for extension from a fitting. Figure 9-21 — A-Brass close nipple. B-Galvanized 10 ft. nipple. At times, you may use the dielectric or insulating type of fittings. (Figure 9-22) These fittings connect underground tanks or hot-water tanks. They are also used to join pipes of dissimilar metals. The purpose of dielectric fittings is to curtail galvanic corrosion or electrolytic action. The most common dielectric fittings are the union, coupling, and bushing. Figure 9-22 — Typical dielectric union. 1.1.3 Joints and Connections There are various methods of joining pipes for water distribution systems. Each method is designed to withstand internal (hydrostatic) pressure in the pipe and normal soil loads if joints and connections are belowground. Some of these methods produce the types of joints and connections described below.  9-13 1.1.3.1 Flared and Sweated Joints Used with copper pipe and tubing. The end of a copper pipe forms into a funnel-like shape so that it can be held in a threaded fitting. (Figure 9-23) This method is flaring, and the result is called a flared joint. Figure 9-23 — Typical flared joint. A sweated joint (Figure 9-24) uses soft solder instead of threads or flares. This method joins the metals at the 450-800º range. Figure 9-24 — Typical sweated joint. Occasionally, copper pipe or tubing is fused by heating with a gas flame and silver-aIloy filler metal. This is silver brazing (or hard soldering) (Figure 9-25) and done at temperature ranges of 1100- 1600º. Figure 9-25 — Typical silver brazed joint. 1.1.3.2 Solvent Welded, Fusion Welded, Fillet Welded, Threaded, and Flanged Joints Used with plastic pipes. A solvent welded joint (Figure 9-26) involves applying a primer and the solvent cement. Before applying the primer and solvent, the pipe and fitting must be at similar temperatures; do not undertake this fitting when the temperature is below 40°F, above 90°F, or when the pipes are exposed to direct sunlight. Figure 9-26 — Typical solvent welded joint.  9-14 In fusion welded joints, (Figure 9-27) a gas or electrically heated welding tool simultaneously heats the meeting surfaces of the pipe and fitting to a uniform plastic state. The two components are joined together to fuse in a homogeneous bond and allowed to cool. Figure 9-27 — Typical fusion welded joint. Fillet welded joints (Figure 9-28) are made with uniform heat and pressure on a welding rod during application of a bead. This process can also repair leaks in thermoplastics. Figure 9-29 — A-CPVC threaded joint. B-Teflon tape. Threaded joints (Figure 9-29) are commonly used for temporary and lowpressure piping since threading reduces the pipe wall thickness. Teflon tape is often used for pipe joint compound. Flanged joints (Figure 9-30) are for process lines that are dismantled frequently. They join plastic flanges together with soft rubber gaskets. Figure 9-30 — Typical flanged joint ad gasket.  9-15 1.1.3.3 Bell-and-Spigot and Mechanical Joints Used with cast-iron pressure pipe and fittings for water mains. Bell and spigot lines (Figure 9-31) may be joined by the use of lead, lead wool, or sometimes a sulfur compound. Figure 9-31 — Typical bell and spigot joint. Mechanical joints (Figure 9-32) are made with rubber sealing rings held in place by metal follower rings that are bolted to the pipe. These permit expansion and contraction of the pipe without injury to the joints. Figure 9-32 — Typical mechanical joint. 1.1.3.4 Threaded Pipe Joints Galvanized steel, galvanized wrought iron, and black-iron pipe only use threaded joints. The process includes connecting threaded male and female ends. Nontoxic compounds (Figure 9-33) are used for thread lubricant on water pipes, while powdered graphite and oil are used for steam pipes. Figure 9-33 — A-Typical threaded joint. B-Pipe joint compound. 1.1.4 Valves Valves stop, start, or regulate the flow of water into, through, or from pipes. Essentially, valves consist of a body containing an entrance and an exit with a means of stopping the flow in between with a disk or plug tightly pressed against a seating surface. There are many different valve designs, but this lesson will discuss only the three most common: gate, check, and globe.  9-16 1.1.4.1 Gate Valve A gate valve is a linear motion valve used to start or stop fluid flow; it does not regulate or throttle flow. The gate valve may have a wedge-shaped movable plug, or a (single or double) round disk that fits tightly against the seat when the valve is closed. (Figure 9- 34) When the gate is open, it provides unrestricted flow. It allows fluid to flow through in a straight line with little resistance, friction, or pressure drop, provided the valve gate or disk is kept fully open. Figure 9-34 — A-Wedge gate valve. B-Disk gate valve. A gate valve releases a variable amount with each turn of the gate but must always be operated in either the fully open or fully closed position. A partly closed gate will cause vibration and chattering, damaging the seating surfaces. 1.1.4.2 Check Valve A check valve is used to prevent backflow in pipelines. They are entirely automatic and used where the flow of liquids, vapors, or gases is required in one direction only. Check valves fall into two main groups: swing check valves (Figure 9-35) and lift check valves. (Figure 9-36)  9-17 A swing check valve is used for unrestricted flow. Figure 9-35 — Typical swing check valve. A lift check valve is usually used for air or gases or when a check valve is operated frequently. Figure 9-36 — Typical lift check valve. 1.1.4.3 Globe Valve The globe valve, (Figure 9-37) so-called because of its globular-shaped body, regulates the flow of liquids, gases, and vapor flow by means of throttling (adjusting rate of flow).  9-18 They are well suited for services requiring regulated flow and/or frequent valve settings (throttling). 9-37 — Typical globe valve. 1.1.5 Pipe Supports Structurally, pipes are only designed to withstanding normal soil loads and internal pressures up to their hydrostatic pressure rating. Therefore, any pipe aboveground or in the interior of buildings supplying air, water, or steam, must be adequately supported to prevent sagging. The weight of the pipes plus the weight of fluid contained in them may produce strained joints and breaks that can cause leaks in the valves. Figure 9-38 shows several methods of supporting pipe within a structure in both horizontal and vertical positions.  9-19 Figure 9-38 — Typical pipe supports within a structure. On water mains, thrust blocks (Figure 9-39) made of concrete or other applicable materials, are installed at all changes of direction to prevent pipe displacement caused by the movement of water under high pressure. Figure 9-39 — Typical thrust block application.  9-20 1.1.6 Pipe Insulation Insulating the pipelines helps prevent heat passage from steam or hot-water pipes to the surrounding air or from the surrounding air to cold-water lines. In some cold regions, insulation prevents water from freezing in a pipe, especially when the pipe runs outside a building. Thus, hot-water lines are insulated to prevent loss of heat, while potablewater (drinking water) lines are insulated to prevent absorption of heat. Insulation also subdues noise made by the flow of water inside pipes, such as water closet discharges. Figure 9-40 shows some typical pipe insulations. Figure 9-40 — Typical pipe insulation.

1.2.0 Sanitary Drainage System A drainage system carries sewage, rainwater, or other liquid wastes to a point of disposal. There are three types of drainage systems—storm, industrial, and sanitary. While a storm or industrial drain system is not out of the scope of a large Seabee project, the most common tasking is for installation of a sanitary drainage system. A properly functioning sanitary drainage system carries sanitary and domestic wastes from a source (or collection system) to a sewage treatment plant or facility without collecting any additional surface water or groundwater. This prevents overload of the treatment facility. 1.2.1 Piping Materials The type of material used for piping depends on location and availability as well as whether the installation is:

• above ground within a building — usually consists of (or a combination of) brass or copper pipe, cast-iron, galvanized wrought iron, galvanized steel, lead, or plastic polyvinyl chloride (PVC).  9-21

• underground within a building — may be cast-iron, galvanized steel, lead, or PVC. Cast-iron and PVC are the most popular.

• underground outside a building —may be cast-iron soil pipe, vitrified clay, concrete, or PVC (the most common). Like water distribution systems, the growing popularity of PVC piping for sanitary drainage is its

• unique combination of chemical and physical properties

• ease of installation

• cost effectiveness 1.2.1.1 Cast-Iron Soil Pipe (CISP) This type of pipe is composed of gray cast iron made of compact close-grained pig iron, scrap iron and steel, metallurgical coke, or limestone. (Figure 9-41) CISP is normally used in or under buildings; it usually protrudes at least 5 ft from the building to connect to a concrete or clay sewer line.

• 5- and 10-ft lengths

• nominal inside diameters of 2, 3, 4, 5, 6, 8, 10, 12, and 15 in.

• single-hub or double-hub Hubs (bells) of cast-iron soil pipe are enlarged sleeve-like fittings cast as a part of the pipe to make watertight and pressure-tight joints with oakum and lead. Figure 9-41 — Single hub cast-iron soil pipe (CISP) with cutter. Cast-iron soil pipe is also used under roads or other places of heavy traffic. If the soil is unstable or contains cinder and ashes, vitrified clay pipe is used instead of cast-iron soil pipe. 1.2.1.2 Vitrified Clay Pipe (VCP) and Concrete Pipe Vitrified clay pipe (VCP) (Figure 9-42) is made of moistened, powdered clay processed to a very hard, inert, glass-like state.  9-22 VCP is used for house sewer lines, sanitary sewer mains, and storm drains.

• 2-, 2 ½-, and 3-ft lengths

• diameters from 4- to 42-in.

• hub and a spigot ends Figure 9-42 — Vitrified soil pipe (VSP) spigot and hub. Unreinforced concrete pipe is used to meet the requirements for sewer drainage in the smaller sizes —those less than 24 in. However, reinforced concrete (Figure 9-43) pipe is also available in elliptical as well as round shape with diameters from 1- to over 12-feet. Figure 9-43 — Concrete pipe. 1.2.1.3 Plastic Pipe Rigid polyvinyl chloride pipe (Figure 9-44) application has expanded greatly over the years for use in underground sanitary sewage systems. At one time, plastic piping was primarily for limited industrial and domestic uses such as farm water and lawn sprinklers systems. Now, plastic pipe is used for all kinds of water and drainage applications. It has the following qualities:  9-23

• outstanding resistance to nearly all acids, caustics, salt solutions, and other corrosive liquids and gases

• does not rust, corrode, scale, or pit inside or outside

• nontoxic, nonconductive, and not subject to electrolytic corrosion—a major cause of failure when metal pipe is installed underground

• low resistance to abrasion resulting in maximum flow rate and minimum buildup of sludge and slime Figure 9-44 — Rigid plastic sewer pipe. 1.2.2 Fittings Fittings for sanitary (waste) drainage systems (Figure 9-45) are similar in shape to those used for water distribution systems. However, as in water distributions systems, a system’s various fittings can be the same general shape, but vary in specific details according to the type of piping materials used. Special mechanical seal adapters are also available for joining different types of pipes, such as cast-iron soil pipe to vitrified clay pipe, or vice versa.  9-24 1.2.2.1 Bends A bend is termed by either a fraction or a degree. The fraction term is a fraction of a 360º radius. Thus, a 1/16 bend is a 22 1/2º turn, a 1/8 bend is 45º, and a 1/4 bend is 90º. There are also short-radius and long-radius fittings available as well as reducers and increasers. Figure 9-45 — Typical sanitary pipe fittings - bends and reducers. 1.2.2.2 Tees Tees (Figure 9-46) connect branches to continuous lines. A test tee is used in stack and waste installations where the vertical stack joins the horizontal sanitary sewer. It allows the plumber to fill the system with water while testing for leakage. A tapped tee is used with the venting system where it is called the main vent tee. The sanitary tee is commonly used in a main stack to allow the takeoff of a pipe branch. Figure 9-46 — Typical sanitary pipe fittings - Tees.  9-25 1.2.2.3 Ninety-Degree Y-Branches (Figure 9-47) Straight 90° Y-branch—feeds a branch into a main as nearly as possible in a line parallel to the main flow. Reducing 90° Y-branch—same as straight type except the branch is smaller than the main. Double 90° Y-branch (or double combination Y and 1/8 bend)— especially useful as an individual vent. Box type 90° Y-branch—two takeoffs form a 90° angle with the main pipe and also spaced 90º from each other. Figure 9-47 — Typical sanitary pipe fittings – 90º Y-Branches. 1.2.2.4 Forty-Five-Degree Y-Branches 45° branches (Figure 9-48) join two or three sanitary sewer branches at a 45° angle in a straight-Y, double-Y or V configuration. Straight 45° Y-branch—true Y. Reducing 45º Y-branch—a straight section with a 45° takeoff of a smaller size Figure 9-48 — Typical sanitary pipe fittings – 45º Y-Branches.  9-26 Vitrified clay pipes and concrete pipes are used outside of buildings, which greatly reduces the number of different types of necessary fittings. 1.2.3 Joints and Connections A sanitary drainage system’s joints and connections will vary according to the type of pipe material used. 1.2.3.1 Lead and Oakum Joint, Compression Joint, and No-Hub Joint Cast-iron soil pipe uses one of three types of connections. (Figure 9-49) Lead and oakum joint—oakum (made of hemp impregnated with bituminous compound and loosely twisted or spun into a rope or yarn) packed into the hub completely around the joint, with melted lead poured over it. Compression joint—an assembly tool forces the spigot end of the pipe or fitting into the lubricated gasket inside the hub. No-hub joint—a gasket with a stainless steel shield and retaining assembly to tighten as a clamp. Figure 9-49 — CISP joint connections.  9-27 1.2.3.2 Mortar and Bituminous Joints Common to vitrified clay or concrete pipes and fittings, following an oakum packing, instead of lead, joints are mortared using grout (a mixture of cement, sand, and water). Speed seal joints (rubber rings) (Figure 9- 50) have become widespread in joining vitrified clay pipe. They eliminate the oakum and mortar joints thus expediting project completion and lowering labor costs. This type of seal is made a part of the vitrified pipe joint when manufactured. Figure 9-50 — VCP speed seal. 1.2.4 Traps A trap (Figure 9-51) is a device that catches and holds a quantity of water, thus forming a fluid seal that prevents sewage decomposition gases from entering the building through the drainage pipe. A number of different types of traps are available; however, the trap mainly used with plumbing fixtures is the P-trap.

Figure 9-51 — Typical P-trap.  9-28 1.2.5 Vents Without a vent, water or waste discharged from one fixture tends to create a vacuum/siphon affect on other fixture traps as it goes through the pipes. A properly functioning vent (pipe) (Figure 9-52) allows sufficient air to enter the system to eliminate that condition. It also directs gasses that develop naturally in a sewage drainage system to vent to the outside. This means that the vent piping system must serve all the various fixtures. It does this by connecting a main vent (with branches) to the main soil and waste vent at a location below the lowest and above the highest waste connection. Vent piping materials may be galvanized pipe, cast-iron soil pipe, and, at times, brass, or copper, but plastic piping is increasingly the material of choice. A main vent is the principal artery of the venting system. Vent branches connect and run undiminished in size as directly as possible from the building drain to the open air above The main soil and waste vent is that portion of the main soil and waste stack that extends above the highest fixture branch through the roof to the exterior of the building. Figure 9-52 — Typical main vent system.  9-29 Installers use various configurations to vent fixtures. The selection depends largely on the location and grouping of the plumbing fixtures. The individual vent (Figure 9-53) (also referred to as a back vent or continuous vent) is the most common. This vent can be adapted to all fixtures and installed as a single or a battery of two or more. It prevents both direct and indirect siphonage. A common vent (Figure 9-54) vents two traps to a single vent pipe when lavatory pairs are side-by-side, or back-to-back on either side of a partition. The waste from both discharges into a double sanitary tee. Figure 9-54 — Common vent. Figure 9-53 — Individual vent system in single and battery.  9-30 A circuit vent (Figure 9-55) extends from the main vent to a connection on the horizontal waste branch between the next to last and last fixtures with a maximum of eight fixtures on any circuit. Since some fixtures discharge their waste through a part of the pipe that acts as a vent for others, the vent may clog. To reduce clogging, the vent should connect to the top of the branch rather than the side. Water and waste from the last fixture scours the vents of the other fixtures. Figure 9-55 — Circuit vent. When liquid waste flows through a portion of a vent pipe, it is a wet vent. (Figure 9-56) A loop vent also has liquid waste through a portion and then connects into the waste stack unit to form a loop. Useable for a small group of bathroom fixtures, such as a lavatory, water closet, and shower, it needs to be sized to accommodate those three units. A lavatory should be individually vented to prevent loss of the trap seal through siphonage and allow the relatively clean water to scour the wet vent to prevent a buildup of excessive waste material. Figure 9-56 — Wet vent and loop vent. NOTE A water closet must not drain into a wet vent. Proper-sized piping must be used in all phases of the venting system. The diameter of the main vent stack must be no less than 2 in. when draining more than four units. The actual diameter depends on the developed length of the vent stack and on the number of fixture units installed on the soil or waste stack. The diameter of a vent stack should be at least as large as that of the soil or waste stack. 

1.2.6 Branches

Soil and waste pipe branches (Figure 9-57) are horizontal branch takeoffs that connect various fixtures and the vertical stack Installers can use a Y-branch with a 1/8 bend caulked into it, or a sanitary tee, an extra-shortpattern 90º Y-branch. The sanitary tee is better to eliminate the extra fitting and caulked joint required for the 1/8 bend takeoff but some local codes allow additional 1/8 bend connections. Generally, waste pipes have a downward grade to ensure complete drainage. Horizontal vents should also pitch slightly downward to facilitate discharge of condensation. Figure 9-57 — Typical branch connections.

 

Test Your Knowledge

1. Builders commonly use copper, plastic, galvanized steel, or cast iron. Of those, plastic is becoming the most common for use due its _______ and _________________.

A. strength, lack of friction
B. chemical properties, lower cost of materials
C. lower cost of materials, ease of installation
D. durability, availability

In the Navy, mechanical systems vary greatly depending on whether a system is aboard ship or shore-based. As an engineering tech, your concern will be with shore-based systems ranging from permanent installations with the most modern fixtures, equipment, and appurtenances, to temporary installations at advanced bases that normally use the most economical materials that serve the purpose. In this lesson, a mechanical plan refers to drawings, layouts, diagrams, and notes that relate to water distribution and sanitary drainage systems only. Heating and air conditioning, refrigeration, and other like systems are not included.

2.0.0 MECHANICAL PLAN

2.1.0 Water Supply and Distribution Diagram Normally, a structure’s water supply system starts at the water main. A self-tapping tool (Figure 9-58) drills and taps into this source (the source is still under pressure) and a corporation stop is installed during the same process. Water then enters the building through a coldwater service line that usually runs through a gate valve-meter-gate valve configuration. Figure 9-58 — Water main selftapping tool and typical service line. As an engineering technician, you may be called upon to develop field sketches and drawings from larger sets of plans, or in reverse, to do “as-built” drawings and sketches. You may at some point need to do drawings of existing conditions so planners involved in a remodel or rehabilitation project can design retrofit potential possibilities. The following three isometric diagrams demonstrate typical layout drawings that apply to mechanical systems for plumbing, that is, for water distribution and soil and waste removal.  9-33 Figure 9-59 shows typical hotand cold-water service lines for a single-story residential building and how the lines connect to the fixtures. This layout is a riser diagram in isometric as a method of visualizing or showing a three dimensional picture of the pipes in one drawing. Figure 9-59 — Typical hot-water and cold-water risers diagram.

2.2.0 Waste and Soil Drainage Diagram Figure 9-60 shows the waste and soil pipes fittings and symbols associated with the hot- and cold-water risers diagram. The arrow represents the direction of flow; all pipes are sloping towards the building drain. Figure 9-60 — Typical waste and soil risers diagram.  9-34 Figure 9-61 shows the basic layout of a simple but typical drainage system. Refer to it as the lesson presents the function of each element. Figure 9-61 — Basic drainage system layout and terminology.

• Fixture drain — pipe extending from the P-trap of a fixture to a junction with any other drainpipe

• Fixture branch — horizontal drainpipe connecting fixtures to the stack

• Soil and waste fixture branch — pipe that feeds into a vertical pipe, referred to as a stack

• Soil stack — stack that includes human waste (from water closets or other fixtures with similar functions)

• Waste stack — stack that carries waste but does not include human waste

• Floor drain — receptacle used to receive water drained from the floor; usually located near heating, laundry, or other unit subject to overflow or leakage

• Cleanout — fitting with a removable plate or plug that provides access for cleaning out extraneous material

• Building drain (house drain) — the lowest piping of the drainage system receiving discharge from all other drainage pipes and extending to a point 3 ft (or local code requirement) outside the building wall

• Building sewer — the horizontal piping extending from the end of the building drain to the community sewer or independent disposal unit  9-35

2.3.0 Plumbing Layout In construction drafting, a mechanical (or utility) plan normally includes both water distribution and sanitary drainage systems combined, especially on smaller buildings or houses. The plumbing layout is usually drawn into a copy of the floor plan for proper orientation with existing plumbing fixtures, walls and partition outlines, and other utility features. Figure 9-62 shows a typical plumbing layout. For mechanical symbols, refer to ANSI Y32.4-1977, Graphic Symbols Used in Architectural and Building Construction and MIL- STD-17-1, Mechanical Symbols. Figure 9-62 — Typical plumbing layout plan.

2.4.0 Mechanical Symbols As previously stated, you are not expected to design a system, but you will be expected to draw a workable plumbing plan for use by the plumbing crew or any other interested parties. To accomplish this, you must be familiar with terms, symbols, definitions, and basic concepts of the plumbing trade. As a rule, plumbing plans show the location of fixtures and fittings to be installed, along with the size and route of piping. The details are left to the plumber (UT), who is responsible for installing a properly connected system according to applicable codes, specifications, and good plumbing and construction practices. Generally, plumbing plans make use of four types of symbols: piping, fittings, valves, and fixtures.  9-36 2.4.1 Piping Symbols On plans, line symbols for piping are solid or dashed lines indicating type, location, and proposed use. (Figure 9-63) Size should be noted alongside each route. Piping up to 12 in. in diameter is referred to by its nominal size, approximately the inside diameter (I.D.). The exact inside diameter depends on the classification of pipe. Heavy types of piping have smaller inside diameters because their wall thickness is greater. Piping over 12 in. in diameter is referred to by its outside diameter (O.D.). Figure 9-63 — Line symbols for piping. 2.4.2 Fitting Symbols The pipe fitting symbols shown in Figure 9-64 are the basic line symbols used in conjunction with valve symbols. They define the size of the pipe, the method of branching and coupling, and the purpose of the pipe. This is important because the purpose of the pipe determines what piping material to use. The inverse is also true; the piping material will determine how it can be used.  9-37 Figure 9-64 — Fitting symbols for piping. Only a few of the symbols for fittings, joints, and connections are shown here. For additional symbols on welded and soldered joints, refer ANSI Y32.4-1977, Graphic Symbols Used in Architectural and Building Construction and MIL- STD-17-1, Mechanical Symbols. 2.4.3 Valve Symbols Figure 9-65 shows symbols used for only the most frequently encountered valves. Normally, type of material and valve sizes are not identified on mechanical drawings but are assumed from the type of material and size of connecting pipe. However, when specified on the lists of materials (plumbing takeoff), valves are called out by size, type of material, and working pressure; for example, 2-in. gate valve, PVC, 175-lb working pressure.  9-38 Figure 9-65 — Valve symbols for piping. 2.4.4 Fixture Symbols Figure 9-66 provides symbols and abbreviations for general appurtenances such as drains, as well as other basic fixtures such as baths, sinks, and water closets. The latter are often shown on the plans by pictorial or block symbols. The extent to which the symbols are used depends on the nature of the drawing. In some cases, fixtures are specified on a bill of materials or other schedule keyed to the plumbing plan. When the fixtures are identified on a schedule, you can use symbols that closely resemble the actual fixtures or obtain commercially available mechanical symbol templates.  9-39 Figure 9-66 — Plumbing fixture symbols. Summary As an engineering technician, you must have wide familiarity with all the construction disciplines, their general terms, materials, equipment, and procedures, to be able to translate drawings into working sketches or the reverse, field sketches into drawings. Mechanical systems for water distribution and waste removal are only two of many, but they are also two of the most common. A comfortable knowledge of plumbing terminology (Figure 9-67), materials, and symbols will expedite any tasking you may have to produce their drawings. Figure 9-67 — Typical water supply terminology.  9-40

Review Questions

  1. The system of pipes, fixtures, and appurtenances used inside a building for supplying water and removing wastes is known by what general term? A. Mechanical systems B. Plumbing C. Water distribution D. Piping 2. With which of the following codes must you become familiar when working with mechanical plans? A. National Plumbing Code and National Electrical Code® B. National Plumbing Code and local NAVFAC codes C. Local codes and National Plumbing Code D. Local codes and ANSI codes 3. A water service pipe begins at the _______________. A. hose bib B. water main C. water meter D. water distribution pipe 4. A water distribution pipe begins at the _____________. A. hose bib B. water main C. water meter D. water service pipe 5. Traditionally, copper has been widely used for tubing in piping systems for which of the following reasons? A. It is less costly than other types of pipe. B. It is available in two wall thicknesses and is faster to install. C. It does not rust and is resistant to scale particles in the pipe. D. Fittings are screwed to the pipe which allows for faster completion of the piping system. 6. Copper pipe is manufactured in ___ grades and thicknesses, ___ of which are appropriate for water distribution systems from water main to tap. A. 6, 3 B. 5, 3 C. 4, 2 D. 4, 3  9-41 7. Copper is durable and connects well to valves but should not be installed if the water has a ____________level. A. low-pH (high acidic) B. high-pH (low acidic) C. high water table D. low water table 8. Which of the following types of copper tubing is frequently used as replacement piping because of its flexibility? A. Type K B. Type L, hard tempered C. Type M D. Type L, soft tempered 9. Which of the following advantages does plastic pipe have over metal? A. Flexibility B. High resistance to rupture and total resistance to rust C. It can be installed either above or below ground D. All of the above 10. What type of polyvinyl chloride pipe can be used in both cold-water and hot-water systems? A. PVC B. APVC C. CPVC D. PVC-C 11. The principal mechanical difference between CPVC and PVC is that CPVC is significantly more malleable, allowing greater flexibility and ________________. A. long runs B. crush resistance C. quick connections D. lighter handling 12. Galvanized steel pipe sizes are based on what nominal size? A. Inside diameter B. Outside diameter C. Wall thickness D. Inside radius  9-42 13. What type of pipe material is frequently used for water mains and service pipe up to a building? A. Galvanized steel B. Copper C. Cast-iron D. Plastic 14. What two types of malleable iron or cast iron pipe fittings are used for steel pipe or wrought iron? A. a) pressure, b) recessed B. a) nominal, b) sized C. a) inside diameter, b) outside diameter D. a) nominal, b) recessed 15. A Durham fitting is also known as a ____________ fitting. A. standard B. pressure C. cast-iron drainage D. speed 16. How many parts does a ground joint union have? A. 1 B. 2 C. 3 D. 4 17. How many parts does a flange union have? A. 1 B. 2 C. 3 D. 4 18. An eccentric reducer joins pipes of different sizes so the two pieces of pipe will ___________. A. line up for a straight run B. turn at right angles C. turn vertically for a riser D. not be in line with each other 19. A nipple is a ____________________. A. cast-iron threaded cap B. galvanized threaded plug C. length of pipe with a male thread on each end D. copper reducing coupler  9-43 20. What type of fitting for joining straight should be used in runs of dissimilar metal pipe that require easy disconnection? A. Union B. Coupling C. Dielectric union D. Dielectric coupling 21. What type of piping uses flared and sweated joints? A. Plastic B. Copper C. Cast-iron D. Galvanized steel 22. What type of piping uses solvent welded, fusion welded, fillet welded, threaded, and flanged joints? A. Plastic B. Copper C. Cast-iron D. Galvanized steel 23. What type of piping uses bell-and-spigot, and mechanical joints? A. Plastic B. Copper C. Cast-iron D. Galvanized steel 24. What type of piping uses threaded joints only? A. Plastic B. Copper C. Cast-iron D. Galvanized steel IN ANSWERING QUESTIONS 25 THROUGH 28, SELECT THE TYPE OF VALVE FROM THE FOLLOWING LIST THAT BEST MATCHES THE DESCRIPTION GIVEN IN THE QUESTION. A. Globe Valve B. Gate Valve C. Check Valve 25. This valve has a wedge-shaped, movable plug or round disk that fits tightly against the seat when closed. A. A B. B C. C  9-44 26. This valve is well suited for use when a regulated flow is required. A. A B. B C. C 27. This valve must be operated in the fully open or fully closed position. A. A B. B C. C 28. This valve is used to prevent backflow in a pipeline. A. A B. B C. C 29. Any pipe ______________________ must be adequately supported to prevent sagging. A. from the water main to the meter B. from the meter to the distribution pipes C. aboveground or in the building interior D. corporation stop to the building 30. On water mains, thrust blocks should be installed for what purpose? A. To prevent pipe displacement caused by high water pressure B. To prevent pipe ruptures caused by high water pressure C. To prevent sagging due to the weight of the piping material D. To prevent sagging due to the weight of the pipe and the water contained in the pipe 31. What purpose does pipe insulation serve? A. Helps prevents heat passage from pipes to surrounding air B. Helps prevent lines from absorbing heat C. Subdues noise D. All of the above 32. Where is cast-iron soil pipe (CISP) normally used? A. Where the soil is unstable B. Under buildings C. In soil containing cinder and ashes D. In light traffic areas  9-45 33. Vitrified Clay Pipe (VCP) is made of _______________. A. vitrified crushed rock B. moistened powdered clay C. vitrified glass D. moistened powdered silica 34. Which piping material is becoming increasingly popular for use in underground sanitary sewage systems? A. Cast iron B. Polyvinyl chloride C. Concrete D. Wrought iron 35. What cast-iron fitting should you use to make a 22 l/2-degree change in pipe direction? A. Combination Y and 1/8 bend B. 1/4 bend C. Short sweep 1/4 bend D. 1/16 bend 36. A test tee is used in stack and waste installations where the vertical stack joins the ________. A. horizontal sanitary sewer B. vent stack C. clean out D. double Y branch 37. Which of the following type of joint is not used for cast-iron soil pipe? A. Speed seal B. Compression C. No-hub D. Lead and oakum 38. What fittings are used in waste pipe systems to catch and hold water, thereby forming a seal to prevent sewer gases from backing up into a building? A. Traps B. Street ells C. Valves D Vents  9-46 39. Without a vent, water or waste discharged through a system tends to create a ________ effect on other fixtures. A. pressure B. siphon C. overflow D. venting 40. When liquid waste flows through a portion of a vent pipe, _________. A. it is plumbed incorrectly B. it will block the venting C. it is a wet vent D. it is a temporary overflow 41. What type of configuration does a building’s cold water service usually run through? A. Globe valve-gate valve-meter B. Gate valve-check valve-meter C. Gate valve-meter-globe valve D. Gate valve-meter-gate valve 42. In what way, if any, do waste stacks differ from soil stacks? A. Waste stacks carry human waste, soil stacks do not B. Soil stacks carry human waste, waste stacks do not C. Waste stacks empty into building drains, soil stacks empty into building sewers D. None 43. Unless designated otherwise by local code, what is the minimum distance a building drain must extend beyond the building wall? A. 2 ft B. 3 ft C. 6 ft D. 10 ft 44. Piping up to 12 in. in diameter is referred to by its ______________. A. inside diameter B. nominal size C. outside diameter D. fitting size 45. Piping over 12 in. in diameter is referred to by its ______________. A. inside diameter B. nominal size C. outside diameter D. fitting size  9-47 46  For valve symbols, the type of material and valve size should always be identified on the drawings. A. True B. False  9-48 Trade Terms Introduced in this Chapter Bell and spigot joint A connection between two sections of pipe, the straight spigot end of one section is inserted in the flared-out end of the adjoining section A pipe fitting that extends a run by joining two pipes of different diameter; often called a reducing coupling Dielectric A nonconducting substance, i.e. an insulator Galvanic corrosion An electrochemical process in which one metal corrodes preferentially when in contact with a different type of metal pH A measure of the acidity or basicity (alkali) of a solution Vitrified clay pipe (VCP) Pipe made from clay that has been subjected to vitrification, a process which fuses the clay particles to a very hard, inert, glass-like state; commonly used in sewer gravity collection mains because of its reasonable price and resistance to almost all domestic and industrial sewage Bell reducer

Chapter 10 Electrical Systems and Plans

As an engineering technician, you will be working with drawings to accomplish various tasks depending on your specific assignment. Just as you need to be familiar with wood framing plans and concrete plans for structural elements, and mechanical plans for plumbing and waste removal, you must also be familiar with electrical plans for power service and distribution. An engineering tech working on a set of drawings or plans must clearly convey his or her ideas (or instructions) to the installer, usually a Construction Electrician (CE). To do so, you must understand and be thoroughly familiar with the basic methods and functions of materials and fixtures used to install an electrical system. In conjunction with the previous chapters on wood, concrete and masonry, and mechanical systems, this lesson will enable you to prepare construction drawings, revise as-built drawings in the field, and easily incorporate minor design changes.

When you have completed this lesson, you will be able to do the following.

1. Describe the different types of electrical power distribution systems.
2. Interpret different types of electrical plans.

Contents

1.0.0 Electrical Systems

2.0.0 Electrical Plans

 

1.0.0 ELECTRICAL SYSTEMS

Occupied buildings, as well as most other structures, require an electrical system to provide power for lighting and various appliances and equipment. An electrical system has three distinct elements:

• Generation — A power plant generates electrical energy by conversion from some other energy source such as wind, geothermal, coal, nuclear, solar, hydro, etc.

• Distribution — An electrical transmission system carries electrical current externally from the generating station via substations and transformers to building locations.

• Internal wiring — An internal electrical wiring system distributes electricity to illuminate the building and provide power to appliances and equipment. This lesson will only present the external power transmission and the interior wiring distribution system, with its various materials and fittings used in installation. For more information, refer to the latest edition of Construction Electrician Basic, NAVEDTRA 14026A, National Electrical Code® (NEC®), and Construction Electrician Advanced, NAVEDTRA 14027A

1.1.0 Electrical (Power) Distribution System

A complete electrical distribution system brings power from the generating plant through substations, feeders, and transformers to a building’s premises by overhead power poles or underground lines. This delivery network is generally considered a combination of two sections, the transmission section and the distribution section. The difference between the two sections depends on the function of each at a particular time. In a small power system, the distinctive difference tends to disappear, and the transmission section merges with the distribution section. The term “distribution section” normally designates the outside lines but the distribution system frequently continues inside the building to include power outlets. Most land-based power systems use alternating current (AC) rather than direct current (DC), principally because transformers can be used only with AC. An AC distribution system usually contains one or more generators (technically known as alternators in an ac system); a wiring system of feeders, which carry the generated power to a distribution center; and the distribution center, which distributes the power to wiring systems called primary mains and secondary mains. Figure 10-1 illustrates a typical transmission and distribution system. Power from the generating station may be distributed by overhead transmission and distribution lines, by underground cable, or by a combination of both. At most advance bases, Seabees commonly use overhead feeder lines because they are cheaper to build, simpler to inspect, and easier to maintain than underground cables, but underground cable is preferred at airports and runways to prevent hazardous flight conditions.  10-4 Figure 10-1 — Typical electrical transmission and distribution system. 1.1.1 Overhead Power Distribution A system may be a three-wire or a four-wire system, depending upon whether the alternators are connected in a delta or wye configuration. Figure 10-2 View A is a schematic diagram showing a delta connection. The coil marked “stator” represents the stationary coils of wire in the alternator; the one marked “rotor” represents the coils, which rotate on the armature. Power is taken off the stator from three connections, which in the drawing form a triangle or delta. All three wires are live (HOT) wires. Figure 10-2 View B shows a Wye (Y)-connected alternator (three-phase, four-wire). N represents a common or neutral point to which the stator coils are all connected. The current is taken off the stator by the three lines (wires), 1, 2, and 3, connected to the stator coil ends; and also by a fourth line, N, connected to the neutral point. Lines 1, 2, and 3 are hot wires; line N is neutral. Figure 10-2 — Delta- and Wye-connected alternator diagrams.  10-5 In a delta-connected alternator system (Figure 10-2 View A), the voltage developed in any pair of wires, or in all three wires, is always the same; therefore, a delta-connected system has only a single voltage rating (220 V in Figure 10-2). In a Y-connected alternator system (Figure 10-2 View B), the voltage developed differs depending on the combinations of wires. Note in Figure 10-2 that lines 1 and 2 take power from two stator coils (A and C), lines 1 and 3 from two stator coils (C and B), as well as lines 2 and 3 from two stator coils (A and B). However, neutral (N) and line 2 take power from only one coil (A); neutral (N) and line 1 from one coil only (C), and neutral (N) and line 3 also from only one coil (B). Therefore, a Y-connected alternator can produce two different voltages: a higher voltage in any pair of (or all three) hot wires and a lower voltage in any hot wire paired with the neutral wire. Output taken from a pair of wires is single-phase voltage; output from three wires is three-phase voltage. Figure 10-3 demonstrates the voltage cycle of a three-phase system. Because of differing benefits derived from each of the two generating systems, some electrical equipment is designed to operate only on single-phase voltage, while other equipment is designed to operate only on three-phase voltage. This includes the alternators themselves; a system with a three-phase alternator is called a three-phase system. However, even in such a system, single-phase voltage can be obtained by tapping only two of the wires. Figure 10-3 — One voltage cycle of a three-phase system. Figure 10-4 shows an illustration of a three-phase, three-wire overhead power distribution system. Figure 10-5 shows a matching wiring diagram of Figure 10-4. The system has an alternator generating 220 V. From the generating station, threephase, three-wire feeders carry the power overhead to the distribution points where two primary mains branch off. One of these primary mains carries power to the motor pool for direct (note the three wires) wiring to a three-phase motor designed to operate on 220 V, and (through a transformer) for a lighting system and a single-phase motor, both designed to operate on 110 V (note the two wires).  10-6 Figure 10-4 — Typical overhead three-phase, three-wire power distribution system. Figure 10-5 — Wiring diagram of overhead three-phase three-wire power distribution system in Figure 10-4. The other primary main carries power to operational headquarters, living quarters, and the mess hall. This power is also carried through a transformer that reduces the power to the secondary main to 110 V single phase. Figure 10-6 shows an illustration of a four-wire system serving the same facilities. Figure 10-7 shows a matching wiring diagram of Figure 10-6. In this scenario, there is a four-wire Y-connected alternator rated at 110/220 V and no transformers are necessary to reduce the power to 110 V single phase for the  10-7 secondary mains. The neutral wire in a four-wire system exists so that lower voltage can be used in the system. The secondary mains are developed by simply tapping into pairs of wires, one a hot wire and the other the neutral wire. The 220-V, three-phase motor is tapped into the three hot wires delivering the 220 V, three-phase power from the alternator. Figure 10-6 — Typical overhead three-phase four-wire power distribution system. Figure 10-7 — Wiring diagram of overhead three-phase four-wire power distribution system in Figure 10-6. Since a three-wire three-phase 220V delivery system needs a transformer to reduce the voltage to the common usage 110 V, we need to know a little more about what a transformer is. A transformer (Figure 10-8) is a device for either increasing or reducing  10-8 the voltage in an electrical circuit. It does this through a number of coil windings around a core. Figure 10-8 — Example of step up and step down transformer coil windings. Step down transformers can range in size from small portables like those for a cell phone charger to permanently mounted heavy ones like those commonly hung with cross-arm brackets attached to an electric pole. (Figure 10-9) Figure 10-9 — Common step down transformer. Long-distance power transmission requires a voltage higher than is normally generated. In this case, a transformer is used to step-up the voltage to that required for long distance transmission (Figure 10-10). At the service distribution end, the voltage is reduced again to the voltage required for lights and equipment. A transformer is used there also, but this time it is a step-down transformer.  10-9 Figure 10-10 — Step-up transformer for long distance transmission. The voltage must be stepped-up for long distance transmission because of natural resistance; the greater the distance, the greater the resistance, so the greater the force needed to push the current through the transmission line. Let’s look at Ohm’s Law, I = E/R where I represents current (in Amperes), E is electromotive force (in Volts) (also called Voltage), and R is resistance (in Ohms). From the formula, given a constant voltage (E), than current (I) varies inversely to resistance (R). To maintain the required current (I) as the resistance increases, the voltage, or electromotive force (E), must increase accordingly. The voltage increase makes it possible to use smaller wires or cables. This in turn minimizes the support requirements for aboveground transmission lines and consequently minimizes the cost of the system. 1.1.2 Underground Distribution The Navy uses underground power distribution systems on most shore facilities for several reasons:

• better security against high winds and storms than overhead lines

• more clear areas and open spaces for operations of heavy mobile equipment

• greater security against enemy attack than overhead lines There are three principal categories of underground lines: duct lines, cables buried directly, and conduits located in tunnels. The system most frequently installed by  10-10 construction battalions is the underground duct system (Figure 10-11), which consists of manholes, handholes, duct lines, and cables. In general, a representation of the system layout and a list of materials needed to install the system can be found in a standard set of drawings. Figure 10-11 — Seabees preparing to install an underground duct system.

1.2.0 Interior Electrical Wiring System

In electrical terminology, the term “service” means the electrical system that brings power from the exterior power distribution line to a point inside (or on) the building. From there, it is distributed to the building circuits. The key term is “service” and it is used in conjunction with other terms to identify specific segments:

• Service Conductor — supplies power from the exterior distribution system to the entry point of the building o Service Drop — conductors for overhead service o Service Lateral — conductors for underground service

• Service Entrance — brings power into (or onto) the building from the service conductor entrance to the service equipment

• Service Equipment — the equipment located near the entry point of the service conductor. This equipment is the main control and means of cutting off the power supply to the building. It usually consists of a circuit breaker or switch or fuses, 1.2.1 Service Conductors A service drop conductor runs from a pole to the building. (Figure 10-12) It may be an approved multi-conductor cable or an individual (single) conductor.  10-11 In either case, it must have thermoplastic, rubber, or other weatherproof insulation. It must also be of sufficient current carrying capacity to ensure that a prospective maximum load will not create enough temperature change (heat) to damage the insulation. The NEC® specifies the minimum size conductors allowable for different load (amperage) requirements. Figure 10-12 — Typical service drop. A service lateral conductor brings power into a building from below ground. (Figure 10- 13).Sometimes these conductors are tied to an overhead distribution system and run down the pole into the ground before they run into the building. In other cases, the entire distribution system, except for the transformer, is underground. A service lateral may be connected directly to a secondary main or to a transformer if a separate transformer serves the building. It may be installed in rigid conduit (metallic or nonmetallic) or with underground service entrance (USE) cable. Figure 10-13 shows the layout of an underground service lateral run from a transformer to a junction box and through the service entrance to the service equipment. Figure 10-13 — Typical service lateral.  10-12 1.2.2 Service Entrance The service entrance is the starting point for interior wiring. It brings power from the service conductor (drop or lateral) to the service equipment. (Figure 10-14) The service drop conductor connects to the service entrance conductor just outside the building. The service entrance conductor may be an approved single conductor run through a protective raceway, such as rigid conduit (metallic or nonmetallic), or an approved type of service entrance cable that does not need raceway protection unless it is likely to be damaged by abrasions or from being struck by passing equipment. Where single conductors are used, they must be insulated and of the wire size specified by the NEC®. Figure 10-14 — Typical service entrance conductors. Figure 10-14 also shows a service head (also called a weatherhead) which is used with a raceway to provide an entrance for the conductors. The weatherhead is designed to reduce abrasion to the insulation and has a downward facing opening to prevent rain from entering the raceway. The service entrance conductor leads to the service equipment panel (Figure 10-15) that provides a means of disconnecting the supply source’s service conductors from the interior electrical wiring system. The service entrance panel may consist of a single manually operated switch with a fuse or a circuit breaker. The NEC® sets 60 amperes (A) as the minimum size for fuse type entrance switches and 50A for the circuit breaker type. Rather than burning out like a fuse, a circuit breaker is a protective device that automatically opens the circuit when amperage exceeds its rating. Restoring power is a matter of reducing the amperage draw and closing the circuit again with a switch instead of replacing a fuse. The NEC® recommends a minimum size of 100-A service for individual residences. However, when no more than two two-wire branch circuits are installed, a 30-A entrance switch may be used.  10-13 Figure 10-15 — Typical service equipment panels. 1.2.3 Panelboard NEC® defines a panelboard as a single panel, or a group of panel units designated for assembly in the form of a single panel, including buses. (Figure 10-16). Figure 10-16 — A-Panelboard with breaker panel. B-Panelboard with fuse panel. A panelboard comes with or without switches and/or automatic over-current protective devices for the control of light, heat, or power circuits of individual as well as aggregate capacity. It is designed for placement in a cabinet or cutout box, in or against a wall or partition, and is only accessible from the front. A breaker panel uses a thermal unit built into the switch with the breaker preset at the factory to open automatically at a predetermined ampere setting. It may be reset to the ON position after a short cooling-off period.  10-14 Lighting panels (Figure 10-17, View A) are normally equipped with 15A single-pole automatic circuit breakers, while power panels (Figure 10-17, View B) may have one-, two-, or three-pole automatic circuit breakers with a capacity to handle the designated load. In most buildings, the service equipment’s entrance switch and panelboards can and should be mounted close to each other. However, they must be placed where service and maintenance can be easily performed. Figure 10-17 — A-Lighting panel. B-Power panel. They should not block any passage but should be located as near as possible to the center of the electrical load to minimize any unnecessary electrical resistance due to long runs (remember Ohm’s Law). In addition, they should not be placed near exposure to corrosive fumes or dampness. 1.2.4 Conductors Because of the conducting and ductile properties of copper and aluminum, electrical conductors are usually either drawn copper or aluminum formed into wire. They provide paths for the flow of electrical current. To protect personnel, conductors are usually covered with insulating materials to minimize the chances for short circuits. Atmospheric conditions, voltage requirements, and environmental and operating temperatures are factors to consider in selecting the type of wire with insulating materials for a particular job. 1.2.4.1 Single Conductors A single conductor (Figure 10-18) may consist of one solid wire or a number of smaller stranded solid wires that share in carrying the total current. A stranded conductor is more flexible, making it more adaptable for pulling through bends in a conduit.  10-15 Figure 10-18 — Typical insulated single conductors. Conductors vary in diameter and use according to their intended electrical current load. Wire manufacturers have established a numerical system to eliminate the cumbersome use of circular mil (fractional-inch diameters) in describing wire sizes. The American Wire Gauge (AWG) Standard (Figure 10-19) provides an easy common reference for wire sizes. Notice the larger the wire gauge number, the smaller the diameter of the wire. No. 8 and larger wires are normally used for heavy power circuits or as service entrance leads to buildings. No. 12 AWG is a wire size used most frequently for interior wiring. No. 16 or 18 AWG stranded wire is used to conduct current from outlet boxes to sockets in lighting fixtures and is called “fixture wire.” Figure 10-19 — American Wire Gauge (AWG) (partial)  10-16 A multi-wire conductor (called a cable) is an assembly of two or more conductors insulated from each other with additional insulation or a protective shield formed or wound around the group of conductors. (Figure 10-20) The covering or insulation for individual wires is color coded for proper identification. Figure 10-20 — Typical insulated multi-wire (cable) conductors. Two of these common types of cable need more attention. Romex (trade name) (Figure 10-20, View A) is a nonmetallic-sheathed cable (NMC). It comes in sizes No. 14 through 2 for copper conductors and No. 12 through 2 for aluminum or copper-clad aluminum conductors. It comes with a bare (uninsulated) ground wire laid in intervals between the circuit conductors and under the outside braid. The ground wire is used to ensure the grounding of all metal boxes in the circuit, and furnishes the ground for the grounded type of convenience outlets required in Navy installations. Nonmetallic-sheathed cable is used for temporary wiring in locations where using conduit would be unfeasible. BX (Figure 10-20, View B) is a metallic-armored cable. BX tends to ground after installation. Small metal burrs on the armor can, because of vibration, penetrate the insulation and cause a ground. The building codes of most cities restrict the use of BX cables to the control circuits for oil burners and similar usage. BX cables come in sizes from No. 14 to 2 AWG, and each cable may contain one, two, three, or four conductors. The armor on the cable furnishes a continuous ground between boxes. 1.2.5 Insulation Electrical conductors are available with various kinds of insulating materials. The more common are rubber, thermoplastic, and varnished cambric, but less frequently, special types of paper, glass, silk, and enamel are also used. 1.2.4.2 Multi-wire (Cable) Conductors  10-17 One factor to consider when selecting properly insulated conductors are the NEC® recommendations of insulation type for use in dry, damp, and wet locations. The NEC® considers installation in the following as wet locations:

• underground installations

• concrete slabs and masonry

• direct contact with the earth

• areas subject to saturation with water or other liquids Another factor to consider is temperature. Different insulations have different maximum temperature ratings. Check the NEC® and any applicable local codes to ensure you use the appropriate insulation for the location and temperature considered in the plans. The following are a few examples of insulation composition, location application, and maximum temperature rating:

• Type RH o a heat-resistant compound that will stand higher temperature than Type R o commonly used in dry locations o maximum temperature rating of 167°F

• Type RHW o moisture-resistant rubber compound for use where the wire may be subject to wet conditions o used in both wet and dry locations o maximum temperature rating of 167°F

• Type RUH o high grade rubber compound consisting of 90-percent latex o often used for direct burial in dry locations o maximum temperature rating of 140°F Thermoplastic insulation’s advantages are long life, toughness, a dielectric strength (capacity for insulating) equal to rubber, and it requires no protective covering over the insulation. Common types of thermoplastic insulation are:

• Type T — suitable only for dry locations with a maximum temperature rating of 140°F

• Type TW — moisture-resistant with a temperature rating of 140°F

• Type TA — thermoplastic asbestos compound combining the characteristics of Types T and TW with a maximum temperature rating of 194°F. Its use is restricted to switchboard wiring. Varnished cambric insulation has an insulating quality midway between that of rubber and paper. It is more flexible than paper; its dielectric strength is greater than that of rubber, and ordinary oil and grease do not adversely affect it. It is manufactured in either standard type (black finish) or heat-resistant type (yellow finish). Varnished insulation is restricted to dry locations with applications such as motor leads, transformer leads, and high-voltage cables.  10-18 1.2.6 Conduits and Fittings An electrical conduit is a pipe, tube, or other means in which electrical wires are installed for protection from the elements or accidental damage. Much like plumbing, the conduit’s fittings depend upon the type of pipe or tubing used. Navy construction generally uses rigid, thin-wall, or flexible conduit. 1.2.6.1 Rigid Conduit Rigid galvanized steel or aluminum conduit is made in 10-ft lengths, in sizes from 1/2 in. to 6 in. in diameter, threaded on both ends, with a coupling on one end. Figure 10-21 shows rigid conduit and various fittings. Figure 10-21 — Rigid conduit and fittings. Again like plumbing’s use of galvanized pipe, installing rigid conduit involves a good deal of cutting, bending, and threading.  10-19 An ordinary hacksaw or special wheel pipe cutter is used for cutting, and a ratchet type of mechanical die is used for threading the cut ends. Bending can be done manually, using a bending tool commonly called a hickey (Figure 10-22), or hydraulically. A hydraulic bender is recommended for making smooth and accurate bends. Figure 10-22 — Conduit bender (Hickey). Condulets are a convenient way of making bends on sharp corners and reducing the number of bends made in a run of conduit, especially in conduit intended for exposure to the elements. Another type of rigid conduit approved for use by NAVFAC is the polyvinyl chloride (PVC) pipe. (Figure 10-23) Plastic conduit is especially suitable for use in areas where corrosion of metal conduit is a problem. PVC’s advantages include light handling weight, ease of installation, and leak proof joints. Intended primarily for underground wire and cable raceway use, it is available in two forms. Type I is designed for concrete encasement. Type II is designed for direct earth burial. A solvent-type adhesive welding process joins rigid plastic conduit and fittings together. Figure 10-23 — Seabees installing PVC conduit. PVC also comes in sizes of 1/2 to 6 in. in diameter with fittings available from the manufacturer. (For more information on PVC fittings, refer to Article 370 of the NEC®.)  10-20 Electric metallic tubing (EMT) or thin-wall conduit is a conduit with a wall thickness much less than that of rigid conduit. (Figure 10-24) It is made in sizes from 1/2 to 2 in. in diameter. Thin-wall conduit cannot be threaded; therefore, special types of fittings are used for connecting pipe to pipe and pipe to boxes. Figure 10-24 — Thin-wall conduit and fittings. Flexible conduit (called Greenfield) is a spirally wrapped metal band wound upon itself and interlocking in such a manner as to provide a round cross section of high mechanical strength and flexibility. (Figure 10-25) Figure 10-25 — Flexible conduit and fittings. It is used where rigid conduit would not be feasible. It requires no elbow fittings. 1.2.6.2 Thin-Wall Conduit 1.2.6.3 Flexible Conduit  10-21 Greenfield is available in sizes from 1/2 to 3 in. in diameter and in two types: the standard plain or unfinished-metal type and a moisture-resistant type called sealtite, which has a plastic or latex jacket. The moisture-resistant type is not intended for general use but only for connecting motors or portable equipment in damp or wet locations where connection flexibility is needed. 1.2.7 Wire Connectors Figure 10-26 shows various types of connectors used to join or splice conductors. The type used will depend on the type of installation and the wire size. Most connectors operate on the same principle, that of gripping or pressing the conductors together. Wire nuts are used extensively for connecting insulated single conductors (both solid and stranded) installed inside of buildings. Figure 10-26 — Typical cable and wire connectors. 1.2.8 Outlet Boxes An outlet box is simply a metal (or plastic) container, set flush or nearly flush with the wall, floor, or ceiling, into which an outlet receptacle or switch will be inserted and fastened. Outlet boxes used in Navy construction are usually made of galvanized steel. However, along with the increase of other plastic materials in construction, nonmetallic boxes made of rigid plastic compounds are being used for approved installation. Outlet boxes bind together the elements of a conduit or cable system in a continuously grounded system. They also provide a means of holding conduit in position, along with space and protection for mounted switches and receptacles, and working space for making splices and connections. Boxes can be round, octagonal, square, or rectangular. Commonly used outlet boxes are shown in Figure 10-27.  10-22 View A — a 4-in. octagon box used for ceiling outlets. This box is made with 1/2- or 3/4-in. knockouts—indentations that can be knocked out to make holes for the admission of conductors and connectors. View B — a 4 11/16-in. square box used for heavy duty, such as a range or dryer receptacle. It is made with knockouts up to 1 in. in diameter. View C — a single receptacle gang box used for switches or receptacles. Two or more boxes can be ganged (combined) to install more than one switch or receptacle at a location. View D — a utility box, called a handy box, made with 1/2- or 3/4-in. knockouts and used principally for open-type work. View E — a 4-in. square box with 1/2- or 3/4-in. knockouts, used quite often for switch or receptacle installation. It is equipped with plastic rings having flanges of various depths so that the box may be set in plaster walls of various thicknesses. Figure 10-27 — Typical outlet boxes. Besides the boxes shown, special boxes called conduit gang boxes are made to accommodate three, four, five, or six switches. The NEC® requires outlet boxes be 1 1/2 in. deep except where the use of a box that deep would result in injury to the building structure or is impractical. In such cases, a box not less than 1/2 in. deep may be used. For switch boxes, 2 1/2-in. in depth is the most widely used. Also per NEC® requirements, outside edges of outlet and switch boxes without flush plates cannot be recessed more than 1/4 in. below the surface of the finished wall. 1.2.9 Receptacles Receptacles are used to plug in lights and appliances around the building. Figure 10-28 shows some of the most common receptacles.  10-23 Figure 10-28 — Common receptacles. A convenience outlet (Figure 10-28, View A) is a duplex receptacle with two vertical or T-slots and a round contact for the ground. This ground is connected to the frame of the receptacle and is grounded to the box by way of screws that secure the receptacle to the box. A range receptacle (Figure 10-28, View B) may be either a surface type or a flush type. It has two slanted contacts and one vertical contact and is rated at 50 A. Receptacles for clothes dryers are similar but are rated at 30 A. Range and dryer receptacles are rated at 250 V and are used with three-wire, 115/230 V, two hot wires and a neutral. An air conditioner receptacle taking 230 V (Figure 10-28, View C) is made with two horizontal slots and one round contact for the ground. Strip receptacles (Figure 10-28, View D) used in the Navy allow movement of the receptacle to any desired location. These strips are available in 3-ft and 6-ft lengths and may be used around the entire room. They are particularly desirable with portable equipment or fixtures such as drafting tables and audio-visual equipment. Exterior locations require special weatherproof outlets to resist weather damage and minimize potential hazards from water contacting the conductors. 1.2.10 Switches For interior wiring, single-pole, three- or four-way toggle switches are used. Most of the switches will be single-pole, but occasionally a three-way system is installed, and on rare occasions, a four-way system.  10-24 A single-pole switch is a one-blade, on-and-off switch that may be installed singly or in multiples of two or more in a gang box. In a three-way switch circuit there are two positions, either of which may be used to turn a light ON or OFF. The typical situation is one in which one switch is at the head of a stairway and the other at the foot. A four-way switch is an extension of a three-way circuit by the addition of a four-way switch in the line between the two three-way switches. This allows on/off switching from three locations. Note that three- and four-way switches can be used as single-pole switches, and fourway switches can be used as three-way switches. Some activities may install all smallwattage, four-way switches for all lighting circuits to reduce their inventories. However, three- and four-way switches are usually larger than single-pole switches and take up more box room. The size of a switch depends on its ampacity (related maximum amperage capacity). The ampacity and maximum allowable voltage are stamped on the switch. Test Your Knowledge  1. Most land-based power systems use alternating current (ac) because ________. A. direct current voltage is unstable B. alternating current is cheaper to produce C. direct current requires heavier wiring D. transformers can be used only with ac

2.0.0 ELECTRICAL PLANS

Like mechanical plans, electrical plan information and layout are usually superimposed on the plot plan and the building plan, thus providing common reference points for all the respective trades. This lesson will address electrical plans pertaining to the electrical (power) distribution system (outside power lines and equipment for multi-building installations) and the interior electrical wiring system. With electrical drawings, the layout for both light and power is your main concern as an engineering tech, and your tasking may include developing electrical drawings and layouts from notes, sketches, and specifications provided by the designing engineer. You are not required to design the electrical wiring system, but you must be familiar with symbols, nomenclature, basic functions of components, and installation methods, as well as the transmission, distribution, and circuit hookups associated with the electrical systems. In addition, you must be familiar with both NEC® and local codes, standards, and specifications, and be able to apply that knowledge in drawing electrical plans.

2.1.0 Standards and Specifications Requirements

Electrical system safety is of prime importance for both personnel and base operations. Consequently, it is imperative that all Navy electrical installations ashore conform to rigid standards and specifications. When preparing construction drawings, engineering techs, like  10-25 CEs, must follow the specifications issued by Naval Facilities Engineering Command (NAVFACENGCOM). In particular, an engineering tech working on electrical wiring and layout diagrams for electrical plans should refer to the latest edition of American National Standards Institute (ANSI) Y32.9 and ANSI Y14.15. 2.1.1 Codes Installing electrical systems by code requirements and procedures offers protection for the consumer against unskilled electrical labor. In addition to providing a common standard, the NEC® serves as a basis for limiting the size and type of wiring for specific use, circuit size, outlet spacing, conduit requirements, and other functions. Be certain you always have a copy of the latest edition of the NEC® available. A copy should be maintained in the technical library. In addition to NEC® standards, local codes are also used when separate electrical sections are applicable to the building locale. These local codes are similar to NEC® standards for the system wiring in that all of the electrical devices and fixtures that will connect to the wiring (in the electrical plans materials list) must meet certain specifications and minimum requirements. Underwriters Laboratories (UL) is an independent organization that tests various electrical fixtures and devices to determine if they meet minimum specification and safety requirements as set up by UL. Approved fixtures and devices may then bear UL labels. (Figure 10-29) Figure 10-29 — Underwriters Laboratory logo. 2.1.2 Permit On Seabee projects, utility drawings (both mechanical and electrical) receive a thorough review before the granting and issuing of an excavation (or digging) permit. This minimizes the hazards to personnel as well as underground utilities, supply lines, and structures during the construction process. To achieve maximum safety, the reviewing agency must have accurate drawings of existing conditions. As-built and working drawings must note and reflect all minor design changes and field adjustments. Therefore, close coordination and cooperation must develop within and among all of the parties involved in the project. They jointly need to maintain periodic checks on red-lined prints so that they can compare information and verify it as up to date.

2.2.0 Electrical Symbols

There are a myriad of electrical symbols used in schematic drawings, electronics, avionics, shipboard lighting, and so on. The ones you will use as an engineering tech will be limited to those typical of the construction industry. An electrical plan’s symbols indicate general layout, units, related equipment, fixtures and fittings, and the routing and  10-26 interconnection of various electrical wiring. Figure 10-30 shows most common types of symbols used in electrical drawings for construction. Figure 10-30 — Common electrical symbols for construction. To see additional or special symbols, refer to the appendix and/or to ANSI Y32.9. To add electrical symbols on a drawing, as in drawing a mechanical plan, it is best to use templates. For example, a wiring symbol is usually drawn as a single line but it also includes slanting “tick marks” to indicate the number of wires in an electrical circuit.

2.3.0 Exterior Electrical Layout (Plan)

Exterior distribution lines deliver electrical power from a source (generating station or transmission substation) to various points for service drop or service lateral. The NAVFAC P-437, Facilities Planning Guide, shows the exterior electrical network layout for a 100-man camp. (Figure 10-31) It is a typical exterior layout plan, and this condensed layout shows:

• site plan of the camp area with location of facilities and corresponding electrical distribution layout plan

• list of facilities with a legend identifying the facilities by item symbol, facility number, description, and quantity

• electrical load data table  10-27 As an engineering tech, you may be called upon to trace, modify, revise, and even review the workability of this or similar drawings. Therefore, you need to study and become comfortably familiar with electrical plans while gaining a working knowledge of how the Advanced Base Functional Component (ABFC) System works. Review the contents of the NAVFAC P-437. It offers a wide variety of plans, drawings, and applications for use in Seabee construction.  10-28 Figure 10-31 — Typical exterior electrical layout plan.  10-29

2.4.0 Interior Electrical Layout (Plan)

The interior electrical layout for a small building is usually drawn into a print of the floor plan. On larger projects, additional separate drawing sheets are necessary to accommodate detailed information needed to meet construction requirements. Figure 10-32 shows an interior electrical layout of a typical public works shop. Note again that the electrical wiring diagram is superimposed on an architectural floor plan (Lighting circuits use three-wire No. 12 AWG). The drawing also provides additional specifics needed build this PW shop: a list of assemblies, an electrical load table, and a panel schedule for the 225-A three-phase circuit breaker. The service lateral entrance (item 10 on the list of assemblies) delivers a four-wire, 120/208-V power into the building. Follow these basic steps as a guide in developing an interior electrical plan. Show: 1. location of service panel and its rating in amps 2. all wall and ceiling outlets 3. all special-purpose outlets such as telephones, communications, doorbells, and so forth 4. all switches and their outlet connections 5. all convenience outlets If required, complete a schedule of electrical fixtures, with symbols, legends, and notes necessary to clarify any special requirements in the drawing that are not stipulated in the specifications. Following these sequential steps will establish good working habits to minimize omissions or errors in your drawings.  10-30 Figure 10-32 — Typical interior electrical plan.  10-31 Summary This lesson has followed the electrical system from power plant generation through transmission lines to the substation distribution system and on through a service drop or service lateral to the interior of a building for the individual Seabee’s use in a 100 man camp or PWC shop. As an engineering technician, your tasking is important in providing accurate and timely electrical system information through your drawings for installation, revisions, or asbuilts for future reference. Couple this with your knowledge of mechanical plans and you will soon be able to develop the “Utility” drawings for a project by application of the appropriate symbols for both mechanical and electrical plans. Figure 10-33 — From generation-transmission-distribution to Seabee.  10-32

Review Questions

6HOHFWWKH&RUUHFW5HVSRQVH 1. Which of the following descriptions best defines electrical distribution? A. An electrical transmission system that carries electrical current externally from the generating station via substations and transformers to building locations. B. A power plant that distributes electrical energy by conversion from some other energy source such as wind, geothermal, coal, etc. C. An internal electrical wiring system that distributes electricity to illuminate the building and provide power to appliances and equipment. D. A transmission tower that distributes electrical energy from a substation to a building without a transformer. 2. A complete electrical delivery network is considered a combination of the _____section and the _____section. A. generation, transmission B. transmission, distribution C. transmission, internal wiring D. distribution, internal wiring 3. What type of feeder lines do Seabees use at most advance bases? A. Underground cable B. Automatic C. Overhead D. Internal 4. Alternators for a three-wire distribution system are connected in a _____ configuration. A. secondary B. primary C. wye (Y) D. delta 5. A delta connected alternator system has _____ voltage rating(s). A. 1 B. 2 C. 3 D. 4 6. A wye (Y) connected alternator system has _____ voltage rating(s). A 1 B. 2 C. 3 D. 4  10-33 7. What element in a three-wire power distribution system makes it possible to draw 110V from a 220V alternating generator? A. Transformer B. Ground Wire C. Neutral Wire D. Bridge 8. What element in a four-wire power distribution system makes it possible to draw 110V from a 220V alternating generator? A. Transformer B. Ground Wire C. Neutral Wire D. Bridge 9. What type of voltage is required for long-distance transmission? A. Exact voltage from power plant generator B. Voltage higher than normally generated C. Voltage lower than normally generated D. Voltage can be flexible depending on delta or wye (Y) connection 10. What type of transformer is placed between the transmission line and service distribution? A. 220V B. 110V C. Step-up D. Step-down 11. According to Ohm’s law, current varies _____ to _____. A. directly, resistance B. inversely, voltage C. inversely, resistance D. It does not vary 12. Which of the following reasons is NOT an advantage of installing electrical distribution systems underground, rather than overhead? A. Underground installation costs are less. B. Underground lines are secure against high winds. C. Underground lines are less susceptible to enemy attack. D. Underground installation provides open land areas free from distribution systems.  10-34 13. Which underground power distribution system do Seabees most frequently install? A. Conduits located in tunnels B. Duct lines C. Cables buried directly D. Tunneled 14. What supplies power from the exterior distribution system to the entry point of the building? A. Panel board B. Switchboard C. Service drop or lateral D. Service entrance 15. What term is used for the starting point for interior wiring? A. Service equipment B. Service conductor C. Service entrance D. Service lateral 16. What amperage does the NEC® recommend for circuit breaker type entrance switches? A. 50A B. 60A C. 100A D. 110A 17. What amperage does the NEC® recommend for individual residences? A. 50A B. 60A C. 100A D. 110A 18. Lighting panels are normally equipped with _____ automatic circuit breakers. A. 15A single pole B. 20A single pole C. 30A paired D. 50A paired  10-35 19. Compared to a No. 4 AWG conductor, the size of a No. 16 AWG conductor is _____. A. smaller B. shorter C. larger D. longer 20. What wire size is most frequently used for interior wiring? A. 8 AWG B. 12 AWG C. 16 AWG D. 18 AWG 21. What is another term for multi-wire conductors? A. Pairs B. Doubles C. Triples with ground D. Cable 22. In which of the following locations is ROMEX NOT authorized for use? A. Embedded in concrete B. Garages C. Storage battery rooms D. All of the above 23. Which of the following types of insulated wire should be used for installation in wet locations? A. RH B. RHW C. RUH D. All of the above 24. A manual conduit bender is called a _____. A. turning tool B. curving tool C. hickey D. turn out 25. Instead of manually making a sharp bend in rigid aluminum conduit, which of the following fittings should you use? A. Coupling B. Conduit union C. Galvanized steel elbow D. Condulet  10-36 26. Which type of PVC conduit is designated for direct earth burial? A. Type I B. Type I R C. Type II D. Type II R 27. Thin-wall conduit _______________. A. must be threaded B. uses a solvent type adhesive weld C. can use rigid conduit fittings D. uses special types of fittings 28. Which of the following boxes would you normally use for a ceiling outlet? A. 4 11/16-in. square heavy duty B. Utility C. 4-in. octagon D. 4-in. square 29. According to NEC® requirements, what is the maximum recess allowed below a finished wall for switch boxes? A. 1/16-inch B. 1/8-inch C. 1/4-inch D. 1/2-inch 30.  If you use the National Electrical Code, NEC®, you do not need to follow local codes. A. True B. False 31. Utility drawings (both mechanical and electrical) are thoroughly reviewed before granting and issuing _____ permits. A. building B. construction C. excavation D. demolition  10-37 32. Which of the following definitions best describes the symbol for a specialpurpose receptacle outlet? A. A circle inscribed in a triangle B. A circle containing a smaller inscribed circle C. A triangle D. A solid triangle inscribed in a circle 33. Which of the following definitions best describes the symbol for a singlepole switch? A. An S B. A circle containing an inscribed S C. A square containing an inscribed S D. A vertically oriented rectangle with a horizontal line on the left 34. Which of the following definitions best describes the symbol for a ceiling outlet? A. A circle B. A circle containing an inscribed C C. A circle with four radiating lines in an X pattern D. A circle containing an inscribed L 35. What NAVFAC publication offers a wide variety of plans, drawings, and applications for use in Seabee Advanced Base Functional Component (ABFC) systems? A. NAVFAC P-307 B. NAVFAC P-405 C. NAVFAC P-437 D. NAVFAC P-300 36.  When drawing exterior or interior electrical plans, you should not superimpose them over site or building plans. A. True B. False

Chapter 11 Construction Drawings

Whenever a property’s cognizant authority intends to change the property by disturbing the natural soil or erecting a structure, they need to communicate their intentions to the constructors. They do this through a set of construction drawings. The drawings describe the soil disturbance, structure, or facility with a set of related drawings that give a sequential graphic description of each phase of the construction process. For example, site drawings will show the location, boundaries, contours, and outstanding physical features of the construction project’s footprint and its adjoining areas. Depending on the size and complexity of the project, succeeding drawings will provide further graphic and printed instructions for each phase of construction. They may include architectural for concept and finishes, structural for foundation and superstructure, mechanical for water distribution and waste removal, and electrical for power distribution. Others may include, although less frequently, heating, ventilating, and air-conditioning, fire sprinkler systems, alarm systems, and/or landscaping. This lesson will cover the typical drawings used by most moderate sized construction projects. There may be more (or fewer) drawings for any given project, but the concept is the same for all drawings: convey the designer’s concept and intentions through drawings to the builder. As an engineering tech, one of your tasks will be to provide accurate information through your drawings for your unit’s Seabees to get the job done.

When you have completed this lesson, you will be able to:

1. Describe the different types of construction drawings.
2. Describe the procedures for preparation of project drawings.
3. State the main divisions of project drawings.

 

Contents

1.0.0 Types of Construction Drawings

2.0.0 Project Drawing Preparation

3.0.0 Main Divisions of Project Drawing

 

1.0.0 TYPES OF CONSTRUCTION DRAWINGS

Construction drawings are categorized by intended purpose. Besides the type used in the field to do the on-site activities, other types are often needed in the larger scope of “Construction” from conceptual ideas to the finite details of a manufactured part. This lesson will cover some of the types commonly used in military construction.

1.1.0 Presentation Drawings

Presentation drawings (as the name implies) present the proposed building or facility in an attractive setting in its natural surrounding at the proposed site. They often consist of perspective views complete with colors and shading. (Figure 11-1) Presentation drawings are usually used to “sell” an idea or design concept, so as an engineering tech assigned to the drafting section, you would rarely be tasked with developing them, but you need to be able to recognize them. Figure 11-1 – Example of presentation drawing-Gulfport duplexes post Katrina.

1.2.0 Shop Drawings

Shop drawings can be more than just a drawing. They can also be schedules, diagrams, or other related data intended to illustrate materials, products, or systems for some portion of the work. (Figure 11-2) The construction contractor, subcontractor, manufacturer, distributor, or supplier can prepare them along with providing product data. Product data include brochures, illustrations, performance charts, and other  11-4 information by which the work will be judged. As an engineering tech, you may be required to draft shop drawings for minor shop and field projects. Figure 11-2 – Typical shop drawing — (Doorframe ordering options.) You may need to draw shop items, such as doors, cabinets, and small portable structures from portions of the design drawings, specifications, material schedules, or from freehand sketches given by the design engineer.

1.3.0 Master Plan Drawings

Master plan drawings are commonly used in the architectural, topographical, and construction planning processes. They show sufficient features for use as guides in long-range area development. (Figure 11-3) Figure 11-3 – Example of simple existing plan and proposed master plan. They usually contain:

On existing and proposed Navy installations, the Resident Officer in Charge of Construction (ROICC) and the Public Works Center (PWC) constantly maintain and upgrade the master plan and general development drawings as well as the as-builts.

1.4.0 Working Drawings

A working drawing (project drawing) is any drawing that furnishes the information craftsmen require to manufacture a machine part (Figure 11-4) or builders and crew require to erect a structure. Working drawings can be prepared from a freehand sketch or from a design drawing. They present information complete enough that the user will require no further information. A good set of project drawings includes all the drawings necessary for each Seabee rating to complete its stage of a project. These drawings show the size, quantity, location, and relationships of a building’s components. Figure 11-4 – Typical working drawing for a machine part.  11-6 A complete set of project drawings consists of general drawings, detail drawings, assembly drawings, and always a bill of materials.

• General drawings consist of “plan views” (from above) and “elevation views” (from side or front) drawn on a relatively small-defined scale, such as 1/8 in. = 1 ft or 1/4 in. = 1 ft. Most general drawings are in orthographic projections although sometimes details may appear in isometric or cavalier projections. (Figure 11-5) Figure 11-5 – Typical views for general drawings.

• Detail drawings show a particular item on a scale larger than the general drawing’s scale. A detail drawing may include additional features not viewable from the perspective of the general drawing or items too small to appear on a general drawing. They may also be in a view other than the general drawing’s; for example, the detail may be in an isometric view to provide a three dimensional perspective for additional information. (Figure 11-6) Figure 11-6 – Typical detail drawing.

• An assembly drawing can be either an exterior or a sectional view of an object. It may be drawn to a smaller or larger scale than the detail drawings, but its  11-7 purpose in any scale is to show the proper relationship of elements to each another. This procedure provides a check on the accuracy of the design and detail drawings and often discloses errors. (Figure 11-7) Figure 11-7 – Typical assembly drawing.

• A bill of materials may be incorporated on the drawing sheet if space is available, but if not, it must be listed on a separate sheet. It contains a list of the quantities, types, sizes, and units of materials required to construct the object presented in the drawing. (Figure 11-8) Figure 11-8 – Typical bill of materials. With the exception of expeditionary or expedient construction, in a typical military construction project, NAVFACENGCOM will review and evaluate working (project) drawings to ensure good quality, consistency, and cost effectiveness in a design. The drawings will go through stages during the review process. The following paragraphs  11-8 describe these stages, from the initial development of the project to the final phase of construction. 1.4.1 Preliminary Drawings The designer or architects and engineers (A/E) firm prepares preliminary drawings in the early planning or promotional stage of a project’s development. They are strictly initial concepts and provide a means of communication between the designer and the customer. Preliminary drawings are NOT intended for construction. Their purpose is to explore design concepts, material selection, and preliminary cost estimates; solicit input and approval by the customer; and provide a basis for preparing working drawings. By the time preliminary drawings reach the 35-percent stage of completion, they will contain the following information at a minimum:

• Site plans

• Architectural floor plans

• Elevations

• Building sections

• Preliminary finish schedule and furniture layout

• Interior and exterior mechanical and electrical data

• Civil and structural details If the preliminary drawings are intended for use as Seabee project, the senior regional Seabee command will review them for construction methods or procedures. If the project is to be contracted to other sources, the local ROICC will provide the review.

1.4.2 Final Drawings

100% complete and used for bidding, the final drawings (Finals) are signed by the contracting officer and become the official contract drawings once the contract is awarded. However, with the concurrence of both the contractor and contracting officer, final drawings are often revised to show adjustments made by a scope change or a change order. At this stage, no further functional input may be introduced into the final drawings because of time constraints or cost implications. In general, final drawings, together with project specifications, cost estimates, and all of the calculations, comprise the final stages of design requirements.

1.4.3 Red-Lined Drawings

Red-lined drawings get their name from the color used to indicate a minor design change or field adjustment. Using the official contract drawings, the mark-ups usually come from the field by the various trades involved in the project with the mark-ups reflecting the as-built conditions during construction.

1.4.4 As-Built Drawings

These are the original contract drawings (or copies) that are changed to incorporate the various as-built conditions from all the accumulated red-lined drawings. The construction contractor or military construction force (NMCB) must provide the ROICC with as-built drawings indicating any deviations from the contract drawings. The as-built marked-up prints must reflect exact as-built conditions and show all features of the  11-9 project as constructed. After completion of the project, the ROICC transmits the as-built marked-up prints to their cognizant Engineering Field Division (EFD).

1.4.5 Record Drawings

Record drawings are the original contract drawings (corrected according to the marked prints) that provide a permanent record of as-built conditions upon completion of a project. EFD may retain custody or transfer them to stations with a Public Works Center (PWC).

1.5.0 Conceptual Designs

Conceptual designs in the Navy include both definitive designs and standard designs for structures and facilities needed on a repetitive basis. Both are prepared designs or drawings defining various functional, engineering, and logistical requirements. They provide a uniform basis for planning and design.

1.5.1 Definitive Designs

Definitive designs are drawings of typical buildings and structures found in NAVFAC P272, Definitive Designs for Naval Shore Facilities, Part 1. They provide general guidance to prepare project drawings and specifications. A/E contractors or in-house staff can refer to these definitive designs for floor plan arrangements, building sections and elevations, and utility requirements. NAVFACP-272 Part 2 contains specific guidance in preparing project designs for more complex facilities. These may include equipment layouts, piping diagrams, electrical schematics, and other critical requirements. NOTE Valid technical information from P-272 has been included in the Unified Facilities Criteria (UFC) for the particular facility type; see the appropriate UFC for further information. The facilities type of design includes additional information in the form of single-line schematics, bubble diagrams, or facility plates (Figure 11-9), graphics that show functional relationships or building layout such as individual rooms within the facility. Facility plates may show:

• The location of equipment and furnishings within a room

• The location of utilities serving the room

• The location and size of doors and windows

• A ceiling plan reflecting the location of lighting fixtures

• Other technical design information about the room Facility plates are used instead of definitive designs whenever the plates effectively convey the necessary design data, or whenever the definitive designs are scheduled for development, revision, or validation. Most of the facility plates can be found within the pages of criteria or design manuals (DMs).  11-10 Figure 11-9 – Example of a facility plate (based on Definitive Design 1404366).

1.5.2 Standard Designs

Standard designs are detailed working drawings of specialized, unique, naval facility structures, such as waterfronts and fleet moorings, aircraft operations and maintenance facilities, and ammunition storage facilities. They form a part of the construction documents and require only supplemental drawings for adapting the facility to the specific site. These drawings (except for ammunition facilities) can be modified as necessary to meet on-site requirements. WARNING Ammunition and explosive design standards may NOT be modified without approval from Naval Facilities Engineering Command (NAVFACENGCOM). WARNING When using standard designs for a construction project, with or without modifications, the cognizant EFD must assign new title blocks and drawing numbers. A third source of detailed construction drawings, although NOT definitive, is the NAVFAC P-437, Facilities Planning Guide, Vol. 1. The P-437 contains facility and assembly drawings of pre-engineered structures used to meet the Naval Construction Force (NCF) needs at advanced bases in peacetime and during contingency operations. Thus, if construction planners need a particular facility to meet tactical and/or strategic situational requirements, they can easily and readily identify the required facility and provide support. Along with the detailed drawings, the P-437 also provides other useful information for construction management such as the required land area, crew size and man-hours by skill, and the fuel necessary to make a component, facility, or assembly operational

 

Test Your Knowledge

1. An engineering technician assigned to the drafting section would rarely be tasked with developing a _______ drawing.

A. shop
B. preliminary
C. working
D. presentation

 

2.0.0 PROJECT DRAWING PREPARATION

All NAVFACENGCOM project drawings are prepared according to ASME Y14.100. Military handbook UFC 1-300-09N provides policy and procedure for preparing and developing project drawings. They must be complete, accurate, and explicit. For naval facility construction projects, the project drawings and the design specifications are the basis for both contract and construction. engineering techs and in-house planners also benefit from clear and consistent project drawings resulting from the policies and procedures in UFC 1-300-09N, especially when revising project drawings.

2.1.0 Policy and Standards

NAVFACENGCOM establishes the design criteria for project drawings. These criteria also apply to the definitive designs, standard designs, standard drawings, and project specifications. NAVFACENGCOM allows EFDs and A/Es latitude in new concepts, creative thinking, and the use of new materials, but when they are considering deviations from mandatory criteria, they need to obtain prior clearance from NAVFACENGCOM headquarters. Use customary U.S. dimensions on project drawings unless the project is in an area that normally uses System International (SI).The International System of Units is the internationally accepted “metric” system. However, use of the word “metric” is no longer an accepted practice. For details of the proper use of SI units, refer to IEEE/ASTM SI 10-1997, Standard for Use of International System of Units (SI): The Modern Metric System for generic conversions, and ASTM E621-79, Recommended Practice for the Use of Metric (SI) Units in Building Design and Construction, for conversions in engineering and design.

2.2.0 Order of Drawings

Arrangement of project drawings for buildings and structures follow a specific order: 1. Title Sheet and Index — specific project title and an index of drawings (for projects containing 60 or more drawings) 2. Plot or Vicinity Plans — plot or vicinity plans or both, as well as civil and utility service plans (for small projects, this sheet should include an index of drawings) 3. Landscape and Irrigation — (if applicable) 4. Architectural — (including interior design as applicable) 5. Structural 6. Mechanical — (heating, ventilation, and air conditioning) 7. Plumbing — (water service and waste removal) 8. Electrical — (interior service from utility service plan) 9. Fire Protection — (fireproofing and suppression) For NAVFACENGCOM drawings, use the following drawing sheet sizes and format.

• Flat 17 x 22 (C size) - When small sheets are required

• Flat 22 x 34 (D size) - for project and other drawings

• Flat 28 x 40 (F size) - option to 22 x 34 For further information about drawing sizes and format, refer to lesson 4.

2.2.1 Title Blocks

The title block provides significant information about both the approval process and the development of the drawing. (Figure 11-10) It includes:

• Name and location of the activity preparing the drawing

• Drawing title and number

• Approval within the activity

• Approval by an activity other or different than the source preparing the drawing

• Information relative to preparation of the drawing

o The predominant scale used

o Drawing size letter designation

o Sheet number for multiple sheet drawings

 

The code identification number or Federal Supply Code for Manufacturers (FSCM) “80091” is required in the title block of all NAVFACENGCOM drawings Figure 11-10 – Example of NAVFACENGCOM title block. All 22- by 34-in. (D-size) drawings use vertical title block format (Figure 11-11); whereas, it is optional for 28- by 40-in. (Fsize) drawings. Chapter 4 of this course, and American National Standards Institute, ANSI Y14.1-1980 show the layout and format for title blocks. Figure 11-11 – Example of vertical title block.  11-14

2.2.2 Drawing Numbers NAVFACENGCOM drawing numbers issued to individual EFDs are within the following limits:

• NORTHERN DIVISION 2 000 000 to 2 999 999

• CHESAPengineering techKE DIVISION 3 000 000 to 3 999 999

• ATLANTIC DIVISION 4 000 000 to 4 999 999

• SOUTHERN DIVISION 5 000 000 to 5 999 999

• WESTERN DIVISION 6 000 000 to 6 999 999

• PACIFIC DIVISION 7 000 000 to 7 999 999 Reassignment of NAVFAC drawing numbers is required to accommodate the NAVFAC transformation and standup of new Facility Engineering Commands. The Business Management System (BMS) has been updated to reflect these new number assignments. Until the ieFACMAN tool becomes functional, each command is responsible for issuing, assigning, and recording their assigned numbers. The new series of drawing numbers assigned to each command can be accessed via the BMS or the following table. When the ieFACMAN tool becomes operational, the link to the current table in BMS will be replaced with a link to the new tool. Table 11-1- Drawing numbers assigned to each command. ACTIVITY DRAWING NUMBERS NFESC--------------------------------------------- 10 000 000 – 10 299 999 Exped. Logistics Center----------------------- 10 300 000 – 10 599 999 NAVFAC Crane Center------------------------ 10 600 000 – 10 999 999 NAVFAC Midwest------------------------------- 11 000 000 – 11 999 999 NAVFAC Mid-Atlantic-------------------------- 12 000 000 – 12 999 999 NAVFAC Washington-------------------------- 13 000 000 – 13 999 999 NAVFAC Atlantic-------------------------------- 14 000 000 – 14 999 999 NAVFAC Southeast---------------------------- 15 000 000 – 15 999 999 NAVFAC Northwest---------------------------- 16 000 000 – 16 999 999 NAVFAC Pacific--------------------------------- 17 000 000 – 17 999 999 NAVFAC Marianas----------------------------- To be given by NAVFAC Pacific NAVFAC Far East------------------------------ To be given by NAVFAC Pacific NAVFAC Southwest---------------------------- 18 000 000 – 18 999 999 NAVFAC Hawaii--------------------------------- 19 000 000 – 19 999 999 NAVFAC Europe-------------------------------- To be given by NAVFAC Atlantic  11-15 Figure 11-12 is an example of a drawing number assigned by NAVFAC Southwest to a local activity. Figure 11-12 – Number assigned by . Do not use an assigned number for any other drawing even though the drawing to which it has been assigned is not being used. For example, extensive revisions may require a new drawing with a new assigned drawing number. The original drawing (and assigned number) is maintained for record purposes and development tracking. In such cases, place a cross-reference note directly above or adjacent to the title block. Old Drawing Note: New Drawing note: THIS DRAWING SUPERSEDED THIS DRAWING SUPERSEDES BY DRAWING NO. ___________ DRAWING NO. _____________

2.2.3 Drawing Revisions

Revise NAVFACENGCOM project drawings according to ASME Y14.100. The revision block may include a separate “PREPARED BY” column to indicate the organization, such as an A/E firm, that prepared the revision. Figure 11-13 shows the layout of the modified revision block.  11-16 Figure 11-13 – Example of revision blocks for NAVFACENGCOM drawings.

2.2.4 Graphic Scales

Graphic scales are located in the title block on the lower right-hand corner of each drawing sheet, with the words “Graphic Scales” directly over them. The correct graphic scales must be prominent on each drawing, since reproduced and reduced drawings do not always scale proportionately.

2.2.5 Line Conventions and Lettering

Pay close attention to the opaqueness and uniform weight of lines. (Figure 11-14) Figure 11-14 – Example of line characteristics. Refer to Chapter 4 and ANSI Y14.2M, Line Conventions and Lettering, Engineering Drawing and Related Documentation Practices. Use uppercase lettering except for notes on maps and similar drawings, where you may use lowercase lettering. The  11-17 minimum allowable height of freehand letters is 5/32 (0.156) in. and of mechanical or computer graphics is 0.150 in. For abbreviations on drawings, use MIL-STD-12D.

2.3.0 Dimensioning and Tolerancing

Clearly define engineering intent by preparing all dimensions and tolerances according to ANSI Y14.5M, Dimensioning and Tolerancing for Engineering Drawings. Some of the fundamental rules are as follows: 1. A toleranced dimension may: o Have it applied directly to the dimension o Be indicated by a general note on the drawing sheet 2. Dimensions: o Should be arranged to provide optimum readability of required information o Should be selected to suit the function o Should not be subject to more than one interpretation 3. Dimensioning for size, form, and location of features are: o To be complete o To provide no more dimensions than those necessary for complete definition o Not to use “sealing” (measuring the size of a feature directly from an engineering drawing) o Not to use assumptions of a distance or size o To minimize the use of a reference dimension Dimensioning format and standards to meet specific requirements will be discussed in this lesson. Notice that dimensioning construction or project drawings differs in some applications from dimensioning general technical drawings. This occurs primarily because of the materials and methods of construction. 2.3.1 Units of Measure A drawing’s units of measurement should meet the criteria of the user and the geographical area in which the plans will be used. The U.S. commonly uses the inch as the linear unit on project drawings while the common SI (metric) linear unit is the millimeter. Individual linear unit identification is NOT required on drawings where ALL dimensions are in either millimeters or inches. However, when this is the case, drawings should contain a note stating “Unless Otherwise Specified, All Dimensions Are in Inches” (or Millimeters,” as applicable). Millimeter dimension values shown on an inch-dimensioned drawing must be followed by the symbol “mm”, while inch dimension values shown on a millimeter-dimensioned drawing must be followed by the abbreviation “in.”  11-18 Figure 11-15 provides examples of dimensioning angular units. Dimensions for angular units are expressed in one of two ways:

• Degrees, minutes, and seconds, Example A

• Degrees and decimal parts of a degree, Example B Figure 11-15 – Examples of dimensioning angular units.

2.3.2 Application of Dimensions

Apply dimensions by using dimension lines, extension lines, or a leader from a dimension that includes a note or specification directed to the appropriate feature. Some of the standard rules are as follows: 1. Break dimension lines to insert numerals in one of two ways. (Figure 11-16) The examples 40, 25, and 14, are the preferred method of drawing dimension lines in many forms of drafting. However, examples 20 and 28 show an easier and time saving, in fact customary, method, for construction drawings. Draw unbroken dimension lines from one extension line to another and place the numerals above the dimension line parallel to the direction of measurement. Figure 11-16 – Examples of breaking lines to insert numerals. 2. Align dimension lines and (if practical) group them for uniform appearance. (Figure 11-17) Space the first dimension line no more than 10mm (3/8 in. U.S.) from the object line. Space succeeding parallel dimension lines not less than 6 mm (1/4 in. U.S.).  11-19 Where there are several parallel dimension lines, stagger the numerals for easier reading. 3. Dimension angles with an arc drawn so that its center is at the apex of the angle and the arrowheads terminate at the extension of the two sides. (Figure 11-15) If space is limited, place the arrows outside the extension line with the dimension between the extension lines. (Figure 11-16) 4. Avoid crossing dimension lines as much as possible. If crossing is unavoidable, do not break dimension lines. Refer again to Figure 11-14 for line characteristics. Extension lines (projection lines) indicate the extension of a surface or point to a location away from the object. Usually drawn perpendicular to dimension lines, they may be at an oblique angle where space is limited. (Figure 11-18 A) Figure 11-18 – Examples of extension lines. Place the shortest dimension line as the closest to the object’ outline to minimize crossing extension lines over one another or over dimension lines. (Figure 11-18 B) Break extension (not dimension) lines where they cross arrowheads or dimension lines close to arrowheads. (Figure 11-18 C) Figure 11-17– Examples of grouping and spacing lines.  11-20 Leaders (or leader lines) direct dimensions, notes, or symbols to the intended place on the drawing. (Figure 11- 19) Figure 11-19 – Examples of leader lines.

2.4.0 Drawing Symbols

Most construction drawings are drawn on a small scale, so standard graphic symbols are used to present information more complete about the construction items and materials. These symbols are used frequently in construction drawings so their meanings must be familiar to both preparer and user. The primary sources for a particular symbol are the Military (Drawing) Standards (MILSTD) and the American National Standards Institute (ANSI). Refer to these standards before you use other references. Some of the most commonly used military standards and the particular symbols are: STANDARD DESCRIPTION MIL-STD-14 Architectural Symbols (latest revision) MIL-STD-17-1 Mechanical Symbols (latest revision) MIL-STD-18 Structural Symbols (latest revision) ANSI Y32.9-1972 (R1989) Graphic Symbols for Electrical Wiring and Layout Diagrams Used in Architecture and Building Construction ANSI Y32.4-1977 (R1999) Graphic Symbols for Plumbing Fixtures for Diagrams Used in Architecture and Building Construction ANSI/AWS A2.4-2007 Symbols for Welding Sometimes other symbols are not included in any of the standards mentioned. (Figure 11-20)  11-21 NAVFACENGCOM provides guidance through one of their handbooks for using these symbols to develop project drawings. They are in common use for both civilian and military project drawings. As an engineering tech, you will find that your knowledge of applicable symbols will greatly assist you in accomplishing the job correctly, promptly, and above all, with confidence. Figure 11-20 – Construction drawing symbols identifying sections, elevations, and details. Figures 11-21 through 11-23 show a few basic welding and architectural symbols. Figure 11-21 – Example of basic weld symbols. Figure 11-21 – Example of basic weld symbols.  11-22 Figure 11-22 – Example of extensive weld symbols and applications.  11-23 Figure 11-23 – Example of common architectural symbols for materials.  11-24 Obviously, there will be many symbols available for use in drawings to communicate the architect and engineers’ intentions for the building. As you may be tasked with developing additional drawings from a contract set of drawings, you need to remain aware of the many common symbols’ meanings and be able to research any uncommon symbol meaning within your department’s technical library.

2.5.0 Drawing Notes

Construction drawing notes are brief, clear, and explicit statements regarding construction methods, material use, and finish. Notes are either specific or general. Specific notes are used either to reflect dimensioning information on the drawing or to be explanatory. As a means of saving space, many of the terms used in this type of notes are often expressed as abbreviations. (Figure 11-24) Figure 11-24 – Typical specific note. General notes refer to all of the notes on the drawing not accompanied by a leader and an arrowhead. Place general notes for a set of drawings covering one particular type of work on the first sheet of the set. (Figure 11-25) When using the conventional horizontal block, place general notes a minimum of 3 in. below the space provided for the revision block. When using the vertical title block, place them on the right side of the drawing. Figure 11-25 –Typical general note.  11-25 General notes for architectural and structural drawings may include pertinent data used in the design such as:

• Roof, floor, wind, seismic and other loads

• Allowable soil pressure or pile-bearing capacity

• Allowable unit stresses of all the construction materials

General notes for civil, mechanical, electrical, sanitary, plumbing, or similar groupings may include references for vertical and horizontal control (including soundings) and basic specific design data. General notes may also refer to a schedule that includes notes grouped together in a tabular form according to the specific construction material or process. Schedules for items like doors, windows, rooms, and footings are somewhat more detailed. Their formats will be presented later in this lesson.

 

3.0.0 MAIN DIVISIONS of PROJECT DRAWING

Project drawings (working drawings) are typically divided into the following major categories: civil, architectural, structural, mechanical, electrical, and fire protection. Seabee construction follows the same categories with the exception of fire protection, which is not a common tasking for the NCF. Regardless of the category, working drawings:

• Provide a basis for making material, labor, and equipment estimates before construction begins

• Give instructions for construction, showing sizes and locations of various parts

• Provide a means of coordination between different ratings

• Complement specifications; one source of information is incomplete without the other

3.1.0 Civil Drawings

Civil drawings encompass a variety of plans and information including:

• Site preparation and site development

• Fencing

• Rigid and flexible pavements for roads and walkways

• Environmental pollution control

• Water supply units (that is, pumps and wells) Civil drawings typically begin with a designating letter “C” in the title block. A set can vary from a bare minimum to several sheets depending on the size of the project. On an  11-26 average-size project, the first sheet will have a location map, soil boring log, legends, and occasionally, site plans and small civil drawing details. (Soil boring tests determine the water table of the construction site and classify the existing soil.) A site plan furnishes the essential data for laying out the proposed building lines. Drawn from survey notes and sketches, it shows contours, boundaries, roads, utilities, trees, structures, references, and other significant physical features. Civil drawings showing both existing and finished contours enables the initial site crew (Equipment Operators) to estimate the amount of any soil displacement (cut and fill) and prepare the site for construction. It also allows them to plan for the site finishing (including landscaping) upon completion of building construction. As an engineering tech, you must be familiar with the methods and symbols used on civil site plans, maps, and topographic drawings. (Figure 11-26) Figure 11-26 – Example of common plot symbols for civil drawings. Drawn to scale, most site plans use the engineer’s scale (divided into decimalized fractions of an inch) rather than the architect’s scale (divided into binary fractionalization of the inch). For buildings on small lots, the scales normally used are 1 in. = 10 ft or 1 in. = 20 ft. This means that 1 in. on the drawing is equal to 10 or 20 ft, whichever the case may be, on the ground. Since the engineer’s scale is the principal means of making scaled site plans, you need to be thoroughly familiar with its use. On a set of project drawings prepared by an A/E firm, the physical information provided on the site plan is taken from surveyor-prepared field notes or sketches. (Figure 11-27)  11-27 Planners and estimators may also use information contained on the site plan when figuring areas available for staging of equipment and materials, quantities of soil for disturbance, the amount and types of equipment needed, quantities of materials required, and labor for each. Figure 11-27 – Typical civil drawing site plan.  11-28 As an engineering tech, you may be tasked with drawing a site plan or revising one. The following steps provide the basic procedure to develop a site plan.

  1. Lay out the site plan from the surveyor’s drawing.
    1. Show boundary lines or limits of construction.
    2. Show existing trees and permanent structures.
    3. Note any existing features that must be removed.
  2. Draw contour lines with dashed lines. (Note: Place contour lines on the reverse side of the drafting sheet to make future changes or revisions easier).
  3. Draw the proposed building and all surrounding construction, such as sidewalks and parking areas.
    1. Show building wall outline with solid lines.
    2. Show roof overhang outline with dashed lines.
  4. Give the finished floor elevations of the building(s), garage(s), and desired finish elevations for any sidewalk and/or parking areas.
  5. Review the existing contour lines. Surface water must run towards a storm drainage system and not towards the buildings or other structures.
  6. Place the dimensions. Establish them from the property line to the exterior wall of the building, not the overhang. Locate the building and other constructions by a minimum of two location dimensions, more if the building is not positioned parallel with the property line. Include distances to road centerlines, utility lines, easements; and any restrictions or obstructions to the site, such as utility poles and hydrants.
  7. Double-check your drawing. Take a second look at finish grade elevations, datum point, and other related information. Keeping a site plan checklist handy is a good technique to make sure a site plan provides complete and accurate information.

3.2.0 Architectural Drawings

Architectural drawings typically begin with a designating letter “A” in the title block. They consist of all the drawings that describe the architectural design and composition of the building. A complete set of architectural drawings include:

For small, uncomplicated buildings, architectural drawings may include foundation and framing plans, normally part of the structural drawings.

3.2.1 Floor Plan

Floor plans are considered the key drawings in a set of project drawings—the drawings that all of the construction personnel will look at and usually the first drawing an engineering tech will work on. A floor plan is a horizontal section through a building, showing the outline or arrangement of the floor. An offset cutting plane is often required to pass through low and high features on the wall in order to reveal features located in the building. Its purpose is to show information about the:

 

Figure 11-28 shows a typical floor plan development. Imagine that after the building’s completion, a cutting plane passes through point WXYZ. Figure 11-28 – Typical simple floor plan development.  11-30 Note that the WXYZ plane passes through at an elevation that includes all the distinctive elements, the windows and doors. If the plane passed through the building above the door height, the floor plan would look like a solid box with closed interior cells. With the upper portion of the cutting plane removed, you are now able to look down on a floor plan that includes all the doors and windows you were previously unable to see. Figure 11-29 shows a floor plan of a concrete masonry unit building (mechanical shop). Figure 11-29 – Example of concrete masonry unit floor plan. It gives the lengths, thicknesses, and character of the outside walls and partitions at a height above floor level. It shows room arrangement and dimensions, location and width of doors and windows, and the location and character of rest rooms and other utility features. Concrete masonry units (CMUs) are a common construction material for Seabee projects, and the unit engineering techs may be tasked with developing the plans. You need to be familiar with drawing a floor plan for any given CMU project. 3.2.1.1 Drawing a Floor Plan Select the proper scale and sheet layout to achieve the best results. Before doing the actual drawing, verify dimensions by drawing up preliminary sketches with approximate sizes for building, room dimensions, wall thicknesses, corridor widths, and so forth. A scale of 1/4 in. = 1 ft is ideal for easy readability, but smaller scales such as 3/16 in. = 1 ft, or 1/8 in. = 1 ft, can be used for large buildings when sheet size is limited. After selecting the scale and sheet layout, tape the sheet to the drafting board and follow the procedures outlined below:  11-31 1. Lay out the drawing construction lines for borders, title block, and exterior limits of the building at any one side. o Draw exterior wall thicknesses first and lay out the rooms and walls from left to right. o Use a “nominal” wall thickness dimension of 6 in. for a wall frame exterior wall that has no brick or stone veneer, or use the nominal wall thicknesses found in the Architectural Graphics Standards (AGS). (Note: Wall thickness varies with the materials used. It is impossible to draw actual dimensions of each material selected.) o Lay out the interior walls across the building, checking rooms, closets, bathrooms, corridors, and so on. Notice in Figure 11-29, between room 109 and the corridor, that a wider wall is necessary to allow room for plumbing pipe to service the wastewater and vents. 2. Locate and draw in all doors. o Use an architectural template to draw exterior and interior doors easily. Exterior doors in residential houses usually swing inward whereas building or fire codes often require commercial building doors to swing outward. (Note: A full or 90-degree door swing template can check that the door swing will not interfere with any equipment, walls, or appurtenances in the room). 3. Locate and draw in all windows, stairs, handrails, and other exterior and interior features, fixtures, equipments, appliances, and cabinets using the proper symbols and conventions. 4. Lay out the guidelines for dimensions and dimension lines. o Double-check and review the accuracy and completeness of the information drawn in. (The building’s basic floor plan should now appear lightly laid out.) o Darken in the plan if the information is accurate. Constructions lines do not need to be darkened or erased but all other lines must be drawn darkly and vary only in width. o Develop a systematic approach for a fast and orderly darkening of lines; common practice is left to right and top to bottom. o Keep the drawings clean. engineering techs often use a clean sheet of paper to cover their finished section of drawing while darkening the exposed section. 5. Draw in section markings on the floor plan and indicate where the wall sections have been taken. (If undecided, they may be placed on the plan later.) o Add all the material symbols, title, graphic scale, and other relative information to complete the drawing. o Go over your floor-plan checklist for completeness. As an engineering tech, one of your challenges (and a measure of your drafting competency) is to apply your dimensioning technique to various types of materials and construction methods. Although the principles of dimensioning and general locations of dimensions are the same for all types of materials and methods, a difference can exist in which dimensions are shown, and how the walls, openings, and partitions are dimensioned to provide accurate, easy, interpretation.  11-32 3.2.1.2 Dimensioning a Floor Plan Lay out and verify dimensions on sketch paper before placing them on the drawing. Except for interior partition dimensions, place as many dimensions as possible outside the plan and far enough away from the plan to avoid interfering with roof overhangs, notes, porches, or other features. This helps prevent overcrowding. In dimensioning floor plans, proceed as follows: 1. For wood-frame construction: Exterior wall — place the extension line of the exterior wall dimension at the outside face of the studs or stud line. (Figure 11-30) Figure 11-30 – Example of dimensioning exterior wall. Interior wall partitions — measure from the outside face of the studs to the centerline of the partition. (Figure 11-31) Occasionally, partitions are measured from outside face of the studs to the face of the interior studs. The important thing is to be consistent. All partition measurements must reference from the same exterior wall. Figure 11-31 – Example of dimensioning interior wall. With veneer — dimension the same as a wood frame without veneer (Figure 11-32). The only difference will be in the overall dimension showing the total size of the house when the veneer is added. Figure 11-32 – Example of dimensioning exterior wall with veneer. In wood frame construction, dimension doors and windows to their centerlines.  11-33 2. For concrete-masonry construction: Exterior and Interior walls — place extension lines on the outside face. In concrete and masonry construction, all dimensions are all given to the face of the walls and not to the centerlines. (Figure 11-33) Figure 11-33 – Example of dimensioning concrete and masonry walls. In concrete and masonry construction, dimension doors and windows to rough openings. Take note again of the dimensioning for the concrete masonry unit mechanical shop. (Figure 11-34) Dimension the rough openings of the doors and windows and the distance between the rough openings. This is the correct procedure for dimensioning concrete or masonry construction. Figure 11-34 – Example of dimensioning concrete and masonry doors and windows. 3. For both wood frame and concrete masonry construction:  11-34 o Take enough time to check your dimensions for legibility and accuracy. Constantly recheck your work during the drawing’s development and again after you have finished. Inaccuracies found early can save you from a time consuming review looking for a dimensional error. Make sure the cumulative total of all short dimensions add up to their corresponding overall dimension. 3.2.2 Elevations Elevations are orthographic projections that show the finished interior and exterior appearance of the structure. Interior elevations often provide details for important finish features such as built-in cabinets and shelves, but they may also be drawn for all interior walls in each room of a building. Cabinet elevations (Figure 11-35) show cabinet lengths and heights, distance between base cabinets and wall cabinets, shelf arrangements, doors and direction of door swings, and materials used. Figure 11-35 – Typical elevation for interior cabinets. Interior elevations show wall lengths, finished floor-to-ceiling heights, doors, windows, other openings, and types of finish materials. Exterior elevations show types of exterior materials and where they are used, finished grade around the structure, roof slope, basement or foundation walls, footings, and all of the vertical dimensions. A complete set of drawings needs a minimum of four elevations to provide the exterior description: front, rear, and the two sides of a structure as they would appear projected on vertical planes. Typically, an elevation is drawn at the same scale as the floor plan, (1/4 in. = 1 ft or 1/8 in. = 1 ft), but occasionally space limitations may require a smaller scale or a larger scale may be used to show more detail. Several methods can be used to identify each elevation as it relates to the floor plan, but the most commonly used Seabee method is to label the elevations with the same terminology used in multi-view and orthographic projection; that is, front, rear, right-side, and left-side elevations (Figure 11-36).  11-35 Figure 11-36 – Typical elevations for exterior views.  11-36 On irregular plans that would not clearly show an orthographic projection from one of the four views, elevations may be identified by a letter or a number. (Figure 11-37) Figure 11-37 – Example of an elevation view for an irregular floor plan. Use the following basic procedures as a guide to develop and draw elevations: 1. Use the same size sheet as the floor plan. o Determine overall height and length of elevations from floor plan and wall section (predetermined by prior computation or a sketch). o Use the same scale for elevations as for floor plan unless there is a specific benefit to a different scale. o Block in the views with construction lines placed in a logical order starting with the front view and working around the building. Front and right-side elevations are usually next to each other with (if necessary) the rear and the left-side elevations below. o Show all elevations on one sheet whenever possible. 2. Draw the exterior limits of the elevations. o Place the floor plan underneath the elevation-drafting sheet for a guide. o The vertical projection lines from the floor plan will define the length of exterior walls and any breaks or corners along the wall, windows, doors, roof overhang, and other elements, such as chimney location. o Horizontal projection lines on your elevation drawing will locate the height of doors and windows, eave line, bottom of fascia, top and bottom of the footing, and top of the roof. 3. Repeat until all elevations are lightly laid out with final changes incorporated into the exterior design. o Darken the drawing from left to right, top to bottom (same procedures used in the floor plan). o Remember, the grade line is the darkest line (disregarding the border lines), and all portions drawn below grade are shown with a dark hidden line.  11-37 4. Add dimensions. o Show vertical dimensions (include the following only): bottom of footing, finished grade, all finished floor lines, height of features, finished ceiling lines, chimney height, and freestanding walls. Refer to Chapter 4 for additional information. 5. Add all notes and pertinent information about exterior materials such as finishes, title, scale, window identification marks, and roof pitch. o Add section symbols to indicate where the sections have been taken. (Figure 11-38 View A) 6. Finish up by adding the material symbols. (Figure 11-38 View B) o Symbols do not take the place of the material notations; they just supplement them. o Go over your elevation checklist for completeness and accuracy of information. Figure 11-38 – Section symbols-View A, Material symbols-View B.

3.3.0 Structural Drawings

Structural drawings typically begin with a designating letter “S” in the title block. A complete set contains all drawings relating to the building’s structural members and their interacting relationship. A set of structural drawings should include foundation plans and details, framing plans and details, wall sections, column and beam details, and all other plans, sections, details, and schedules necessary. General notes in structural drawings should include, when applicable, all roof, floor, wind, seismic, and other loads, along with allowable soil pressure or pile bearing capacity and allowable stresses of all material used in the design. 3.3.1 Foundation Plan A foundation plan is a top view of footings or foundation walls. Actually a horizontal section view cut through the walls of the foundation just below ground floor level, it shows beams, girders, piers or columns, openings, internal composition, and dimensions with centerlines and distances from reference or boundary lines.  11-38 A foundations plan’s primary user will be the building crew that constructs the proposed structure’s foundation. Most foundations in Seabee construction are built with concrete masonry units (CMU) and/or cast-in-place concrete. Figure 11-39 shows a plan view of a concrete/CMU foundation. The plan shows the main foundation will consist of 12 in. CMU walls measuring 28 ft by 22 ft. above a concrete spread footing that is 24 in. wide by 10 in. deep. In this plan, the standard symbol for concrete block identifies the CMU but a specific note should be added to call out the material. Figure 11-39 – Typical foundation plan for CMU footing. A girder will run through the center of the building, supported on both ends by a 4 by 12 in. concrete pilaster abutting the foundation walls with intermediate support from two 12 by 12 in. concrete piers on 18 by 18 in. spread footings 10 in. deep. Before you can draw the foundation plan, you will need to gather all relevant information about the concept of the structure. Observe the type of foundation intended, make a careful study of the materials and methods to be used, and analyze the relative position of the framing to the foundation wall or footing. Before you start, refer to all of the applicable wall sections and typical sill details found in your texts and reference materials such as the Architectural Graphics Standards. Note: Two sides of the footing in Figure 11-39 show concrete sills to support the joists. Did you see that without the A-A elevation detail?  11-39 The ground floor plan serves as the basis for developing the foundation plan, (just as it did for the elevation views). The floor plan readily offers the information you need, such as the general shape of the building, openings, dimensions, and so forth. Use the following basic procedures to develop a foundation plan properly: 1. Prepare and organize your drafting needs. o Draw the foundation plan at the same scale as the floor plan (1/4 in. = 1 ft), with the same sheet size and layout. Drawing the foundation plan by this method is easier because you can save time and effort by tracing the floor plan’s outline and other features. o Center the foundation plan to provide more space for notes and details about the footings. A smaller scale may be used when necessary to save space provided the amount of information given on this plan is limited. 2. Lay out the drafting sheet lightly, beginning with the borders and title block. o Tape a floor plan (original or preferably a print) under the foundation sheet if using the same scale. o Draw the exterior outline of the foundation wall (usually the outside, exterior line of the building), and locate any retaining walls, steps, porches, and fireplaces. o Carefully note the type of frame construction that will be used. Using the floor plan in laying out the foundation plan will vary among wood-frame, masonry, and steel-frame construction. Study these differences closely. Usually, a foundation plan’s dimensions are modified depending on the materials used. o If drawing to a different scale, determine the size of the desired foundation plan and lay it out on the sheet. Follow up by transferring all of the dimensions from the floor plan to the foundation plan. Be especially careful to locate other features accurately with the different scale. 3. Draw the inside wall of the foundation wall once the wall thickness is scaled from the established outside foundation line. o Locate other features such as access doors, vents, and pilasters. Also, draw the foundation for piers, columns, chimney, and any retaining wall, if required. 4. Lay out the footings. o Check the standards for typical details on different types of footings and the minimum allowable footing size for intended type of frame construction. o Draw and note any required additional structural information. For example, in wood-frame construction, the foundation plan commonly shows the structural information for the first floor as well. If so required, locate and lay in the supporting beam or girder and the size, spacing, and direction of floor joists. 5. Lay out the dimensions. o Double-check all dimensions to ensure they are correct, complete, and include all the features required in the drawing. o Add all of the notes, materials, appropriate plan symbols, and other pertinent information required to complete the plan. 6. Draw in the scale to the plan and the title of the drawing. Review your foundationplan checklist, and make sure the entire drawing is darkened in and labeled.  11-40 3.3.2 Framing Plan Framing plans show the size, number, and location of either steel or wood structural members. Separate framing plans may be drawn for the floors, the walls, and the roof. Floor framing plans must specify the sizes and spacing of joists, girders, and columns used to support the floor. If necessary, add detail drawings to show the methods of anchoring joists and girders to the columns and foundation walls or footings. (Figure 11-40) Figure 11-40 – Typical detail for anchoring joist. The floor framing plan is a plan view of the layout of girders, beams, and joists. Figure 11-41 shows a typical floor framing plan.  11-41 Figure 11-41 – Example of a structural upper floor, wood frame plan. Joists and double framing are drawn in the position they will occupy in the completed building. Joists do not need dimensions at every location. Notes provide the necessary information, in this case “2" by 8" joists @ 16” O.C.” (on center). Bridging is also drawn in position perpendicular to the joist but called out by note as “2- 1” x 3” bridging”. The span of the joist controls the number of required rows of cross bridging. The rows should not be more than 7 or 8 ft apart. Hence, a 14-ft span may need only one row of bridging, but a 16-ft span needs two rows. Notes also identify floor openings, trimmers, plates, or doubles to support heavier floor loads. Floor framing plans do not indicate length dimensions for individual pieces. The builder is able to determine those from overall building dimensions, dimensions for each bay, or distances between columns or posts. Wall framing plans (Figure 11-42) show the location and method of framing openings and ceiling heights so that studs and posts can be cut.  11-42 Figure 11-42 – Example of a structural wall, wood frame plan. Roof framing plans for wood frame construction are drawn in the same manner as the floor framing plan. The rafters are shown in the same manner as joists, with rafters shown spanning the building and supporting the roof. The size, spacing, roof slope, and all of the details are also shown in the plan. (Figure 11-43) Roof framing plans for precast or cast-in-place concrete construction should indicate with symbols the location of:

• Bearing walls

• Beams and columns

• Direction and size of steel reinforcing bars

• The direction of the span

• Size and thickness of required structural members Figure 11-44 shows an example of a cast-in-place structural roof framing plan with beams, joists, metal deck, welded wire fabric, schedule, and general notes.  11-43 Figure 11-43 – Example of a structural roof, wood frame plan.  11-44 Figure 11-44 – Example of a structural roof, cast-in-place framing plan.  11-45 Use the following procedures when preparing framing plans: 1. For roof wood-frame plans: o Trace or transfer the dimensions and location of exterior stud wall. o Lay out the limits of roof overhang. o Lay out roof framing by locating the ridgeboard. o Lay out all of the required intersecting pieces. 2. For floor wood-frame plans: o Transfer dimensions of the foundation walls or footings. o Lay out supporting girders and joists in their proper spacing. o Notice any bearing wails, stairwells, and other openings when developing an elevated-floor framing plan. 3. For concrete framing plans: o Lay out the dimensions of the bearing walls below the floor (or roof) being framed, for example, a foundation plan to draw the first-floor framing or firstfloor plan to draw the second-floor framing. o Add the location of beams, columns, direction of the span, size of precast concrete, or reinforcing steel for cast-in-place concrete. 4. For steel framing plans: o Trace off or transfer the dimensions of all of the bearing walls, columns, and beams below the floor (or roof) being framed. o Lay out the steel framing, using the grid system, a common setup used in steel framing. 5. For all framing plans whether wood, concrete, or steel, to finish: o Lay out guidelines for dimensions, notes, and labels. o Darken in all of the framing and fill in the notes and dimensions o Draw in the section and detail marks. o Go over your structural plans checklist and check the dimensions against those traced from the floor plan.

3.4.0 Mechanical Drawings

Chapter 9 provides symbols for components associated with mechanical systems and describes methods used to develop a mechanical plan. This section will focus on applicable procedures for drawing residential or commercial building plumbing plans. A separate mechanical plan is drawn for some residences and commercial structures. They show water supply and fixtures, waste disposal lines, equipment such as hot water tank or recirculation hot water loop, and other supply and disposal sources. Apply the following procedures to draw a plumbing plan: 1. Trace the floor plan, showing all exterior and interior walls, major appliances, and plumbing fixtures. o Draw the outline of the building in thin but visible lines.  11-46 o Orient your drawing with enough space left to add fixture schedules, legends, details, or other related information. 2. Draw the water-supply line from the source into the house. o Draw water supply lines to all fixtures with appropriate line thickness and symbols for drawing valves, fittings, and pipe sizes. o Draw the disposal system from the point where the house (or building) drain meets the house (building) sewer. o Draw the waste and vent stacks. 3. Add the symbol legend, drawing title, notes, and scales; fill in the title block, and double-check dimensions and checklist. Plumbing plans alone can become difficult to read and fully comprehend, so general practice is to prepare and include riser diagrams like those in Figure 11-45 from Chapter 9. Figure 11-45 – Examples of general practice isometric plumbing diagrams. These isometric drawings are easier to understand and invaluable to material estimators and installers, the Utilitiesman crews (UTs). Drawing sheets in the mechanical division are frequently identified by the letter M in the title block and the mechanical division will include, in addition to plumbing plans and details, any necessary drawings for heating, ventilation, and air conditioning (HVAC) systems. These sheets containing any HVAC drawings will precede those for plumbing in the order of drawings.

3.5.0 Electrical Drawings

Chapter 10 provides symbols for components associated with electrical distribution systems and interior wiring, and describes methods used to develop an electrical plan. Drawing sheets in the electrical division are frequently identified by the letter E in their title blocks.  11-47 When working with electricity, a simple Operational Risk Management (ORM) process will conclude that it is important for engineering techs not only to understand electrical symbols and drafting methods, but also to learn a great deal about how the system works. engineering techs must also recognize the need for the safety requirements of the system and the minimum requirements of the National Electrical Code (NEC) and any local codes that apply to the drawing. Use the same procedures to draw an electrical plan as were applied to the mechanical plan; for example, use correct line thickness and orientation and employ standard symbols as much as possible. 1. After the floor plan is traced (see mechanical): o Draw the meter and service panel noting voltage rating and amperage. o Draw convenience outlets, ceiling and wall fixtures, and other electrical devices. 2. Draw switches. o Connect switches to fixtures or convenience outlets using a template or a french curve (curved lines may be solid or dashed and included in symbols list). o Add circuits, circuit numbers, and circuit notations. 3. Add symbol legend and fixture legend (if required), drawing title, scale, fill in the title block, and as usual, go over the drawing for completeness and accuracy.

3.6.0 Sections

Sections most commonly apply to the architectural and structural divisions but they can be used in any division to amplify information as necessary. Sections show the type of construction required, types of materials, locations, and method of assembling the building parts. Although they may be used in each of the divisions and are important to those responsible for that division, perhaps the most important of all are wall sections found in the structural drawings. Wall sections, commonly drawn at a scale of 3/4 in. = 1 ft, provide a wealth of information necessary to understand the structural arrangement, construction methods, and material composition of the walls of the building. (Figure 11-46) They are used extensively to visualize both the engineered requirements of the wall support system and architectural requirements of the building’s finish.  11-48 Figure 11-46 – Example of structural wall section showing “wealth of information” needed. When a cutting plane passes through the narrow width of a building, as shown in Figure 11-47, it displays a transverse or cross section. Figure 11-47 – Typical cross section cut view development.  11-49 When a cutting plane passes through the length of a building, it displays a longitudinal section. (Figure 11-48) Figure 11-48 – Typical longitudinal section cut view. Usually located in the architectural division, full building sections are used to clarify the building design and construction process. Transverse and longitudinal sections are usually drawn at the same scale as the floor plan, and staggered (offset) cutting planes are often used as well to show as much construction information as possible with the fewest drawings. Drawing a separate section for every wall and part of a building would soon become time consuming since many sections are identical. To simplify construction drawings and save time and effort, common practice is to use typical sections where exact duplications occur. (Figure 11-49) Figure 11-49 – Example of typical section view.  11-50 Make a sketch of the section before beginning the actual drawing and have it checked by the leading petty officer or another experienced engineering tech. This should give the best results and save time by ensuring that your work is compatible with their concept of the building’s design. If placing more than one section of similar view on a sheet, give the users a “tour” through the building by arranging the sections in a progressive sequence from the front of the building to the rear. Use the following procedures to develop sections: 1. Select the appropriate scale and lay out the first section lightly. o Lay out all other sections; allow enough space between for notes and dimensions. o Align multiple sections to the same elevation so they relate to one another. o Maintain enough clearance for subtitles, scale, and title block. 2. Lay out the guidelines for the material labels, leaders, and vertical dimensions. 3. Darken the section drawings using the top-down, left to right system. o Put in all of the labels, notes, and dimensions. o Add any detail markings. 4. Add material symbols (Note: For neatness and fast erasure for a minor change or revision, some engineering techs prefer to place symbols at the back of the sheet). o Place the title and scale below to complete the section drawing. o Review the section checklist for accuracy and completeness.

3.7.0 Details

Details are large-scale drawings of construction assemblies and installations that cannot be clearly shown in the sections. These enlarged drawings show the various parts in more detail and how they will be connected and placed. Scale depends on how large the drawing needs to be magnified to explain the required information clearly. Details are usually drawn at a larger scale than the sections, generally 1 in., 1 1/2 in., or 3 in. = 1 ft. Graphic Standards and Sweet’s Catalogs contain details commonly used for installation of items such as doorframes, window frames, fireproofing, and material connections; they do, however, need to be adapted to the particular building being drawn. When different conditions actually exist, avoid the use of “typical” details; they will be misleading and cause confusion. An engineering tech needs to understand construction well enough to make accurate detail drawings for each unique situation. Details are commonly used for some specific phases and elements of construction such as foundations, doors, windows, cornices, and so forth. Show their details with the applicable main division of construction drawings and group them so that references can be made easily from the general drawing. (Figure 11-50)  11-51 Figure 11-50 – Example of detail grouping.  11-52 It is important to select the appropriate sheet to draw the detail on. Place details relating to a drawing on the same sheet if possible. If space is limited, place details with related section drawings, schedules, or on a separate sheet set aside for details. For example, door details should be placed on the sheet with the floor plans, on a sheet with sections including doors, on the sheet with the door schedule, or on a sheet set aside for details. Use the following procedures to develop detail drawings: 1. Lay out the details on the particular sheet. o Lightly draw extension lines, dimensions lines, and guidelines for all dimensions. 2. Darken in the details, one at a time, using a system similar to that used in drawing sections, the top-down, left to right system. o Add labels, notes, dimensions; show all sizes and thicknesses of materials. 3. Add material symbols. o Place title and scale below the detail to complete the detail drawing. o Review detail for accuracy and completeness. 3.8 0 Schedules Schedules are tabular or graphic arrangements of extensive information or notes related to construction materials. They provide planners, estimators, contractors, and suppliers a quick and easy way to share similar data, save time, and reduce construction errors. In the Seabees, various elements of the construction team depend greatly upon the accuracy and efficiency of information conveyed on the drawing (plan) schedules.

• Planners and estimators (P&E) in accurately preparing takeoffs

• Supply department (S-4) in properly ordering construction materials

• Construction crew (line companies and detachments) in installing the materials in their proper locations Most schedules relate to doors, windows, and room finishes. A door schedule can vary from a bare minimum to extensive. (Figure 11-51) DOOR SCHEDULE NUMBER QTY FLR SIZE DIMENSIONS WIDTH HEIGHT R/O DESCRIPTION DO1 2 1 3070 36X84X1 3/4" 36" 84" 37X85 1/2 EXT. HINGED PANEL DO2 2 1 3070 36X84X1 3/4" 36" 84" 37X85 1/2 4-PANEL DO3 3 1 3070 36X84X1 3/4" 36" 84" 37X85 1/2 HINGED-GLASS DO4 4 1 6070 36X84X1 3/4" 36" 84" 37X85 1/2 HINGED-PANEL DO5 1 1 6068 72X80” 72" 80" 73X81 1/2 SLIDER-GLASS DO6 8 1 19080 228X96" 228" 96" 229X97 1/2 GARAGE 4-PANEL DO7 4 1 3670 42X84X1 3/4" 42" 84" 43X85 1/2 HINGED-GLASS  11-53 Figure 11-51 – Example of a door schedule. A door schedule may include door number, quantity, mark or code number, type, size, material description, lintel, and remarks. Doors are commonly marked with a number or numbers and letters; the letter “D” is a common designation used for doors (sometimes enclosed in a circle or other shape). A window schedule (Figure 11-52) provides an organized presentation of the significant window characteristics. Information often includes mark, window type, size, required opening size, material type, lintels, and remarks. WINDOW SCHEDULE NUMBER QTY FLR SIZE DIMENSIONS WIDTH HEIGHT R/O DESCRIPTION WO1 2 3 3036 36X42” 36" 42" 37X43 1/2 SNGL CASEMENT WO2 4 3 4050 48X60” 48" 60" 49X61 1/2 SNGL CASEMENT WO3 3 2 3052 36X62” 36" 62" 37X63 1/2 FIXED GLASS WO4 4 2 2014 24X16” 24" 16" 25X17 1/2 FIXED GLASS WO5 1 3 1070 12X84” 12" 84" 13X85 1/2 FIXED GLASS WO6 3 1 7040 84X48” 84" 48" 85X491/2 FIXED GLASS WO7 4 1 80174 96X207 1/2” 96" 208" 97X209 MULLED UNIT  11-54 Like doors, windows are often marked with letters or letters with numbers and sometimes enclosed in a circle or other shape; letter “W” is most commonly used for window schedules. A material finish schedule (Figure 11-53) may include room number, material finish for floors, walls, base, and remarks. Where several rooms in a row have identical finish, common practice is to use the ditto mark (´´) or initials DO to repeat the above entry. Material Finish Schedule Room Description Flooring Walls Ceiling Carpet Resilient Ceramic, Quarry Tile Concrete, Other Brick, Wood High Impact Gypsum Board Ceramic Tile Exposed CMU Open to Structure Acoustical Tile Gypsum Board Public Main Entrance ▲ ▲ ▲ ▲ ▲ ▲ Entry Gallery ▲ ▲ ▲ ▲ ▲ ▲ ▲ Concourse ▲ ▲ ▲ ▲ ▲ ▲ ▲ Patron Toilets ▲ ▲ ▲ Lockers ▲ ▲ ▲ ▲ Bowling Lanes and Approaches ▲ ▲ ▲ Bowler Seating and Spectator Seating ▲ ▲ ▲ Figure 11-52 – Example of a window schedule.  11-55 Mechanics Pinsetters/Service Aisle ▲ ▲ ▲ ▲ ▲ Mechanic’s Workroom ▲ ▲ ▲ Mechanic’s Toilet ▲ ▲ ▲ Laundry ▲ ▲ ▲ ▲ Storage ▲ ▲ ▲ ▲ ▲ ▲ Figure 11-53 – Example of a material finish schedule. Take great care when making a change in the material finish for a particular room. Such changes may greatly affect other rooms below it in the schedule. Errors are less likely to occur and revisions will be easier to handle if you letter each space in the schedule individually. Remember; whenever possible place all of the schedules on the same sheet as their respective drawings on the building.

3.9.0 Bill of Materials

A bill of materials (BM) is a tabular statement of material requirements for a given project. It contains information, such as stock numbers, unit of issue, quantity, line item number, description, vendor, and cost. Sometimes the bill of materials will be submitted on material estimate sheets or material takeoff sheets, but all will contain similar information. The bill of materials is actually a grouped compilation based on all of the takeoffs and estimates of material needed to complete a structure. The takeoff sheet is usually an actual tally and check of the items shown, noted, or specified on the construction drawings and specifications. In most cases, each NAVFACENGCOM drawing will contain a separate BM. However, sometimes an in-house project prepared by a local command will contain a BM incorporated within the set of drawings. Figure 11-54 shows an example of a completed Bill of Materials.  11-56 Figure 11-54 – Example of a bill of material on standard form. Summary A complete set of construction drawings for a project can range from only a few sheets for a simple project with no requirements for mechanical service or electrical to hundreds of sheets with multiple divisions to accommodate the requirements of each of the construction trades’ areas of responsibility. As an engineering tech tasked with developing drawings, to be able to communicate clearly the intentions of the designer, you need to have a general knowledge and appreciation of the materials, assembly, and working practices of each rating’s trade. If you couple your general knowledge of each rating’s work with your specific knowledge of how to communicate on paper with drawings and symbols, you can be a successful engineering tech while assigned to the drafting division. Clear, concise, accurate, and timely drawings are always appreciated by the “hands-on” crews.  11-57

Review Questions

6HOHFWWKH&RUUHFW5HVSRQVH 1. Which drawings present a proposed building or facility in an attractive setting? A. Presentation B. Master Plan C. Preliminary D. Record 2. Which drawings can actually be a schedule or diagram? A. Red-Lined B. Working C. Shop D. Preliminary 3. Which drawings are commonly used in architectural, topographical, and construction planning? A. Final B. Preliminary C. Presentation D. Master Plan 4. Which drawings can be prepared by the construction contractor, subcontractor, manufacturer, distributor, or supplier? A. Red-Lined B. Shop C. Preliminary D. Working 5. Which organization(s) maintains and upgrades the master plan on existing and proposed Navy installations? A. Naval Facilities Engineering Command (NAVFACENGCOM) B. Regional Engineering Field Division (EFD) C. Local Base Command D. Resident Officer in Charge of Construction (ROICC) and Public Works Center (PWC) 6. Working drawings are also known as _____ drawings. A. project B. preliminary C. red-lined D. shop  11-58 7. What does a complete set of project drawings always contain? A. An electrical division B. Preliminary Drawings C. As-Builts D. Bill of Materials 8. General drawings are drawn on a relatively small-defined scale, such as _____. A. 1/16 in. = 1 ft or 1/8 in. = 1 ft. B. 1/4 in. = 1 ft or 1/2 in. = 1 ft. C. 1/8 in. = 1 ft or 1/4 in. = 1 ft. D. 1/2 in. = 1 ft or 1 in. = 1 ft. 9. In what projection are most general drawings presented? A. Elevation B. Cavalier C. Isometric D. Orthographic 10.  Detail drawings must be presented in the same view as the general drawing to prevent confusion. A. True B. False 11. Which drawings provide a check on the accuracy of the design and detail drawings and often disclose errors? A. Assembly B. Working C. Final D. Red-Lined 12.  A bill of materials must always be listed on a separate sheet. A. True B. False 13. Except for expeditionary or expedient construction, in a typical military construction project, _____ will review and evaluate working drawings? A. Public Works Center (PWC) B. Regional Engineering Field Division (EFD) C. Naval Facilities Engineering Command (NAVFACENGCOM) D. Resident Officer in Charge of Construction (ROICC)  11-59 14. What organization reviews preliminary drawings if a project is not a Seabee project but will be contracted to other sources? A. Local ROICC B. Local PWC C. Regional EFD D. NAVFACENGCOM 15. Which drawings become the official contract drawings once the contract is awarded? A. Final B. General C. Working D. Master Plan 16. The construction contractor or the military construction force (NMCB) must provide _____ with as-built drawings indicating any deviations from the contract drawings. A. PWC B. EFD C. the ROICC D. the base command 17. Conceptual designs in the Navy include both definitive designs and standard designs for structures and facilities needed on a(n) _____basis. A. repetitive B. expeditionary C. emergency D. humanitarian 18. What term describes the detailed working drawings of specialized, unique, naval facility structures? A. Facilities Planning B. Facilities Design C. Definitive Designs D. Standard Designs 19.  Ammunition and explosive design standards may be modified to accommodate local terrain. A. True B. False  11-60 20. What organization assigns new title blocks and drawing numbers when using standard designs for a construction project? A. EFD B. PWC C. NAVFACENGCOM D. Local command 21. What source provides useful information for Seabee planners such as the required land area, crew size, man-hours by skill, and the fuel to build a contingency structure? A. NAVFAC P-34, Engineering and Design Criteria for Navy Facilities B. NAVFAC P-437, Facilities Planning Guide C. NAVFAC P-272, Definitive Designs for Naval Shore Facilities, Part 1 D. NAVFAC P-272, Definitive Designs for Naval Shore Facilities, Part 2 22. What resource provides policy and procedure for preparing and developing project drawings? A. NAVFAC P-437, Facilities Planning Guide B. NAVFAC P-34, Engineering and Design Criteria for Navy Facilities C. MIL-HDBK-1006/1 D. NAVFAC P-272, Definitive Designs for Naval Shore Facilities, Part 2 23. What Federal Supply Code for Manufacturers (FSCM) number is required in the title block of all NAVFACENGCOM drawings? A. 00891 B. 80091 C. 91008 D. 90081 24.  If an EFD issued drawing number is no longer being used, it can be reused on a current project. A. True B. False 25. What resource provides guidance on revising NAVFACENGCON project drawings? A. DOD-STD-100 B. MIL-HDBK-1006/1 C. NAVFAC P-437, Facilities Planning Guide D. NAVFAC P-34, Engineering and Design Criteria for Navy Facilities  11-61 26. What is the minimum allowable height of freehand letters? A. 5/32 in. B. 3/16 in. C. 1/4 in. D. 5/16 in. 27. As an engineering tech developing drawing for use OUTCONUS, what common linear unit of measurement should be used? A. Mils B. Inch C. Millimeter D. As meets the user and geographical area criteria 28. What notes are used either to reflect dimensioning information on the drawing or to be explanatory? A. Primary B. Secondary C. Specific D. General 29. What notes refer to all of the notes on the drawing not accompanied by a leader and an arrowhead? A. Primary B. Secondary C. Specific D. General 30. When using the conventional horizontal block, general notes must be placed a minimum of _____ below the revision block space. A. 2 in. B. 3 in. C. 4 in. D. 5 in. 31. Into what major categories are project drawings divided? A. Site, architectural, structural, mechanical, electrical, and fire protection B. Civil, architectural, skeletal, mechanical, power, and fire protection C. Civil, architectural, structural, plumbing, power, and fire protection D. Civil, architectural, structural, mechanical, electrical, and fire protection  11-62 32. The _____ drawings allow the Equipment Operators to estimate the amount of any soil displacement (cut and fill) and prepare the site for construction. A. architectural B. civil C. soil boring log D. delta 33. What type of scale is typically used for site plans on civil drawings? A. 1/8 = 1 in. B. 1/4 = 1 in. C. Architect’s scale D. Engineer’s scale 34. What drawings are considered the key drawings in a set of project drawings? A. Building sections B. Floor plans C. Elevations D. Details 35. What should be done before placing dimensions on a drawing? A. Convert them to inches. B. Rescale them. C. Convert them from engineer’s scale to architect’s scale. D. Lay out and verify them on sketch paper. 36. In concrete and masonry construction, all dimensions are all given to the _____ of the walls. A. centerline B. face C. veneer D. lintel 37.  Elevations are typically drawn at the same scale as the floor plan. A. True B. False 38. What drawing should contain all roof, floor, wind, seismic, and other loads? A. Civil B. Architectural C. Structural D. Schedule  11-63 39. What serves as the basis for developing the foundation plan? A. Architectural drawings B. Civil drawings C. Site plan D. Ground floor plan 40. The floor framing plan is a(n) _____ view of the layout of girders, beams, and joists. A. elevation B. plan C. isometric D. cut away 41.  Roof framing plans for wood frame construction are drawn in the same manner as the floor framing plan. A. True B. False 42. What additional drawings are commonly provided for plumbing (mechanical) plans that are difficult to read? A. Riser diagrams B. Large scale details C. Sectional cuts D. Orthographic 43. What is the next step in creating an electrical drawing after tracing the floor plan? A. Add circuits, circuit numbers, and circuit notations. B. Draw switches. C. Draw convenience outlets. D. Draw the meter and service panel noting voltage rating and amperage. 44. Sections most commonly apply to the _____ and _____ divisions. A. architectural, structural B. civil, architectural C. civil, structural D. architectural, mechanical 45. Full building sections are usually located in the _____ division. A. mechanical B. structural C. architectural D. electrical  11-64 46. What scale should be used to draw details? A. 1 in. = 1 ft. B. 11/2 in. = 1 ft. C. 3 in. = 1 ft. D. Large enough to explain required information 47. Most schedules relate to doors, windows, and _____. A. room finishes B. concrete pours C. material deliveries D. contract phases 48.  A bill of material can be submitted on a material estimate sheet or material takeoff sheet as well as on a bill of material form. A. True B. False  11-65 Trade Terms Introduced in This Chapter Cavalier projections Also called cavalier perspective or high view point; a way to represent a three-dimensional object on a flat drawing, and more specifically, a type of oblique projection. Isometric projections A form of graphical projection, more specifically, a form of axonometric projection; a method of visually representing three-dimensional objects in two dimensions, in which the three coordinate axes appear equally foreshortened and the angles between any two of them are 120°. Lintel A horizontal beam used in the construction of buildings and a major architectural contribution of ancient Greece. It usually supports the masonry above a window or door opening. Also know as a header. Orthographic projections A means of representing a three-dimensional object in two dimensions; with multiview orthographic projections, up to six pictures of an object are produced, with each projection plane parallel to one of the coordinate axes of the object. Veneer A thin covering of material, such as brick, placed over a backing material of wood frame or block. 

 

****************************************************************************************************************

Chapter 12 Surveying: Elements and Equipment

This lesson provides an overview of surveying with emphasis on the principles and procedures of basic surveying and the use of various surveying equipment, instruments, and accessories. For you as an engineering tech, accurate surveying is essential because sound decisions in engineering practice depend on the results of your surveys. Surveying is the science of determining the relative positions of points on or near the earth’s surface. These points may be needed to locate or lay out roads, airfields, and structures of all kinds. They may be needed for cultural, hydrographic, or terrain features for mapping, and, in the military, these points may be targets for artillery and mortar fire. The relative horizontal positions of these points are determined from distances and directions measured in the field. Their vertical positions are computed from differences in elevation, which are measured directly or indirectly from an established point of reference or datum. The earliest application of surveying was in establishing land boundaries. Although many surveyors still establish or subdivide boundaries of landed properties, the purposes of surveys have branched out to many other areas.

Courts may call upon surveyors to substantiate locations of objects involved in cases, such as major traffic accidents, maritime disasters, or even murder cases, in which direction and distance have a bearing. Surveying continues to play an extremely important role in many branches of engineering. Today, surveys are used to map the earth above and below; for navigational charts used in the air, on land, and at sea, and for certain tasks in geology, forestry, archeology, and landscape architecture. As a surveyor, you submit survey results before, during, and after planning and construction of advanced base structures, bridges, roads, drainage works, pipelines, and other types of conventional ground systems. In addition, an engineering tech assigned to an oceanographic unit may be involved in hydrography to a great extent, establishing an offshore triangulation network, depth sounding, and mapping. Again, though these surveys are for various purposes, the basic operations are the same— they involve measurements and computations, fieldwork, and office work.

When you have completed this lesson, you will be able to:

1. Describe the different classifications of surveying.
2. Describe the different types of surveys.
3. Describe the different types of surveying operations.
4. Describe the purpose and uses of basic surveying instruments.
5. Describe the purpose and uses of field equipment.
6. Identify field supplies needed for surveying operations.

Contents

1.0.0 Classification of Surveying

2.0.0 Types of Surveys

3.0.0 Types of Surveying Operations

4.0.0 Basic Surveying Instruments

5.0.0 Field Equipment

6.0.0 Field Supplies

Summary

Review Questions


1.0.0 CLASSIFICATION of SURVEYING

Generally, surveying is divided into two major categories: plane and geodetic surveying.

1.1.0 Plane Surveying

PLANE SURVEYING is a process of surveying in which the portion of the earth being surveyed is considered a plane. The term is used to designate survey work in which the distances or areas involved are small enough that the curvature of the earth can be disregarded without significant error. In general, the term plane surveying applies to surveys of land areas and boundaries (land surveying) in which the areas are of limited extent. For small areas, precise results may be obtained with plane surveying methods, but the accuracy and precision of such results will decrease as the area surveyed increases in size. To make computations in plane surveying, you will use formulas of plane trigonometry, algebra, and analytical geometry. A great number of surveys are of the plane surveying type. Surveys for the location and construction of highways and roads, canals, landing fields, and railroads are classified under plane surveying. Considering that an arc of 10 mile is only 0.04 greater that its subtended chord, that a plane surface tangent to a spherical arc departs only about eight inches at one mile from the point of tangency, and that the sum of the angles of a spherical triangle is only 1 sec greater than the sum of the angles of a plane triangle for an area of approximately 75 square miles on the earth’s surface, it is reasonable to consider the errors caused by the earth’s curvature only in precise surveys of large areas. In this training manual, we will primarily discuss plane surveying rather than geodetic surveying.

1.2.0 Geodetic Surveying

Geodetic surveying is a process of surveying in which the shape and size of the earth are considered. This type of survey is suited for large areas and long lines and is used to find the precise location of basic points needed for establishing control for other surveys. In geodetic surveys, the stations are normally long distances apart, and this type of surveying requires more precise instruments and surveying methods than does plane surveying. The shape of the earth is thought of as a spheroid, although in a technical sense, it is not really a spheroid. In 1924, the convention of the International Geodetic and Geophysical Union adopted 41,852,960 feet as the diameter of the earth at the equator and 41,711,940 feet as the diameter at its polar axis. The equatorial diameter was computed on the assumption that the flattening of the earth caused by gravitational attraction is exactly 1/297. Therefore, distances measured on or near the surface of the earth are not along straight lines or planes, but on a curved surface. Hence, computation of distances in geodetic surveys make allowances for the earth’s minor and major diameters, from which a spheroid of reference is developed. The position of each geodetic station is related to this spheroid. The positions are expressed as latitudes (angles north or south of the Equator) and longitudes (angles east or west of a prime meridian) or as northings and castings on a rectangular grid. The methods used in geodetic surveying are beyond the scope of this training manual. 

 

Test Your Knowledge

1. In surveying, the relative horizontal positions of points are determined in relationship to which of the following elements- measured in the field?

A. Only from distances
B. Only from directions
C. From either distances or directions
D. From both distances and directions

2. When is a survey considered to be a geodetic survey?

A. When the earth’s curvature must be considered
B. When the surface surveyed is water
C. When the data from the survey will be used for mapping
D. When the survey is either a ground or an aerial survey

 

2.0.0 TYPES of SURVEYS

Generally, surveys can be classified by their functions. Functionally, surveys are classed as construction, topographic, route, and special. Special surveys, such as photogrammetry, hydrography, and property surveys, are conducted either with special equipment or for a special purpose. Some of the types of surveys that you may perform as an engineering tech are discussed in the following paragraphs.

2.1.0 Construction Surveys

Construction surveys (sometimes called engineering surveys) obtain data essential for planning, estimating, locating, and layout for the various phases of construction activities or projects. This type of survey includes reconnaissance, preliminary, location, and layout surveys. The objectives of engineering or construction surveying include the following:

  1. Obtaining reconnaissance information and preliminary data engineers require for selecting suitable routes and sites and for preparing structural designs
  2. Defining selected locations by establishing a system of reference points
  3. Guiding construction forces by setting stakes or otherwise marking lines, grades, and principal points and by giving technical assistance
  4. Measuring construction items in place for preparing progress reports
  5. Dimensioning structures for preparation of as-built plans

All of the above objectives are called engineering surveys by the American Society of Civil Engineers (ASCE), and the term “construction survey” is applied to the last three objectives only. The Army Corps of Engineers, on the other hand, generally applies the term “construction surveying” to all of the objectives listed above. Engineering and/or construction surveys, then, form part of a series of activities leading to the construction of a man-made structure. The term “structure” is usually confined to something, like a building or bridge, built of structural members. It is used here in a broader sense, however, to include all man-made features, such as graded areas; sewer, power, and water lines; roads and highways, and waterfront structures. Construction surveys normally cover areas small enough to use the plane surveying methods and techniques.

2.2.0 Topographic Surveys

The purpose of a topographic survey is to gather survey data about the natural and man-made features of land, as well as its elevations. From this information, a three-dimensional map may be prepared. You may prepare the topographic map in the office after collecting the field data or prepare it right away in the field by plane table. The work usually consists of the following:

  1. Establishing horizontal and vertical control that will serve as the framework of the survey
  2. Determining enough horizontal location and elevation (usually called side shots) of ground points to provide enough data for plotting when the map is prepared
  3. Locating natural and man-made features that may be required by the purpose of the survey
  4. Computing distances, angles, and Elevations
  5. Drawing the topographic map Topographic surveys are commonly identified with horizontal and/or vertical control of third and lower-order accuracies.

2.3.0 Route Surveys

Route surveys are those conducted for the location and construction of lines of transportation or communication that continue across country for some distance, such as highways, railroads, open-conduit systems, pipelines, and power lines. Generally, the preliminary survey for this work takes the form of a topographic survey.

In the final stage, the work may consist of the following:

  1. Locating the center line, usually marked by stakes at 100 feet intervals called stations
  2. Determining elevations along and across the center line for plotting profile and cross sections
  3. Plotting the profile and cross sections and fixing the grades
  4. Computing the volumes of earthwork and preparing a mass diagram
  5. Staking out the extremities for cuts and fills
  6. Determining drainage areas for ditches and culverts
  7. Laying out structures, such as bridges and culverts
  8. Locating right-of-way boundaries and staking out fence lines, if necessary

2.4.0 Special Surveys

As mentioned earlier in this lesson, special surveys are conducted for a specific purpose and with special surveying equipment and methods. A brief discussion of some of the special surveys follows.

2.4.1 Land Surveys

Land surveys (sometimes called cadastral or property surveys) are conducted to establish the exact location, boundaries, or subdivision of a tract of land in any specified area. This type of survey requires professional registration in all states. Presently, land surveys generally consist of the following chores:

  1. Establishing markers or monuments to define and thereby preserve the boundaries of land belonging to a private concern, a corporation, or the government.
  2. Relocating markers or monuments legally established by original surveys. This requires examining previous survey records and retracing what was done. When some markers or monuments are missing, they are reestablished following recognized procedures, using whatever information is available.
  3. Rerunning old land survey lines to determine their lengths and directions. As a result of the high cost of land, old lines are re-measured to get more precise measurements.
  4. Subdividing landed estates into parcels of predetermined sizes and shapes.
  5. Calculating areas, distances, and directions and preparing the land map to portray the survey data so that it can be used as a permanent record.
  6. Writing a technical description for deeds.

2.4.2 Control Surveys

Control surveys provide “basic control” or horizontal and vertical positions of points to which supplementary surveys are adjusted. These types of surveys (sometimes termed geodetic surveys) are conducted to provide geographic positions and plane coordinates of triangulation/ traverse stations and the elevations of bench marks. These control points are further used as references for hydrographic surveys of coastal waters, for topographic control, and for the control of many state, city, and private surveys. Horizontal and vertical controls generated by land (geodetic) surveys provide coordinated position data for all surveyors. Therefore, these types of surveys must use first-order and second-order accuracies.

2.4.3 Hydrographic Surveys

Hydrographic surveys are made to acquire data required to chart and/or map shorelines and bottom depths of streams, rivers, lakes, reservoirs, and other larger bodies of water. This type of survey is also important for navigation and the developing water resources for flood control, irrigation, electrical power, and water supply. LIke other special surveys, hydrographic surveys make use of several types of electronic and radio-acoustical instruments. These special devices are commonly used to determine water depths and the location of objects on the bottom by a method called taking soundings. A surveyor takes soundings by measuring the time required for sound to travel downward and reflect back to a receiver aboard a vessel.

Test Your Knowledge

3. Reestablishing an old property boundary from missing requires what kind of survey?

A. Topographic
B. Construction
C. Route
D. Land

4. Gathering information needed to prepare as-built drawings for a completed project requires what kind of survey?

A. Topographic
B. Construction
C. Route
D. Land

5. Gathering data about the natural and man-made features of the land requires what kind of survey?

A. Topographic
B. Construction
C. Route
D. Land

 

3.0.0 TYPES of SURVEYING OPERATIONS

The practice of surveying actually boils down to fieldwork and office work. Field work consists of taking measurements, collecting engineering data, and testing materials. Office work includes computation and drawing the necessary information for the purpose of the survey.

3.1.0 Fieldwork

Fieldwork is of primary importance in all types of surveys. To be a skilled surveyor, you must spend a certain amount of time in the field to acquire needed experience. This training manual will help you understand the theory behind surveying, instruments and their uses, and surveying methods. However, proficiency in actual surveying, as in other professions, depends largely upon the duration, extent, and variety of experience. Develop the habit of studying a problem thoroughly before going into the field. Know exactly what is to be done, how to do it, and the instruments and materials necessary to do it. Developing speed and consistent accuracy in all your fieldwork is essential. This means that you will need practice in handling the instruments, taking observations, keeping field notes, and planning systematic moves. Do not accept any measurement as correct without verification. Whenever possible, verify using a method different than that used in the original measurement. Ensure that the precision of your measurements are consistent with the accepted standard for the survey. Fieldwork also includes adjusting the instruments and caring for field equipment. Do not attempt to adjust any instrument unless you understand the workings or functions of its parts. Instrument adjustments in the early stages of your career require close supervision from a senior engineering tech.

3.1.1 Collection of Engineering Data

Collecting engineering data is part of Seabee surveying. Engineering data is any information essential for efficient construction. Most of your fieldwork, such as running a traverse, leveling, and determining cuts and fills, may be classified under this category. However, compiling these field measurements and converting them into a common medium of value to the engineer requires skill you can only attain through experience. Although all planning and organization is generally handled by the engineering officer or by a senior engineering tech, the actual collection of engineering data will generally be delegated to  12-8 you; hence, it is to your advantage to understand the procedures early on. This job may require combination of fieldwork and office work. If information of the same quality can be found in sources other than actual fieldwork, do not hesitate to use them. If necessary, use spot checks to verify certain points, depending on the source.

Each project requires the study of a different set of engineering data, so the engineering officer or the senior engineering techs must devise a workable method of compilation for each particular project. The compiled data must be complete in all respects required by the project and the compilation completed with sufficient lead time. Generally, a separate folder for each project is maintained and labeled. Some of the engineering data that may be considered for many projects are as follows:

3.1.2 Factors Affecting Fieldwork

The surveyor must constantly be alert to the different conditions encountered in the field. Physical factors, such as terrain and weather conditions, affect each field survey to varying degrees. Fog or mist can limit the ability to take telescope measurements. Swamps and flood plains under high water can impede taping surveys. Sights over open water or fields of flat, unbroken terrain create ambiguities in measurements taken with microwave equipment. The lengths of light-wave distance in measurements are reduced in bright sunlight. Generally, reconnaissance will predetermine the conditions and alert the survey party to the best methods and the rate of progress to expect.

Technical readiness is another factor affecting fieldwork. As you gain experience in handling various surveying instruments, you can shorten survey time and avoid errors that would require resurvey.

The purpose and type of survey are primary factors determining accuracy requirements. First-order triangulation, which becomes the basis or “control” of future surveys, is made to high-accuracy standards. Cuts and fills for a highway survey, on the other hand, have much lower accuracy standards. Some construction surveys require computing normally inaccessible distances. Compute the distance by means of trigonometry, using the angles and the one distance that can be measured. You must make the measurements to a high degree of precision to maintain accuracy in the computed distance. In simple terms, the purpose of the survey determines the accuracy requirements. The required accuracy, in turn, influences the selection of instruments and procedures. For instance, comparatively rough procedures can be used in measuring for earthmoving, but grade and alignment of a highway have to be much more precise. Each increase in precision also increases the time required to make the measurement, since you must take greater care and more observations.

There is always a slight degree of error in survey measurements. No measurement is ever exact. The errors can be systematic or accidental and are explained later in the lesson. Survey measurements are also subject to mistakes. These occur most commonly from misunderstanding of the problem, poor judgment, confusion on the part of the surveyor, or simple oversight. By working out a systematic procedure, the surveyor will often detect a mistake when an operation seems out of place. That procedure will be an advantage in setting up the equipment, making observations, recording field notes, and making computations.

Survey speed is not the result of hurrying; it is the result of saving time through the following factors:

  1. The skill of the surveyor in handling the Instruments
  2. Intelligent planning and preparation of the work
  3. Making only those measurements that are consistent with the accuracy requirements

Experience is of great value, but in the final analysis, it is the exercise of common sense that makes the difference between a good surveyor and an exceptional surveyor.

3.1.3 Field Survey Parties

The size of a field survey party depends upon the survey requirements, the equipment available, the method of survey, and the number of personnel needed to perform the tasks required. The Seabees commonly use three types of field survey parties: level party, transit party, and stadia party.

3.1.3.1 Level Party

The smallest leveling party consists of two people: an instrumentman and a rodman. In this type of organization, the instrumentman acts as note keeper. The party may need another recorder and one or more extra rodmen to improve the efficiency of the leveling operations. Having additional rodmen eliminates the waiting periods while one person moves from point to point, and an additional recorder allows the instrumentman to take readings as soon as the rodmen are in position. When leveling operations take place alongside other control surveys, the leveling party may become part of a combined party with personnel assuming dual duties, as the workload requires or the party chief directs.

3.1.3.2 Transit Party

A transit party consists of at least three people: an instrumentman, a head chainman, and a party chief. The party chief is usually the note keeper and may double as rear chainman, or there may be an additional rear chainman. The instrumentman operates the transit; the head chainman measures the horizontal distances; and the party chief directs the survey and keeps the notes.

3.1.3.3 Stadia Party

A stadia party consists of at least three people: an instrumentman, a note keeper, and a rodman. However, if the distance between the points is great, the party should include a second rodman so that one can proceed to a new point while the other holds the rod on the point being observed. The note keeper records the data called off by the instrumentman and makes the sketches required.

3.1.4 Field Notes

Field notes are the only record left after the field survey party departs the survey site. If these notes are not clear and complete, the field survey is of little value. It is therefore necessary that your field notes contain a complete record of all of the measurements made during the survey and that they include, where necessary, sketches and narrations to clarify the notes. The following guidelines apply.

3.1.4.1 Lettering

All field notes should be lettered legibly. The lettering should be freehand vertical or slanted Gothic style, as illustrated in basic drafting. A fairly hard pencil or a mechanical lead holder with a 3H or 4H lead is recommended.

3.1.4.2 Format

Notes must be made in the regular field notebook and not on scraps of paper for later transcription. Record separate surveys on separate pages or in different books. Mark the front cover of the field notebook with the name of the project, its general location, the types of measurements recorded, the designation of the survey unit, and other pertinent information.

The inside front cover should contain instructions for the return of the notebook, if lost. Reserve the right-hand pages as an index of the field notes, a list of party personnel and their duties, a list of the instruments used, dates and reasons for any instrument changes during the course of the survey, and a sketch and description of the project.

Throughout the remainder of the notebook, clearly indicate the beginning and ending of each day’s work. Where pertinent, also record the weather, including temperature and wind velocities. To minimize recording errors, someone other than the recorder should check and initial all data entered in the notebook.

3.1.4.3 Recording

Field note recording takes three general forms: tabulation, sketches, and descriptions. Any or all of these forms may be combined, when necessary, to make a complete record.

In tabulation, the numerical measurements are recorded in columns according to a prescribed plan. Spaces are also reserved to permit necessary computations.

Sketches add much to clarify field notes; use them liberally when applicable. You may draw them to an approximate scale or exaggerate important details for clarity. A small ruler or triangle can aid in making sketches. Add measurements directly on the sketch or keyed in some way to the tabular data. An important requirement of a sketch is legibility. See that the sketch is drawn clearly and is large enough to easily understand.

Tabulation, with or without added sketches, can also be supplemented with descriptions. The description may be only one or two words to clarify the recorded measurements, or it may be a lengthy narrative if it is to be used at some future time to locate a survey monument.

Erasures are not permitted in field notebooks. Line out individual numbers or lines recorded incorrectly and insert the correct values. Neatly cross out pages to be rejected and reference them to their substitutes. This procedure is mandatory since the field notebook is the book of record and is often used as legal evidence. Use standard abbreviations, signs, and symbols in field notebooks. If there is any doubt as to their meaning, give an explanation in the form of notes or legends.

3.2.0 Office Work

Office work in surveying consists of converting the field measurements into a usable format. The conversion of computed, often mathematical, values may be required immediately to continue the work, or it may be delayed until completion of a series of field measurements. Although these operations are performed in the field during lapses between measurements, they can also be considered office work. Such operations are normally done to save time. Special equipment, such as calculators, conversion tables, and some drafting equipment, are used in most office work. In office work, converting field measurements (also called reducing) involves computing, adjusting, and applying a standard rule to numerical values.

3.2.1 Computation

In any field survey operation, measurements are derived by the application of some form of mathematical computation. It may be simple addition of several full lengths and a partial tape length to record a total linear distance between two points. It may be adding or subtracting differences in elevation to determine the height of instrument or the elevation during leveling. Then again, it may be checking angles to ensure that the allowable error is not exceeded. Office computing converts these distances, elevations, and angles into a more usable form. The finished measurements may end up as a computed volume of dirt to be moved for a highway cut or fill, an area of land needed for a Seabee construction project, or a new position of a point from which other measurements can be made. In general, office computing reduces the field notes to either a tabular or graphic form for a permanent record or for continuation of fieldwork.

3.2.2 Adjustment

Some survey processes are not complete until measurements are within usable limits or the measurements have been corrected to distribute accumulated errors. Small errors that are not apparent in individual measurements can accumulate to a sizeable amount. Adjusting is the process of distributing these errors over many points or stations until the effect on each point is reduced enough to put all measurements within usable limits.

For example, assume that 100 measurements were made to the nearest unit for the accuracy required. This requires estimating the nearest one-half unit during measurement. At the end of the course, an error of + 4 units results. Adjusting this means each measurement is reduced 0.04 unit. Since the measurements were read only to the nearest unit, this adjustment would not be measurable at any point, and the adjusted result would be correct.

3.2.2.1 Significant Figures

Significant figures are those digits in a number that have meaning; that is, those values that are known to be exact. In a measured quantity, the accuracy of the measurement determines the number of significant figures. For example, a roughly measured distance of 193 feet has three significant figures. More carefully measured, the same distance, 192.7 feet, has four significant figures. If measured still more accurately, 192.68 feet has five significant figures.

In surveying, the significant figures should reflect the allowable error, or tolerance, in the measurements. For example, suppose a measurement of 941.26 units is made with a probable error of ± 0.03 unit. The ± 0.03 casts some doubt on the fifth digit which can vary from 3 to 9, but the fourth digit will still remain 2. We can say that 941.26 has five significant figures; and from the allowable error, we know the fifth digit is doubtful. However, if the probable error were ±0.07, the fourth digit could be affected. The number could vary from 941.19 to 941.33, and the fourth digit could be read 1, 2, or 3. The fifth digit in this measurement is meaningless. The number has only four significant figures and should be written as such.

The number of significant figures in a number ending in one or more zeros is unknown unless more information is given. The zeros may have been added to show the location of the decimal point; for example, 73200 may have three, four, or five significant figures, depending on whether the true value is accurate to 100, 10, or 1 unit(s). If the number is written 73200.0, accuracy is carried to the tenth of a unit and indicates six significant figures.

When decimals are used, the number of significant figures is not always the number of digits. A zero may or may not be significant, depending on its position with respect to the decimal and the digits. As mentioned above, zeros may have been added to show the position of the decimal point. Study the following examples:

In long computations, carry out the values to one more digit than the result requires. Round off the number to the required number of digits as a final step.

3.2.2.2 Rounding Off Numbers
3.2.2.3 Checking

Computations Most mathematical problems can be solved by more than one method. To check a set of computations, use a method that differs from the original method, if possible. An inverse solution, starting with the computed value and solving for the field data, is one possibility. You can also use the planimeter and the protractor for approximate checking. Use a graphical solution when feasible, especially if it takes less time than a mathematical or logarithmic solution. Always recompute each step that cannot be checked by any other method, and, if possible, another engineering tech should recompute the problem. When an error or mistake is found, the computation should be rechecked before the correction is accepted.

3.2.3 Drafting Used in Surveying

Except for some freehand sketches, drafting in surveying is generally performed by mechanical means; for example lines and surveying symbols are generally drawn with the aid of a straightedge, spline, template, etcetera. The drawings directly related to surveying are maps, profiles, cross sections, mass diagrams, and, to some extent, other graphical calculations. Their usefulness depends upon how accurately you plot the points and lines representing the field measurements. You must adhere to the requirements of standard drawing practices.

When drawing a property map, include the following general information:

Besides the above information, some other items may be required for the map to become a public record. When this is the case, consult the local office of the Bureau of Land Management or the local surveyors’ society for the correct general information requirements to be included in the map to be drawn.

In drawing maps that will be used as a basis for studies, such as those to be used in roads, structures, or waterfront construction, you are required to include the following general information:

Maps developed as a basis for studies are so varied in purpose that general information will be adequate for some, but not all. The engineering technician, when in doubt, should consult the senior engineering tech, the engineering officer, or the operations officer for the information desired in the proposed map. The senior engineering tech or the chief of the field survey party must know all these requirements before actual fieldwork begins.

A map with too much information is as bad as a map with too little information. It is not uncommon to find a map so crowded with information and other details that it is hard to comprehend. If this happens, draw the map to a larger scale or reduce the information or details on it. Then provide separate notes or descriptions for other information that will not fit well, thus causing the appearance of overcrowding. Studying the features and quality of existing maps developed architects and engineers (A & E) agencies will aid you a great deal in your own map drawing.

3.2.4 Orientation Symbol

Every map you draw has to have an orientation symbol (sometimes called the meridian arrows). The symbol representing the direction of the meridian is a needle or feathered arrow pointing north. It must be long enough to be transferred accurately to any part of the map. The full-head arrow represents the true meridian, the half-head arrow the magnetic meridian. If you draw both (Figure 12-1), you must indicate the angle between them. If possible, the top of a map must always be oriented north; however, the shape of the mapped area or the most important features of the project may alter this preference.

 

Figure 12-1 – An orientation symbol.

3.2.5 Kinds of Maps

Maps are classified according to purpose, scale, or type. Maps classified according to purpose include strategic, tactical, and artillery maps; communications, utilities, or soil maps; and maps pertaining to special studies. Those classified according to scale are large-scale, medium-scale, and small-scale. Some of the more common type classifications, such as geographic, planimetric, topographic, hydrographic, special purpose, and photomaps or mosaics, are briefly described in the next several paragraphs.

3.2.5.1 Geographic Maps

A geographic map is a map of a large area, such as a state or country, that shows the location of towns, counties, cities, rivers or streams, lakes, roads, and principal civil boundaries, such as county and state lines. Maps showing the general location of human works, such as the Railroad Map of the United States, the Irrigation Map of Arizona, and the Panama Canal Zone Map, are also classified as geographical maps.

3.2.5.2 Planimetric Maps

These maps show natural or man-made features in a horizontal plane only. They omit relief in any measurable form. A few examples of planimetric maps are property, city layout, site plan, communications, route and distance, and isogonic maps of the magnetic variation lines.

3.2.5.3 Topographic Maps

Maps that depict the natural and man-made features of the earth’s surface in a measurable form, showing both horizontal and vertical positions are called topographical maps. Vertical positions, or relief, are normally represented by contours. A precise topographic map shows surface features so perfectly that it can be used for making an exact three-dimensional model of the area. Such a model is called a relief map.

3.2.5.4 Hydrographic Maps

A hydrographic map shows the shorelines, location and depth of soundings, and often the topographic and other features of lands adjacent to the shorelines. It also shows the locations of both horizontal and vertical control in the area.

3.2.5.5 Special-Purpose Maps

These are maps developed for specific purposes. A preliminary map developed from a preliminary survey of a highway, a location map showing the alignment of the located line, and a right-of-way map showing the boundaries of the right-of-way and the adjacent lands all come under the heading of special purpose maps.

3.2.5.6 Mosaic and Overlays

 

Editor's Note

The procedures described in this section, "Mosaic and Overlays," have been largely replaced with satellite imaging.  I will update this material when information from the appropriate experts becomes available.

The aerial photographic mosaic is constructed from two or more overlapping prints joined so that they form a single picture. Usually, vertical photographs are used to obtain a map-like result; however, oblique photographs may be used, in which case the result is a panorama. The mosaic has become increasingly useful in cartography and related fields since World War I. It can represent large geographic areas with each feature of terrain assuming its natural appearance and approximating its proportionate size. The U.S. Army Topographic Command has developed from mosaics a multicolored map of the entire United States and maps of other countries. The Army calls it a pictomap; this is the type of map that is generally used in a war zone. Aerial photographs may be converted into line maps by the use of overlays. Usually, these are made by tracing the details from the photograph onto transparent paper or vellum and adding such marginal data as desired. This line map may then be reproduced quickly by blueprinting or by lithography (Figure 12-2).

 

Figure 12-2 – An aerial photograph, and a line map made by overlays of that aerial photograph

 

 

Test Your Knowledge

6. When engineering data for a construction project is collected, which of the following items or information should be considered?

A. Climatology in the local area of the project site
B. Availability of labor and materials
C. Accessibility of construction equipment to the project site
D. All of the above

7. Which of the following factors makes the difference between a good surveyor and an exceptional surveyor?

A. The ability to collect data quickly
B. The ability to exercise sound judgment and common sense
C. Consistent accuracy in field work
D. The habit of ensuring that all survey results are verified before acceptance

8. Where in the field notebook should party personnel and their duties be listed?

A. Front cover
B. Inside front cover
C. Right-hand pages

4.0.0 BASIC SURVEYING INSTRUMENTS

4.1.0 Magnetic Compass

Most fieldwork done by an engineering technician (especially at the third- and second-class levels) consists of field measurements and/or computations involving plane surveying of ordinary precision. This section describes the basic instruments, tools, and other equipment used for this type of surveying. Instruments used for more precise surveys will also be described briefly.

Surveying instruments come in various forms, yet their basic functions are similar. A magnetic compass consists principally of a circular compass card, usually graduated in degrees, and a magnetic needle, mounted and free to rotate on a pivot located at the center of the card. The needle, when free from any local attraction (caused by metal), lines itself up with the local magnetic meridian as a result of the attraction of the earth’s magnetic north pole.

The magnetic compass is the most commonly used and simplest instrument for measuring directions and angles in the field. The lensatic compass  is most commonly used for compass courses, map orientation, and angle direction during mortar and field artillery fires.

In addition to this type of compass, there are several others used exclusively for field surveys. The engineer’s transit compass, located between the standards on the upper plate, is graduated from 0° through 360° for measuring azimuths, and in quadrants of 90° for measuring bearings. The Brunton pocket compass (Figure 12-3) is a combination compass and clinometer. It can be mounted on a light tripod or staff, or it may be cradled in the palm of the hand. Other types of compasses can also be found in some surveying instruments such as the theodolite and plane table.

 

Figure 12-3 – A Brunton pocket transit.

4.2.0 Theodolite

A theodolite is essentially a transit of high precision. Theodolites come in different sizes and weights and from different manufacturers. Theodolites may differ in appearance, but their essential parts and operation are basically alike. Some of the models currently available include the WILD (Herrbrugg), BRUNSON, K&E (Keuffel & Esser), and PATH theodolites.

4.2.1 One-Minute Theodolite

The one minute directional theodolite is essentially a directional type of instrument. With this type of instrument, however, you can observe horizontal and vertical angles, as with a transit.

The theodolite (Figure 12-4) is a compact, lightweight, dustproof, optical reading instrument. The scales read directly to the nearest minute or 0.2 mil and are illuminated by either natural or artificial light.

 

Figure 12-4 – The one minute theodolite.

The main or essential parts of this type of theodolite are discussed in the next several paragraphs.

4.2.1.1 Horizontal Motion

The horizontal motion clamp and tangent screw are located on the lower portion of the alidade and adjacent to each other. They are used for moving the theodolite in azimuth. Located on the horizontal circle casting is a horizontal circle clamp that fastens the circle to the alidade. When this horizontal (repeating) circle clamp is in the lever-down position, the horizontal circle turns with the telescope. With the circle clamp in the lever-up position, the circle is unclamped and the telescope turns independently. This combination permits use of the theodolite as a repeating instrument. To use the theodolite as a directional type of instrument, use the circle clamp only to set the initial reading. Set an initial reading of 0°30´ on the plates when you require a direct and reverse (D/R) pointing. This will minimize the possibility of ending the D/R pointing with a negative value.

4.2.1.2 Vertical Motion

Located on the standard opposite the vertical circle are the vertical motion clamp and tangent screw. The tangent screw is located on the lower left and at right angles to the clamp. Using the vertical motion clamp and the tangent screw, the telescope can be rotated in the vertical plane completely around the axis (360°).

4.2.1.3 Levels

The level vials on a theodolite are the circular, the plate, the vertical circle, and the telescope. The circular level is located on the tribrach of the instrument and is used to roughly level the instrument. The plate level, located between the two standards, is used for leveling the instrument in the horizontal plane. The vertical circle level (vertical collimation) vial is often referred to as a split bubble. This level vial is completely built in, adjacent to the vertical circle, and viewed through a prism and 450 mirror system from the eyepiece end of the telescope. This results in the viewing of one-half of each end of the bubble at the same time. Leveling consists of bringing the two halves together into exact coincidence (Figure 12-5).

 

Figure 12-5 – Leveling by bringing two halves together into exact coincidence

The telescope level, mounted below the telescope, uses a prism system and a 450 mirror for leveling operations. Plunging the telescope to the reverse position brings the level assembly to the top.

4.2.1.4 Telescope

The telescope of a theodolite can be rotated around the horizontal axis for direct and reverse readings. It is a 28-power instrument with a short focusing distance of about 1.4 meters. The cross wires are focused by turning the eyepiece; the image, by turning the focusing ring. The reticle has horizontal and vertical cross wires, a set of vertical and horizontal ticks (at a stadia ratio of 1:100), and a solar circle on the reticle for making solar observations. This circle covers 31 minutes of arc and can be imposed on the sun’s image (32 minutes of arc) to make the pointing refer to the sun’s center. One-half of the vertical line is split for finer centering on small distant objects.

The telescope of the theodolite is an inverted image type. Its cross wires can be illuminated by either sunlight reflected by mirrors or by battery source. Adjust the amount of illumination for the telescope by changing the position of the illumination mirror.

4.2.1.5 Tribrach

The tribrach assembly, found on most makes and models, is a detachable part of the theodolite that contains the leveling screw, the circular level, and the optical plumbing device. A locking device holds the alidade and the tribrach together and permits interchanging of instruments without moving the tripod. In a “leapfrog” method, the instrument (alidade) is detached after observations are completed. It is then moved to the next station and another tribrach. This procedure reduces the amount of instrument setup time by half.

4.2.1.6 Circles

The theodolite circles are read through an optical microscope. The eyepiece is located to the right of the telescope in the direct position and to the left in the reverse. The microscope consists of a series of lenses and prisms that bring both the horizontal and the vertical circle images into a single field of View. Degree-graduated scales show the images of both circles as they would appear through the microscope of the one minute theodolite. Both circles are graduated from 0° to 360° with an index graduation for each degree on the main scales. This scale’s graduation appears to be superimposed over an auxiliary that is graduated in minutes to cover a span of 60 minutes (1°). The position of the degree mark on the auxiliary scale is used as an index to get a direct reading in degrees and minutes. If necessary, these scales can be interpolated to the nearest 0.2 minute of arc. The vertical circle reads 0° when the theodolite’s telescope is pointed at the zenith, and 180° when it is pointed straight down. A level line reads 90° in the direct position and 270 in the reverse. The values read from the vertical circle are referred to as zenith distances and not vertical angles (Figure 12-6).

 

Figure 12-6 – Converting zenith distance into vertical angles (degrees).

In the mil-graduated scales (Figure 12-7, the images of both circles are shown as they would appear through the reading microscope of the 0.2-mil theodolite. Both circles are graduated from 0 to 6,400 mils. The main scales are marked and numbered every 10 mils, with the last zero dropped.

 

Figure 12-7 – Vertical angles from zenith distances (mils).

The auxiliary scales are graduated from 0 to 10 roils in 0.2-mil increments. Readings on the auxiliary scale can be interpolated to 0.1 mil. The vertical circle reads 0 mil when the telescope is pointed at the zenith, and 3,200 mils when it is pointed straight down. A level line reads 1,600 roils in the direct position and 4,800 roils in the reverse. The values read are zenith distances.

4.2.2 One-Second Theodolite

The one second theodolite (Figure 12-8) is a precision direction type instrument for observing horizontal and vertical directions.

 

Figure 12-8 – One second Theodolite.

This instrument is similar to, but slightly larger than, the one minute theodolite. The one second theodolite is compact, lightweight, dustproof, optical reading, and tripod-mounted. It has one spindle, one plate level, a circular level, horizontal and vertical circles read by an optical microscope directly to one second (0.002 roil), clamping and tangent screws for controlling the motion, and a leveling head with three foot screws.

The circles are read using the coincidence method rather than the direct method. There is an inverter knob for reading the horizontal and vertical circles independently. The essential parts of a one second theodolite are very similar to those of the one minute theodolite, including the horizontal and vertical motions, the levels, the telescope, the tribrach, and the optical system (Figure 12-9). The main difference between the two types, besides precision, is the manner in which the circles are read.

 

Figure 12-9 –Circle-reading optical system.

To view a circle in the one second theodolite select it by turning the inverter knob on the right standard. The field of the circle-reading microscope shows the image of the circle with lines spaced at 20 second intervals, every third line numbered to indicate a degree, and the image of the micrometer scale on which the unit minutes and seconds are read. The numbers increase in value (00 to 3600) clockwise around the circle. The coincidence knob on the side of, and near the top of, the right standard is used in reading either of the circles. Use the collimation level and its tangent screw to read the vertical circle.

Read the circles of the theodolite by the coincidence method, in which you obtain optical coincidence between diametrically opposite graduations of the circle by turning the micrometer or coincidence knob. When you turn this knob, the images of the opposite sides of the circle appear to move in opposite directions across the field of the circlereading microscope. The graduations can be brought into optical coincidence and appear to form continuous lines crossing the dividing line. An index mark indicates the circle graduations to be used in making the coincidence. The index mark will be either in line with a circle graduation or midway between two graduations. Make the final coincidence adjustment between the graduations in line with the index mark or when this index mark is halfway between the two closest graduations.

4.2.2.1 Horizontal Circle

To read the horizontal circle, turn the inverter or circle-selector knob until its black line is horizontal. Adjust the illuminating mirror to give uniform lighting to both sections of the horizontal circle; then view the micrometer scale through the circle-reading microscope. Focus the microscope eyepiece so that the graduations are sharply defined.

From this point, continue in the following way:

  1. Turn the coincidence knob until the images of the opposite sides of the circle move into coincidence. Turning this knob also moves the micrometer scale.
  2. Read the degrees and tens of minutes from the image of the circle. The nearest upright number to the left of the index mark is the number of degrees (105). The diametrically opposite number (the number ± 180) is 285. The number of divisions of the circle between the upright 105 and inverted 285 gives the number of tens of minutes. You may also use the index for direct reading of the tens of minutes. Each graduation is treated as 20 seconds. Thus, the number of graduations from the degree value to the index mark multiplied by 20 seconds is the value. If the index falls between graduations, add another 10 seconds when reading the tens of minutes directly.
  3. The scale has two rows of numbers below the graduations; the bottom row is the unit minutes and the top row, seconds.
  4. Add the values determined in Steps 2 and 3 above.
4.2.2.2 Vertical Circle

When reading the vertical circle, turn the circle-selector knob until its black line is vertical. Adjust the mirror on the left standard and focus the microscope eyepiece. Continue by:

  1. Using the vertical circle tangent screw to move the collimation level until the ends of its bubble appear in coincidence in the collimation level viewer on the left standard.
  2. Reading the vertical circle and micrometer scale as described before. Be sure to have proper coincidence before taking the reading.

The vertical circle graduations are numbered to give a 00 reading with the telescope pointing to the zenith. Consequently, the vertical circle reading will be 900 for a horizontal sight with the telescope direct and 2700 for a horizontal sight with the telescope reversed.

There are two separate occasions for setting the horizontal circle of the theodolite. In the first case, set the circle to read a given value with the telescope pointed at a target. With the theodolite pointed at the target and with the azimuth clamp tightened, set the circle as follows: Set the micrometer scale to read the unit minutes and the seconds of the given values. Then, with the circle-setting knob, turn the circle until you obtain coincidence at the degree and tens of minutes value of the given reading. This setting normally can be made accurately to plus or minus five seconds. After the circle is set in this manner, determining the actual reading.

In the second case, set the circle to a given angle. When measuring a predetermined angle, first point the instrument along the initial line from which the angle is to be measured and read the circle. Add the value of the angle to the circle reading to determine the circle reading for the second pointing. Set the micrometer scale to read the unit minutes and the seconds of the value to be set on the circle. Then turn the instrument in azimuth and make coincidence at the degrees and tens of minutes value to be set. The predetermined value can usually be set on the circle in this way to plus or minus two seconds.

4.3.0 Precision Level

The self-leveling level has in recent years become standard equipment. These precision instruments are like conventional levels with several additional features.

A precision level is equipped with an extra-sensitive level vial. The sensitivity of a level vial is usually expressed in terms of the size of the vertical angle the telescope must be moved to cause the bubble in the level vial to move from one graduation to the next.

The sensitivity of the level vial on an ordinary level is about 20 seconds. On a precise level, the level vial sensitivity is about two seconds. The telescope level vial on an ordinary transit has a sensitivity of about 30 seconds. The more sensitive the level vial is, the more difficult it is to center the bubble. If the level vial on an ordinary level had a sensitivity as high as two seconds, the smallest possible movement of the level screw would cause a large motion of the bubble.

For this reason, a precise level is usually also a tilting level. On a tilting level, the telescope is hinged at the objective end in order to raise or lower the eyepiece end. The eyepiece end rests on a finely threaded micrometer screw that turns to raise or lower the eyepiece end in small increments. The instrument is first leveled, as nearly as possible, following the typical steps. The bubble is then brought to exact center by the use of the micrometer screw.

4.3.1 Military Level

The military level (Figure 12-10) is a semi-precise level designed for more precise work than the engineer’s level. The telescope is 30-power, 10-inch-long, interior-focusing with an inverting eyepiece and an enclosed fixed reticle. The reticle is mounted internally and cannot be adjusted as in other instruments. It contains cross wires and a set of stadia hairs. The objective is focused by an internal field lens through a rack and pinion, controlled by a knob on the upper right-hand side of the telescope.

 

Figure 12-10 – A military level.

Tilt the telescope and level vial through a small angle in the vertical plane to make the line of sight exactly horizontal just before making the rod reading. The tilting is done by a screw with a graduated drum located below the telescope eyepiece. A cam is provided to raise the telescope off of the tilting device to hold it firmly when you are moving the instrument during the preliminary leveling. An eyepiece, located to the left of the telescope, is used for viewing the bubble through the prism system that brings both ends of the bubble into coincidence.

The level vial is located directly under the telescope, but to the left and below, directly in line with the capstan screws under the bubble viewing eyepiece. The level vial’s sensitivity is 30 seconds per 2-millimeter spacing. A circular bubble that is viewed through a 450 mirror is provided for the first approximate leveling before the long level vial is used. For night work, battery-powered electric illumination lights the long bubble, the reticle, and the circular level. The clamping screw and the horizontal motion tangent screw are located on the right-hand side; the former near the spindle and the latter below the objective lens. The instrument has a three-screw leveling head. The tripod for this level has a non-extension leg to add rigidity and stability to the setup.

4.3.2 Self-Leveling Level

The self-leveling level, also called automatic level, (Figure 12-11) is a precise, time-saving development in leveling instruments. It does away with the tubular spirit level, whose bubble takes a longer time to center as well as reset to its correct position.

 

Figure 12-11 – An automatic level.

The self-leveling level is equipped with a small bull’s-eye level and three leveling screws. The leveling screws, which are on a triangular foot plate, are used to give an approximate center of the bull’s-eye level. The line of sight automatically becomes horizontal and remains horizontal as long as the bubble remains approximately centered. A prismatic device called a compensator makes this possible. The compensator is suspended on fine, nonmagnetic wires. The action of gravity on the compensator causes the optical system to swing into the position that defines a horizontal sight. This horizontal line of sight is maintained despite a slight out of level of the telescope or even when a slight disturbance occurs on the instrument.

4.3.0 Hand Level

The hand level, like all surveying levels, is an instrument that combines a level vial and a sighting device. It is generally used for rough leveling work. In cross-sectional work, for example, terrain irregularities may cause elevations to go beyond the instrument range from a setup. A hand level is useful for extending approximate elevations off the control survey line beyond the limits of the instruments.

For greater stability, both hand levels may be rested against a tree, rod, range pole, or on top of a staff. A horizontal line, called an index line, is provided in the sight tube as a reference line. The level vial is mounted atop a slot in the sight tube in which a reflector is set at a 45° angle. This permits the observer, while sighting through the tube, to see the landscape or object, the position of the bubble in the vial, and the index line at the same time. The distances over which a hand level is sighted are comparatively short; therefore, it provides no magnification for the sighting.

The Abney hand level is more specialized than the Locke type. It has a clinometer for measuring the vertical angle and the percent of grade. The clinometers has a reversible graduated arc assembly mounted on one side. The lower side of the arc is graduated in degrees, and the upper side, in percent of slope. The level vial is attached to the axis of rotation at the index arm. When the index arm is set at zero, the clinometer is used like a plain hand level. The bubble is centered by moving the arc and not the sighting tube as is the case in the plain hand level. Thus, the difference between the line of sight and the level bubble axis can be read in degrees or percent of slope from the position of the index arm of the arc. The 45° reflector and the sighting principle with its view of the landscape, bubble, and index line are the same as in the plain hand level.

 

Test Your Knowledge

9. What part of an engineer’s transit serves the same function as the tribrach of the theodolite?

A. Leveling assembly
B. Lower plate
C. Upper plate
D. Standard

4.4.0 Trimble® 5600 and Terramodel™ Software

The Trimble® 5600 Total Station (Figure 12-12) is designed to support integrated surveying by combining GPS and optical survey data from the field into an electronic file that can used with Trimble office software for processing. Integrated surveying enables you to maximize the best of both surveying techniques for optimal efficiency in the field. 

 

Figure 12-12 – Trimble® 5600 Total Station.

The Trimble Terramodel™ software package (Figure 12-13) allows the import of raw data collected using conventional instruments or the automated total stations and roving GPS receivers to a Windows™ based personal computer. The software provides the capability to view project data as an interactive 3D model, which makes design and processing of data from a survey extremely efficient. Possessing CAD functions the Terramodel™ software enables you to perform survey and CAD tasks all with one package.

 

Figure 12-13 – Terramodel™ Screen Example.

 

5.0.0 FIELD EQUIPMENT

 The term field equipment, as used in this training manual, includes all devices, tools, and instrument accessories used in field measurement.

5.1.0 Field Tools

If you are running a survey across rough terrain, the essential equipment you will need includes various types of tools used for clearing the line; that is, for cutting down brush and other natural growth as circumstances require.

Surveying procedures usually permit bypassing large trees. Occasionally, however, it may be necessary to fell one. If heavy equipment is available, an EO may fell the tree with a bulldozer. The next best method is by means of a power-driven chain saw. If no chain saw is available, a one-man or two-man crosscut saw may be.

The machete and brush hook (Figure 12-14) are used for clearing small saplings, bushes, vines, and similar growth. Axes and hatchets are used for felling trees and also for marking trees by blazing. Files and stones are used to sharpen the edges of tools. Hubs, stakes, pipe, and other driven markers are often driven with the driving peen of a hatchet or a single-bit ax.

 

 Figure 12-14 – Standard field tools.

A sledgehammer, however, is a more suitable tool for driving markers. A double-faced, long-handled sledgehammer is swung with both hands. There are also short-handled sledgehammers, swung with one hand. A sledgehammer is classified according to the weight of the head; common weights are 6, 8, 10, 12, 14, and 16 lb. The 8- and 10-lb weights are the most commonly used.

When the ground is too compact or frozen to permit driving wooden stakes and hubs directly, open the way for a stake or hub by first driving in a heavy, conical-pointed steel bar, 10 to 16 inches long, called a bull-point. You can use one of the heavy steel form pins, used to pin down side forms for concrete paving, as a bull-point; however, the pyramidal pavement-breaker bit on a jack hammer (pneumatic hammer used to drive paving breaker bits, stone drills, and the like) makes a better bull-point. Because a jack hammer bit is made of high-carbon steel, it is liable to chip and mushroom when subjected to heavy pounding. Do not use a bull-point with a badly damaged head; to avoid injury to personnel, refinish it by grinding or cutting off before using it.. In searching for hidden markers, you may need a shovel for clearing top cover by careful digging. In soft ground, such as loose, sandy soil, you may prefer to use a square-pointed shovel or a probing steel rod to locate buried markers.

Chipping bituminous pavement off of manhole covers and levering them up may require a pick. Sometimes you will need a crowbar for levering manhole covers. A dip needle or a battery-powered instrument called a pipe finder, similar in principle to a mine detector, helps to locate buried metal markers. These instruments are used in engineering surveys to locate utility pipelines, buried manhole and valve box covers, and the like. You can generally borrow these instruments from the utilities division of the Public Works Department (PWD) of larger shore stations.

5.2.0 Surveying Tapes

Tapes are used in surveying to measure horizontal, vertical, and slope distances. They may be made of a ribbon or a band of steel, an alloy of steel, cloth reinforced with metal, or synthetic materials. Tapes are issued in various lengths and widths and graduated in a variety of ways.

5.2.1 Metallic Tapes

A metallic tape is made of high-grade synthetic material with strong metallic strands (bronze/brass- copper wire) woven in the warped face of the tape and coated with a tough plastic for durability. Standard lengths are 50 and 100 feet.

Some are graduated in feet and inches to the nearest one-fourth inch. Others are graduated in feet and decimals of a foot to the nearest 0.05 feet. Metallic tapes are generally used for rough measurements, such as cross-sectional work, road-work slope staking, side shots in topographic surveys, and many others in the same category. Nonmetallic tapes woven from synthetic yarn, such as nylon, and coated with plastic are available; some surveyors prefer to use tapes of this type. Nonmetallic tapes are of special value to power and utility field personnel, especially when they are working in the vicinity of high voltage circuits.

5.2.2 Steel Tapes

Direct linear measurements of ordinary or more accurate precision require a steel tape. The most commonly used length is 100 feet, but tapes are also available in 50-, 200-, 300-, and 500-feet lengths. All tapes except the 500-foot are band-types, the common band widths being ¼ and 5/16 inch. The 500-tape is usually a flat-wire type.

Most steel tapes are graduated in feet and decimals of feet, but some are graduated in feet and inches, meters, Gunter’s links, and chains or other linear units. From now on, when we discuss a tape, we will be talking about one that is graduated in feet and decimals of a foot unless stated otherwise.

Some tapes, called engineer’s or direct reading tapes, are graduated in subdivisions of each foot. The tape most commonly used, however, is the so-called chain tape, on which only the first foot at the zero end of the tape is graduated in subdivisions; the main body of the tape is graduated only at every one foot mark. A steel tape is sometimes equipped with a reel on which the tape can be wound, although a tape can be, and often is, detached from the reel for convenience.

There are various types of surveying tapes; metallic tape, steel tape on an open reel, steel tape on a closed reel, and special types of low-expansion steel tape, generally called an Invar tape or Lovar tape, used in high-order work.

5.2.3 Invar Tapes

Nickel-steel alloy tapes, known as Invar, Nilvar, or Lovar, have a coefficient of thermal expansion of about one-tenth to one-thirtieth (as low as 0.0000002 per 10F) that of steel. These tapes are used primarily in high-precision work. They must be handled in exactly the same manner as other precise surveying instruments.

The alloy metal is relatively soft and can easily break or kink if mishandled. Ordinarily, you should not use Invar tapes when a steel tape can give the desired accuracy under the same operating conditions. Use Invar tapes only for very precise measurements, such as those for base lines and in city work. When not in use, the tape should be stored in a reel. Except for special locations where the ground surface is hard and flat, such as roadways or railroads beds, use the Invar tape over special supports or stools and do not permit it to touch the ground.

5.3.0 Surveying Accessories

Surveying accessories include the equipment, tools, and other devices that are not an integral part of the surveying instrument itself. They come as separate items; thus, they are ordered separately through the Navy supply system.

When you run a traverse, for example, your primary instruments may be the transit and the steel tape. The accessories you need to do the actual measurement will be the following: a tripod to support the transit, a range pole to sight, a plumb bob to center the instrument on the point, perhaps tape supports if the survey is of high precision, and so forth You must become familiar with the proper care of this equipment and use it properly.

5.3.1 Tripod

The tripod is the base or foundation that supports the survey instrument and keeps it stable during observations. A tripod consists of a head to which the instrument is attached, three wooden or metal legs that are hinged at the head, and pointed metal shoes on each leg to be pressed or anchored into the ground to achieve a firm setup. The leg hinge is adjusted so that the leg will just begin to fall slowly when it is raised to an angle of about 45°. The tripod head may have screw threads on which the instrument is mounted directly, a screw projecting upward through the plate, or a hole or slot through which a special bolt is inserted to attach to the instrument. Two types of tripods are furnished to surveyors: the fixed-leg tripod and the extension leg tripod. The fixed-leg type is also called a stilt-leg or rigid tripod, and the extension leg tripod is also called a jack-leg tripod (Figure 12-15). Each fixed leg may consist of two lengths of wood as a unit or a single length of wood split at the top and attached to a hinged tripod head fitting and to a metal shoe.

 

Figure 12-15 – Types of tripods.

At points along the length of the tripod legs, perpendicular brace pieces are sometimes added to give greater stability. The extension tripod leg is made of two sections that slide longitudinally. On rough ground, the legs are adjusted to different lengths to establish a horizontal tripod head or to set the instrument at the most comfortable working height for the observer.

You must swing the fixed legs in or out in varying amounts to level the head. Instrument height is not easy to control, and the you must learn the correct spread of the legs to get the desired height. Wide-frame tripods have greater torsional stability and tend to vibrate less in the wind.

Grip the surveying instrument firmly to avoid dropping it while you are mounting it on the tripod. Hold the transit by the right standard (opposite the vertical circle) while you are attaching it. Hold the engineer’s level at the center of the telescope, but grip theodolites and precise levels near the base of the instrument. Screw the instruments down to a firm bearing but not so tightly that they will bind or the screw threads will strip.

In setting up the tripod, place the legs so that setup is stable. On level terrain, you can achieve this by having each leg form an angle of about 600 with the ground surface. Loosen the restraining strap from around the three legs, and secure it around one leg. An effective way to set the tripod down is to grip it with two of the legs close to the body while you stand over the point where the setup is required.

With one hand, push the third leg out away from the body until it is about 50° to 60° with a horizontal. Lower the tripod until the third leg is on the ground. Place one hand on each of the first two legs, and spread them while taking a short backward step, using the third leg as a pivot point. When the two legs look about as far away from the mark as the third one and all three are about equally spaced, lower the two legs and press them into the ground. Make any slight adjustment to level the head further by moving the third leg a few inches in or out before pressing it into the ground.

On smooth or slippery paved rock surfaces, tighten the tripod legs hinges while setting up to prevent the legs from spreading and causing the tripod to fall. Make use of holes or cracks in the ground to brace the tripod. In some cases, as a safety factor, tie the three legs together or brace them with rock or bushes after they are set to keep them from spreading. If you are setting up on a slippery finished floor, you may fit rubber shoes to the metal shoes, or use an equilateral triangle leg retainer to prevent the legs from sliding.

When setting up on steeply sloping ground, place the third leg uphill and at a greater distance from the mark. Set the other two legs as before, but before releasing them, check the stability of the setup to see that the weight of the instrument and tripod head will not overbalance and cause the tripod to slip or fall.

Take proper care in handling the tripod. When the legs are set in the ground, be careful to apply pressure longitudinally. Pressure across the leg can crack the wooden pieces. Adjust the hinge joint and do not over tighten it enough to cause strain on the joint or strip or lock the metal threads. Keep the machined tripod head covered with the head cover or protective cap when you are not in using it, and do not scratch or burr the head by mishandling it. When using the tripod, place the protective cap in the instrument box to prevent it from being misplaced or damaged. Any damage to the protective cap can be transferred to the tripod head. Remove any mud, clay, or sand adhering to the tripod, and wipe the tripod with a damp cloth and dry it. Coat the metal parts with a light film of oil or wipe them with an oily cloth. Foreign matter can get into hinged joints or on the machined surfaces and cause wear. Stability is the tripod’s greatest asset. Instability, wear, or damaged bearing surfaces on the tripod can evolve into unexplainable errors in the final survey results.

5.3.2 Range Pole

A range pole (also called a lining rod) is a wood or metal pole, usually about eight feet long and about 1/2 to one inch in diameter; it is has a steel point or shoe and painted bands of alternating red and white to increase its visibility. The range pole is held vertically on a point or plumbed over a point, so the point may be observed through an optical instrument. Its primary use is as a sighting rod for linear or angular measurements. For work of ordinary precision, chainmen may keep on line by observing a range pole. A range pole may also be used for approximate stadia measurement.

5.3.3 Plumb Bob, Cord, and Target

A plumb bob is a pointed, tapered brass or bronze weight that is suspended from a cord for the general purpose of determining the plumb line from a point on the ground. Common weights for plumb bobs are 6, 8, 10, 12, 14, 16, 18, and 24 oz; the 12- and the 16- oz are the most popular.

A plumb bob is a precision instrument and you must care for it as such. If the tip becomes bent, the cord from which the bob is suspended will not occupy the true plumb line over the point indicated by the tip. A plumb bob usually has a detachable tip, so if the tip becomes damaged, you can renew it without replacing the entire instrument.

Each survey party member should be equipped with a leather sheath, and the bob should be placed in the sheath whenever it is not in use. To make the cord from a plumb bob more conspicuous for observation purposes, attach an oval form aluminum target (Figure 12-16A).

 

Figure 12-16 – The plumb bob, cord, and target.

The oval target has reinforced edges, and the face is enameled in quadrants alternately with red and white. Also, you may use a flat rectangular plastic target (Figure 12-16B). It has rounded corners with alternate red and white quadrants on its face. These plumb bob string targets are pocket size with approximate dimensions of 2 by 4 inches.

5.3.4 Optical Plumbing Assembly

The optical plumbing assembly, or plummet, is a device built into the alidade or the tribrach of some instruments to center the instrument over a point. The plummet consists of a small prismatic telescope with a cross wire or marked circle reticle adjusted to be in line with the vertical axis of the instrument. After the instrument is leveled, a sighting through the plummet will check the centering over a point quickly. The advantages of the plummet over the plumb bob are that it permits the observer to center over a point from the height of the instrument stand, and it is not affected by the wind. The plummet is especially useful for work on high stands. A plumb bob requires someone at ground level to steady it and to inform the observer on the platform how to move the instrument and when it is exactly over the point. With the plummet, the observer does the centering and checking.

5.3.5 Tape Accessories

There is usually a leather thong at each end of a tape by which you can hold the tape when using the full length. When using only part of the tape, you can hold the zero end by the thong, and hold the tape at an intermediate point by means of a tape clamp handle. When a tape is not supported throughout— that is, when it is held above ground between a couple of crew members—you must apply a correction for the amount of sag in the tape. To make this correction, apply a certain amount of tension using a tension scale and/or spring balance (Figure 12-17).

 

Figure 12-17 – The tension scale and spring balance.

The tension scale is graduated in pounds from 0 to 30. It is clipped to the eye at the end of the tape, and the tension is applied until the desired reading appears on the scale. A pair of staffs can be used to make the work easier. Wrap the rawhide thongs around the staff at a convenient height and grip them firmly. Brace the bottom end of the staff against the foot and tuck the upper end under the arm. Apply tension by using the shoulder and leaning against the poles. Use the spring balance in a similar fashion for work of higher precision.

The stool device is called a tapping stool or chaining buck and is used in high precision work. It is a metal three-legged stand with an adjustable sliding head and a hand wheel operating device for locking the plate (the top surface of the sliding head) in any desired position. A line is scribed on the plate. During taping operations, move the head until the scribed line is directly under a particular graduation on the tape; then use the hand wheel to lock the head. When the tape is shifted ahead to measure the next interval, hold the graduation exactly over the line until the next stool is adjusted and locked. The basic purpose of taping stools is to furnish stable, elevated surfaces on which taped distances can be marked accurately. When stools are not available, 2 by 4s or 4 by 4s are often driven into the ground for use as chaining bucks.

The length of a tape varies with the temperature, and the precision of a survey may require you to apply corrections for this. For work of ordinary precision, you can assume that the temperature of the tape is about the same as that of the air. For work requiring higher precision, attach a tape thermometer to the tape. For very precise work, use two thermometers, one positioned at each end. If the two indicate different temperatures, use the mean between them.

5.3.6 Chaining Pin

A chaining pin (also called a taping arrow) is a metal pin about one foot long. It has a circular eye at one end and a point for pushing it into the ground at the other. These pins come in sets of 11 pins, carried on a wire ring passed through the eyes in the pins or in a sheath called a quiver.

Chaining pins can be used for the temporary marking of points in a great variety of situations, but they are used most frequently to keep count of tape increments in the chaining of long distances.

5.3.7 Leveling Rod, Target, and Rod Level

A leveling rod, is a tape supported vertically and is used to measure the vertical distance (difference in elevation) between a line of sight and a required point above or below it. This point may be a permanent elevation (bench mark), or it may be some natural or constructed surface.

There are several types of leveling rods. The most popular of all, the Philadelphia rod, (Figure 12-18), is a graduated wooden rod made of two sections and extendable from 7 to 13 feet.

 

Figure 12-18 – The Philadelphia rod.

Each foot is subdivided into hundredths of a foot. Instead of each hundredth being marked with a line or tick, the distance between alternate ones is painted black on a white background. Thus, the value for each hundredth is the distance between the colors; the top of the black, even values, the bottom of the black, odd values. The tenths are numbered in black, the feet in red. This rod may be used with the level, transit, theodolite, and with the hand level on occasion to measure the difference in elevation.

The instrumentman reads the leveling rod directly by the sighting through the telescope, or it may be target-read. Conditions that hinder direct reading, such as poor visibility, long sights, and sights partially obstructed by, for example, brush or leaves, sometimes necessitate using targets. The target is also used to mark a rod reading when numerous points are set to the same elevation from one instrument setup. Targets for the Philadelphia rod are usually oval, with the long axis at right angles to the rod, and the quadrants of the target painted alternately red and white. The target is held in place on the rod by a C-clamp and a thumbscrew. A lever on the face of the target is used for fine adjustment of the target to the line of sight of the level. The targets have rectangular openings approximately the width of the rod and 0.15 feet high through which you can see the face of the rod. A linear vernier scale is mounted on the edge of the opening with the zero on the horizontal line of the target for reading to thousandths of a foot. When the target is used, the rodman takes the rod reading.

The other types of leveling rods differ from the Philadelphia rod only in details. The Frisco rod, for direct reading only, is available with two or three sliding sections. The Chicago rod is available with three or four sections that, instead of sliding, are joined at the end to each other like a fishing rod. The architect’s or builder’s rod is a two-section rod similar to the Philadelphia but graduated in feet and inches to the nearest one-eighth inch rather than decimally. The upper section of the Lenker self-computing rod has the graduations on a continuous metal belt that can be rotated to set any desired graduation at the level of the height of the instrument (HI). To use the rod, set the rod on the bench mark and bring the graduation that indicates the elevation of the bench mark level with the HI. As long as the level remains at that same setup, wherever you set the rod on a point, you read the elevation of the point directly. In short, the Lenker rod does away with the necessity for computing the elevations. The targets furnished with the metric rod have a vernier that permits reading the scale to the nearest millimeter. The metric rod can be extended from 2.0 to 3.7 meters.

For high-precision leveling, there are precise leveling rods as well as precise engineer’s levels. A Lovar rod is usually T-shaped in cross section and has the scale inscribed on a strip of Lovar metal. A precise rod usually has a tapering, hardened steel base. Some are equipped with thermometers for applying temperature correction. Precise rods generally contain built-in rod levels.

A rod reading is accurate only if the rod is perfectly plumbed. If it is out of plumb, the reading will be greater than the actual vertical distance between the HI and the base of the rod. Therefore, to ensure a truly plumbed leveling rod, use a rod level. There are two types of rod levels generally used with standard leveling rods (Figure 12-19). The one at the left is called the bull’s-eye level, and one on the right is the vial level.

 

Figure 12-19 – Types of rod levels.

Take proper care of leveling rods. The care consists of keeping them clean, free of sand and dirt, unwarped, and readable. Always carry them over the shoulder or under the arm from point to point. Dragging them through the brush or along the ground will wear away or chip the paint. When they are not in use, store the leveling rods in their cases to prevent warping. The cases are generally designed to support the rods either flat or on their sides. Do not lean them against a wall or allow them to remain on damp ground for any extended period, since this can produce a curvature in the rods and result in unpredictable random and systematic errors in leveling.

5.3.8 Stadia Boards

To determine linear distance by stadia, observe a stadia rod or stadia board through a telescope containing stadia hairs, and note the size of the interval intercepted by the hairs. Each tenth of a foot is marked by the point of one of the black, saw-toothed graduations. The interval between the point of a black tooth and the next adjacent white gullet between two black teeth represents 0.05 feet.

5.3.9 Turning-Point Pins and Plates

The point on which a leveling rod is held between a foresight and the next back sight while the instrument is being moved to the next setup is called a turning point. It must be sufficiently stable to maintain the accuracy of the level line. Where neither proper natural features nor man-made construction is available, use a turning-point pin, a turning-point plate, or a wooden stake. These not only furnish the solid footings but also identify the same position for both sightings. Normally, you use the pins or plates for short periods and take them up for future use as soon as you complete the instrument readings. Use wooden stakes for longer periods except when wood is scarce or local regulations require their removal. A turning-point pin (Figure 12-20) is made of a tapered steel spike with a round top with a chain or a ring through the shaft for ease in pulling. Drive the pin into the ground with a sledgehammer. After a turning pin has served its purpose at one point, pull it and carry it to the next turning point.

 

Figure 12-20– The turning-point pin and plate.

Turning-point plates (Figure 12-20) are triangular metal plates with turned-down corners or added spikes that form prongs and have a projection or bump in the center to accept the rod. The plates are used in loose, sandy, or unstable soils. Set the plate by placing it on the ground, points down, and stepping on it to press it to a firm bearing. After using it, lift it; shake it free of dirt and mud, and carry it forward to the next turning point.

5.3.10 Magnifying Glass

A magnifying glass is used mainly to aid the instrumentman in reading graduations that are provided with verniers, such as the horizontal and vertical circle of a transit. Although these graduations can be read with the naked eye, a magnifying glass makes the reading easier and decreases the chance of reading the wrong coincidence.

The transit box typically comes equipped with a 3x and 10x pocket magnifying glass. To avoid unknowingly dropping a magnifying glass in the field, attach it to a loop of string. The instrumentman puts his or her head through the loop, retaining the string around the neck, and carrying the magnifying glass in a pocket. At the end of each day’s work, always return the magnifying glass to its proper place in the instrument case.

5.3.11 Adjusting Pins

Surveying instruments are built to allow minor adjustments in the field without much loss of time while the work is in progress. The adjustments are made by loosening or tightening the capstan screws turned with adjusting pins. These pins are also included   12-36 in the instrument box. They come in various sizes depending upon the type of instrument and the hole sizes of its capstan screws. Use the pin that fits the hole in the capstan head. A pin that is too small, will ruin the head of the screw.

Surveying instrument dealers usually replace these pins free of charge. Like the magnifying glass, adjusting pins should be carried in the pocket and not left in the instrument box while a survey is in progress. This will save a lot of valuable time when you need the pins. Do not use wires, nails, screwdrivers, and the like, as substitutes for adjusting pins.

5.3.12 Tape Repair Kit

Even though you handle the tape properly and carefully during field measurements, some tapes still break under unforeseen circumstances. During chaining operations, when the area is quite far from the base of operations, always be sure to have a tape repair kit with you so that you can rejoin any broken tape in the field, or if you has bring an extra tape, you can take the broken tape back to the office for repair.

The tape repair kit usually contains a pair of small snips, the tape sections of proper size and graduations, a hand punch or bench punch with block, an assortment of small rivets, a pair of tweezers, a small hammer, and a small file. Before reusing a repaired tape, always compare it with an Invar or Lovar tape to check it for accuracy.

Test Your Knowledge

10. Which of the following tools is best suited for driving pipe markers into surfaces?

A. A hatchet
B. A single bit ax
C. A sledgehammer
D. A bull point

11. After you secure the restraining strap, what is the next step in setting up a tripod?

A. Hold one leg close to your body
B. Hold two legs close to your body
C. Spread the legs, 60 degrees apart
D. Spread the legs until they form about a 50-60 degree angle with the horizontal

12. Which of the following tape accessories should be used to hold the tape securely at an intermediate point?

A. Tape clamp handle
B. Tensions scale
C. Taping stool
D. Staff

 

6.0.0 FIELD SUPPLIES

Field supplies are a variety of materials used to mark the locations of points in the field. For example, pencils, field notebooks, and spare handles for sledgehammers are generally classified as field supplies. Every operation site may require different supplies, but your own experience and the aid of your leading petty officer will allow for making a comprehensive list of supplies necessary for a projected survey mission. This section describes the items generally required for a mission.

6.1.0 Survey Point Markers

The material used as a survey point marker depends upon where the point is located and whether the marker is to be temporary, semi permanent, or permanent. For example, a wooden stake can be easily driven to mark the location of a point in a grassy field, but it cannot be used to mark a point on the surface of a concrete highway.

Similarly, though a wooden stake is easy to drive in a grassy field to mark a property line corner, a marker of this kind would not last as long as a piece of pipe or a concrete monument. The following sections describe most of the material commonly used as semi permanent or permanent markers of points in the field. For purely temporary marking, it is often unnecessary to expend any marking materials. For example, a point in ordinary soil is often temporarily marked by a hole made with the point of a plumb bob, a chaining pin, or some other pointed device. In rough chaining of distances, even the mere imprint of a heel in the ground may suffice. A point on a concrete surface may be temporarily marked by an X drawn with keel (lumber crayon), a pencil, or some similar marking device. A large nail serves well as a temporary point in relatively stable ground or compacted materials.

6.1.1 Semi Permanent Markers

Wooden hubs and stakes are extensively used as semi permanent markers of points in the field. The principal distinction between the two is the fact that a hub is usually driven to bring its top flush with, or almost flush with, the ground surface. A hub is used principally to mark the station point for an instrument setup. It is usually made of two by two inch stock and is from five to twelve inches long. The average length is about eight inches. Shorter lengths are used in hard ground, longer lengths in softer ground. A surveyor’s tack, made of galvanized iron or stainless steel with a depression in the center of the head, is driven into the top of the hub to locate the exact point where the instrument is to be plumbed.

Stakes improvised in the field may be cylindrical or any other shape available. However, manufactured stakes are rectangular in cross section because the faces of a stake are often inscribed with data relevant to the point the stake is marking. A stake that marks a bench mark, for instance, is inscribed with the symbol that identifies the bench mark and with the elevation. A stake that marks a station on a traverse is inscribed with the symbol of the particular station, such as 2 + 45.06. A grade stake is inscribed with the number of vertical feet of cut (material to be excavated) or of fill (material to be filled in) required to bring the elevation of the surface to the specified grade elevation.

6.1.2 Permanent Markers

Permanent station markers are used to mark points to be used for a long period of time. Horizontal and vertical control stations are generally marked with permanent markers. These markers could be in the following forms:

All permanent survey station markers should be referenced so they can be replaced if disturbed. Methods of referencing points are discussed later in this training manual.

Surveyor’s tacks, spikes, and nails are often driven into growing trees, bituminous, or other semisolid surfaces as permanent markers. A nail will be more conspicuous if it is driven through a bottle cap, washer, plastic tape, or “shiner”. A shiner is a thin metal disk much like the top or bottom of a frozen fruit juice can. A spad is a nail equipped with a hook for suspending a plumb bob. It is driven into an overhead surface, such as the top of a tunnel. The plumb bob will locate on the floor the point vertically below the point where the spad is driven. Points on concrete or stone surfaces are often marked with an X cut with a hammer and chisel. Another way to do this is to cut holes with a star drill and then plug them with lead.

A much more durable form of marker is made of a length of metal pipe—usually called iron pipe regardless of the actual metal used. Lengths run from about 18 to 24 inches. Sawed-off lengths of pipe have open ends; pipes cut with a shear have pinched ends and are called pinch pipe. There are also manufactured pipe markers, some of which are T-shaped rather than cylindrical in cross section. A commercial marker may be a copper-plated steel rod. All commercial markers have caps or heads that permit center punching for precise point location and stamping of the identifying information.

A still more durable form of marker is the concrete monument. A short length of brass rod is often set in the concrete to mark the exact location of the point. Concrete monuments used as permanent markers by various federal survey agencies have identifying disks set in concrete (Figure 12- 21).

 

Figure 12-21 -Various types of federal marking disks.

Points on concrete or masonry surfaces may be permanently marked by setting lengths of cylindrical brass stock into holes plugged with lead or grout. Brass stock markers set in pavement are commonly called coppers. Manufactured brass disks may be set in grouted holes in street pavements, sidewalks, steps, or the tops of retaining walls. Points on bituminous surfaces maybe marked by driving in pipe, railroad spikes, or case-hardened masonry nails, commonly called PK nails. A center punch for marking a precise location on metal stock or metal caps is a common item of equipment for a surveyor.

6.2.0 Marking Materials

Keel, or lumber crayon, is a thick crayon used for marking stakes or other surfaces. Common marking devices containing quick-drying fluid and a felt tip are also popular for marking stakes. All of these types of graphic marking materials come in various colors. In addition to keel, paint is used to mark pavement surfaces. Paint may be brushed on or sprayed from a spray can. To make the location of a point conspicuous, use a circle, cross, or triangle. Identification symbols, such as station or traverse numbers, may also be painted on. For a neater job, stencils are sometimes used.

6.3.0 Flagging

Colored cloth bunting or plastic tape is often used to make stakes conspicuous so they will be easier to find or to warn Equipment Operators away. Flagging may also be used for identification purposes. For example, traverse stakes may be marked with one color, grade stakes with another. Red, yellow, orange, and white are the most popular colors for flagging.

6.4.0 Note-Keeping Materials

Field notes are usually kept in a bound, standard field notebook. Sometimes loose-leaf notebooks are used but are not generally recommended because of the chance of losing pages. Notebooks are classified as engineer’s or transit field books, level books, cross section books, and so forth, depending on their use.

In a transit book, the left-hand side of the page is used for recording measurement data, and the right-hand side of the page, for remarks, sketches, and other supplementary information. The other field books generally follow the same pattern of usage. A transit or a level book may be used for recording any type of survey. You may add or modify the column headings to suit the required data you desire to record.

6.5.0 Personal Protective and Safety Equipment

In addition to the necessary field supplies and equipment, a field party must carry all necessary items of personal protective equipment, such as containers for drinking water, first-aid kits, gloves, and foul weather gear. A field survey party is usually working a considerable distance away from the main operational base. If, for example, you happen to be chaining through a marsh filled with icy water, you would not have a chance to return to the base to get your rubber boots.

You are required to wear a hard hat whenever you work in a construction area where the assigned personnel are regularly required to wear hard hats. Study all situations in advance, considering both the physical and environmental conditions—doing so may avoid situations dangerous to you and other crewmembers.

 

Test Your Knowledge

15. The type of material to be used for survey point markers depends upon which of the following conditions?

A. The location of the point
B. Whether the point is temporary or permanent
C. The discretion of the engineer officer
D. Both A and B

16. Which of the following types of markers is/are generally used for horizontal and vertical control stations?

A. Iron pipe filled with concrete
B. Bronze disks set in concrete
C. A hole drilled in concrete and filled with lead
D. All of the above

 

Summary

In this lesson, you were presented with information relevant to safe, efficient, and effective methods and applications. Specifically, you learned about survey classification, types of survey operations, standard issue surveying instruments, field equipment, and field supplies. Through clear comprehension of surveying theory and procedures, not only will your work as a surveyor be sought out within the industry, but the quality and precision of your efforts will be second to none.

Review Questions

 1. In surveying, the vertical position of a point is determined in which of the following ways?

A. Measuring directly from a datum
B. Measuring indirectly from a datum
C. Computation from differences in elevation that are measured directly or indirectly from a datum

2. Increasing the areas surveyed with plane surveying methods will have what effect on (a) accuracy and (b) precision?

A. (a) Increase (b) decrease
B. (a) Decrease (b) decrease
C. (a) Decrease (b) increase
D. (a) Increase (b) increase

3. Determining the directions and elevations of a new highway requires what kind of survey?

A. Topographic
B. Construction
C. Route
D. Land

4. Which of the following types of surveys is also known as an engineering survey?

A. Route
B. Construction
C. Topographic
D. Cadastral

5. In surveying practice, which, if any, of the following tasks is considered to be an element of office work?

A. Computing and plotting necessary information
B. Taking measurements
C. Collecting engineering data
D. None of the above

6. In general, which, if any, of the following actions will best predetermine field conditions and allow the selection of methods to be used for a survey?

A. Reviewing topographic maps
B. Site reconnaissance
C. Checking local weather conditions
D. None of the above

7. Which of the following conditions must be considered when determining the size of a field survey party?

A. The availability of equipment
B. The methods that will be used
C. The requirements of the survey
D. All of the above

8. A transit party should consist of at least what three people?

A. Instrumentman, rodman, and note keeper
B. Rodman, head chainman, and note keeper
C. Party chief, head chainman, and instrumentman
D. Instrumentman, head chainman, and note keeper

9. In field notebooks, all lettering should be performed in a freehand Gothic style with which of the following grades of pencil lead?

A. 2H or 3H
B. 3H or 4H
C. 4H or 5H

10. Where in the field notebook should name and location of the project, the types of measurements, and the designation of the survey unit be written?

A. Front cover
B. Inside front cover
C. Right-hand pages

11. Instructions for returning the notebook if it is lost belong in what part of the field notebook?

A. On the front cover
B. Inside the front cover
C. On the right-hand pages

12. In keeping field notes, which of the following procedures is/are mandatory?

A. Notes are never kept on individual scraps of paper for later transcription to notebooks.
B. Erasures are never permitted; incorrect entries are lined-out and correct entries inserted.
C. Rejected pages are neatly crossed-out and referenced to the substituted pages.
D. All of the above

13. In a measured distance that required 200 measurements, the total error was -9 units. For this error to be adjusted, each measurement must be:

A. Increased by 0.045
B. Increased by 0.450
C. Decreased by 0.450
D. Decreased by 0.045

14. A measured distance is 302.12 feet. This measurement contains what total number of significant figures?

A. Five
B. Two
C. Three
D. Four

15. If you round off 92.454 to three significant figures, what is the resulting number?

A. 92.4
B. 92.5
C. 92.40
D. 92.50

16. When drawing a property map, you should include which of the following items?

A. The length and direction of each boundary line
B. Reference points referred from an established coordinate system
C. Names of important details, such as roads, streams, and landmarks.
D. All of the above

17. In an orientation symbol, a full-head arrow represents what direction or orientation information, if any?

A. Magnetic meridian
B. True meridian
C. Magnetic declination
D. None

18. Which of the following factors will influence the orientation of a map drawn on standard size drawing paper?

A. The shape of the mapped area
B. The size of the mapped area
C. The scale of the map
D. The purpose of the map

19. A map that should be used for making a model of an 18-hole golf course is known as what type?

A. Geographic
B. Planimetric
C. Topographic

20. An ordinary road map of the state of Florida is an example of what type of map?

A. Geographic
B. Planimetric
C. Topographic

21. A naval station base map that shows only the layout of buildings and roads is what type of map?

A. Geographic
B. Planimetric
C. Topographic

22. For a one minute theodolite, which of the following actions occur when the circle clamp is in the lever-down position?

A. The circle is clamped and turns with the telescope.
B. The circle is clamped and the telescope turns independently.
C. The circle is unclamped and the telescope turns independently.
D. The circle is unclamped and turns with the telescope.

23. The lower half of the vertical line on the reticle of a theodolite is split for what purpose?

A. To center triangular-shaped distant objects
B. To determine the width of distant objects
C. To center small distant objects
D. To determine the height of distant objects

24. What are the values read from the vertical circle of a theodolite called?

A. Vertical angles
B. Direct angles
C. Zenith distances
D. Direct distances

25. What part of a one second theodolite is used to select whether the angle being read is a vertical or horizontal angle?

A. Circle tangent screw
B. Inverter knob (circle-selector)
C. Circle setting knob
D. Circular level

26. The difference between two diametrically opposite members on the circle of a one second theodolite as viewed through the circle reading microscope is equal to plus or minus how many degrees?

A. 90
B. 180
C. 270
D. 360

27. The bubble of a level vial on the surveying instrument may become increasingly difficult to center because of what factor?

A. Temperature
B. Vial age
C. Humidity
D. Vial sensitivity

28. On a tilting level, which of the following screws is used to bring the bubble to the exact center?

A. Tangent
B. Micrometer
C. Leveling
D. Centering

29. The purpose of the compensator in a self-leveling level is to compensate for which of the following factors?

A. Misalignment of the vertical hair only
B. Misalignment of the horizontal hair only
C. Misalignment of both the vertical and horizontal hairs
D. A slight out-of-level of the telescope

30. Which of the following tools should you use when cleaning away small saplings and vines?

A. Chain saw
B. Brush hook
C. Coping saw
D. Bull point

31. Which of the following tools should you use to lift a manhole cover?

A. A long-handled shovel
B. A crowbar
C. A long-bladed screwdriver
D. A machete

32. Which, if any, of the following devices is used to locate buried metal markers?

A. Dip needle
B. Mine detector
C. Probing steel
D. None of the above

33. Which of the following tapes should be used for the high-precision measurement of a base line that is in the vicinity of a high-voltage circuit?

A. Metallic
B. Nonmetallic
C. Steel
D. Invar

34. To run a traverse in steep terrain on a windy day, which of the following tripods should you use to support the transit?

A. Stilt-leg
B. Wide-frame rigid
C. Wide-frame jack-leg
D. Jack-leg

35. The effectiveness of the plumb bob, cord, and target set as a precision instrument will be post impaired by what condition?

A. Faded paint on the target
B. Dust on any part of the set
C. A damaged or bent tip on the plumb bob
D. A worn leather sheath

36. In high-precision measurement, which of the following tape accessories should be used to mark accurately the distance indicated by the tape graduation?

A. Tension scale
B. Taping stool
C. Staff
D. Tape thermometer

37. When target reading is being performed, what survey party member reads the rod?

A. Chainman
B. Instrumentman
C. Flagman
D. Rodman

38. During leveling operations, in which of the following soil conditions should you use a turning point plate?

A. Sandy or muddy soil
B. Compacted gravel
C. Ordinary stable soils
D. Rocky pasture land

*******************************

Chapter 13 Direct Linear Measurements and Field Survey Safety

This lesson covers the various duties, techniques, and skills a chaining crew member must learn to perform chaining operations safely, efficiently, and effectively. It also covers some of the devices used in chaining itself. Because methods of measuring horizontal differences with a tape, chain, and/or electronic measuring instruments are critical to successful chain crew procedures, this lesson will also discuss direct linear measurements. As a crew member, you should be concerned not only about the task at hand but also about potential hazards to which you may be exposed in the field. Always recognize precautions and safety measures applicable to the survey field crew. This lesson covers precautions, safety measures, and additional duties the crew normally performs.

When you have completed this lesson, you will be prepared to:

1. State the duties and responsibilities of a chaining crew member.
2. Describe the different methods of conducting direct linear measurements.
3. State the safety precautions pertaining to the field party.
4. Describe the additional duties of a survey crew.

Contents

1.0.0 Duties of a Chaining Crew Member

2.0.0 Methods of Direct Linear Measurements

3.0.0 Field Party Safety

4.0.0 Additional Duties of a Survey Crew

 

 

1.0.0 DUTIES of a CHAINING CREW MEMBER

Chaining operations include more than the specific task of chaining. Several other tasks are undertaken as part of the process. In some cases, these duties can be modified or tailored contingent upon the job, terrain features, and other conditions that may affect the speed and accuracy of the operation.

1.1.0 Giving Hand and Voice Signals

During fieldwork, communication is essential. Sometimes you may be close enough to use voice communication; but more often, hand signals will be necessary. Use standard voice signals instead of shouting to avoid misunderstanding. Use hand signals when circumstances require. There are standard hand signals (Figure 13-1), but any set of signals mutually agreed upon and understood by all members of the party can be used.

 

Figure 13-1 – A surveyor’s hand signals. 

Always face the person you are signalling. If it is difficult to see the other person, hold white flagging when giving signals. When signals are given over snow-covered areas, red or orange flagging is more appropriate.

Standard hand signals include:

 

Figure 13-2 – Hand signals for numerals.

o One- Right arm extended diagonally down to the right from the body

o Two- Right arm extended straight out from the body

o Three- Right arm extended diagonally up and out from the right shoulder

o Four- Left arm extended diagonally up and out from the left shoulder

o Five- Left arm extended straight out from the body

o Six- Left arm extended diagonally down to the left from the body

o Seven- Both arms extended diagonally down and out from the body

o Eight- both arms extended strait out from the body

o Nine- Both arms extended diagonally up and out from the body

o Zero- Hitting the top of the head with an up and down motion of the palm

Indicate a decimal point using a signal that is easily distinguishable from the other signals. Ensure that you can see both the left and right side of your signalman for numeral signals one through six. Use numeral signals only when it is absolutely necessary. Numeral signals are often misinterpreted, which results in mistakes. Always use hand signals consistently, and ensure that all survey team members are completely familiar with them.

1.2.0 Clearing the Line

A crew must clear a line ahead when chaining (or taping) across brush-covered country. Before you start to swing, make sure that no one is within range. You may cut ordinary scrub growth in unsettled areas more or less as needed. If, however, you encounter large trees or shrubs that may be of value, consult your party chief for advice. Even though a tree or shrub lies directly on the chaining line, it is never absolutely necessary to cut it down. If preserving the tree or shrub is desirable, you can always triangulate around it or bypass it by some other method, as described later in this lesson. The principle technical problem in clearing the line is keeping on the line. When possible, this is accomplished with natural foresights, that is, bearings taken on natural or artificial objects lying ahead. If there is no distinctive object lying on the line of bearing ahead, keep the line by blazing ahead. Set up the compass and sight ahead on a tree lying as far ahead as possible. Blaze that tree (using red or white flagging as a marker is also an acceptable method for marking), then clear a line toward the tree. If growth is too high and thick for a sight to be made, work ahead by looking back and aligning on a couple of markers on the line already covered.

1.3.0 Giving Backsights and Foresights

To run a line by instrument from a point of known location to point B, for example, and given a distance and direction ahead, the instrumentman usually proceeds with the following:

  1. Setting up the instrument (usually a transit) over point A
  2. Training the telescope on the given direction of the line to B
  3. Sighting through the telescope to keep the chainmen on the line for as many consecutive foresights as can be observed from that particular instrument set up

If the chainmen are using a 100-foot tape, and have trained the instrument along the line of direction, the head chainman walks away with the zero-foot end of the tape, while the rear chainman holds the 100-foot end on the point plumbed by the instrument. After the head chaiman has walked out the whole 100 feet, a plumb bob is dropped on a cord from the zero-foot mark to the ground. The instrumentman sights along the line and thus determines the direction in which the head chainman must move to bring the plumb bomb onto the line. The “move right” or “move left” signal is given if needed. When the head chainman has been brought by signal to the vicinity of the line, the instrumentman signals for the final placement of the plumb bob by calling out, “To you!” (Meaning “Move the plumb bob toward yourself!”) or “Away!” (Meaning, “Move the plumb bob away from yourself!”). When the plumb bob is exactly on the line, the instrument man calls out, “Good!” or “All right!” The head chainman then marks the point indicated by the plumb bob in the correct manner. The first 100 feet is then considered measured on the given line of direction.  13-9 If the distance to be measured is long, the chainmen will eventually proceed beyond the scope of the instrument as it is then set up. The instrumentman must shift the instrument ahead to the last point marked by the head chainman. When the instrument has been set up over this point, the instrumentman must reorient the telescope to the line of direction. To do this, he or she usually plunges the telescope (rotates it vertically) and backlights on a point on the line already laid off. In taking backlights, the instrumentman is guided by the rear chainman who holds on, or plumbs over, the point. When the telescope has been trained on the backsight point, it is again plunged. The telescope is trained in the desired direction.

1.3.1 Holding on a Point

If the chainman can site the point on the ground through the telescope, he or she may simply hold on the point; that is, hold a pencil point, chaining pin point, plumb bob point, or some other appropriate indicator on the point (Figure 13-3).

 

Figure 13-3 – Short sight indicators.

Whatever the indicator may be, it is essential to hold it in an exactly vertical position. For short sights, it is also essential that the shaft of the indicator be relatively slender so that the vertical cross hair can be aligned with sufficient exactness.

1.3.2 Plumbing over a Point

If intervening low growth or some other circumstance makes sighting the point on the ground impossible for the instrumentman, the chainman must plumb over the point, using the plumb bob and cord. If the distance is too far for observation of the plumb bob cord, the cord should be equipped with a plumb bob target, or you may use a range pole. In the absence of a target when using the plumb bob, you may tie a piece of colored flagging to the cord or use a handkerchief (Figure 13-4). 

 

Figure 13-4 – Target substitution. 

Some chainmen prefer to hold the plumb bob and cord with the cord running over the forefinger. Others prefer to run the cord over their thumb. If you are plumbing high (that is, required to hold the cord at chest level or above), learn to brace your holding arm with your other arm, and against your body or head or both, to avoid unsteadiness and fatigue. When there is wind, you may find it difficult to hold the plumb bob suspended over a point. It will tend to swing back and forth. You can overcome this problem by bouncing the point of the plumb bob slightly up and down on the point. For a long sight, it is much better to plumb over a point with a range pole. For a short sight, however, the shaft of a range pole is too thick to permit exact alignment of the vertical cross hair. For long sights, or for sights on a point that is to be sighted repeatedly, constructing a semi-permanent target is often desirable. There are no definite rules for constructing targets because they are typically built from materials at hand. Use your ingenuity to ensure that the target is high enough to be seen, strong enough to withstand prevailing winds, and is plumbed over a point (Figure 13-5).

 

Figure 13-5 – Semi-permanent targets.

1.4.0 Marking Control Points, Reference Points, and Monuments

In general, control surveys deal with established points. To define these points, surveyors have to mark them. Certain points are made permanent, and others are temporary. A long term line, for example, may be marked at each end with a bronze disk set in concrete, or with a center-punched metal rod driven flush with the ground. For less permanent control points, wooden stakes or hubs with nails, shiners, and floggings are typically used.

1.4.1 Placing Driven Markers

Always set a driven marker exactly vertically on the point it is supposed to mark. If you drive it on a slant, the top of the marker will not define the correct location of the point. To drive the marker vertically, first align it vertically; then, using a sledgehammer or other type of driving implement, strike each blow squarely on the flat end of the hub or stake. You will normally drive a wooden hub to mark the exact horizontal location of a point, usually for the purpose of plumbing an instrument over the point. Consequently, the top of a hub (or other markers used for the same purpose) will not normally need to extend much above the ground line. Mark the precise location of the point is marked by a hub tack, punch mark, or other precise marker driven or set in the top of the hub. For work on asphalt roads or runways, you’ll find it easier to use flagging or a soda pop top and a nail as a marker; in concrete and other hard surfaces, you can use orange paint or a star-drilled hole plugged with lead. The choice of markers depends on the surveyor’s judgment as well as the purpose of the survey. In frozen or otherwise extra hard ground, use a bull-point to start a hole for a stake or hub. Remember that the stake or hub will   13-11 follow the line of the opening made by the bull-point. Therefore, if the bull-point is not driven vertically, the stake or hub will not be vertical either.

1.4.2 Placing Monuments

In surveying, a monument is a permanent object or structure used where a point or station must be retained indefinitely for future reference. It may simply consist of a conspicuous point carved on an outcrop of a ledge rock or it may be constructed in concrete (Figure 13-6).

 

Figure 13-6 – Common types of survey monuments.

The top of the monument should have an area large enough to include the required point and any necessary reference data. The depth of the monument should be sufficient to extend below the frost line. If the depth of the frost line is unknown, a minimum depth of three feet is generally accepted. Other factors, such as soil condition and stability of foundation, may also affect the depth of the monuments. Check the area for soil stability to provide an adequate foundation. A monument settles in the same manner as any other structure if it does not have an adequate foundation. Mark the exact location of the point on a monument by chiseling an “X” on the surface or by drilling a hole with a star drill and hammering in a lead filler or grouting in a length of brass stock (often called a copper). When grouting a copper, use neat cement grout because a fluid grout would flow into and fill the small space around the copper. If the point can be placed at the same time as the casting of the monument, the copper can be pushed down into the surface of the monument before the concrete begins to harden. If you are near an armory, you may be able to obtain large, expended brass shell casings. The primer end of a shell casing makes an excellent survey point marker when it is embedded in a concrete monument. With a little imagination and ingenuity, you can easily design and construct adequate survey monuments.

1.4.3 Identifying Points

Mark a point with identification information and any additional relevant data. You can make temporary identification marks with keel and more permanent ones with paint. An even more permanent mark consists of a metal plate set in concrete. Mark a point that indicates a traverse station with the symbol or number of the station, such as “STA. B” or “STA. 21”. Mark a point on a stationed traverse with the particular station, such as 2 +   13-12 87.08. Frequently, a point will serve as a traverse station and a bench mark. A bench mark is marked with an identifying symbol and usually the elevation. In marking such an elevation, do not use a decimal point, as in 317.22 feet. Instead, raise the figures that indicate the fractional part and underline them.

1.4.4 Referencing Points

Tie in or reference all control points. Record the ties or reference points in the field book as you establish them in the field. The record may be made by sketch, work description, or the combination of the sketch and notes. You must reference the control point to some permanent type of object in its vicinity; if no such objects exist, drive reference hubs at points where they are unlikely to be disturbed. These ties are important in recovering control points that have been covered or otherwise hidden or in reestablishing them accurately if they have been removed. Record the reference location of a particular point on the remarks page of the field book (Figure 13-7 and 13-8).

 

 Figure 13-7 – Natural and manmade reference points.

 

Figure 13-8 – Accurate methods for tying points.

 

For a permanent control point, such as a triangulation point, monument, or bench mark, prepare a complete station description individually for each station. The field offices of the National Oceanic and Atmospheric Administration or the National Geological Survey have these station descriptions on separate cards. They do this so they can easily run a copy for anyone requesting a description of a particular station. They also maintain a vicinity map on which these points are plotted, and these station descriptions are used in conjunction with this map. The Navy’s public works offices also maintain descriptions of stations within their naval reservation and its vicinity for immediate reference. Referencing points are ideal for recovering points that have been covered or otherwise hidden and reestablishing points accurately. As you gain more experience, you may be assigned the task of writing a station description. When writing a station description, be sure to describe the location in detail, and make a sketch showing the location, ties, as well as magnetic or true meridian. Make your description concise and clear, and be sure to test its effectiveness by letting another engineering tech (preferably not a member of the survey party that established the point) interpret your description. From the feedback of the interpretation, you can determine the accuracy of your written description. Your description, for example, should be written as follows (Figure 13-8): “Point A—plugged G.I. pipe 65.21 ft SE of NE corner of PWC Admin. Bldg. (Bldg. 208) and 81.42 ft from the SE corner of same building. It is 18.18 ft W of the center of a circular manhole cover located in Saratoga Street.”

1.4.5 Protecting Markers

Protect markers from physical disturbance by erecting a temporary fence (or barricade) around them. Sometimes guard stakes embellished with colored flaggings are simply driven near the hub or similar marker to serve as deterrence against machinery or heavy equipment traffic. Protect permanent markers with fixed barricades, such as steel or concrete casing.

 

Test Your Knowledge

1. What actions should the rodman take in response to a boost-the-rod signal?

A. Raise the rod and hold it at a specified distance above the ground
B. Turn the rod upside down
C. Raise the rod slowly until the instrumentman has read the whole-foot mark
D. Move the top of the rod in a short arc towards the instrument

2. What term is used to describe consecutive sights taken through a telescope for the purpose of keeping chainmen on line?

A. Running line
B. Bench mark
C. Foresight
D. Backsight

3. When an important station is marked with a hub, measurements are made to one or more other points and recorded in a field notebook to assure what information?

A. The hub can be relocated if plowed up and displaced.
B. The hub location is precisely determined.
C. The reference points are located accurately.
D. The elevation of the hub can be determined.

 

2.0.0 METHODS of DIRECT LINEAR MEASUREMENTS

One of the most fundamental surveying operations is the measurement of horizontal distance between two points on the surface of the earth. Generally, there are two basic methods used: direct and indirect. Direct linear measurements, as explained earlier in this lesson, are methods used for determining horizontal distances with a tape (or chain) and/or with an electronic distance-measuring instrument. Indirect methods to take measurements use the transit and stadia or the theodolite and stadia. This section will discuss the common methods of direct linear measurements.

2.1.0 Chaining (Taping)

The most common method used in determining or laying off linear measurements for construction surveys, triangulation base lines, and traverse distances is called chaining. The name is carried over from the early days when surveyors used the Gunter’s chain and the engineer’s chain. Today, it is more appropriate to call this operation taping because the steel tape has replaced the chain as the surveyor’s measuring device. This manual, however, will use chaining and taping interchangeably.

2.1.1 Identifying Duties of Chaining Party Members

The smallest chaining party could consist of only two people—one at each end of the tape. To lay off a line to a desired distance, one person holds the zero end of the tape and advances in the direction of the distant point, while the other holds a whole number of the tape at the starting point. The person ahead, holding the zero end, is the head chainman; the other person is the rear chainman. In ordinary chaining operations, if the distance being measured is greater than a tape length, it is necessary to mark the terminal point with a range pole. In this way, the rear chainman can keep the head chainman aligned at all times whenever a full tape length or a portion of it is transferred to the ground. The head chainman also acts as the recorder, and the rear chainman is responsible for keeping the tape in alignment. If more speed or precision in taping is required, additional personnel are assigned to the party. This relieves the chainmen of some of their duties and permits them to concentrate primarily on the measurement. For more precise chaining, a three-man party is essential. In addition to the head and rear chainmen, a stretcherman is part of a three-man party. The duties of the stretcherman are to apply and maintain the correct tension on the tape while the chainmen do the measuring. The head chainman still acts as the recorder and reads and records the temperature of the tape. Either of the two chaining parties described may have additional personnel assigned as follows:

2.1.2 Coiling and Throwing a Steel Tape

Tapes generally come equipped with a reel; however, it is not always necessary to replace a steel tape on the reel at the end of each work period. A tape can be easily coiled and thrown into a circular roll. Grasp the 100 foot graduation on the tape face with your left hand. Using your right hand, take in five feet of tape at a time. Place the 95 foot mark over the 100 foot mark, next the 90 foot mark over the 95 foot mark—holding these five-foot marks firmly with the left hand so that the tape will not turn over. Continue this operation for the entire length of the tape, placing each five-foot division over the preceding one until reaching the zero graduation (Actually, you can start at either end of the tape, whichever is convenient.) As you are taking in the tape, you will notice that the coils fall into a figure eight shape. When coiling is complete, square up the tape ribbons. The leather thong at the 100 foot end should be on the underside of the coil next to your hand. Wrap the thong around the complete coil. Continue wrapping until there is just enough of the thong left to insert it through the coil at about the 50 foot graduation. Draw the thong firmly back against the completed windings of the thong. You can throw the tape into a more compact circular roll by giving the figure eight a twist, (Figure 13-9).

 

Figure 13-9 – Throwing the tape into a circular roll.

 Now, tie the tape with the remaining thong.  To use the tape again, reverse the process. Be sure to let the tape out from the zero end in the same way that it was wound. Walk away from the end of the tape as you unwind it to prevent kinks.

2.1.3 Chaining on Level Ground

When taping distances on a relatively level surface and of the third or lower order accuracy, laying the tape on smooth ground or paved road or supporting its ends by taping stools/stakes is appropriate. In horizontal chaining, hold the tape horizontally, and project the positions of the pertinent graduations to the ground by a plumb bob and cord. For ordinary chaining on level ground, you will generally use the following procedures:

1. Set a range pole on line slightly behind the point toward which the taping will proceed. The rear chainman, with one chaining pin, is stationed at the starting point of the line to be measured.

2. The head chainman, holding the zero end of the tape and with 10 pins in hand, then moves forward, toward the distant point while using the range pole as a guide. Assuming that the tape was already off the reel when they started, the rear chainman watches the tail end (the 100-foot mark) of the tape as the head chainman moves forward.

3. When the rear chainman sees that the tail end is about to reach position, he or she uses the verbal cue, “Chain!” to solicit the head chainman to stop and look back. The rear chainman holds the 100 foot mark at the starting point and checks the alignment; then signals the way the head chainman should move to bring the chaining pin in line. While doing this, they are both in a kneeling position, the rear chainman facing the distant point, and the head chainman to one side facing the line so that the rear chainman has a clear view of the range pole. The head chainman, while stretching the tape with one hand, sets the pin vertically on line a short distance past the zero mark with the other hand. Then by pulling the tape taut and making sure that the tape is straight, the head chainman brings it in contact with the pin, while the rear chainman, watching carefully for the 100 foot mark to be exactly on the point calls, “All right‘’. At this point, the head chainman relocates the pin to exactly the zero mark of the tape and places it sloping away from the line. The head chainman pulls on the tape again to make sure that the zero mark really matches the point where the pin is stuck in the ground and calls “All right” or “Stuck”. This is a signal to the rear chainman to release the tape so he can continue forward for the next measurement. The chainmen repeat this process until the entire distance is measured. 4. As the rear chainman moves forward, the pin is pulled from the point. Thus, there is always one pin stuck in the ground, and the number of pins in possession indicates the number of 100 foot (stations) tape lengths they have measured from the starting point to the pin in the ground. Every time the head chainman runs out of pins, the rear chainman comes forward, and both of them count the pins in the rear chainman’s possession. There should be 10 pins.

 2.1.3.1 Supporting the Tape

When a full tape length is measured, two chainmen support the ends. The tape may be laid on a level ground surface, such as a paved road or railroad rail, or suspended between stools or bucks set under the ends of the tape. For precise measurement, such as a base line measurement, the tape is supported at midpoint or even at quarter points by bucks or stakes. In horizontal taping over sloping or irregular terrain, one end of the tape is held on the point at ground level, while the other end is supported high enough to make the tape horizontal. The rear chainman holds a full graduation of the tape at the point near the ground, and the head chainman, holding the zero end, projects the desired distance to the point on the ground by using the plumb bob (Figure 13-10). 

 

Figure 13-10 – Horizontal taping on a slope.

 2.1.3.2 Aligning the Tape

Any misalignment of the tape, either horizontally or vertically, will result in an error in the measurement. Misalignment always results in a recorded distance that is too long, or a laid offline that is too short. This is obvious, since the shortest distance between two points is a straight line. Keep the tape straight and level at all times.

2.1.3.3 Applying Tension

A tape supported or held only at the ends will hang in the shape of a curve, called a catenary. Depending on the tension or pull applied at the ends, this catenary will become shallower or deeper, and the distance between the supported ends will vary considerably. To standardize this distance, apply a recommended “standard” tension when you are measuring. Attach a spring balance or tension handle to one end of the tape and measure the correct standard tension. The amount of standard tension is discussed later under “Making Tape Corrections”. Maintaining a constant tension for any length of time by a hand pull is uncomfortable and can be erratic. For easier chaining, each chainman uses a pole or rod from one half inch to two inches in diameter, and about six feet long. The leather thong attached to the tension handle is wrapped around the pole at the proper height. The chainman braces the bottom end of the pole against the outside of his or her foot and applies tension by bracing his or her shoulder against the pole and shifting his or her body weight until the correct tension reads on the scale. This position can be held steadily and comfortably for a comparatively long time. Measuring distances less than a full tape length requires the clamp handle (or “scissors clamp”), which is attached to the tape at some convenient point along its length. The handle permits a firm hold on the tape and furnishes a convenient attachment for a spring balance. When properly used, the handle will prevent the tape from kinking.

2.1.3.4 Reading the Tape

A chain tape may be either a plus (or add) tape, or a minus (or subtract) tape. On a plus tape, the end foot, graduated in subdivisions, is an extra foot, lying outside the zero foot mark on the tape and graduated away from the zero foot mark. On a minus tape, the end foot, graduated in subdivisions, is the foot lying between the zero foot mark and one foot mark and graduated away from the zero foot mark and toward the one foot mark. This difference is significant for measuring a distance of less than a full tape length. Suppose that you are measuring the distance between point A and point B with a 100 foot tape, and the distance is less than 100 feet. Suppose that you are the head chainman. To start, you and the rear chainman are both at point A. You walk away from point A with the zero-foot end of the tape. Because this is a plus tape, the tape has an extra foot beyond the zero-foot end, and this foot is subdivided into hundredths of a foot, reading from the zero. You set the zero on point B, or plumb it over point B then call out, “Take a foot”. The rear chainman then pulls back the first even foot graduation between A and B to point A, or plumbs it over point A. As an example, if this is a 34 foot graduation, the rear chainman will call out “thirty-four”. Now read the subdivided end foot graduation that is on or over point B. Let’s say it is the 0.82 foot graduation. You call out, “Point eight two‘’. The rear chainman rechecks the even-foot graduation on point A and calls out, “Thirtyfour point eight two”. As you can see, your subdivided foot reading is added to his even foot reading; hence, the expression “plus” tape. Suppose now that you are measuring the same distance between the same points, but using a “minus” tape, that is, a tape on which the subdivided end foot lies between the zero-foot and one foot graduations. This time when you walk away with the zero-foot end, you set the one foot graduation on point B and call out, “take a foot”. The rear chainman then hauls back the first even-foot graduation between A and B to point A but this time on the 35 foot graduation so the rear chainman calls out, “thirty-five”, which is your cue to read the subdivided foot graduation on point B. This time it is the 0.18 foot graduation, so you call out, “Minus point one eight”. The rear chainman mentally subtracts the 0.18 foot from 35.00 feet and calls out, “Thirty-four point eight two”. When you are also acting as the recorder, be sure to recheck the subtraction before you record the distance in the field notebook.

2.1.3.5 Giving a Line

 The range pole is set on line slightly behind the point toward which the taping will proceed. Line may be given (that is, the person with the range pole may be guided or signaled onto the line) by “eyeball” (that is, by eye-observation alignment by the rear chainman or someone else at the point from which chaining is proceeding) or by instrument.

2.1.4 Slope Chaining

The methods used in slope chaining are similar to those used in chaining on level ground, though there are some minor differences. In slope chaining, the tape is held along the slope of the ground, the slope distance is measured, and the slope distance is converted, by computation, to horizontal distance. The slope angle is usually measured with an Abney hand level and clinometer; however, for precise measurement, it is measured with a transit. In using the clinometer, take the slope angle along a line parallel to the slope of the ground or along the tape that is held taut and parallel to the slope of the ground. To use the clinometer, sight on an object that is usually a point on a pole approximately equal to your Height of Instrument (HI); that is, the vertical distance from the ground to the center (horizontal axis) of the sight tube. While sighting the object, rotate the level tube about the axis of vertical arc until the cross hairs bisect the bubble as you look through the eyepiece. Then, read either the slope angle or percentage on the vertical arc and record it along with the slope distance measurement. Compute the horizontal distance, or in other words, apply the tape correction. If you are marking the station points, apply the corrections to the slope distances as the chaining progresses. Compute these corrections mentally, by calculator, or by using a table. If the ground slope is fairly uniform, and if the tape corrections do not exceed one foot, a plus 100 foot tape is very useful to establish these station points. The head chainman determines the slope correction first, and then lays off the true slope distance that gives a horizontal distance of 100 feet. If the slope is less than two percent, no slope correction is required. Slope corrections are discussed later in this lesson.

2.1.5 Horizontal Chaining

In horizontal chaining, the tape is supported only at its ends and held in a horizontal position. Plumb bobs are used to project the end graduations of the tape (or, for a less-than-tape length measurement, an end and an intermediate graduation) to the ground. Be very careful when you use the plumb bob both in exerting a steady pull on the tape and in determining when the tape is horizontal. 3lumbing Plumbing is complete when the tape is in horizontal alignment and under the proper tension. The rear chainman holds a plumb bob cord at the proper graduation of the tape, and the point of the plumb bob about one-eighth of an inch above the marker from which the measurement is being made. When the plumb bob is directly over the marker, the rear chainman calls, “mark”. The head chainman holds a plumb bob cord at the correct graduation of the tape with the point of the plumb bob about one inch above the ground. He or she allows the plumb bob to come to rest; sees that the tape is horizontal; checks its alignment and tension; and when the rear chainman calls, allows the plumb bob to fall and stick in the ground. This spot is then marked with a chaining pin. At times, in rough country, a small area around the point may require clearing for dropping the plumb bob. Because the clearing is usually done by kicking away small growth, this type of clearing is commonly called a kickout. To determine the approximate location of the kickout, the head chainman may call, “line for kickout” and then “distance for kickout”. At “Line for kickout”, the rear chainman or instrumentman gives the approximate line by eyeball. At “distance for kickout”, the rear chainman holds approximately over the starting point without being too particular about plumbing.

2.1.5.2 Leveling the Tape To make the tape level when two chainmen are making a horizontal measurement on a slope, the person at the lower level is holding the end at chest level while the person at the higher level is holding it at knee level (Figure 13-11). To maintain the tape in a horizontal position, the chainman at the lower level holds the hand level. By studying the position of the other chainman, he or she decides that it would be possible to hold the tape at chest level. The chainman at the lower level then holds the hand level at about the height of his or her own chest level and trains it on the other chainman. It indicates that a level line from his or her own chest level intersects the person of the other chainman at that person’s knee level, and so calls out, “at your knee” thus informing the other chainman where to hold the end of the tape.  13-20 Figure 13-11 – Horizontal chaining using plumb bobs.

2.1.5.3 Breaking Tape The term breaking tape is used to describe the procedure for directly measuring horizontal distance on sloping ground, or through obstacles that do not permit the use of a full tape length. The procedure used in breaking tape is the same as ordinary chaining on level ground, except that the distances are measured by using portions of a tape (Figure 13-12). Figure 13-12 – Measuring horizontal distances by the “breaking tape” method. Generally, you will start breaking tape when the slope of the existing ground exceeds five percent (this depends also on the height of the chainmen). The reason for breaking tape is that the chainman on the lower ground will have difficulty holding the tape steady and horizontal when that chainman’s point of support exceeds his or her height. You also break tape to avoid hazardous measurements, such as crossing power lines and making measurements across a heavily traveled highway. To measure the horizontal distance by the “breaking tape” method, the chainmen may proceed as follows: 1. The rear chainman stations at point A. 2. The head chainman pulls the tape forward a full tape length uphill toward point B and drops it approximately on line with the two range poles.  13-21 3. He or she then comes back along the tape until reaching a point at which a partial tape length, held level, is below the armpits of the rear chainman at point A. 4. At this point, the head chainman selects a convenient whole-foot graduation, and the chainmen measure off the partial tape length (distance Aa) from starting point. 5. Then, the head chainman calls out, “holding sixty”, so that the rear chainman knows what graduation is held when the measurement is made. As in other chaining methods, the rear chainman always checks the alignment. After the pin is placed, the rear chainman (leaving the tape lying in position) moves forward to point “a” and gives a pin to the head chainman who, in turn, moves to point b. To make sure that the rear chainman takes the right graduation, the head chainman calls out, “hold sixty”. This procedure is repeated until a full station is measured or until a full-tape length measurement is possible. To measure distance “bc”, both chainmen will probably use plumb bobs to transfer the distance to the ground. Remember that the rear chainman gives the head chainman a pin only at each intermediate point of a tape length. He keeps the pin at full tape lengths to keep track of the number of stations laid out as in ordinary horizontal chaining.

2.1.5.4 Laying Off a Given Distance Frequently, a chaining party is required to lay off a given distance and establish a new point on the ground. This is measuring by using a known distance on the tape and transferring it to the ground. If the distance is greater than a tape length, then the procedure described for measuring a full tape length is followed for the required number of full tape lengths. The remaining partial tape length is then laid off by setting the rear chainman’s plumb bob at the appropriate tape graduation.

2.1.6 Making Tape Corrections

A 100 foot tape should, in theory, indicate exactly 100.00 feet when it is in fact measuring 100.00 feet. However, a tape supported only at the ends has a sag in it, so when it indicates 100.00 feet, the actual distance measured is less. Even a tape supported throughout on a flat surface can be slightly longer under tension than it is without tension. Also, a tape will be longer when it is warm than when it is cold.

2.1.6.1 Calibrating a Tape

All tapes are graduated under controlled conditions of temperature and tension. When the tapes are taken to the field, these conditions change. The tape, regardless of the material used to make it, will be either too short or too long. For low accuracy surveys, the amount of error is too small to be considered. As accuracy requirements increase, however, variations caused by the temperature and sag must be computed and used to correct the measured distance. In the higher orders of accuracy, the original graduation is checked for accuracy or calibrated at intervals against a standard distance. This standard is usually two points, a tape length apart, that have been set and marked using a more precise tape or a tape already checked. The standard may be just the precise or checked tape (known as the king or master tape). This tape is kept in a safe location and is not used for making field measurements, but only to check the accuracy of the field tapes. For the highest orders of accuracy, the tapes are sent to the National Bureau of Standards, U.S. Department of Commerce, Washington, DC, 20234, for standardization under exact conditions of tension, temperature, and points of support. A tape standardization certificate is issued for each tape, showing the amount of error under the different support conditions and the coefficient of expansion. The certificate (or a copy) is kept with each tape. For field operations, the tapes are combined in sets; one is selected as the king tape, while the others are used as field tapes. The standard tension for a tape supported throughout is 10 pounds, and the standard temperature is 68 degrees Fahrenheit. Standard length is, simply, the nominal length of the tape. A 100 foot tape, for example, at a temperature of 68°F, supported throughout, and subject to a tension of 10 pounds, should indicate 100 feet when it is measuring exactly 100 feet. To calibrate a 100 foot tape means to determine the exact distance it is actually measuring when it indicates 100 feet, while being supported throughout, at a temperature of 68°F and under a tension of 10 pounds. In addition to the National Bureau of Standards, many state and municipal authorities provide standardizing service.

2.1.6.2 Recognizing Tape or Standard Error

Suppose now that you send a 100 foot tape to the Bureau of Standards to be calibrated; the bureau will return a certificate with the tape. Assume that the certificate states that when the tape, supported throughout at a temperature of 68°F, and under a tension of 10 pounds, indicates 100 feet, it actually measures 100.003 feet on the standard tape. The tape, then, has a standard error (also called tape error) of 0.003 feet for every 100 feet it measures. This tape “reads short.” Depending on the order of precision of the survey, you may have to apply this as a correction to measurements made with this particular tape.

2.1.6.3 Correcting for Standard Error

Whether you add or subtract, the standard error depends upon the direction of the error. The tape in the previous example indicates a distance that is shorter than it actually measures; in other words, when you use this tape to lay off a distance of 100 feet, the line is actually 100.003 feet. The decision to add or subtract the error depends upon whether you are measuring to determine the distance between two points or to set a point at a given distance from another. Assume first that you’re measuring the distance between two given points, and the distance as indicated by the tape is 362.73 feet. The total tape error is 0.003 times the number of tape lengths. In this case, it is 0.003 x 3.6273 = 0.0108819 feet, which rounds off to 0.01 foot. Then add the tape error. The correct distance between the two points, then, is 362.74 feet. Suppose now that with the same tape, you are to set a point 362.73 feet away from another point. Your correction here will be applied in the opposite direction. Since the tape reads short, the laid tape distance of 362.73 feet is longer than 362.73 feet by the amount of the total correction for standard error (0.01 foot). Therefore, you must subtract the total tape error. To lay off a distance of 362.73 feet with this tape, measure off a distance of 362.72 feet. Suppose now that the Bureau of Standards calibration certificate states that when a tape indicates 100.00 feet under standard conditions, it is actually measuring only 99.997 feet. Again, the standard error is 0.003 feet per 100 feet, but this tape “reads long”; that is, the interval it indicates is longer than the interval it is actually measuring. Suppose you measure the distance between two given points with the tape and find that the tape indicates 362.73 feet. The total standard error is still 0.01 feet. Because the tape reads long, however, the distance it indicates is longer than the distance it actually  13-23 measures. Therefore subtract the total standard error and record the distance between the given points at 362.72 feet. Suppose you are using this same tape to set a point 362.73 feet away from another point. Again, the total standard error is 0.01 feet. Because the tape reads long, however, a measurement of 362.73 feet by the tape will actually be less than 362.73 feet. Therefore, add the total correction for standard error, and measure off 362.74 feet by the tape. 2.1.6.4 Correcting for Temperature Variation Take a 100 foot steel tape that has been calibrated at a standard temperature of 68°F. The coefficient of thermal expansion of steel is about 0.0000065 units per 1°F. The steel tape becomes longer when its temperature is higher than the standard and shortens the same amount when it is colder. The general formula for variation in temperature correction is as follows: Ct = 0.0000065(T- To) Where Ct = Correction for expansion or contraction caused by variation in temperature. L =Tape calibrated length To = Standard temperature (usually 68°F) T = Temperature during measurement From the above formula, you can deduce that the correction for a 100 foot tape is about 0.00065 feet per 1°F, which is about 0.01 feet for every 15°F change in temperature above or below the standard temperature of 68°F. The temperature correction applies in the same manner and direction as the standard tape error. If the tape measurement is taken at a higher temperature than standard, the tape will expand and read short; naturally the correction should be added. The error caused by variation in temperature is greatly reduced when an Invar tape is used.

2.1.6.5 Correcting for Sag Even under standard tension, a tape supported or held only at the ends will sag in the center, based on its weight per unit length. This sag will cause the recorded distance to be greater than the length being measured. When the tape is supported at its midpoint, the effect of sag in the two sections is considerably less than when the tape is supported only at its ends. As the number of equally spaced intermediate supports increases, the distance between the end graduations will approach the length of the tape when supported throughout its length. The correction for the error caused by the sag between the two supports for any section can be determined by the following equation: Cs = w 2 l 3 24t 2 Where Cs = Correction for sag (in feet) w =Weight per unit length of tape (in pounds per foot) l = The length of the suspended section of tape (in feet) t = Tension applied to the tape (in pounds)  13-24 For full tape-length measurements, the correction for sag is usually taken care of by calibrating the tape. The tape must be calibrated regardless of how it is supported and under standard temperatures and tension. To reduce the value of the horizontal correction for sag, the Bureau of Standards suggests standard tensions for tapes supported at only the ends as follows:

Generally, for a heavy 100 foot tape weighing about three pounds that was standardized, whether supported throughout or at the ends only, the systematic error per tape length caused by sag is as follows:

For the engineering technician’s survey work, measurements are normally in the lower order of precision. The correction for sag varies with the cube of the unsupported length; for short spans, it is often negligible.

2.1.6.6 Correcting for Slope

When you take a measurement with a tape along an inclined plane (along the natural slope of the ground), the taped distance is greater than the horizontal distance. The difference between the slope distance and the horizontal distance (s – d) is called the slope correction. Always subtract this correction from the slope distance. To compute for the slope correction, you should know either the vertical angle, A, or the difference in elevation, h, between the taped stations. When you use the vertical angle, the formula for slope correction is as follows: Ch = s Vers A Since Vers A = (1 – cosA) then Ch = s(1 – cosA) where Ch = The slope distance correction s = The tape slope distance (usually a tape length) A = The vertical angle When you use the difference in elevation, the approximate formula derived by the Pythagorean Theorem of a right triangle for the slope correction (Figure 13-13), for the slope correction is as follows: h2 = s2 – d2 Figure 13-13 – Correction for slope distance.  13-25 h2 = (s + d)(s – d) s – d = h2 s + d But for a small slope, d is approximately equal to s; therefore, s + d = 2d and since Ch = s – d Ch = h2 2s For slopes greater than five percent, a closer approximation of can be determined by expanding the formula to: 3 42 2 8s h s h Ch ==

2.1.7 Preparing Chaining Notes

There are several general, yet important principles applicable to all types of field notes. Recording of accurate measurements and other data is essential, as is inclusion of any additional information required to identify and clarify the data. Field notes must be legible and accurate. Record all notes in pencil; a 3H or 4H pencil is best for the job. A pencil that is too soft blunts too quickly; one that is too hard makes a faint mark and scores the paper. In the field, carry a pocketknife or pocket pencil sharpener to keep your pencil sharpened. Erasures are not permitted in field notes. Suppose that in the course of chaining several intervals you make a 10 foot “bust” in one of the intervals by misreading 10 feet as 20 feet. After you total up the distance, some circumstance leads you to suspect that the total is off. You recheck the work and discover where you made the bust. The notebook record for that interval must be changed. Make the change by crossing out the wrong entries and entering the correct ones above them—not by erasing the wrong entries.

2.1.7.1 Recording Notes for Horizontal Chaining There are typical examples of a horizontal chaining conducted for a closed traverse (Figure 13-14). The chaining party started at station A and chained around by way of B, C, and so on. Arriving back at A, the party reversed its direction and chained back around by way of E, D, C, and so on, as a check. The distance recorded for each traverse line was the mean (average) between the forward measurement and the backward measurement.  13-26 Figure 13-14 – Notes for horizontal chaining. Note on the bottom left-hand side of the data page that the tape had a standard error of 0.013 feet per 100 feet of tape. The error is marked “ + ”, meaning that the amount of error should be added to the measurement as indicated by the tape since the tape was reading short. The corrections in the “Correction” column indicate that only correction for standard error was made. If corrections for temperature and sag had been made, the algebraic sum of all three would have been entered in the correction column, or additional columns for temperature and sag correction would appear. The symbol for each station is listed in the first column on the data page. Opposite, on the remarks page, a description of the station is recorded. In the second and third columns on the data page, the measured forward and backward distances between adjacent stations are recorded. The average distance is recorded in the fourth column. In the fifth column, the standard error of 0.013 feet per 100 feet of tape is computed for each mean measurement. In the sixth column, the result of this error, added to the mean measurement, appears as the “Corrected Length”. The sum of the corrected lengths appears below as “Total Length Perimeter.”

2.1.7.2 Recording Notes for Slope Chaining

There are many good examples of slope chaining notes (Figure 13-15). Notice that on the data page, extra columns have been assigned for the temperature of the tape at each interval, the difference in elevation between supports, and the slope distance. Under “Tape Corr.” in the fifth column, enter the standard error for each interval. The tape had a standard error of 0.013 feet per 100 feet; therefore, the standard error for each interval except the last is 0.013 feet. For the last interval of 73.18 feet, the error works out as 0.009 feet. The “Temp. Corr.” column is located to the right of the “Tape Corr.” column. For the first two intervals measured, the temperature of the tape was 78°F, or 10°F above standard. The correction amounts to 0.01 foot for each 15°F above standard; therefore, the total temperature correction for each of these intervals equals the value of x in the equation:  13-27 10 x 15 0.01 = The total temperature correction is 0.007 feet. Because the temperature was above standard, the tape lengthened and was reading short. So add the corrections as indicated by the plus signs. To the right of the “Temp. Corr” column is the “Slope Corr” column. Subtract its entries as indicated. Use the equation to compute the slope correction: 2s h C 2 h = For the first taped interval, h is 6.0 feet and s is 100 feet. Therefore: h2 = 6.02 = 36.0 feet 2s = 2 x 100 = 200 feet Compute the slope correction as follows: 0.180 feet 200.00 36.00 = The “Total Corr” column is next to the column for slope correction, and contains the algebraic sum of the three corrections for each taped interval. In the “Horiz. Dist” column, determine each value by subtracting the total correction for each interval from the measured slope distance for that interval. At the bottom of this column, the sum of the horizontal distances appears. This is the horizontal distance from station K to station L. Figure 13-15 – Notes for horizontal chaining.  13-28

2.1.8 Solving Surveying Problems by Tape

Before modern instruments for measuring angles directly in the field were devised, the tape (or rather, its equivalent, the Gunter’s chain) was often used. This tape was used not only for measuring linear distances but also for measuring angles more accurately than was possible with a compass.

2.1.8.1 Laying Out a Right Angle In laying out a right angle (or erecting a perpendicular) by tape, apply the basic trigonometric theory that a triangle with sides in the ratio of 3:4:5 is always a right triangle. Assume that on the line AB (Figure 13-16); using a 100 foot tape to run a line from C perpendicular to AB is most appropriate. If a triangle with sides in the ratio of 3:4:5 is a right triangle, then one with sides in the ratio of 30:40:50 is also a right triangle. From C, measure off DC, 30 feet long. Set the zero-foot end of the tape on D and the 100 foot end on C. Have someone hold the 50 foot and 60 foot marks on the tape together and run out the bight. When the tape becomes taut, the 40 foot length from C will be perpendicular to AB.

2.1.8.2 Measuring an Angle by Tape There are two methods commonly used to determine the size of an angle by tape: the chord method and the tangent method. Apply the chord method, using the example in (Figure 13-17). Suppose you want to determine the size of angle A. Measure off equal distances from A (80.0 feet), and establish points B and C. Measure BC; assume that it measures 39.5 feet. Now determine the size of angle A by applying the following equation: bc c)b)(s2(s cosA1 −− =− in which c)b(a feet99.7 2 1 s =++= First, solving for: 1 - cosA Figure 13-16 – Laying out a right angle using a 100 foot tape.  13-29 we have 0.12128 6400 776.2 6400 2(19.7)(19.7) cosA1 =− == Since 1 – cosA = 0.12128 cosA = 1.00000 – 0.12128 = 0.87872 Reference to a table of natural functions shows that the angle with cos equal to 0.87872 measures, to the nearest one minute, 28°29’. The intervals measured off from A are equal in this example for mere convenience. The solution will work just as well for unequal intervals. In determining the size of an angle by the tangent method, simply lay off a right triangle and solve for angle A by the common tangent solution. Suppose you want to determine the size of angle A (Figure 13-18). Measure off AC a convenient length (for the sake of example, 80.0 feet). Lay off CB perpendicular to AC and measure it; for the sake of example, it measures 54.5 feet. Compute the angle using the following formula: 0.68125 80.0 54.5 tanA == The angle with tangent 0.68125 measures 34°18´.

2.1.8.3 Laying Off an Angle of a Given Size

 Assess an angle of a given size by applying the tangent right triangle solution (Figure 13-19). To lay off a line AC from A, 25° from line AB, measure off a hypothetical 80.0 feet from A to establish point B. Erect a perpendicular from B (the dotted line in Figure 13-18). Measure off along the perpendicular side (opposite side), the distance that, Figure 13-17 – The chord method. Figure 13-18 – The tangent method.  13-30 when divided by the adjacent side, will give the value of the natural tangent of 25°. Use the following formula: 80.0 a tan25 =° a = tan2580.0 ° The tangent of 25°is 0.46631, so a = 80.0 x 0.46631 = 37.3 feet Measure off 37.3 feet from B to establish point C. A line from A through C will form an angle of 25° from AB.

2.1.9 Identifying Chaining Mistakes and Errors In surveying, there is a significant distinction between errors and mistakes. Errors result from factors such as the effects of nature, the physical condition of the personnel performing the survey, and the condition of instruments. Mistakes, however, are simply human blunders. While errors may be compensated for, mistakes can be detected, corrected, and better yet, prevented only by the exercise of care.

2.1.9.1 Common Mistakes Mistakes may result from poor work habits, lack of judgment, or confusion. They are often costly, time consuming, and difficult to detect. The easiest way to avoid them is to establish a finite procedure and follow it, being constantly alert during the operations in which mistakes are possible. Some of the more common mistakes are as follows:

2.1.9.2 Recognizing Common Errors

There are two types of errors: accidental and systematic. An accidental error is, generally speaking, one that may have a varying value. Examples include:

 

 Figure 13-19 – Laying off an angle of a given size.

You can minimize accidental errors simply by being careful, but they cannot be entirely eliminated. A systematic error has a constant value. The standard error in a tape, for example, is a systematic error. Temperature and sag corrections are applied to correct that particular systematic error. Systematic errors in general can be compensated for or otherwise eliminated by the application of corrections.

2.1.10 Caring for and Maintaining a Survey Tape If a steel or metallic tape gets a kink in it, it is consequently subjected to strain. The tape, in the best case scenario, will be distorted at the point where the kink lies. At worst, if the strain is strong enough, the tape will break at the point where the kink lies. Kinks, therefore, are to be avoided at all costs; it is especially important to avoid putting a strain on a tape that has a kink. Under favorable circumstances, when a tape is shifted ahead, the head chainman may simply drag it over the ground. The rear chainman should not assist by dragging that end because this develops a curve in the tape. This curve may snag on an obstruction or cause a kink. When a tape is being dragged, the rear chainman should simply allow the end to trail along. The cardinal rule is “keep the tape straight.” When taping in traffic, plan your moves in advance and make the measurement as quickly as you can. If possible, do not let vehicles run over the tape; however, if this is absolutely unavoidable, be sure the tape is laid flat and taut on the road. Never let a vehicle run over a tape laid on a soft or rugged ground surface. Tapes are made as corrosion-resistant as possible, but no steel tape is entirely immune to corrosion, especially when used around salty water. Always wipe the tape dry before putting it away, and oil it periodically with light, rust-resistant oil. If a tape does rust, rubbing it with light steel wool dipped in a rust-removing compound is the best and safest way to remove the rust. Tapes, especially those in reels, should be removed from the reel and inspected each week for signs of corrosion. A damp climate in your area of operations could easily start corrosion of tapes.

2.1.11 Splicing a Tape In spite of being carefully handled, tapes sometimes break. Rejoin a broken tape by splicing. Repair a relatively light tape with a punch-and-rivet tape splicer and repair stock (Figure 13-20). A repair stock consists of a length of tape of the same thickness and width as that of the broken tape. When reparining a tape, use a good section of the tape for calibration (matching a whole-foot mark). Place the section used for calibrating beside the broken section to maintain the original length of the tape after rejoining it.  13-32 Figure 13-20 – A punch-and-rivet tape splicer with repair stock. In splicing a broken tape, first align and rivet the repair stock at one end of the break. Next, place the repair stock on the face of the other section of the tape by using the calibrating section as a measure for the break splice. Insert one rivet at a time and arrange rivets in a triangular pattern. Do not place rivets closer together that one-fourth inch from center to center. Using a three-edge file, file partially through the surplus stock diagonally across the tape. The segment of the surplus will readily break off, leaving a clean splice. Repair heavy steel tapes in a similar manner, using a tape repair kit.

2.2.0 Measuring by the Electronic Distance-Measuring System

The electronic distance-measuring system is incorporated in various present-day surveying practices, including traverse and triangulation network. In traverse measurements, accurate distances are directly measured in a straight line and with minimum instrument setups. In triangulation, the system is used to conduct base line measurements precise enough to maintain survey accuracy. In the electronic distance-measuring system, the length of a linear interval is determined by using equipment that sends out an electronic impulse of some sort, such as a radar microwave or a modulated light wave, and measures the time required for the impulse to travel the length of the interval. The velocity or rate of travel of the impulse is known. Therefore, once the time is also known, the length of the linear interval can be determined by applying the well-known equation “distance = rate x time.” Two types of Electronic Distance-Measuring devices (also called EDMs) commonly used today are microwave devices and light wave devices.

2.2.1 Measuring by Microwave Devices The microwave distance-measuring device is an electronic instrument that transmits precisely controlled radio waves between two units. The waves are compared and electronically changed into a visually readable form from which the distance between the units can be computed.  13-33 The unit that originates and transmits the modulated radio waves is called the master (Figure 13-21). The unit at the opposite end of the line from the master is known as the remote. The two are identical instruments, each being adaptable to use as either master or remote. The remote unit receives the original transmission, interprets it, and puts it on a new carrier. It then amplifies this new modulation and retransmits it to the master. The master analyzes the new transmission and translates it into a trace on a cathode ray tube that can be read visually. The trace information is converted into a distance based on the velocity of the radio waves. Because atmospheric conditions affect this velocity, apply corrections for temperature and barometric pressure according to instructions. Each instrument is equipped with a shortwave telephone set. By this means, the person at each instrument can maintain communication with the other. Further details of the system operating methods are available through the manufacturer’s instructions.

2.2.2 Measuring by Light Wave Devices The light wave measuring device uses electro-optical instruments to measure distances accurately. The device consists basically of two units: the measuring unit (transmitter/ receiver) and the reflector unit. The distance is measured by precise electronic timing of a modulated light wave after it travels to, and when it returns from, a reflector at the other end of a course (Figure 13-22). When the instrument receives the reflected light flash, it registers readings that can be converted into the linear distance between the instrument and the reflector (with corrections made for atmospheric conditions). Like their microwave counterparts, the light wave distance-measuring devices are capable of first order base lines in triangulation and all orders of traverse distance measurements. Most of these instruments have a rated range of 200 to 50,000 meters. Figure 13-22 – Typical configuration of a light wave distance-measuring device. Figure 13-21 – Setting a microwave distance-measuring unit.  13-34 Treat these instruments, like all delicate scientific equipment, with proper care and operator maintenance so that they may continue to be available for use. Refer to the instrument manufacturer’s manual for instructions on basic operation, care, adjustments, calibrations, and other details of the system.

 

Test Your Knowledge

4. In a three-person chaining party operation, who keeps a complete record of all measurements made by the party?

A. Head chainman
B. Rear chainman
C. Stretcherman
D. Instrumentman

5. In beginning a horizontal chaining operation, the rear chainman, with one chaining pin, stations him or herself at the starting point. The head chainman then moves towards the distant point to be measured holding what part of the tape and a total of how many chaining pins, respectively?

A. The 100 foot end of the tape and one chaining pin
B. The 100 foot end of the chain and ten chaining pins
C. The zero end of the chain and one chaining pin
D. The zero end of the chain and ten chaining pins

6. In measuring the exact length of a building using the minus tape, what is the length of the building if the 65 foot mark is held at the outer face of the end wall when the head chainman calls out “Minus point three six”?

A. 63.64 feet
B. 64.36 feet
C. 64.64 feet
D. 65.36 feet

3.0.0 FIELD PARTY SAFETY

A surveying field party is frequently working its way through rugged terrain a long distance away from any professional medical assistance. Working through brush, felling trees, scaling bluffs, and crossing streams are all hazardous activities. The use of sharp-edged tools, such as machetes, brush hooks, axes, and hatchets is equally hazardous. Besides those dangers inherent in the work itself, a party may be exposed to a variety of natural dangers, such as those created by weather conditions, reptiles, insects, and poisonous plants. In some areas, there may be dangerous wild animals or even dangerous domestic animals, such as vicious dogs or angry bulls. When a party is working along a thoroughfare with vehicular traffic, the danger of being hit by a vehicle is ever-present. In the midst of such a variety of constant dangers, the only way to prevent injury is through the exercise of constant care and vigilance. Every person in a party must be aware of all existing hazards, be able to recognize a hazardous situation, and be trained to take the correct preventive measures. Indeed, it is common practice for surveying field crews to prepare a checklist of essential items, personal protective equipment, communication gear, and other miscellaneous items relative to the line of work.

3.1.0 Administering First Aid

If personal injuries do occur, they must be taken care of to the extent possible by the application of first aid. First aid is the emergency care given sick or injured persons until regular medical or surgical aid can be obtained. Every person in a field party, however junior in rate and experience, must be able to administer first aid. A chaining party may consist of only two persons, one of whom may be very junior in rate and time in service. If the party chief is the one injured, the junior member will be responsible for administering first aid. As a rule, field crew members should be familiar with the telephone number and location of the hospital or dispensary nearest to where their party will be operating, have a transport vehicle available and ready, and have valid government vehicle operator’s licenses. In addition, they should keep a first-aid kit handy at all times.

3.2.0 Protecting Against Weather Hazards

For all weather hazards, the best preventive measure is adequate protective clothing. When frostbite is a possibility, wear a hat that covers your ears, gloves/mittens for your hands, and cold weather footgear for your feet. These are the primary areas most subject to frostbite. Wear a hat when there is danger of heatstroke. Unless or until you are immune to sunburn (by tanning), keep your skin concealed from the sun. Fair haired or sandy-haired individuals, even when they tan, may be susceptible to a form of skin cancer caused by exposure to sunlight. If you are in this category, keep the skin covered whether you “tan” or not. In general, when you set forth with a field party, wear or carry with you clothing that will provide adequate protection against the weather— not just the weather conditions at the time you set forth, but as they may develop before you get back.

3.3.0 Recognizing and Avoiding Poisonous Reptiles and Insects

The safest assumption regarding snakes or insects you do not recognize is that they are poisonous. The poisonous snakes of North America belong to the viper family. The distinguishing characteristics of a viper are a flat head and a thick body. The most common North American viper is the rattlesnake, distinguishable by a row of hard rings, called rattles, on the tail. The snake makes a rattling sound with them when it is angry or alarmed. The banded, or timber, rattler of the northeastern United States is smooth and silver-gray in color. The diamondback rattler of the United States deep south is silver-gray with a diamond-shaped pattern on the skin. The western diamondback rattler has the same diamond pattern, but is a copper color. The red rattler of southern California is a deeper copper color. Besides the rattlesnake, the most common North American poisonous snake is the water moccasin, sometimes called the cottonmouth because of a white mouth lining that the snake exposes when preparing to strike. The skin of the water moccasin is dark brown with black bars on the upper side and black blotched with yellowish white on the under side. The reddish brown copperhead has no rattles. This viper is found especially in uplands of the eastern Unites States. The most common poisonous insects encountered in North America are the black widow spider, the tarantula, and the scorpion. The black widow (which may be encountered anywhere in the United States) is recognizable by its small, shiny black body. The tarantula is a long-legged, hairy member of the spider family, found chiefly in and close to Texas. The scorpion, found mainly in the semi-tropical parts of the United States, resembles a lobster or crawfish in shape.

3.4.0 Avoiding or Treating Poisoning from Poisonous Plants

The Standard First Aid Training Course contains an extensive section on poisons. However, it does not mention a type of poisoning to which survey parties are particularly exposed— poisoning from contact with poisonous plants. Exposure to poisonous plants is not likely to be fatal (although it can be, under certain circumstances), but it can cause a lot of misery and considerable reduction in on-the-job efficiency. The most common poisonous plants in the United States are poison ivy, (including a variety called poison oak) and poison sumac, both of which occur everywhere in North America. These plants contain and exude a resinous juice that produces a severe reaction when it comes into contact with the skin of the average person. The first symptom of itching or a burning sensation may develop in a few hours or even after five days or more. The delay in the development of symptoms is often confusing when an attempt is made to determine the time or location where contact with the plant occurred. The itching sensation and subsequent inflammation, which usually develops into watery blisters under the skin, may continue for several days from a single contamination. Persistence of symptoms over a long period is most likely caused by new contacts with the plants or by contact with previously contaminated clothing or animals. Severe infection may produce more serious and painful symptoms such as abscesses, enlarged glands, fever, or other complications. Secondary infections are always possible in any break in the skin that occurs when the watery blisters break. With poison ivy, the next development is usually the appearance of a scabrous, deep red rash over large skin areas. With poison sumac, large blisters filled with a thick yellowish white liquid strongly resembling pus usually occur. When the blisters break, this liquid runs over adjacent skin areas, enlarging the area of infection. The resinous juice exuded by these poisonous plants is almost entirely non-volatile; that is, non-evaporating or will not dry up. Consequently, the juice may be carried on clothing, shoes, tools, or soil for long periods. In this way, it may infect persons who have not come into contact with the plants themselves. Individuals have, in fact, been severely infected by spores carried through air by smoke from burning plants. Infection by resinous juice carried on the fur of animals is another possible mode for exposure. To avoid contact with the plants themselves, know what they look like. Poison ivy has a trefoil (three leaflets) leaf (Figure 13-23). The upper surface of the leaflet has a shiny, varnished appearance. The variety called poison oak has a serrated leaflet, or lobed, edges like that of an oak leaf (Figure 13-24). Ordinary poison ivy is usually a vine; and poison oak is usually a bush. In the flowering season, both types produce clusters of small white berries.  13-37 Figure 13-23 – Different varieties of poison ivy leaves. Some sumacs are poisonous, but others are harmless. It is difficult to distinguish the leaf of a poisonous sumac from the leaf of a nonpoisonous sumac. The only way to tell the poisonous plant from the harmless one is by the fruit. Both plants produce a drooping fruit cluster. The difference lies in the color of their fruits—that of the harmless sumac is red; that of the poison sumac is white. Outside of the fruit season, avoid contact with all sumacs. There are no “do-it-yourself” remedies for plant poisoning. Treatment for poisonous plant exposure must be administered or at least supervised by professional medical personnel. While treatment must be administered professionally, if you have reason to believe that you have been infected, wash thoroughly with water and an alkaline laundry soap. Do not use an oily soap (most facial soaps are oily) because they tend to spread the poison. Lather profusely, and do not rinse the lather off, but allow it to dry on the skin. Repeat this procedure every three to four hours, allowing the lather to dry each time. If job conditions make contact with plants unavoidable, wear gloves and long sleeve shirts and keep all other skin areas covered. When you remove your clothing, take care not to allow any skin area to come into contact with exposed clothing, and launder all clothing at once.

3.5.0 Using Field Equipment Safely

The standard source of information on the safe use of dangerous field equipment and other safety precautions is Safety Precautions for Shore Activities, NAVMAT P-5100. A copy of this publication should be available in your technical library. Since tools are a Figure 13-2 – 3RisonRDN  13-38 potential source of danger in all occupations, inspect them periodically to assess whether they need any repairs and/or replacements. Only use tools that are in good condition. There should be no loose heads on any hand tools. Keep sharp-edged tools sharp. Store all tools safely when they are not in use. If you temporarily lay down tools with sharp blades or points, place them in such a way that no injury can result to anyone. Use sheaths or guards to carry sharp-edged or pointed tools from one place to another. If no sheath is available, carry a sharp-edged or pointed tool with the edge or point away from your body and take care not to injure others with it. When working near other people, carry your range poles or level rods vertically against your body so that you will not injure another person’s head or eyes if you turn suddenly. Do not hold a stake or bull-point with your hand around the shank while another person is driving it with a sledgehammer. Do not let a tape or plumb bob cord slide fast through your hands. Always use tools correctly and for the task for which they are intended. For example, when cutting brush near the ground with a machete, swing away from your legs and feet. Never cut at short range from your body. Be sure that the radius of your swing is clear of obstructions, such as vines or twigs that might deflect the intended direction of the swing. Use your full arm’s length to get a safe-swing radius. Always work at least 10 feet away from the nearest person. If it is necessary to use an ax to clear an area, prevent painful blisters by wearing a pair of thin gloves. Above all, use common sense and consider the possible results of your actions. To climb poles and trees safely, use authorized climbing equipment. A lineman’s pole climbers are made of steel and have a strap loop and short spur. Tree climbers have straps, pads for protection against friction, and a longer spur for penetrating bark. To avoid falling, use both the belt and the straps. Except in an emergency, never work in or on trees during a high wind. Watch out for power lines that may be in contact with the tree you are climbing. Always conduct burning operations in the clear, where the fire will not ignite tree leaves or limbs, dry wooded areas, or nearby buildings. Remember that it is imperative to extinguish all burning or smoldering material completely before leaving it unattended. When practicable, use only nonflammable solvents for cleaning instruments. Do not leave the caps off or the stoppers out of flammable liquid containers. Use solvents only in well ventilated locations.

3.6.0 Following Safety Procedures in Traffic

A party working on a busy roadway is in constant danger of being struck. Every motion made by a member of such a party must be made with constant and complete awareness that vehicular traffic is proceeding as usual. Taking the following precautions, however, can minimize that danger:

 

Test Your Knowledge

7. Which of the following descriptions is characteristic of poisonous snakes found on the North American continent?

A. Brightly colored
B. Smaller than nonpoisonous snakes
C. Flat headed and thick bodied
D. Equipped with tail rattles

8. What North American poisonous snake shows the white lining inside its mouth just before striking?

A. Copperhead
B. Rattler
C. Coral
D. Water moccasin

9. A poisonous plant has a juice that is nonvolatile. This means that the juice of this plant will:

A. Evaporate quickly
B. Not stain clothing
C. Not evaporate quickly
D. Not infect a person unless the plant itself is touched

 

4.0.0 ADDITIONAL DUTIES of a SURVEY CREW

A survey crew member may perform other tasks, including:

4.1.0 Maintaining Surveying Equipment

Generally, the maintenance of surveying equipment and accessories involves proper cleaning and stowage. For example, steel tapes, brush hooks, axes, chain saws, and so forth, must be cleaned and dried and, if necessary, a thin coat of oil applied after each day’s work before equipment is stored for the night. Never stow any surveying gear (especially if made of ferrous material) without checking it thoroughly to ensure it is clean and dry— this is particularly important for steel tapes.  13-40 Sengineering techBEEs have a multitude of jobs done under variable conditions, sometimes using the same equipment, sometimes using different equipment. Because of this, neglecting the proper care of equipment for even one day can result in rusty, inoperable equipment, and financial responsibility for government property loss or damage due to negligence falls on you. Regularly sharpen surveying clearing tools, and replace any broken handles (especially those on sledgehammers). For delicate equipment, consult the manufacturer’s handbook or other applicable publications before attempting any servicing or cleaning. When necessary, ask your senior engineering tech to explain the correct procedure.

4.2.0 Preparing for Field Party’s Essential Needs

Party chiefs prepare lists of equipment and supplies needed for each day, and it is the responsibility of everyone in the survey party to review the list and ensure that everything needed is in fact present on the list. When reviewing the field party’s essential needs list, remember to consider your personal needs in addition to the equipment necessary for the job, especially if the job is a significant distance from base camp. In a triangulation survey, for example, your stations are generally situated in remote places. You may be ferried to your station point by helicopter or by some other means, depending on the location and the mode of transportation available. Be sure to take extra drinking water to jobs like this, and do not discard your excess water until you are safely back to base camp.

4.3.0 Maintaining Field Sanitation

In the field, devices necessary for maintaining personal hygiene and field sanitation are improvised. If you are surveying at a remote location, you are unlikely to find a waterborne sewage system available for your use. The typical alternative is digging a “cat hole” about one foot deep and burying all waste completely. Always dispose of garbage properly during field surveys. Whenever possible, avoid burning dry garbage on site. Disposal bags offer a good means of preventing litter; use them whenever available. In extremely hot climates, your supply of potable water will run low at a faster rate. To avoid dehydration, you must treat your own water or face infections or diseases such as dysentery, cholera, diarrhea, and typhoid fever. It is imperative that water taken from any source (such as lakes, rivers, streams, and ponds) be properly treated before being used, as all these sources are presumed to be contaminated. To treat water for drinking, use either a plastic or aluminum canteen with the water purification compounds available in tablet form (iodine) or in ampule form (calcium hypochlorite). When disinfecting compounds are not available, boiling the water is another method for killing disease-producing organisms.

4.4.0 Giving Vehicle Prestart Checks and Maintaining Vehicle Operations

The field survey crew is likely to be assigned a vehicle to transport people and equipment to and from the jobsite. Before operating the vehicle, the operator will give it a prestart check to make sure that it is ready to run. When a vehicle is assigned to you, an operator’s daily pre-service maintenance report is issued at the dispatch office. Use this form to record or log items in the vehicle that require attention as observed during  the prestart check and during the working day. Other information, such as mileage readings, operating hours, and fuel consumption may also be required.

 

Test Your Knowledge

10.  In addition to surveying duties, a survey crew member may be responsible for picking up trash.

A. True
B. False

11. All lake, river, stream, and pond water is presumed what?

A. Fresh
B. Potable
C. Contaminated

12.  Boiling is a sufficient method for killing disease-producing organisms in water.

A. True
B. False

 

Summary

In this lesson, you were presented with information relating to direct linear measurements and field survey safety. You were introduced to the specific duties of a chaining crew member including marking control reference and monument points, making direct linear measurements, correcting measurements and preparing chain notes. This topic addressed solving surveying problems with the tape, identifying chaining mistakes and errors, caring for and maintaining survey tape, and splicing tape. You also learned about measuring with the Electronic Distance-Measuring System, with both a microwave device and a light wave device. You were presented with information relating to field party safety, which emphasized first aid administration, protection from weather, avoidance and treatment of poisons in nature, safe use of equipment, and caution in high traffic situations. The end of this lesson was devoted to the additional duties of the survey crew in which you learned about survey equipment maintenance, preparation for essential needs, field sanitation maintenance, and prestart vehicle checks.

Review Questions

1. The instrumentman is moving his right arm, which is extended upward, and to the right. What message is he signaling to the rodman? A. The rodman must move the rod to the right. B. The rodman must move the top of the rod to the right until it is vertical. C. The rodman must move the rod to the left. D. The rodman must move the top of the rod to the left until it is vertical. 2. An instrumentman extends both arms upward. What does this indicate to the rodman? A. Move forward. B. Reverse the rod. C. Pick up the instrument. D. Face the rod. 3. The instrumentman extends both arms out horizontally from his shoulders and waves them up and down. What message is he giving to the rodman? A. Come in B. Pick up the instrument C. All right D. Move forward 4. In clearing the chaining line, what should you do when a valuable tree lies directly in your path? A. Triangulate around it B. Request that the owner cut down the tree, or that he allow you to cut down the tree C. Cut it down D. Choose a different chaining line 5. For what reason should a chainman use an indicator that is narrower than a range pole when holding on or plumbing over a point for short sights? A. To enable the instrumentman to align the indicator exactly with the vertical cross hair of the instrument B. To enable the instrument to sight beyond the point C. To enable the chainman to carry out duties without becoming fatigued D. To enable the chain man to hold the indicator steady  13-43 6. When running a line from point A to point B, what action does the instrumentman take when he or she “plunges” the telescope? A. Turns the telescope 180 degrees to the right from a sight on point A to a sight on point B B. Rotates the telescope vertically from a sight on point A to a sight on point B C. Turns the telescope 180 degrees to the left from a sight on point A to a sight on point B D. Moves the telescope from point A to point B 7. When plumbing over a point, which of the following actions should you take to overcome the problem of wind blowing the plumb bob back and forth? A. Rest the point of the plumb bob on the point being plumbed. B. Bounce the point of the plumb bob slightly up and down on the point being plumbed. C. Shorted the plumb bob cord. D. Have a second person hold the point of the plumb bob steady on the point being plumbed. 8. You should mark the horizontal location of a point over which to plumb a transit by which of the following means? A. A flag or chaining pin B. A leveling rod or range pole C. A precise marker driven or set in the top of the hub D. A bull-point or spad 9. Survey control points are marked in the field by which of the following means? A. Bronze disks set in concrete B. Center-punched metal rods driven flush with the ground C. Wooden stakes or soda pop tops and nails driven flush with the ground D. Each of the above 10. In addition to an identifying symbol, what marking is usually placed on a bench mark constructed by surveyors to identify a point for a construction project? A. The abbreviation for bench mark, BM B. The elevation of the bench mark C. A number showing the order in which the bench mark is to be considered D. A number denoting the distance of the bench mark from the point of beginning  13-44 11. As survey control points are established in the field, in what manner are they recorded in the field notebook? A. By sketch B. By word description C. By either A or B, or a combination of both D. By detailed drawing 12. What tool is used to mark a terminal point in a chaining operation when the distance being measured is greater than the tape length? A. Surveyor’s arrow B. Chaining pin C. Philadelphia rod D. Range pole 13. When the head chainman runs out of chaining pins, what total number of pins should the rear chainman have? A. 0 B. 1 C. 9 D. 10 14. Which of the following devices helps apply the correct tension to a tap that is supported at its ends only? A. Taping stool B. Spring balance C. Scissors clamp D. Chaining buck 15. Including the 0 foot mark, a total of how many whole foot marks are indicated on a 100 foot plus tape? A. 99 B. 100 C. 101 D. 102 16. When slope chaining, which of the following can you obtain by direct reading? A. Slope angle only B. Slope angle and slope distance C. Horizontal distance only D. Slope angle and horizontal distance  13-45 17. In horizontal chaining operations, a call of a “mark” from the rear chainman signals the head chainman to take which of the following actions? A. Pull the end of the tape B. Stick a chaining pin into the ground C. Measure the tension on the tape D. Release the plumb bob 18. When team members are making a horizontal measurement on a slope, the chainman on the lower level determines at what height the chainman on the higher level will hold the tape by using what instrument? A. A transit B. A theodolite C. A hand level D. A plumb bob 19. In which of the following situations should the breaking tape method of measuring be used? A. Determining the horizontal distance between points on terrain having a six to one slope ratio B. Measuring the width of major access roads C. Measuring horizontal distances in heavily wooded and obstructed areas D. All of the above 20. A two-person party is using the breaking chain procedure and a 100 foot tape to chain a line on a steep slope. When, if ever, does the rear chainman give the front chainman a chaining pin? A. Each time only a 25 foot distance is measured B. Each time only a 50 foot distance is measured C. Each time an even foot distance of less than 100 feet is measured D. Never 21. The standard error of a 100 foot tape can be determined in which of the following ways? A. By calibration by the Bureau of Standards B. By comparison with a length of a calibrated 100 foot tape C. By comparison with a known 100 foot distance D. By each of the above means 22. When calibrating a tape, remember that the standard tension and corresponding temperature for a 100 foot tape supported throughout is what? A. 5 pounds at 65 degrees B. 10 pounds at 68 degrees C. 15 pounds at 68 degrees D. 20 pounds at 65 degrees  13-46 23. A 100 foot tape has a standard error of 0.003 feet. What is the total error for a taped distance of 471.56 feet (rounding off to the nearest 0.01 foot)? A. 0.00 B. 0.01 C. 0.02 D. 0.05 24. Under standard conditions, a tape indicates 100.00 feet when it should actually measure 99.996 feet. Using this tape, how far should you measure to see a point 450 feet away from another point? A. 449.96 B. 449.98 C. 450.02 D. 450.04 25. A tape has a standard error which causes it to indicate 99.996 feet when it actually measures 100.00 feet. What is the actual distance between two points if the taped distance is 259.05 feet? A. 259.04 B. 259.05 C. 259.06 D. 260.00 26. A steel tape is used to lay out the distance from point A to point B. If the thermometer attached to the tape reads 79 degrees, what is the actual distance laid to offset the effect of change in temperature? A. 168.09 B. 168.99 C. 169.01 D. 169.07 27. A steel tape is used to lay out the distance from point A to point B. If the thermometer attached to the tape reads 35 degrees, how much should be added or subtracted to the measurement in order to compensate for the change in temperature? A. Add 0.02 feet B. Subtract 0.02 feet C. Add 0.04 feet D. Subtract 0.04 feet 28. A three pound, 100 foot tape is used to measure 60 feet. If the chainman maintained a pull of 20 pounds what is the correction of sag? A. 0.02 feet B. 0.03 feet C. 0.04 feet D. 0.05 feet  13-47 29. When is the slope correction subtracted from the taped slope distance? A. When taping uphill only B. When taping downhill only C. When applying the slope correction formula for 10 percent slopes only D. Always 30. When determining accurate slope correction, what is the maximum slope for which you should use the following formula? s h Ch 2 2 = A. 5% B. 10% C. 20% D. 30% 31. What is the proper way to correct an error in field notes? A. Erase the error B. Blot out the error C. Draw a line through the error and enter the correct information above D. Circle and initial the error 32. In which of the following ratios does the length of the sides indicate that the triangle is a right triangle? A. 10:15:20 B. 18:24:30 C. 20:30:40 D. 30:40:50 33. Computing the size of an angle by the chord method involves the partial solution of a triangle in which the only known values are which of the following measurements? A. The size of two angles B. The length of the sides C. The seize of two angles and length of one side D. The lengths of two sides and the size of one angle 34. Reading a tape upside down and obtaining, for example, 69 instead of 96 and leaving out an entire tape length are samples of what? A. Natural errors B. Instrumental errors C. Personal errors D. Mistakes  13-48 35. In caring for and maintaining steel tapes, a chainman should make it a practice to take which of the following steps? A. Inspect all tapes weekly B. Wipe them dry before storing them C. Coat them from time to time with light rust-resistant oil D. All of the above 36. What is the proper sequence of steps in splicing a broken steel tape? 1. Align and rivet the repair stock at one end of the break. 2. Insert one rivet at a time and arrange the rivets in a triangular pattern 3. Place the repair stock on the face of the other section of the tape, using the calibration section as a measure for the break splice. 4. Use a three-edge file to partially cut through the surplus stock A. 1, 2, 3, 4 B. 1, 3, 2, 4 C. 3, 1, 2, 4 D. 4, 2, 1, 3 37. In which of the following ways are microwave and light wave EDM devices the same? A. Both have interchangeable transmitters and receivers B. Both require the application of correction for atmospheric conditions C. Both are used for the direct measurement of distances D. Both should be used for only short distances of less than 600 feet 38. What symptom is usually the first to be noticed by someone who has come in contact with poison ivy or poison oak? A. A cluster of large blisters B. A deep red rash C. An extreme itching D. A cluster of small blisters 39. Poisonous sumac can be distinguished from nonpoisonous sumac in what way? A. It bears red berries B. It has more leaves C. It bears white fruit D. It grows closer to the ground 40. The first-aid procedure for plant poisoning of the skin consists of which of the following steps? A. Soaping and rinsing frequently B. Applying a light coat of oil C. Obtaining immediate medical care D. Soaping with an alkaline laundry soap and not rinsing it off  13-49 41. While surveying, the members of a field party must work on and near a heavily traveled highway that they are forced to cross several times a day. They can reduce the danger of being struck by a moving vehicle by taking which of the following precautions? A. Wearing brightly colored outer clothing B. Detouring traffic away from the field party C. Erecting conspicuous signs and barriers D. All of the above


******************************************

Chapter 14 Horizontal Control

Locating points, objects, and/or details on the surface of the earth requires an established system of control stations. An engineering tech can easily determine the relative positions of detail points if these points are tied into a local control station, or if the control station is tied into a geodetic control, those positions can be located relative to a worldwide control system. The main control system is formed by a triangulation network supplemented by a line surveyed across a plot of ground (a traverse). A traverse that has been established and is used to locate detail points and objects is often called a control traverse. Any line from which points and objects are located is a control line. A survey is controlled horizontally by measuring horizontal distances and horizontal angles. This type of survey is often referred to as a horizontal control. Additionally, horizontal control surveys establish supplementary control stations for use in construction surveys. Supplementary control stations usually consist of one or more short traverses running close to or across a construction area to afford easy tie-ins for various projects. These stations are established to the degree of accuracy needed for the purpose of the survey. In this lesson, we will identify common procedures used in converting angular measurements taken from a compass or transit survey, recognize the methods used in establishing horizontal control, and identify various field procedures used in running a traverse survey.

When you have completed this lesson, you will be able to:

1. Describe the procedures for determining distance and direction.
2. Describe the procedures for conducting transit tape surveys.
3. Describe the procedures for conducting traverse operations.

Contents

1.0.0 Directions and Distances

2.0.0 Transit-Tape Survey

3.0.0 Organizing the Party

 

1.0.0 DIRECTIONS and DISTANCES

There are various ways of describing the horizontal locations of a point. In the final analysis, these ways are all reducible to the basic method of description of stating the length (distance) and direction of a straight line between the point whose location is being described and a reference point. Direction, like horizontal location itself, is also relative to the direction of a line and can only be stated relative to a reference line of known (or sometimes of assumed) direction. In true geographical direction, the reference line is the meridian passing through the point where the observer is located, and the direction of a line passing through that point is described in terms of the horizontal angle between that line and the meridian. In magnetic geographical direction, the reference line is the magnetic meridian instead of the true meridian.

1.1.0 Converting Directions

Most typically, the bearing gives the direction of a traverse line. In field traversing, however, turning deflection angles with a transit is more convenient than orienting each traverse line to a meridian.

1.1.1 Converting Bearings to Deflection Angles

Converting bearings to deflection angles is based on a well-known geometrical proposition (Figure 14-1). When two meridians (or parallel lines) are intersected by another line (a traverse), angles (vertically opposite angles) are equal. It is also the case that , and (corresponding angles). 1 21 23 3 ,,, BandBAandABandBAandA = AA 2 = BB 2 Therefore:

• === AAAA 321

• === BBBB 321 The sum of the angles that form a straight line is 180°; the sum of angles around the point is 360°. When a traverse contains traverse lines AB, BC, and CD (Figure 14-2) the meridians through the traverse stations are indicated by the lines NS, N’S’, and N’’S’’. Although meridians are not, in fact, exactly parallel, assume they are for conversion purposes. Consequently, we have here three parallel lines intersected by traverses, and the angles created will therefore be equal (Figure 14- 2). The bearing of AB is N20°E, which means that angle NAB measures 20°. To determine the deflection angle between AB and BC:

• If angle NAB measures 20°, then angle N’BB’ must also measure 20° because the two corresponding angles are equal. Figure 14-1 – The relationship of corresponding angles.  14-4

• The bearing of BC is given as S50°E, which means angle S’BC measures 50°E. The sum of the angle N’BB’ plus S’BC plus the deflection angle between AB and BC (angle B’BC) is 180°. Therefore, the size of the deflection angle is: o 180° - (N’BB’ + S’BC) or o 180° - (50° + 20°) = 110° The figure indicates that the angle should be turned to the right; therefore, the complete deflection angle description is 110°R. The bearing of CD is N70°E; therefore, angle N’’CD measures 70°. Angle S’’CC’ is equal to angle S’BC and therefore measures 50°. The deflection angle between BC and CD equals:

• 180° - (S’’CC + N’’CD) or

• 180° - (50° + 70°) = 60° Therefore, the angle should be turned to the left.

1.1.2 Converting Deflection Angles to Bearings

Converting deflection angles to bearings applies the process for converting bearings into deflection angles. Suppose that you know the deflection angles (Figure 14-2) and want to determine the corresponding bearings. To do this, you must know at least one traverse line bearing. Assume that the bearing of AB is known, and you need the bearing of BC. The size of the deflection angle B’BC is 110°, and the size of angle N’BB’ is the same as the size of NAB, which is 20°. BC’s angle of bearing size is:

• 180° - (B’BC +NAB) or

• 180° - (110 + 20°) = 50° BC lies in the second or SE quadrant (Figure 14-2); therefore, the full description of the bearing is S50°E.

1.1.3 Converting Bearings to Interior and Exterior Angles

Converting a bearing to an interior angle or exterior angle also applies the procedure used to convert deflection angles into bearings. Suppose that (Figure 14-2), angle ABC is an interior angle and you want to determine the size. You know that angle ABS´ equals angle NAB, and therefore measures 20°. You know from the bearing of BC that, angle S’BC measures 50°. The interior angle ABC is: Figure 14-2 – Converting bearings to deflection angles from given traverse data.  14-5 ABS’ + S’BC or 20° + 50° = 70° The sum of the interior and exterior angles at any traverse station or point equals the sum of all the angles around that point, or 360°. Therefore, the exterior angle at station B equals 360° minus the interior angle or 360° - 70° = 290° The process of measuring angles around a point to obtain a check on their sum, which should equal 360°00’, is sometimes referred to as closing the horizon.

1.1.4 Converting Azimuths to Bearings or Vice Versa

Suppose you want to convert an azimuth of 135° to the corresponding bearing. This azimuth is greater than 90° but less than 180°; therefore, the line lies in the southeast quadrant (Figure 14-3). Always measure the bearing angles from the north and south ends of the reference meridian. (When solving any bearing problem, draw a sketch to get a clear picture.) For the azimuth, initiate the horizontal direction clockwise from the meridian plane. Measure it between either the north or the south end of the reference meridian and the line in question. When we talk about azimuth in this training manual, however, you must understand that the azimuth is referenced clockwise from the north point of the meridian. The numerical value of this 135° azimuth angle is measured from the north. Therefore, in this figure, the value of the bearing is 180° - 135° = 45° The complete description of the bearing then is S45°E. For example, in converting a bearing of N30°W into an azimuth angle, the angle location must be in the northwest quadrant. Draw an angle of 30° from the north end of the reference meridian because azimuth angles are measured clockwise from the north end of the reference meridian. To compute this azimuth angle, subtract 30° from 360°; the result is 330°. Therefore, the bearing of N30°W is equal to 330° azimuth angle. Figure 14-3 – Converting azimuths to bearings and vice versa.  14-6

1.2.0 Establishing Direction by Surveyor’s Compass

The basic method of establishing direction of a survey line or point is with a surveyor’s compass. (Notice that on most surveyor’s compasses, the east and west indicators are in the opposite positions from those of the east and west indicators on a map or chart.) Determine the magnetic bearing of the dotted line labeled Line of Sight (LOS) (Figure 14-4). First, mount the compass on asteady support, level it, and wait for the needle to stop oscillating. Then, carefully rotate the compass until the north-south line on the card lies exactly along the line whose bearing is being taken. The bearing is now indicated by the needlepoint. The needlepoint indicates a numerical value of 40°. The card indicates the northeast quadrant. The magnetic bearing is, therefore, N40°E.

1.2.1 Correcting for Local Magnetic Attraction

The compass needle lying along the magnetic meridian (Figure 14-4) means either that the compass is in an area free of local magnetic attraction or that the effect of local attraction has been eliminated by adjustment of the compass card. Local magnetic attraction refers to the deflection of the compass needle caused by a local magnetic force, such as that created by nearby electrical equipment or by a mass of metal, such as a bulldozer. When local attraction exists and is not compensated for, the resultant bearing is a compass bearing. A compass bearing does not become a magnetic bearing until it has been corrected for local attraction. Suppose, for example, you read a compass bearing of N37°E. Suppose the effect of the magnetic attraction of a nearby pole transformer is enough to deflect the compass needle 4° to the west of the magnetic meridian. In the absence of this local attraction, the compass would read N33°E, not N37°E. Therefore, the correct magnetic bearing is N33°E. To correct a compass bearing for local attraction, determine the amount and direction (east or west) of the local attraction. First, set up the compass where you propose to take the bearing. Then, select a distant object that you may presume to be outside the range of any local attraction. Take the bearing of this object. If you read a bearing of S60°W, shift the compass to the immediate vicinity of the object on which you sighted; and take, from there, the bearing of the original setup point. In the absence of any local attraction at the original setup point, read the back bearing of the original bearing or N60°E. Suppose instead you read N48°E. The back bearing of this is S48°W. Therefore, the bearing as indicated by the compass under local attraction is S60°W, but Figure 14-4 – A magnetic compass reading corrected for local attraction.  14-7 as indicated by the compass not under local attraction, it is S48°W. The amount and direction of local attraction is, therefore, 12°W. Whether you add the local attraction to, or subtract it from, the compass bearing to get the magnetic bearing depends on the direction of the local attraction and the quadrant the bearing is in. As a rule, for a bearing in the northeast quadrant, add an easterly attraction to the compass bearing to get the magnetic bearing and subtract a westerly attraction from the compass bearing to get the magnetic bearing. A compass (Figure 14-5) indicates a bearing of S40°W. Suppose the local attraction is 12°W. The needle, then, is 12°W of where it would be without local attraction. In the southwest quadrant, subtract westerly attraction and add easterly attraction. From a study of the paragraphs above, it becomes obvious that the procedure is the opposite for bearings in the northwest or southeast quadrants. In these quadrants, add westerly attraction and subtract easterly attraction to the compass bearing to get the magnetic bearing.

1.2.2 Determining Magnetic Declination and Dip

The angle between the true meridian and the magnetic meridian is magnetic declination. If the north end of the compass needle is pointing to the east of the true meridian, the declination is east. If the north end of the compass needle is pointing west of the true meridian, the declination is west (Figure 14-6). The magnetic needle aligns itself with the earth’s magnetic field and points toward the earth’s magnetic pole. In horizontal projections, these lines incline downward toward the north in the Northern Hemisphere and downward toward the south in the Southern Hemisphere. Since the bar takes the position parallel with the lines of force, it inclines with the horizontal. This phenomenon is known as the magnetic dip. Figure 14-5 – Compass bearing affected by local magnetic attraction. Figure 14-6 – Magnetic declination (west).

1.2.3 Converting Magnetic Bearings to True Bearings

When a compass bearing for local attraction is corrected, what results is a magnetic bearing. As explained previously, in most areas of the earth, a magnetic bearing differs from a true bearing by the amount of the local magnetic declination (called magnetic variation by navigators). The amount and direction of local declination is shown on maps or charts of the area in a format similar to the following: “Magnetic Declination 26°45°W (1988), Annual Increase 11´”. This means, if you are working in 2008 (20 years later), the local declination is: 26°45’ + (11’ x 20) or 26°45’ +220 = 26°45’ + 3°40’ = 30°25’ To convert a magnetic bearing to a true bearing, apply the declination to the magnetic bearing in precisely the same way that you apply local attraction to a compass bearing. If the declination is east, add it to northeast and southwest magnetic bearings, and subtract it from southeast and northwest magnetic bearings. If the declination is west, add it to southeast and northwest magnetic bearings and subtract it from northeast and southwest magnetic bearings. When you have a compass bearing and know both the local attraction and the local declination, you can go from compass bearing to true bearing in a single process by applying the algebraic sum of local attraction and local declination, Suppose that local attraction is 6°W and declination, 15°E. You could correct for local attraction and convert from magnetic to true in the same operation by applying a correction of 9°E to the compass bearing.

1.2.4 Uncorrecting and Unconverting

Correct a compass bearing to a magnetic bearing by applying the local attraction. Convert a magnetic bearing to a true bearing by applying the local declination. Use a magnetic bearing to figure the corresponding compass bearing by using both local attraction and local declination. The terms used to describe these calculations are uncorrecting and unconverting. When uncorrecting or unconverting, apply local attraction and local declination in the reverse direction in which you apply them if you were correcting or converting. For example, with a compass affected by a 10°W local attraction, lay off a line bearing S28°W magnetic by compass. If you are correcting, subtract a westerly attraction in the southwest quadrant. However, for uncorrecting, add a westerly attraction in that quadrant. Therefore, to lay off a line bearing S28°W, you would lay off S38°W by the compass. The same rule applies to azimuths. Suppose you have an azimuth-reading (measured from north) compass set up where local attraction is 10°W, declination is 25°E, and you want to lay off a line with a true azimuth of 256°. The algebraic sum of these is 15°E. Correcting and converting azimuths, requires the addition of easterly corrections, and subtraction of westerly corrections. Therefore, if you were correcting or converting, you would add the 15° to 256°. Because you are uncorrecting or unconverting, however, you subtract; and, to lay off a line with true azimuth 256°, you read 241° by the compass.

1.2.5 Orienting a Compass

Some transit compasses and most surveyor’s and forester’s field compasses are equipped to offset local attraction, local declination, and/or the algebraic sum of the two (Figure 14-7). The upper view of Figure 14-7 shows a compass bearing of N40°W on a compass presumed to be affected by a local attraction of 10°E. In this quadrant, you subtract easterly attraction; therefore, the magnetic bearing should read N30°W. In the lower view, the same compass has been oriented for an error of 10°E by simply rotating the compass card 10°E clockwise. On most orienting compasses, the card can be released for rotating by backing off a small screw on the face of the card. Note that you now read the correct magnetic bearing of N30°W.

1.2.6 Conducting a Compass-Tape Survey

As an example of using a surveyor’s compass to perform a small field survey and compose field notes, lets review the scenario depicted in the sketch and remarks of Figure 14-8. The compass was first setup at station A, then line AE’s bearing is taken for the purpose of later comparison to the forward bearing of engineering tech. Then, line AB’s bearing is taken, and the distance from A to B is chained. The observed bearing of (S62°20´E) is entered beside B in the column headed “Obs. Bearing.” Then the chained distance is entered beside B in the column headed “Dist.” The compass was then shifted to station B, and the back bearing of AB is taken (that is, the bearing of BA) as a check on the previously taken bearing of AB. The back bearing should have the same numerical value (62°20´ in this case) as the forward bearing. A difference in the two would indicate either an inaccuracy in reading one bearing or the other or a difference in the strength of local attraction. Proceeding in this fashion, the survey team continued to take bearings and back bearings, and chain the distances all the way around to the starting point at station A, recording the results after each step. The last forward bearing taken, that of engineering tech, has the same numerical value as the back bearing of engineering tech (bearing of AE) taken at the start. Figure 14-7 – Orienting a compass for a 10° easterly attraction.  14-10 Figure 14-8 – Sample field notes from a compass-tape survey.

1.2.7 Checking Accuracy of Observed Bearings

As a check on the accuracy of the whole bearing-reading process, compute the size of the interior angle at each station from the observed bearings by the method previously described for converting bearings to interior angles. Enter the sizes of these angles in the column headed “Comp. Int. Angle,” and enter the sum below. The sum of the interior angles in a closed traverse should equal the product of 180° (n – 2), n being the number of traverse lines in the traverse. In this case, the traverse has five lines; therefore, the sum of the interior angles should be: 180° (5 – 2) = 180° x 3 = 540° The computed sum is, therefore, the same as the added sum of the angles converted from observed bearings.

1.2.8 Recognizing, Reducing, and Correcting Compass Errors

If a magnetic compass has a bent needle, there will be a constant instrumental error in all observed bearings and azimuths. To check for this condition, set up and level the compass, wait for the needle to cease oscillating, and read the graduation indicated at each end of the needle. If the compass is graduated for bearings, the numerical value at each end of the needle should be the same. If the compass is graduated for azimuths, the readings should be 180° apart. Similarly, if the pivot supporting the needle on a magnetic compass is bent, there will be an instrumental error in the compass. However, this error, instead of being the same for all readings, will vary. Either of these instrumental errors can be eliminated by reading both ends of the needle and using the average between them. Suppose, for example, that with a compass graduated for bearings you read a bearing of N45°E and a back bearing of S44°W. You would use the average, or: ½ (45° + 44°) = N44°30’E The error in the compass should, of course, be corrected as soon as possible. Normally, this is a job for an expert. Remember the cause of a discrepancy in the reading at both  14-11 ends when there is one. It is more probable that the needle, rather than the pivot, is bent. After a bent needle is straightened, if a discrepancy still exists, then probably the pivot is bent too. If a compass needle is sluggish—that is, if it moves unusually slowly in seeking magnetic north—it will probably come to rest a little off the magnetic meridian. The most common cause of sluggishness is weakening of the needle’s magnetism. A needle may be demagnetized by drawing it over a bar magnet. The needle should be drawn from the center of the bar magnet toward the end, with the south end of the needle drawn over the north end of the magnet and vice versa. On each return stroke, lift the needle clear of the magnet. Sometimes the cause of a sluggish needle is a blunt point on the pivot. This may be corrected by sharpening the pivot with a fine file. If the compass is not level when a bearing or azimuth is being read, the reading will be incorrect. A similar error exists if the compass is equipped with sighting vanes and one or more of them are bent. To check for bent compass vanes, set up and level the compass and then sight with the vanes on a plumb bob cord. The most common personal error the observer can make in compass work is MISRengineering techDING. This is caused by the observer’s eye not being vertically above the compass at the time of the reading. Other common mistakes include reading a needle at the wrong end and setting off local attraction or declination in the wrong direction when orienting the compass.

1.3.0 Establishing Directions by Transit

Directions are similarly determined by the use of a transit. This can be done by measuring the size of the horizontal angle between the line whose direction is sought and a reference line. With a transit, however, you are expected to do this with considerably more accuracy and precision than with a surveyor’s compass. Some of the basic procedures associated with the proper operation of the instrument will be discussed in the following paragraphs.

1.3.1 Setting up the Transit

The point at which the LOS, the horizontal axis, and the vertical axis of a transit meet is called the instrument center. The point on the ground over which the center of the instrument is placed is the instrument point, transit point, or station. A wooden stake or hub is usually marked with a tack when used as a transit station or point. To prevent jarring or displacement of the transit, avoid those stations with loose planking, soft or marshy ground, and other conditions that could cause the legs of the tripod to move. The following steps are recommended when you are setting up a transit over a station point:

1. Center the instrument as closely as possible over the definite point by suspending a plumb line from a hook and chain beneath the instrument. Tie the plumb string with a slipknot, so that the height of the plumb is easily adjustable.

2. Move the tripod legs as necessary until the plumb bob is about 1/4 inch short of being over the tack, while maintaining a fairly level foot plate. Spread the tripod legs, and apply sufficient pressure to the legs to ensure their firmness in the ground. Make sure to loosen the wing nuts to release the static pressure before retightening.

3. Turn the plates so that each plate level is parallel to a pair of opposite leveling screws. (It is common practice to have a pair of opposite leveling screws in line with the approximate LOS.) Tighten the leveling screws, and then rotate opposing pairs of leveling screws either toward each other or away from each other until the plate bubbles are centered. If the plumb bob is not directly over the center of the tack, loosen two adjacent leveling screws enough to free the shifting plate. Re-level the instrument if the bubbles become off-center. During breezy conditions, you may shield the plumb line with your body during setup. Sometimes in windy locations, it may be necessary to construct a wind shield. Setting and leveling the transit rapidly requires a skill that develops through consistent practice. Take advantage of any opportunities to train and increase skills in handling surveying instruments. When setting up or operating a transit, do not forget:

1. The plate bubble follows the direction of the left thumb when you are manipulating the leveling screws.

2. Always check to see if the plumb bob is still over the point after leveling it. If the plumb bob has shifted, re-center the instrument.

3. While loosening the two adjacent leveling screws, shift the transit head laterally.

4. Always maintain contact between the leveling screw shoes and the foot plate.

5. Do not disturb the instrument setup until you are certain that all observations at that point are completed and roughly checked. Move the instrument from that setup only after checking with the party chief.

6. Before the transit is moved or taken up, center the instrument on the foot plate, roughly equalize the height of the leveling screws, clamp the upper motion (the lower motion may be tightened lightly), point the telescope vertically upward, and lightly tighten the vertical motion clamp

1.3.2 Measuring Horizontal Angles

The transit contains a graduated horizontal circle, referred to as the horizontal limb. The horizontal limb may be graduated clockwise from 0° through 360° (figure 13-9, view A), or clockwise from 0° through 360° and also in quadrants (figure 13-9, view B); or both clockwise and counterclockwise from 0° through 360° (figure 13-9, view C).  14-13 Figure 14-9 – Three types of horizontal limb graduations. The horizontal limb can be clamped to stay fast when the telescope is rotated (called clamping the lower motion), or it can be released for rotating by hand (called releasing the lower motion). The horizontal limb is paired with another circle (the vernier plate), which is partially graduated on either side of zero graduations located 180° apart on the plate. When the telescope is in the normal (upright) position, the A vernier is located vertically below the eyepiece and the B vernier below the objective end of the telescope. The zero on each vernier is the indicator for reading the sizes of horizontal angles turned on the horizontal limb. To illustrate the method (Figure 14-10) of turning an angle from a reference line with a transit:

1. With the transit properly set over the point or station, bring one of the horizontal verniers near zero by hand; clamp the upper motion; and, by turning the upper tangent screw, set one vernier at 0°, usually starting with the A vernier. Train the telescope to sight the marker (range pole, chaining pin, or the like) held on the reference line; clamp the lower motion, and, by using the lower tangent screw, set the LOS on the marker.

2. Release the upper motion and rotate the telescope to bring the zero on the A vernier in line with the 30° graduation on the horizontal limb. To set the vernier exactly at 30°, use the upper tangent screw. You may use a magnifying glass to set the vernier easily and accurately.

3. Mark the next point with a marker and follow the procedures for establishing a point or station. Figure 14-10 – Setting the vernier at zero-zero (left) and setting an angle exactly on the vernier zero. Similarly, you may use the procedures above to measure a horizontal angle by sighting on two existing points and reading their interior angle. In addition, bear these tips in mind when taking horizontal measurements:

1. Make the centering of the line of sight as close as possible by hand so that you will not turn the tangent screw more than one or two turns. Make the last turn of the tangent screw clockwise to compress the opposing springs.

2. Read the vernier with your eye directly over the top of the coinciding graduations to eliminate the effects of parallax.

3. Take the reading of the other vernier as a check. The readings should be 180° apart.

4. Check the plate bubbles before measuring an angle to see if they are centered, but do not disturb the leveling screws between the initial and final settings of the line of sight. If an angle is measured again, re-level the plate after each reading before sighting again on the starting point.

5. Make sure that the rodman is holding the range pole exactly vertical when you sight at it. When the bottom of the range pole is not visible, let the rodman use a plumb bob.

6. Avoid accidental movement of the horizontal circle; for instance, moving the wrong clamp or tangent screw. If you will observe a number of angles from one setup without moving the horizontal circle, sight at a clearly defined distant object that will serve as a reference mark, and take note of the angle. Occasionally recheck the reading to this point during measurement to ensure no accidental movement has taken place. In an example of a horizontal deflection angle measurement (Figure 14-11), the field notes contain data taken from a loop traverse shown in the sketch. The transit was first set up at station A, and the magnetic bearing of AB was read on the compass. Then the deflection angle between the extension of engineering tech and AB was turned in the following manner:

1. The instrumentman released both clamps, matched the vernier to zero by hand, tightened the upper motion clamp, and set the zero exactly with the upper tangent screw.

2. With the telescope plunged (inverted position), the instrumentman sighted the range pole held on station E. Then he tightened the lower motion clamp and manipulated the lower motion tangent screw to bring the vertical cross hair to exact alignment with the range pole.

3. The instrumentman re-plunged the telescope and trained on the extension of engineering tech. (Notice that the telescope is in its normal position now.) He then released the upper motion and rotated the telescope to the right until the vertical cross hair came into line with the range pole held on station B. He further set the upper motion clamp screw and brought the vertical cross hair into exact alignment with the range pole by manipulating the upper motion tangent screw.

4. The instrumentman then reads the deflection angle size on the A vernier (89°01´). Since the angle was turned to the right, he recorded 89°01´R in the column headed “Defl. Angle.” Likewise, he recorded the chained distance between stations A and B and the magnetic bearing of traverse line AB under their appropriate headings. Figure 14-11– Sample fields from a deflection angle transit-tape survey.  14-16 The instrumentman uses the same method at each traverse station, working clockwise around the traverse to station E. The algebraic sum of the measured deflection angle (angles to the right considered as plus, to the left as minus) is 350°59´. For a closed traverse, the algebraic sum of the deflection angles from the standpoint of pure geometry is 360°00´. Therefore, there is an angular error of disclosure here of 0°01´. This small error would probably be considered a normal error. A large variance would indicate a larger mistake made in the measurements. In this example, the general accuracy of all the angular measurements was checked by comparing the sum of the deflection angles with the theoretical sum. The accuracy of single angular measurement can be checked by closing the horizon. The method is based on the theoretical sum of all the angles around a point being 360°00´. The field notes (Figure 14-12) show the procedure for closing the horizon. The transit was set up at station A, and angle BAC was turned, measuring 51°15´. Then the angle from AC clockwise around to AB was turned, measuring 308°45´. The sum of the two angles is 360°00´. The angular error of closure is therefore 0°00´, meaning that perfect closure is obtained. Figure 14-12 – Sample field notes for closing the horizon.

1.3.3 Measuring Vertical Angles

The vertical circle and the vertical vernier of a transit are used for measuring vertical angles. A vertical angle is the angle measured vertically from a horizontal plane of reference (Figure 14-13, view A). When the telescope is pointed in the horizontal plane (when the telescope is level), the value of the vertical angle is zero. When the telescope is pointed up at a higher feature (elevated), the vertical angle increases from zero and is a plus vertical angle or angle of elevation. These values increase from 0° to +90° when the telescope is pointed straight up. As the telescope is depressed (pointed down), the angle increases in numerical value. A depressed telescope reading, showing that it is below the horizontal plane, is a minus vertical angle or angle of depression. These numerical values increase from 00 to –90° when the telescope is pointed straight down. To measure vertical angles, set the transit upon a definite point and level it. The plate bubbles must be centered carefully, especially for transits that have a fixed vertical  14-17 vernier. Turn the LOS to approximately the point that the horizontal axis is clamped. Then, bring the horizontal cross hair to the point by means of the telescope tangent screw. Read the angle on the vertical limb using the vertical vernier. On a transit with a movable vertical vernier, the vernier is equipped with a control level. The telescope is centered on the point as previously described, but the vernier bubble is centered before the angle is read. The zenith is an imaginary point overhead where the extension of the plumb line will intersect an assumed sphere on which the stars appear projected. The equivalent point, directly below the zenith, is the nadir. Using the zenith permits reading angles in a vertical plane without using a plus or a minus. Theodolites have a vertical scale reading zero when the telescope is pointed at the zenith instead of in a horizontal plane. With the telescope in a direct position and pointed straight up, the reading is 0°; on a horizontal line, the reading is 90°; and straight down, 180°. When measuring vertical angles with the theodolites (Figure 14-13, view B), read the angle of elevation with values less than 90°and the angle of depression with values greater than 90°. These angle measurements with the zenith as the zero value are called the zenith distances. Double zenith distances are observations made with the telescope directly and reversed to eliminate errors caused by the inclination of the vertical axis and the collimation of the vertical circle. Zenith distance is used to measure vertical angles involving trigonometric leveling and in astronomical observations. Figure 14-13 – Vertical angles and zenith

1.3.4 Measuring Angles by Repetition

There is a significant distinction between precision and accuracy. A transit on which angles can be measured to the nearest 20 second is more precise than one that can measure only to the nearest 1 minute. However, this transit is not necessarily more accurate. The inherent angular precision of a transit is increased by the process of repetition. To illustrate this principle, suppose that with a one minute transit you turn the angle between two lines in the field and read 45°00´. The inherent error in the transit is 1´; therefore, the true size of this angle is somewhere between 44°59´30´´ and 45°00´30´´. For example, when using repetition, you leave the upper motion locked but release the lower motion. The horizontal limb will now rotate with the telescope, holding the reading of 45°00´. You plunge the telescope, train again on the initial line of the angle, and again turn the angle. You have now doubled the angle. The A vernier should read approximately 90°00´. For this second reading, the inherent error in the transit is still one minute, but the angle indicated on the A vernier is about twice the size of the actual angle measured. The effect of this is to halve the total possible error. This error was originally plus or minus 30 seconds. Now, the error is plus or minus only 15 seconds. If you measure this angle a total of six times, the total possible error will be reduced to one-sixth of 30 seconds, or plus or minus 5 seconds. In theory, you could go on repeating the angle and increasing the precision indefinitely. In actual practice, because of lost motion in the instrument and accidental errors, it is not necessary to repeat the angle more than six times. The observation may be taken alternately with the telescope plunged before each subsequent observation. But a much simpler way is to take the first half of the observations with the telescope in the normal position, the other half, in an inverted position. Using the details of the previous example, the first three readings may be taken when the telescope is in its normal position; the last three when it is in its reversed position. To avoid the effect of tripod twist, after each repetition, rotate the instrument on its lower motion in the same direction that you turned it during the measurement; that is, the direction of movement should always be either clockwise or counterclockwise. Measuring angles by repetition eliminates certain possible instrumental errors, such as those caused by eccentricity and by non-adjustment of the horizontal axis. Review the field notes for the angle around a station, repeated six times (Figure 14-14). The angle BAC was measured six times, and the angle closing the horizon around station A was also measured six times. The first measurement is not a true repeat, but it is counted as one in the column headed “No. Rep.” (number of repetitions). With the transit first trained on B and the zeros matched, the plate reading was 00°00´. This is recorded beside B in the column headed “Plate Reading”. The upper motion clamp was then released, the telescope was trained on C, and a plate reading of 82°45´ was obtained. This reading is recorded next to the figure ‘‘1” (for “1st repetition”) in the column headed “No. Rep.” The measurement of angle BAC was then repeated five more times. After the final measurement, the plate reading was 136°28´. This plate reading is recorded as the sixth repetition. To get the mean angle, divide some number, or figure, by the total number of repetitions. To determine which figure to use, first multiply the initial measurement by the total number of repetitions. In this case, as follows: 82°45’ x 6 = 496°30’  14-19 Figure 14-14 – Notes for the angle around a station, repeated six times. Next, determine the largest multiple of 360° that can be subtracted from the above product. Obviously, the only multiple of 360° that can be subtracted from 496°30´ is 360°. This multiple is then added to the final measurement to obtain the figure that is to be divided by the total number of repetitions. In this example: 136°28’ + 360° = 496°28’ The mean angle then is 496°28’ 6 = 82°44’40” Enter this in the column headed “Mean Angle”. The following computation shows that you should use the same method to obtain the mean closing angle. 277°15’ x 6 = 1663°30’ 360° x 4 = 1440° (largest multiple of 360° 223°32’ + 1440 = 1663°32’ 1663°32’ 6 = 277°15’20” In the example shown above, the sum of the mean angle (82°44´40´´) and the mean closing angle (277°15´20´´) equals 360°00´00´´. This reflects perfect closure. In actual practice, perfect angle closure would be unlikely.

1.4.0 Running a Distance (Line)

It is often necessary to extend a straight line marked by two points on the ground. Which method is used depends on whether or not there are obstacles in the line ahead, and, if so, whether the obstacles are small or large. 

1.4.1 Double Centering or Double Reversing

The double centering (or double reversing) method is used to prolong or extend a line. Suppose you are extending line AB (Figure 14-15). Set up the transit at B, backsight on A, plunge the telescope to sight ahead, and set the marker at C´. With the telescope still inverted, again sight back on A, but this time, rotate the telescope through 180°. Then replunge the telescope and mark the point C´´. Mark the point C halfway between C´ and C´´. This is the point on the line AB you need to extend. If the instrument is in perfect adjustment (which seldom happens), points C´ and C´´ will coincide with point C. For further extension, move the instrument to C and repeat the procedure to obtain D.

1.4.2 Bypassing an Object by Angle Offset

This method is applied when a tree or other small obstacle is in the LOS between two points. The transit or theodolite is set up at point B (Figure 14-16) as far from the obstacle as practical. Point C is set off the line near the obstacle and where the line BC will clear the obstacle. At B, measure the deflection angle, a. Move the instrument to C, and lay off the deflection angle 2a. Measure the distance BC, and lay off the distance CD equal to BC. Move the instrument to D, and lay off the deflection angle . Mark the point E. Then, line DE is the prolongation of the line AB.

1.4.3 Bypassing an Object by Perpendicular Offset

The bypass an object by perpendicular offset method is used when a large obstruction, such as a building, is in the LOS between two points. The solution establishes a line parallel to the original line at a distance clear from the obstacle (Figure 14-17). Set up the instrument at B, and turn a 90° angle from line AB. Carefully measure and record the distance BB´. Move the instrument to B´, and turn another 90° angle. Lay off B´C´ to clear the obstacle. Move the instrument to C, and turn a third 90° angle. Measure and mark distance CC´, which is equal to BB´. This establishes a point C on the original line. Then move the instrument to C, and turn a fourth 90° angle to establish the alignment CD that is the extension of AB beyond the obstacle. Figure 14-15 – Double centering. Figure 14-16 – Bypassing a small obstacle by the angle off-set method.  14-21 When the distance to clear the obstacle, BB´ or CC´, is less than a tape length, you can avoid turning four 90° angles. Erect perpendicular offsets from points A and B (Figure 14-17) so that AA´ equals BB´. Set up the instrument at B’, and measure angle A´B´B to be sure that it’s 90°. Extend line A´B´ to C´ and then to D´, making sure that point C clears the obstacle. Then, lay off perpendicular offset C´C equal to AA´ or BB´ and perpendicular offset D´D equal to C´C. Then, line CD is the extension of line AB. The total distance of the line AD is the sum of the distances AB, B´C´, and CD. Compute the diagonals formed by the end rectangles and compare the result to the actual measurement, if you can, as a further check.

1.4.4 Line between Non-Intervisible Points

Sometimes running a straight line between nonintervisible points is necessary when events make the use of other methods impractical. If there is an intermediate point on the straight line from which both of the end points can be observed, you may use the balancing in method (also called bucking in, jiggling in, wiggling in, or ranging in). A problem often encountered in surveying is finding a point exactly on the line between two other points when neither can be occupied, or when an obstruction (such as a hill) lies between the two points. The point to be occupied must be located so that both of the other points are visible from it. The process of establishing the intermediate point is known as wiggling in or ranging in. First, estimate the approximate position of the line between the two points at the instrument station by using two range poles. Line in the range poles alternately in the following manner. As shown (in Figure 14-18), view A, set range pole 1 and move range pole 2 until it is exactly on line between pole 1 and point A. Do this by sighting along the edge of pole 1 at the station A until pole 2 seems to be on line. Set Figure 14-17– Bypassing a large obstacle by the perpendicular offset method. Figure 14-18 – Setting up on a line between two points.  14-22 range pole 2 and move pole 1 until it is on line between pole 2 and point C. Now, move pole 2 into line again, then pole 1, alternately, until both are on line AC. The line will appear to pass through both poles and both stations from either viewing position. After finding the approximate position of the line between the two points, set up the instrument on this line. The instrument probably will not be exactly on line, but will be over a point, such as B´, (see Figure 14-19, 9iew B). With the instrument at B´, backsight on A and plunge the telescope and notice where the line of sight C passes the point C. Estimate this distance CC´ and also the distance that B´ would be away from C and A. Estimate the amount to move the instrument to place it on the line you need. Thus, if B´ is midway between A and C, and C´ misses C by three feet to the left, B´ must be moved about one and a half feet to the right to reach B. Continue the sequence of backlighting, plunging the telescope, and moving the instrument until the LOS passes through both A and C. When doing this, the telescope is reversed, but the instrument is not rotated. This means that if the telescope is reversed for backlighting on A, make all sightings on A with the telescope reversed. Mark a point on the ground directly under the instrument. Then, continue to use this method with the telescope direct for each backsight on A. Mark a second point on the ground. The point you need on the line AC is then the midpoint between the two marked points. Wiggling in is usually time consuming. Even though the shifting head of the instrument is used in the final instrument movements, you may have to pick up and move the instrument several times. The following method often saves time. After finding the approximate position of the line between the two points, mark two points B´ and B´´ (Figure 14-19, 9iew C) one or two feet apart where you know they straddle the line AC. Set up over each of these two points in turn and measure the deflection angles . Also measure the horizontal distance between points B´ and B´´. This enables the ability to find the position B on the line AC by using the following equation: βα α + = aa 1 in which is the proportionate offset distance from B´ toward B´´ for the required point B, and and βα are both expressed in minutes or in seconds.

1.5.0 Random Line

It is sometimes necessary to run a straight line from one point to another point that is not visible from the first point. If there is an intermediate point on theline from which both end-points are visible, this can be done by the balancing-in method. If no such intermediate point exists, the random line method (Figure 14-19, 9iew A) is useful. It is challenging to run a line from A to B, when B is a point not visible from A. It happens, however, that there is a clear area to the left of the line AB, through which a random line can be run to C; C being a point visible from A and B. Figure 14-19 – Random line method for locating intermediate stations.  14-23 To train a transit set up at A on B, knowing the size of the angle at A is necessary. You can measure side b and side a, and you can measure the angle at C. Therefore, you have a triangle, of which you know two sides and the included angle. You can solve this triangle for angle A by:

• Determining the size of side c by the law of cosines, then determining the size of angle A by the law of sines

• Solving for angle A by reducing to two right triangles Suppose you find that angle A measures 16°35´. To train a transit at A on B, you would simply train on C and then turn 16°35´ to the right. You may also use the random line method to locate intermediate stations on a survey line. As shown in Figure 14-19, 9iew B, stations 0 + 00 and 2 + 50, now separated by a grove of trees, were placed at some time in the past. You need to locate stations 1 + 00 and 2 + 00, which lie among the trees. Run a line at random from station 0 + 00 until you can see station 2 + 50 from some point, A, on the line. The transitman measures the angle at A and finds it to be 108°00´. The distances from A to stations 0 + 00 and 2 + 50 are chained and found to be 201.00 feet and 98.30 feet. With this information, it is now possible to locate the intermediate stations between stations 0 + 00 and 2 + 50. The distances AB and AD can be computed by ratio and proportion, as follows: AB x 201.0 40.20 ft. 250 50 = = and AB x 201.0 120.60 ft. 250 150 = = Lay off these distances on the random line from point A toward station 0 + 00. The instrumentman then occupies points B and D; turns the same angle, 108°00´, that he or she measured at point A and establishes points C and E on lines from points B and D through the stations being sought. The distances are computed by similar triangles as follows: B stationto BC x 78.64ft98.3 ft 250 200 )(002 =+ = D stationto DE x 39.32ft98.3 ft 250 100 )(001 =+ =

1.6.0 Tying In a Point

Determining the horizontal location of a point or points with reference to a station, or two stations, on a traverse line is commonly termed tying the point. The next several paragraphs present various methods used in the process. Figure 14-20 – Swing offset method of locating points.

1.6.1 Locating Points by Swing Offsets

The swing offset is used for locating points close to the control lines (Figure 14-20). Measurement of a swing offset distance provides an accurate determination of the perpendicular distance from the control line to the point being located. The swing offset is somewhat similar to the range tie (explained later), but as a rule, requires no angle measurement. To determine the swing offset distance, a chainman holds the zero mark of the tape at a corner of the structure while another chainman swings an arc with the graduated end of the tape at the transit line AB. When the shortest reading on the graduated end of the tape is observed by the chainman, the swing offset or perpendicular distance to the control line is obtained at points a or b. In addition, the horizontal distances between the instrument stations (A and B) and the swing offset points (a and b) may be measured and marked. A tie distance and angle ora θ may be measured from either instrument station to the corner of the structure to serve as a check.

1.6.2 Locating Points by Perpendicular Offsets

The method of perpendicular offsets from a control line (Figure 14-21) is similar to swing offsets. This method is more suitable than the swing offset method for locating details of irregular objects, such as stream banks and winding roads. Establish the control line close to the irregular line to be located, and measure perpendicular offsets, aa´, bb´, cc´, and so on, to define the irregular shape. When the offset distances are short, the 90° angles are usually estimated; but when the distances are several hundred feet long, lay off the angles with an instrument. Measure the distances to the offset points from a to i along the control line.

1.6.3 Locating Points by Range Ties

A point’s location can also be determined by means of a range tie, using an angle and a distance. The method requires extra instrument manipulation and should be used only when none of the previous methods are practical. Actually, range ties establish not only the corner of a structure but also the alignment of one of the sides. Assume that the building (Figure 14-22) is not visible from either A or B or that either or both of the distances from A to B to a corner of the building cannot be measured easily. With the instrument set up at either A or B and the line AB established, one member of the party moves along AB until Figure 14-21 – Perpendicular offsets. Figure 14-22 – Range ties.  14-25 he or she reaches point R, which is the intersection of line 1-2 extended. Move the instrument and set up on R, and measure the distance along the line AB to R. An angle measurement to the building is made by using either A or B as the backsight. Measure the range distance, R-2, as well as the building dimensions.

1.7.0 Setting Adjacent Points

To “set a point adjacent to a traverse line” means to establish the location of a point by following given tie data. This tie data may be (1) a perpendicular offset distance from a single specified station, (2) angles from two stations, or (3) an angle from one station and the distance from another station.

1.7.1 Setting Points When Given a Perpendicular Offset Distance

To set a point when given an angle and its distance from a single station, set up the instrument at the station; turn the designated angle, and chain the distance along the LOS. For perpendicular offset, the angle is 90°. To set a point when given a distance from each of two stations, manage by using two tapes if each of the distances is less than a full tape length. To do so, set the zero end of the tapes on both stations; run out the tapes, and match the distance mark on each tape to correspond with the required distance from the stations. When the tape is drawn taut, the point of contact between the tapes will be over the location of the desired point. If one or both of the distances is greater than a full tape length, determine direction of one of the tie lines by correct triangle solution. For example (Figure 14-23), set point B 120.0 feet from station A and 83.5 feet from station C. A and C are 117.0 feet apart. Determine the size of the angle at A by using the triangle solution: bc csbs A ))(( 1 cos −− =− 2 s = (120.01/2 117.0 83.5) =++ 160.25 0.24797 (117.0)(120.0) 2(43.25)(40.25) 1 cos A =− = cos A = 1,00000 − 0.24797 − 0.75203 A 41°= 41 ′ To set point B, set up a transit at A, sight on C, turn 41°14´ to the left, and measure off 120.0 feet on that LOS. As a check, measure BC to be sure it measures 83.5 feet.

Figure 14-23 – Locating a point by distances from two stations.

1.7.2 Setting Points When Given Angles from Two Stations

To set a point when given the angle from each of two traverse stations under ordinary conditions, use a pair of straddle hubs (commonly called straddlers), as shown in Figure 14-24. Here the point is located at an angle of 34°33´ from station 2 + 00 and at an angle of 51°21´ from station 3 + 00. Set up the transit at station 2 + 00, sight it on station 3 + 00, and turn an angle of 34°33´ to the right. For this LOS, drive a pair of straddle hubs, one on either side of the estimated point of intersection of the tie lines. Stretch a cord between the straddlers. Then shift the transit to station 3 + 00, sight it on station 2 + 00, and turn an angle of 51°21´ to the left. Drive a hub at the point where this LOS intercepts the cord between the straddlers. To set a point with a given angle from one station and the distance from another, determine the direction of the distance line by triangle solution. In the example (Figure 14- 25) point B is located 100.0 feet from station A and at an angle of 50°00´ from station C. In this example, you can determine the size of the angle at A by first determining the size of angle B, then subtracting the sum of angles B and C from 180°. The solution for angle B is as follows: 100.0 130.0 sin50° 00 ′ sin B = 0.99585 100.0 130.0(0.76604) sin B = Angle B then measures, to the nearest minute, 84°47´. Therefore, angle A measures: 180° ′ °− 74(8400 ′ 50°+ ′)00 45°= 31 ′ Set up a transit at A, sight on C, and turn 45°13´ to the left. Then, set B by measuring off 100.0 feet on this LOS. As a check, set up the transit at C, sight on A, turn 50°00´ to the right, and make sure this line of sight intercepts the marker at B.

Figure 14-24 – Setting a point using straddlers.

Figure 14-25 – Locating a point by angle and distance from two stations. 

 

Test Your Knowledge

1. What is the size of the deflection angle between traverse lines BC and CD in the figure?

Figure Here

A. 60°
B. 90°
C. 105°
D. 120°

2. What is the approximate true bearing of the object if the local declination is 10°W and the local attraction is 20E?

A. S80°
B. S100°W
C. N80°W
D. N100°E

3. What are the respective bearings of the traverse lines OP in A and B in the figure?

Figure Here

A. N30°E and S30°W
B. S30°W and N30°W
C. S30°E and N30°E
D. N30°E and S30°E

2.0.0 TRANSIT-TAPE SURVEY

The exact method used in transit-tape surveying may vary slightly depending upon the nature of the survey, the intended purpose, the command or unit policy, and the preferences of the survey party chief. The procedures presented in this section are customary methods described in general terms.

2.1.0 Selecting Points for Marking

All points where a traverse changes direction are marked, usually with a hub that locates the station exactly, plus a guard stake on which the station of the change-ofdirection point is inscribed, such as 12 + 35. In the expression “station 12 + 35,” the 12 is called the full station and the 35 is called the plus. The points intended to be tied to the traverse or set in the vicinity of the traverse are usually selected and marked or set as the traverse is run. Select and mark the corresponding tie stations on the traverse at the same time. The first consideration in selecting tie stations is visibility, meaning that tie stations and the point to be tied or set must be intervisible. The next is permanency (not easily disturbed). Last is the strength of the intersection, which generally means that the angle between two tie lines should be as close to 90° as possible. The more acute or obtuse the angle is between tie lines, the less accurate the location of the point defined by their intersection.

2.2.0 Identifying Party Personnel

A typical transit-tape survey party contains two chainmen, a transitman, a recorder (sometimes the transitman or party chief doubles as recorder), a party chief (who may serve as either instrumentman or recorder, or both), and axmen, if needed. The transitman carries, sets up, and operates the transit; the chainmen do the same with the tapes and the marking equipment. When the transitman turns an angle, he calls out the identity and size of the angle to the recorder, as “Deflection angle AB to BC, 75°16´, right”. The recorder repeats this and then makes the entry. Similarly, the head chainman calls out the identity and size of a linear distance, as “B to C, 265.72 feet;” then the recorder repeats this back and makes the entry. If the transitman closes the horizon around a point, he calls out, “Closing angle” and the angle measurement itself. The recorder repeats this and then adds the closing angle to the original angle. If the sum of the angles doesn’t come close to 360°, the recorder notifies the party chief. The party chief is in charge and makes all the significant decisions, such as the stations to be marked on the traverse.

2.3.0 Attaining the Prescribed Order of Precision

The important distinction between accuracy and precision in surveying is that accuracy denotes the degree of conformity with a standard. It relates to the quality of a result whereas precision relates to the quality of the operation by which the result is obtained. The accuracy attained by field surveys is the product of the instructions or specifications to be followed during work and the precision in following those instructions. For example, the “accuracy of a surveyor’s tape” indicates the degree to which an interval of 100 feet, as measured on the tape, actually agrees with the exact interval of a standard 100 foot tape. If a tape indicates 100 feet when the interval it measures is only 99.97 feet, the tape contains an inaccuracy of 0.03 feet for every 100 feet measured. The accuracy of this particular tape, expressed as a fraction, is 0.03/100, or approximately 1/3,300. Precision denotes the degree of refinement in the performance of an operation or in the statement of a result. It relates to the quality of execution and is distinguished from accuracy, which relates to the quality of the result. The term “precision” not only applies to the fidelity of performing the necessary operations but, by custom, has been applied to methods and instruments used in obtaining results of a high order of accuracy. Precision is exemplified by the number of decimal places to which a computation is carried and a result stated. In a general way, the accuracy of a result should determine the precision of its expression. Precision does not have significance unless accuracy is also obtained. In measuring a linear distance with a tape graduated in feet that are subdivided into tenths, you can read (without estimation) only to the nearest tenth (0.1) of a foot. But with a tape graduated to hundredths of a foot, you can directly read distances measured to the nearest hundredth (0.01) of a foot. The apparent nearness of the second tape will be greater; that is, the second tape will have a higher precision. Nature does not allow for perfectly precise measurement. There is always some built-in and/or inherent error, amounting to the size of the smallest graduation. Precision for the first tape above, expressed as a fraction, is 0.1/100 or 1/1,000 and for the second tape, 1/10,000. Precision in measurements is usually expressed in a fractional form with unity as the numerator, indicating the allowable error within a certain limit as indicated by the denominator, such as 1/500. In this case, a maximum error of 1 unit per 500 units measured is acceptable. If the unit of measure is in feet, 1 foot of error for every 500 feet is acceptable. Surveys must be carried out with accuracy, opportunity for errors and mistakes must be avoided. The precision of a survey, however, depends upon the order of precision that is either specified or implied from the nature of the survey.  14-29 The various orders of precision are absolute in meaning. Federal agencies control surveys and generally classify surveys into one of four orders of precision; namely, first order, second order, third order, and fourth order control surveys. The first order is the highest and the fourth order is the lowest standard of accuracy. Because of the type of instruments available in the Sengineering techBEEs, most surveys may not require a precision higher than a third order survey. When the order of precision is not specified, use Table 14-1 as a standard for a horizontal control survey when using the traverse control method. For surveys that call for a higher order of precision, use theodolites to obtain the required precision. Table 14-1 – Control Traverse Order of Precision. ORDER OF PRECISION MAX # OF AZIMUTH COURSES BETWEEN AZIMUTH CHECKS DISTANCE Mengineering techSUREMENT ACCURATE WITHIN MAXIMUM LINengineering techR ERROR OF CLOSURE MAXIMUM ERRORS OF ANGLES FIRST ORDER 15 35,000 1 25,000 1 2 seconds N or* 1.0 second per station SECOND ORDER 25 15,000 1 10,000 1 10 seconds N or* 3.0 seconds per station THIRD ORDER 50 7,500 1 5,000 1 30 seconds N or* 8.0 seconds per station FOURTH ORDER -- 3,000 1 1,000 1 2 minutes or compass

• N = the number of stations carrying azimuth.

• * = use whichever is smaller in value. Survey problems may require the use of the triangulation method. In such a case, use Table 14-2 as a guide for the order of precision if it is not specified in the survey. The practical significance of a prescribed or implied order of precision lies in the fact that the instruments and methods used must be capable of attaining the required precision. The precision of an instrument is indicated by a fraction in which the numerator is the inherent error. (In a one minute transit, the inherent error is one minute.) The denominator is the total number of units in which the error occurs. For a transit, this last then, is 1/5,400, adequate for a third order survey. Precision of a tape is given in terms of the inherent error per 100 feet. A tape that can be read to the nearest 0.01 feet has a precision of 0.01/100, or 1/10,000—adequate for second order work.  14-30

2.3.1 Attaining Precision with a Linear Error of Closure

For a closed traverse, attain a ratio of linear error of closure that corresponds to the order of precision prescribed or implied for the traverse. The ratio of linear error of closure is a fraction in which the numerator is the linear error of closure and the denominator is the total length of the traverse. To understand the concept of linear error of closure, study the closed traverse shown in Figure 14-26. Beginning at station C, this traverse runs N30°E300 feet, thence S30°E300 feet, thence S90°W 300 feet. The end of the closing traverse, BC, lies exactly on the point of beginning, C. This indicates that all angles were turned and all distances chained with perfect accuracy, resulting in perfect closure, or an error of closure of zero feet. Table 14-2 – Triangulation Order of Precision. PRECISION APPLICATION BASE LINE Mengineering techSUREMENT MAX., PROBABLY ERROR TRIANGLE CLOSURE; MAX. AVERAGE ERROR LENGTH CLOSURE: MAX. DISCREPANCY BETWEEN Mengineering techSURED AND COMPUTED LENGTH BASE LINE FIRST ORDER Case I: For city and scientific study survey 1,000,000 1 1.0 seconds 100,000 1 Case II: Basic network of U.S. 1,000,000 1 1.0 seconds 50,000 1 Case III: All other purposes 1,000,000 1 1.0 seconds 25,000 1 SECOND ORDER Case I: Area networks and supplemental cross arcs in national net. 1,000,000 1 1.5 seconds 20,000 1 Case II: Costal areas, inland waterways, and engineering surveys. 500,000 1 3.0 seconds 10,000 1 THIRD ORDER Topographic mapping 250,000 1 5.0 seconds 5,000 1  14-31 However, in reality, perfect accuracy in measurement seldom occurs. In actual practice, the closing traverse line, BC, (Figure 14-26), is likely to be some distance from the starting point, C. If this should happen, and the total accumulated linear distance measured along the traverse lines is 900.09 feet, the ratio of error of closure then is .09/900 or 1/10,000. This resulting ratio is equivalent to the precision prescribed for second order work.

2.3.2 Attaining Precision with a Maximum Angular Error of Closure

The sum of interior angles of a closed traverse will theoretically equal the product of 180° (n – 2), n being the number of sides in the polygon described by the traverse. A prescribed maximum angular error of closure is stated in terms of the product of a given angular value times the square root of the number of interior angles in the traverse. Again, if we use the traverse shown in Figure 14-26 as an example, the prescribed maximum angular error of closure in minutes is 01 because the figure has three interior angles. The sum of the interior angles should be 180°. If the sum of the angles as actually measured and recorded is 179°57´, the angular error of closure is 03´. The maximum permissible error of closure is the product of 01´ times the square root of 3, or about 1.73´. The prescribed maximum angular error of closure has therefore been exceeded.

2.3.3 Meeting Precision Specifications

There are several specifications that provide a general idea of the typical precision requirements for various types of transit tape surveys. When linear and angular errors of closure are specified, a closed traverse is involved.

• Requirements for preliminary surveys and land surveys include the following: o Transit angles to the nearest minute, measured once o Sights on range poles plumbed by eye o Tape leveled by eye, and standard tension estimated o No temperature or sag corrections o Slopes fewer than three percent disregarded o Slopes over three percent measured by breaking chain or by chaining slope distance and applying calculated correction o Maximum angular error of closure in minutes is 1.5 o Maximum ratio linear error of closure, 1/1000 o Pins or stakes set to nearest 0.1 foot

• For most land surveys and highway location surveys, typical precision specifications may read as follows: o Transit angles to nearest minute, measured once o Sights on range poles, plumbed carefully o Tape leveled by hand level, with standard tension by tensionometer or sag correction applied Figure 14-26 – A closed traverse with a perfect closure.  14-32 o Temperature correction applied if air temperature more than 15° different from standard (68°F) o Slopes fewer than two percent disregarded o Slopes over two percent measured by breaking chain or by applying approximate slope correction to slope distance o Pins or stakes set to nearest 0.05 foot o Maximum angular error of closure in minutes is o Maximum ratio linear error of closure, 1/3,000

• For important boundary surveys and extensive topographical surveys, typical precision specifications include the following: o Transit angles by one-rein transit, repeated four times o Sights taken on plumb lines or on range poles carefully plumbed o Temperature and slope corrections applied; tape leveled by level o Pins set to nearest 0.05 foot o Maximum angular error of closure in minutes is . o Maximum ratio linear error of closure is 1/5,000. Note that in the first two specifications, one-time angular measurement is considered sufficiently precise. Many surveyors, however, use two-line angular measurement customarily to maintain a constant check on mistakes

2.3.4 Measuring Angles vs. Measuring Distances

It is usually the case on a transit-tape survey that the equipment for measuring angles is considerably more precise than the equipment for measuring linear distances. This fact leads many surveyors towards a tendency to measure angles with great precision, while overlooking important errors in linear distance measurements. A precision of angular measurement greater than that of linear measurement is useless because angles are only as good as linear distances. Suppose a traverse line BC is run at a right deflection angle of 63°45´ from AB, 180.00 feet to station C. After setting up at B, orient the telescope to AB extended, and turn exactly 63°45´00´´ to the right. But instead of measuring off 180.00 feet, you measure off by 179.96 feet. Regardless of how precisely all of the other angles in the traverse are turned, every station will be dislocated because of the error in the linear measurement of BC. Remember that angles and linear distances must be measured with the same precision.

2.4.0 Identifying Errors and Mistakes in Transit Work

In transit work, errors are grouped into three general categories; namely, instrumental, natural, and personal errors.

2.4.1 Identifying Instrumental Errors

'A transit does not measure angles accurately unless the instrument meets these conditions:

• The vertical cross hair must be perpendicular to the horizontal axis. If the vertical cross hair is not perpendicular, the measurement of horizontal angles will be inaccurate.

• The axis of each of the plate levels must be perpendicular to the vertical axis. If they are not, the instrument cannot be accurately leveled. If the instrument is not level, the measurement of both horizontal and vertical angles will be inaccurate.

• The line of sight through the telescope must be perpendicular to the horizontal axis. If it is not, the line of sight through the telescope inverted will not be 1800 opposite the line of sight through the telescope erect.

• The horizontal axis of the telescope must be perpendicular to the vertical axis. If it is not, the measurement of both horizontal and vertical angles will be inaccurate.

• The axis of the telescope level must be parallel to the line of sight through the telescope. If it is not, the telescope cannot be accurately leveled. If the telescope cannot be accurately leveled, vertical angles cannot be accurately measured.

• The point of intersection of the vertical and horizontal cross hairs must coincide with the true optical axis of the telescope. If it doesn’t, measurement of both horizontal and vertical angles will be inaccurate. Note Any or all of the above conditions may be absent in an instrument that is defective or damaged, or one that needs adjustment or calibration.

2.4.2 Identifying Natural Errors

Common causes of natural errors in transit include:

• The tripod is set in yielding soil. If the tripod settled evenly—that is, if the tip of each leg settled precisely the same amount—there would be little error in the results of measuring horizontal angles. Settlement is usually uneven, however, which results in the instrument not being level.

• Refraction can be a problem; however, its effect is usually negligible in ordinary precision surveying.

• Unequal expansion or contraction of instrument parts caused by excessively high or low temperature can also be a problem, but for ordinary precision surveying, the effect of this is also usually negligible.

• High wind may cause plumbing errors when you are plumbing with a plumb bob and cord and may also cause reading errors because of instrument vibration.

' 2.4.3 Identifying Personal Errors

'Personal errors are the combined results of carelessness and the eye’s physical limitations in setting up, leveling the instrument, and making observations. Common causes of personal errors in transit work include:

• Failure to plumb the vertical axis exactly over the station - Inaccuracy increases drastically as the sight distance decreases (Figure 14-27). As shown, an instrument that was supposed to be set up at A was actually set up at A´, 40 feet away from A. (For demonstration purposes the figure was exaggerated to magnify the error; in actual practice the eccentricity amounts only to a fraction of an inch. Remember that mathematically, one inch is the arc of one minute when the radius is 300 feet.). In the upper view, you can see that with B located 300 feet from A, the angular error caused by the displacement is about eight degrees. In the lower view, however, with B located only 100 feet from A, the angular error  14-34 caused by the displacement is about 22°. The practical lesson to be learned from this is to always plumb the instrument much more carefully for a short sight than for a long one.

• Failure to center plate level bubbles exactly - The consequent error is at a minimum for a horizontal sight and increases as a sight is inclined. The practical lesson is to always level the instrument very carefully for an incline sight.

• Inexact setting or reading of a vernier - The use of a small, powerful pocket magnifying glass is helpful here. Also, after determining the vernier graduation that most nearly coincides with a limb graduation, check the selection by examining the graduations on either side. These should fall in coincidence with the limb counterparts by about the same amount.

• Failure to line up the vertical cross hair with the true vertical axis of the object sighted - The effect is similar to that of not plumbing exactly over the station, which means that the error increases drastically as the length of the sight decreases.

• Failure to bring the image of the cross hair or that of the object sighted into clear focus (parallax) - A fuzzy outline makes exact alignment difficult. Common mistakes in transit work include:

• Turning the wrong tangent screw - For example, turning the lower tangent screw after taking a backsight, introduces an error into the backsight reading.

• Forgetting to tighten the clamp(s), or allowing a clamp slipping when it is supposed to be tight

• Reading in the wrong direction from the index (zero mark) on a double vernier

• Reading the wrong vernier; for example, reading the vernier opposite the one that was set

• Reading angles in the wrong direction; that is, reading from the outer row rather than the inner row, or vice versa, on the horizontal scale

• Failure to take a full-scale reading before reading the vernier - For example, you may drop 20 to 30 minutes from the reading, erroneously recording only the number of minutes indicated on the vernier, such as 15°18´ instead of 15°48´. Do not be so intent on reading the vernier that you lose track of the full-scale reading of the circle.

2.5.0 Caring for and Maintaining Surveying Instruments

'The accuracy and quality of a survey depends upon the condition of the surveying instrument and the experience of the surveyor. The life expectancy and usefulness of Figure 14-27 – Exaggerated illustration of error caused when the transit is not centered exactly over the occupied station.  14-35 an instrument can be extended considerably by careful handling, stowing, and maintenance. Every instrument is accompanied by an instruction manual that indicates not only the proper operation and components of the instrument but also procedures for its care and maintenance. Study this instruction manual thoroughly before attempting to use any instrument.

2.5.1 Carrying and Stowing

Every transit, theodolite, and level comes equipped with a carrying box or case. The instrument and its accessories can be stowed in the case in a manner that ensures a minimum of motion during transportation. Always stow instruments in their carrying cases when not in use.

2.5.2 Cleaning and Lubricating

In general, all surveying instruments, equipment, and tools must be cleaned thoroughly immediately following use. For example, dust off the transit or theodolite and wipe it dry before placing it back in its case after each use. Remove all dust with a clean cloth. This applies particularly to the optical parts. Chamois leather is suitable for this purpose, but a clean handkerchief is better than a soiled chamois leather. Do not use liquid for cleaning — no water, petroleum products, or oil. If necessary, breathe on the lenses before polishing them. When the instrument becomes wet, remove its case and dry it thoroughly at room temperature as soon as is convenient. If you leave the instrument in the closed case, the air inside the hood will take up humidity by increasing temperature and will in time diffuse inside the instrument. While cooling off, the water will condense and form a coating or tarnish that may make any sighting with the telescope and reading of the circles difficult. Remove any mud or dirt that may adhere to the tripod, range pole, level rod, and so forth, after each use. Clean each piece of equipment after each use to eliminate the chance of forgetting to later. This is important, especially when the surveying gear is made of a material susceptible to rust action or decay. When lubricating the instruments, use the recommended lubricant for each part in conjunction with the climatic condition in your area. For instance, graphite is the recommended lubricant for transit moving parts when the transit is to be used in sub-zero temperatures as opposed to the typical light film of oil (preferably watch oil) used in normal weather conditions. Apply the lubricant thinly to avoid making easy repositories for dust. Consult the manufacturer’s manual or your senior engineering tech whenever you are in doubt before doing anything to an instrument.

 

Test Your Knowledge

4. When typing in a point to a station on a traverse, which of the following conditions should you carefully consider?

A. The selected tie station should not be easily disturbed.
B. The tie station must be visible from the point to be tied in.
C. Both A and B are correct.
D. The angle between the tie lines should be no greater than 90°.

5. What is the recommended lubricant for surveying instruments at sub-zero temperatures?

A. Oil
B. Water
C. Petrol
D. Graphite

6. A temperature correction applied to tape measurements is considered to be a typical precision specification for which of the following surveys?

A. Preliminary surveys
B. Land surveys where the value of the land is high
C. Highway location surveys
D. Both B and C

 

3.0.0 TRAVERSE OPERATIONS (FIELD PROCEDURES)

A survey traverse is a sequence of lengths and directions of lines between points on the earth, obtained by or from field measurements and used in determining positions of the points. A survey traverse may determine the relative positions of the points that it connects in series; and, if tied to control stations based on some coordinate system, the positions may be referred to that system. From these computed relative positions, additional data can be measured for layout of new features, such as buildings and roads. Traverse operations (commonly called traversing) are conducted for basic area control, mapping, large construction projects such as military installation or air bases; road, railroad, and pipeline alignment, control of hydrographic surveys, and for many other projects. In general, a traverse is either a closed traverse or an open traverse. A closed loop traverse (Figure 14- 28, view A), as the name implies, forms a continuous loop, enclosing an area. This type of closed traverse starts and ends at the same point, whose relative horizontal position is known. A closed connecting traverse (Figure 14-28, view B) starts and ends at separate points, whose relative positions have been determined by a survey of an equal or higher order accuracy. An open traverse (Figure 14-28, view C) ends at a station whose relative position is not previously known, and unlike a closed traverse, provides no check against mistakes and large errors. Open traverses are often used for preliminary survey for a road or railroad. Figure 14-28 – Types of traverses.  14-37 The order of accuracy for any traverse is determined by the equipment and methods used in the traverse measurements, by the accuracy attained, and by the accuracy of the starting and terminating stations. Hence, the order of accuracy is specified before the measurements are started. For engineering and mapping projects, the distance measurement accuracy for both electronic and taped traverses for first, second, and third order are 1/35,000, 1/15,000, and 1/7,500, respectively. For military use such as field artillery, lower order accuracies of fourth, fifth, and sixth are 1/3,000, 1/1,000, and 1/500, respectively. The order referred to as lower order is applied to all traverses of less than third order. To accomplish a successful operation, the traverse party chief must ensure that initial preparations and careful planning are done before the actual traversing begins.

3.1.0 Organizing the Party

A traverse party may vary in size anywhere from two to twelve personnel, all under the supervision of a traverse party chief. A traverse party usually consists of a distance measuring crew, an angle crew, sometimes a level crew, and other support personnel. This breakdown of personnel is ideal, but on many occasions, the same personnel will have to perform a variety of tasks or functions. Therefore, each party member is trained to assume various duties and functions in several phases of the work survey.

3.2.0 Conducting a Reconnaissance

Whenever possible, make a reconnaissance to determine the starting point, the route to be followed, the points to be controlled, and the closing station. When selecting the starting and closing points, select an existing control station that was determined by a survey whose order of accuracy was equal to or greater than the traverse to be run. When running a traverse in which the direction of the traverse lines are not fixed before the start, select a route that offers minimum clearing of traverse lines. Use the best available maps and aerial photographs during the office and field reconnaissance. By selecting a route properly, you can lay out the traverse to pass relatively close to points that have to be located or staked out. On other surveys, such as road center line layout, predetermine the directions of the traverse lines, and clear all obstructions, including large trees, from the line. Often the assistance of the equipment and construction crews is needed at this point. For the lower order surveys and where you use taping, select the exact route and station locations as the traverse progresses. Always select these stations so that at any one station, both the rear and forward stations are visible, and only a minimum number of instrument setups is kept, reducing the possibility of instrument error and the amount of computing required. Furthermore, the Electronic Distance-Measuring (EDM) devices have made traverse reconnaissance even more important. Consider the possibility of using an EDM after the general alignment in direction and the planned positioning of stations. A tower or platform installed to clear surface obstruction will permit comparatively long optical sights and distance measurements, hence avoiding the necessity of taping it in short increments.

3.3.0 Placing Station Marks S

ome station marks are permanent markers, and some are temporary markers, depending upon the purpose of the traverse. A traverse station that will be reused over a period of several years is usually marked in a permanent manner. Permanent traverse  14-38 station markers take various forms, including iron pipe filled with concrete, a crosscut in concrete or rock, or a hole drilled in concrete or rock and filled with lead, with a tack to mark the exact reference point. Temporary markers are used on traverse stations that may never be reused, or perhaps will be reused only a few times within a period of one or two months. Temporary traverse station markers are usually two-inch by two-inch wooden hubs, 12 inches or more in length. They are driven flush with the ground and have a tack or small nail on top to mark the exact point of reference for angular and linear measurements. To assist in recovering the hub, a one-inch by two-inch wooden guard stake, 16 inches or more in length is driven at an angle so that its top is about one foot over the hub. Keel (lumber crayon) or a large marking pen is used to mark letters and/or numbers on the guard stake to identify the hub. The marked face of the guard stake is toward the hub. Since many of the hubs marking the location of road center lines, landing strips, and other projects will require replacement during construction, reference marks are placed several hundred feet or meters away from the station they reference. Reference marks, usually similar in construction to that of the station hub, are used to reestablish a station if its marker has been disturbed or destroyed.

3.4.0 Tying In to Existing Control

As previously discussed, the starting point of a closed traverse must be a known position or control point; and, for a closed loop traverse, this point is both the starting and closing point. Closed connecting traverses start at one control point and tie into another control point. A traverse starting point should be an existing station with another station visible for orienting the new traverse. The adjacent station must be intervisible with the starting point to make the tie easy. If you do not find the adjacent station easily, observe an astronomic azimuth to orient the starting line, and then continue the traverse. Any existing control near the traverse line should be tied into the new work.

3.5.0 Performing Linear Measurements

As traversing progresses, conduct linear measurements to determine the distance between stations or points. Generally, the required traverse accuracy will determine the type of equipment and the method of measuring the distance. For the lower orders, a single taped distance is sufficient. However, as the order of accuracy gets higher, DOUBLE TAPING (once each way) is required. Compare ordinary steel tapes to an Invar or Lovar tape at specified intervals. For the highest accuracy, use electronic distance-measuring devices (EDM) to measure linear distances. Linear measurements may also be made by indirect methods, using an angle measuring instrument like the transit or theodolite with stadia. When determining the distances by stadia readings, read the vertical angles and use them to convert slope distances to horizontal distances. If double taping or chaining is required, follow these procedures:

  1. Follow a direct line between stations, using a guide, such as a transit and a range pole, for alignment. Start measuring from the occupied station, keeping the front end of the tape aligned with the forward station.
  2. Start back from the forward station, using the same alignment but not the same taping points. The second measurement is independent of the first.
  3. Compare the two distances, and if the measurement is within accuracy requirements, accept the distance. If the two measurements disagree by more than the allowable amount, retape the distance.
  4. Proceed to the next line measurement, and continue double taping until the tie-in control point is reached.

3.6.0 Performing Angular Measurement

Horizontal angles formed by the lines of each traverse station determine the relative directions of the traverse lines. These angles are measured using a transit or a theodolite, and can also be determined graphically with a plane table and alidade. In a traverse, three traverse stations are significant: the rear station, the occupied station, and the forward station (Figure 14-29). Figure 14-29 – Traverse stations and angles. The rear station is the station from which the crew performing the traverse has just moved, or is a point, the azimuth to which is known. The occupied station is the station at which the crew is now located and over which the surveying instrument is set. The forward station is the next station in succession and constitutes the immediate destination of the crew. The stations are numbered consecutively starting at one and continuing throughout the traverse. In addition to the number of the station, an abbreviation indicating the type of traverse is often times included; for example, ET for electronic traverse or TT for theodolite- or transit-tape traverse. Always measure horizontal angles at the occupied station by pointing the instrument toward the rear station and turning the angle clockwise to the forward station for the direct angle and clockwise from the forward to the rear station for the explement (Figure 14-30). If you use a deflection angle, plunge the instrument telescope after sighting the rear station, and read the angle left or right of the forward station.  14-40 Figure 14-30 – Kinds of angles measured at the occupied station.

 

Test Your Knowledge

7. In double taping between traverse stations, you should use which of the following procedures? A. Use only tapes that are calibrated. B. Ensure the stations are spaced so that the distance between stations is less than a full-tape length. Continue taping until the tie-in control point is reached; then retape all measurements C. D. Retape line measurements not within allowable limits. 8.  Closed traverses are often used for preliminary surveying of roads and railroads. A. True B. False 9. Which of the following traverse stations may be a point with a known azimuth location? A. Forward B. Rear C. Occupied

 

Summary

This lesson presented you with information relating to the determination of distance and direction. Specifically, you were introduced to conversion methods for bearings, deflections, and interior and exterior angles, through arithmetic and the use of a compass. After being familiarized with distance and direction, you were presented with the procedures used to conduct transit tape surveys, which includes such tasks as meeting the required order of precision, identifying errors and mistakes, as well as caring for equipment and instruments. Finally, the steps necessary to conduct accurate traverse operations was covered, including organizing the survey party, conducting reconnaissance, and performing the surveying tasks.

 

Review Questions

1. A traverse that has been established and is used to locate detail points and objects are located is a _______.

A. traverse
B. control line
C. control traverse
D. horizontal control

2.  In true geographical direction, the reference line is the meridian passing through the point where the observer is located, and the direction of a line passing through that point is described in terms of the horizontal angle between that line and the meridian.

A. True
B. False

3. The bearing of line AB in the traverse is S2726’W and the bearing of the line BC is N10°17’W. What is the deflection angle between AB and BC in the figure?

A. 37°43’
B. 79°42’
C. 141°60’
D. 142°17’

4. The directions of traverse lines AB and BC are indicated by deflection angles. Determine the bearing of BC by using the figure.

A. N1°E
B. N20°E
C. N23°E
D. N43°E

5. How many degrees are there in the exterior angle ABC as shown in the figure?

A. 205°
B. 210°
C. 220°
D. 235°

6. How many degrees are here in the interior angle ABC as shown in the figure?

A. 120°
B. 130°
C. 140°
D. 150°

7. To convert a bearing in the SE quadrant to the equivalent azimuth, you must use which of the following calculations?

A. Add 90 degrees to the bearing.
B. Add 180 to the bearing.
C. Subtract the bearing from 180°.
D. Subtract the bearing from 360°.

8. Assume that a measured forward bearing on a compass-tape survey was N15°35’W and the back bearing on the same line was S15°15’E. The difference was probably caused by which of the following conditions?

A. Declination
B. Local attraction
C. An error in reading the compass
D. A defect in the compass mechanism

9. The magnetic declination at a given point on the surface of the earth is the horizontal angle that the magnetic meridian makes with what line?

A. The agonic line
B. The true meridian
C. The isogonic line
D. The assumed meridian

10. What is the appropriate compass bearing of the object in the figure?

A. Due north
B. S70°W
C. S30°W
D. S30°E

11. What is the approximate magnetic bearing of the object if the local attraction is 20°E?

A. Due west
B. S50°W
C. Due south
D. N20°W

12. What method should you use to correct or convert a compass azimuth reading to a true azimuth reading when both local attraction and local declination are easterly?

A. Subtract the attraction and declination from the compass reading.
B. Add the attraction and declination to the compass reading.
C. Add the attraction to the compass reading, then subtract the declination from the sum.
D. Add the declination to the compass reading, then subtract the attraction from the sum.

13. When making a closed traverse compass-tape survey, why should you first read and record the back bearing of a traverse line from the first setup point?

A. To offset local attraction
B. To get rid of declination
C. To check the accuracy of your compass
D. To verify the last bearing you will take

14. What is the sum of the interior angles in a closed traverse consisting of size traverse lines?

A. 360°
B. 540°
C. 720°
D. 1,080°

15. If a compass is in error when you are taking bearings at several different places and each error varies from the preceding one, the errors are probably due to which of the following factors?

A. A shifted movable circle
B. A bent frame
C. A bent pivot
D. A bent needle

16. The only compass available for taking bearings has an instrument error. What forward bearing should you use when the compass needle indicates a forward bearing of N22°W and a back bearing of S24°E?

A. S2°E
B. S46°W
C. N46°E
D. N23°W

17. You are using a compass that has an instrument error and is graduated for azimuths. What forward azimuth should you record when the compass needle indicates a forward azimuth of 37° and a back azimuth of 219°?

A. 37°
B. 38°
C. 91°
D. 128°

18. Which of the following defects is most likely to cause a compass to read incorrectly at both ends of its needle?

A. A bent pivot
B. A warped compass card
C. A bent needle
D. A blunt pivot point

19. A compass needle that is weak magnetically should be strengthened by which of the following methods?

A. Placing the magnet in an inductive field
B. Drawing the needle over a magnet
C. Placing the magnet in a shielded box
D. Heating the needle with a lighted match

20. A compass needle acts sluggishly although it has retained its full magnetism. Which of the following methods should be used to make the needle act as it should?

A. Sharpen its points
B. Sharpen the point on the pivot
C. Reshape it with a special tool
D. Demagnetize it

21. In setting up and leveling a transit, you have followed all of the correct procedures. You discover, however, that the plumb bob is still not quite directly over the station point. Which of the following actions should be taken next?

A. Loosen two adjacent leveling screws to free the shifting plate and shift the transit head laterally.
B. Replace the plumb bob.
C. Adjust the tripod legs.
D. Re-level the instrument.

22. Before taking up the transit, which of the following actions should you take concerning the telescope and the vertical motion clamp?

A. Bring the telescope perpendicular to the vertical axis and firmly tighten the clamp.
B. Point the telescope vertically upward and firmly tighten the clamp.
C. Point the telescope vertically upward and loosen the clamp.
D. Point the telescope vertically upward and lightly tighten the clamp.

23. In which of the following ways are the horizontal limbs of transits numbered?

A. 0°-360° clockwise
B. 0°-360° clockwise, also 0°-90° by quadrants
C. 0°-360° clockwise, also 360°-0° counterclockwise
D. Each of the above

24. When you are turning a 40° horizontal angle by transit, what part will normally point to the number of degrees turned?

A. Zero on the A-vernier
B. Zero on the B-vernier
C. 0°-360° graduation on the horizontal limb
D. 40°-320° graduation on the horizontal limb

25. Releasing the upper motion of a transit enables you to take which of the following actions?

A. Hold the telescope in place.
B. Rotate and train the telescope.
C. Hold the horizontal limb in place.
D. Rotate and align the horizontal limb.

26. Which of the following steps should you normally take when turning a 20° horizontal angle from a reference line with a transit?

A. Clamp the lower motion to hold the telescope in place after training it on the reference line.
B. Release the lower motion to rotate the telescope 20°.
C. Align the 0°-360° graduation on the horizontal limb with the zero on the Avernier.
D. Align the 0°-360° graduation on the horizontal limb with the zero on the Bvernier.

27. To fix the exact position of the horizontal limb with respect to the A-vernier, what transit screw, if any, should you use?

A. Telescope clamp screw
B. Upper motion tangent screw
C. Lower motion tangent screw
D. None

28. The closing-the-horizon method of checking the accuracy of angular measurements is based on the geometric fact that the sum of the:

A. Angles in a triangle are 180°.
B. Angles around a point are 360°.
C. Acute angles in a right triangle are 90°.
D. Interior angles of a five-course traverse are 540°.

29. A vertical angle was recorded at +36°. This angle is a measurement of what type?

A. Inclination
B. Declination
C. Depression
D. Elevation

30. You are measuring a 30° angle with a one-minute transit. To improve the precision of this measurement, you turn the angle a total of four times. If the plate reading after the fourth measurement is 119°59’, what is the size of the angle turned?

A. 29°45’45”
B. 29°59’45”
C. 30°00’15”
D. 30°45’15”

31. You have measured an angle using the repetition procedure. If the original measurement was 37°22’ and your sixth and last repeat was 224°12’42”, what is the mean angle?

A. 37°5’7”
B. 37°22’7”
C. 37°10’20”
D. 38°00’57”

32. Which of the following procedures is a method for extending a straight line?

A. Repeating angles
B. Averaging sets of backsight points
C. Double centering

33. What step in the double-centering procedure is taken just before the instrument is rotated through 180° in the horizontal plane?

A. Plunging the telescope
B. Taking the first foresight
C. Taking the backsight
D. Taking the second foresight

34. When double centering resets in two different extension points, what procedure should you use?

A. Extend your line through the first point
B. Extend your line through the second point
C. Extend your line through a point midway between the two extension points
D. Ignore both points and start over again

35. After recording the deflection angle at D as shown in the figure, what is the next step?

A. Take a backsight at A and measure angle ABC.
B. Move the instrument to D and measure the deflection angle at D.
C. Move the instrument to C and measure the deflection angle at C.
D. Move the instrument to A and measure angle BAC.

36. If you use the angle offset method of bypassing an obstacle, what is the size of the deflection angle at C as shown in the figure?

A. 30°
B. 45°
C. 60°
D. 75°

37. Which of the following distances is equal to CD as shown in the figure?

A. AB
B. BD
C. DE
D. BC

38. What is the deflection angle at point D as shown in the figure?

A. 30°L
B. 30°R
C. 60°L
D. 60°R

39. The angle offset and the perpendicular offset methods are useful in establishing a survey line under which of the following conditions?

A. When the length of the survey line cannot be determined by chaining
B. When the slope becomes great enough to require breaking chain
C. When the LOS on the chosen survey line is obstructed
D. When the backsight distance is much less than the foresight distance

40. The “balancing in” process should be used to locate an intermediate point between two control points on a survey line under which of the following conditions? approximately equal

A. When the distances from the intermediate point to the control points are of bypassing an obstacle cannot be used
B. When neither control point is visible from the other, and the other methods
C. When the intermediate point is much closer to one of the control points than it is to the other
D. When the instrument adjustment has a known error.

41. If deflection angles α and β as shown in the figure are four and six minutes, respectively, and distance a is four feet, how far should you set up the instrument from B’ so that it is exactly in line with points A and C?

A. 1.0 foot
B. 1.4 feet
C. 1.6 feet
D. 2.4 feet 

42. For which of the following situations should the random line method be used?

A. To run a line between nonintervisible end points from an intermediate point from which both end points are visible
B. To run a line between nonintervisible end points when there is no intermediate point from which both end points are visible
C. To establish intermediate stations between non-intervisible end points
D. Both B and C

43. What typing-in method should you use when locating the configuration of an irregular shoreline from a traverse line?

A. Swing offsets
B. Random lines
C. Range ties
D. Perpendicular offsets

44. What meaning is generally given to the term “settling a point”?

A. Establishing a point at a designated location
B. Relocating control points that have been destroyed
C. Locating reference lines for a displaced station
D. Setting the instrument upon a designated point

45. You can tie-in a point or set a point to two stations on a traverse by taking which of the following measurements?

A. Its angle and distance from one station
B. Two of its angles, one from each station
C. Its distance from one station and its angle from the other station
D. Each of the above

46. Surveyors use straddlers for what purpose?

A. To relocate control points that have been destroyed
B. To tie in a new traverse with reference to its angle to an old survey line
C. To tie in a point with reference to its angle from two stations
D. To locate the reference lines for a displaced station

47. You must set a marker at a certain point from traverse station 3 + 00 and 4 + 25. The angle from the traverse line to station 3 + 00 and the distance between the point and station 4 + 25 are given. How should you proceed to set the point?

A. Solve for the other angle from the base line, and the distance of the point from the other station; then, set the point by using transit and tape. Check the distance and other angle from the base line.
B. Solve for the angle from the base line to the distance line and set the point by the use of transit and tape. Then check by measuring the base line.
C. Lay out the lines to the point with tape and straddlers, and then check the lines with a transit.
D. Lay out the lines to the point with tape and straddlers and check by re-measuring one leg of the triangle.

48. A closed traverse was to be 15,000 feet in length. The last course was to be 3,000 feet in length. After you turn the last deflection angle and progress 3,000 feet on the last course, you find that you are three feet from the starting point of the traverse. What is the order of precision?

A. First
B. Second
C. Third
D. Fourth

49. If precision of 1/20,000 is required, what is the maximum allowable error of closure for a traverse of 10,560 feet?

A. 0.437 feet
B. 0.528 feet
C. 0.759 feet
D. 1.255 feet

50. Which of the following errors in a transit affects both horizontal and vertical angle measurements?

A. The LOS through the telescope does not coincide with the true optical axis of the telescope.
B. The horizontal axis of the telescope is not perpendicular to the vertical axis.
C. The axis of each of the plate levels is not perpendicular to the vertical axis of the telescope.
D. A, B, and C

51. Which of the following personal errors results in a larger error for inclined sights than for horizontal sights?

A. Failure to focus correctly
B. Failure to center the plate
C. Failure to plumb the transit exactly
D. Failure to line up the vertical cross hair with the true vertical axis of the sighted object

52. Which of the following situations is considered a mistake in transit work?

A. Failure to record the direction in which an angle was turned
B. Turning the deflection angle in the wrong direction
C. Reading the wrong vernier
D. A, B, and C

53. The carrying case for a transit or a theodolite is specifically designed for which of the following conditions?

A. To protect the instrument from extreme temperatures
B. To serve as a part of the instrument when it is set up for use in the field
C. To prevent excess motion when the instrument is being carried
D. All of the above

54. Which of the following actions should you take after an instrument has been exposed to rain and has been wiped down with a clean cloth or chamois leather?

A. Dry it in a heated room.
B. Stow it in its case right away.
C. Dry it thoroughly at ordinary room temperature.

55. Which of the following statements describes the characteristics of an open traverse as compared to a closed connecting traverse?

A. An open traverse has only one previously determined end point, but a closed connecting traverse has two
B. Both types of traverses may not be used for preliminary surveys
C. An open traverse is open at both ends, but a a closed connecting traverse forms a loop so that the ends are closed
D. A closed traverse provides fewer checks against error than an open traverse 

 

 

Chapter 15 Direct Leveling and Basic Engineering Surveys

The leveling operation is used to determine the elevations of points or the differences in elevation between points on the earth’s surface. The leveling operation is important for deriving the data required for various engineering designs, mapping, and construction projects. Data from a finished level survey is used to design roads, highways, and airfields. The data is also used to develop maps showing the general configuration of the ground. Information obtained from leveling operations is used to calculate the volume of earthwork required to complete a construction project.

This lesson addresses the basic principles of direct leveling and the methods used, as well as the duties and responsibilities of the leveling crew. Differential leveling field procedures, precision leveling, and the proper handling of leveling instruments and equipment are also discussed. In addition, this lesson includes a general description of basic engineering surveys and various construction site safety hazards commonly encountered by a survey party.

When you have completed this lesson, you will be able to:

1. Identify the basic terms used in leveling operations.
2. Describe level party organization, equipment, and field procedures.
3. Describe the different methods for conducting leveling operations.
4. Identify common mistakes and errors in leveling operations.
5. Describe the different types of basic engineering surveys and construction site safety.

Contents

1.0.0 Basic Terms Used in Leveling Operations

2.0.0 Level Party Organization, Equipment, and Field Procedures

3.0.0 Methods of Leveling

4.0.0 Precision in Leveling; Mistakes and Errors in Leveling

5.0.0 Basic Engineering Surveys and Construction Site Safety

 

1.0.0 BASIC TERMS USED in LEVELING OPERATIONS

Direct leveling describes the method of measuring vertical distances (differences in elevation) between the plane of known or assumed elevation (datum) and the plane of a point whose elevation is being sought. After the distances are known, they may be added to or subtracted from the known or assumed elevation to get the elevation of the desired point. These vertical distances are measured by using a leveling rod and, usually, an engineer’s level.

Basic vertical control for topographic survey and mapping is derived from first- and second-order leveling. For many construction projects and for filling gaps between second-order bench marks (BMs), less precise third-order leveling is acceptable.

In leveling, a level reference surface, or datum, is established, and an elevation is assigned. This datum may be assigned an assumed elevation, but true elevation is required for the establishment of a BM. A series of properly established BMs is therefore the framework of any vertical control.

Some of the basic terms commonly used in leveling operations are defined in the following paragraphs.

1.1.0 Bench Mark

A bench mark is a relatively permanent object, natural or artificial, bearing a marked point whose elevation is known. BMs are established over an area to serve as the following:

BMs are classified as permanent or temporary. Temporary bench marks (TBMs) are established and retained for the duration of a particular job. Permanent bench marks are established by various governmental agencies. These identification markers are set in stone, iron pipe, or concrete and are sometimes marked with the elevation above sea level. Typical markers are shown in Figure 15-1.

 

Figure 15-1 – Survey markers.

When an elevation is not marked, the information can be found by contacting the governmental agency responsible for the original BM.

BMs may be constructed in several ways. Figure 15-2 shows brass shaft stocks in the tops of permanent horizontal control points (monuments). Monuments of this type may also be used as vertical control BMs. Original BMs may be constructed in the same manner.

 

Figure 15-2 – Horizontal control markers used as BMs.

For short lines and a level circuit of a limited area, any substantial object may be used for vertical control BMs. A remark in your field notes should detail the proper identification of the BMs used.

Figure 15-3 shows a mark commonly used on tops of concrete walls and foundations. Lines are chiseled with a cold chisel or small star drill and then marked with paint or keel (lumber crayon). The chiseled figures should be about the same size as the base area of the rod, preferably, placed on some high spot on the surface of the concrete structure.

 

Figure 15-3 – Benchmarks located on concrete structure.

A spike may be driven into the root of a tree or placed higher up on the trunk of the tree when the limb clearance allows higher rod readings, as shown in Figure 15-4. The rod should be held on the highest edge of the spike, and the elevation should be marked on the blazed portion of the tree.

 

Figure 15-4 – Bench mark on tree.

Figure 15-5 shows a spike driven on a pole or post that also represents a BM. The spike has been driven in horizontally on the face of the post in line with the direction of the level line. In order to use this mark, hold the rod on the uppermost edge of the spike. After you calculate the elevation, mark it on the pole or post for future reference.

 

Figure 15-5 – Bench mark on pole or post.

Stakes driven into the ground can also be used as TBMs, especially if no frost is expected before they are needed.

Monument BMs are often established in a grid system approximately one-half mile apart throughout the base. These BMs, which are generally fenced to mark their location, provide ready referencing elevations for future construction on the station. The fencing also serves to protect the BMs from being accidentally disturbed.

BM systems, or level nets, consist of a series of BMs established within a prescribed order of accuracy along closed circuits. These nets are also tied to a datum. The nets are adjusted by computations that minimize the effects of accidental errors and are identified as being of a specific order of accuracy.

In certain areas, Tidal Bench Marks must be established to obtain the starting datum plane or to check previously established elevations. Tidal bench marks are permanent BMs set on high ground and are tied to the tide station near the water surface.

Tide stations are classified as primary and secondary. Primary stations require observations for periods of 19 years or more to derive basic tidal data for a locality. Secondary stations are operated over a limited period (usually less than 1 year) for a specific purpose, such as checking elevations. Secondary station observations are always compared to and computed from data obtained by primary stations.

A tide station is set up, and observations are made for a period that is determined by a desired accuracy. The observations are then compared with a primary tide station in the area.

A closed loop using spirit levels is run from the tide station over the tidal BMs and is tied back to the tide station. The accuracy of this level line must be the same as or higher than the accuracy required for the BMs.

For permanency, tidal BMs are usually established in sets of three away from the shoreline where natural activity or future construction will not disturb or destroy them. 

1.2.0 Datum

Tidal datums are specific tide levels used as surfaces of reference for depth measurements in the sea and as a base for determining elevations on land. In leveling operations, the tidal datum most commonly used is the Mean Sea Level. Other datums, such as mean low water, mean lower low water, mean high water, and mean higher high water, are sometimes used, depending upon the purpose of the survey. Still other datums are used in foreign countries. Because of the different datums used in foreign countries, it is important to check datum information when conducting leveling operations overseas.

1.2.1 Mean Sea Level

Mean sea level (MSL) is defined as the average height of the sea for all stages of the tide after long periods of observations. It is calculated by averaging the hourly sea level height. Figure 15-6 shows the heights tabulated on a form.

 

Figure 15-6 – Hourly heights of tide required for computing average MSL.

The heights on the form are added both horizontally and vertically. The total sum covering 7 days is entered in the lower right-hand corner of the page. The mean for each calendar month is calculated by combining all daily sums for the month and dividing by the total number of hours in the month. The monthly mean, to two decimal places, is entered on the sheet that includes the record for the last day of the month. Yearly means are determined from the monthly means, and a mean is taken of all yearly means for the period of record. Three or more years of record should be used to determine a reliable sea level. The actual value varies from place to place, but the variation is small. The station used to determine MSL should be on the open coast or on the shore of bays or harbors having free access to the sea. Stations on tidal rivers some distance from the open sea will have a Mean River Level that is higher than mean sea level because of the river slope. It should be noted that MSL is not identical with mean tide level (MTL). MTL is derived from the mean of all high and low points on the tidal curve.

1.2.2 Other Datums

Along the Atlantic coast of the United States, the mean low water (MLW) datum has been adopted as the datum used for hydrographic surveys. It is the mean of all low water tides observed over a long period (usually a 19-year period). Mean lower low water (MLLW) has been generally adopted for hydrographic surveys along the Pacific coast of the United States, Hawaii, Alaska, and the Philippine Islands. It is the mean of the lower of the two low water tides for each day observed over a long period. Mean low water spring (MLWS) is used on the Pacific coast of the Panama Canal Zone. It is defined as the mean of the low waters of the spring tides occurring a day or two after a full moon and is calculated by subtracting one-half of the range of the spring tides from the mean sea tide level.

 

Test Your Knowledge

1. Bench marks (BMs) share what common characteristic?

A. They are permanent.
B. They are marked with a known elevation.
C. They are constructed only from concrete or brass.
D. They are used only for vertical control.

2. Level nets are established within a prescribed order of accuracy and are tied to what reference?

A. Bench mark
B. Traverse station
C. Datum
D. Horizontal control point

3. What datum is generally used for measuring the height of a hill?

A. Mean sea level (MSL)
B. Mean high water (MHW)
C. Mean low water (MLW)
D. Mean low water springs (MLWS)

 

2.0.0 LEVEL PARTY ORGANIZATION, EQUIPMENT and FIELD PROCEDURES

Basic preparations must be performed before any leveling survey is conducted. Proper planning and thorough identification of the procedures are essential to the success of the leveling operation. Participating in preparatory work enhances the experience and increases the capabilities of the crew members. Some of the preparatory work is discussed in the following paragraphs.

2.1.0 Level Party Organization

The size of the leveling party is dependent upon such variables as the order of accuracy required and the number of experienced personnel available. Ordinarily, the smallest crew consists of two individuals: an instrumentman and a rodman. To improve the efficiency of the leveling operations, additional personnel are required. The addition of a second rodman to alternate on backsights (BSs) and foresights (FSs) speeds up the leveling operation. By adding a recorder, the instrumentman can take readings as soon as the rodmen are in position. In surveys requiring a shaded instrument, an umbrellaman is required.

2.1.1 Duties of the Instrumentman

An instrumentman, or levelman, runs the level and makes adjustments required for proper operation. The instrumentman ensures no stations are omitted, turning points (TPs) are properly selected, and BMs are properly established and identified. The instrumentman is usually designated by the engineering tech1 or engineering techC to act as the chief of the party. When a two-man leveling party uses a self-reading rod, the instrumentman is also the recorder. However, if a target rod is used, the rodman usually acts as the recorder. A good instrumentman keeps within the required limits of error.

The chief of the party must be alert to recognize common problems encountered in the field and be able and ready to solve them using the best solution. Sound judgment in determining the proper course of action in handling problems helps assure both the quality of the survey and the meeting of survey schedules.

2.1.2 Handling Leveling Instruments and Equipment

Leveling instruments, as well as all surveying instruments and equipment, must be cared for and handled properly. Pay special attention to avoid any sudden shocks, jolts, and bumps which will require retesting of the instrument. A damaged or disturbed scientific instrument, however minor, can adversely affect correct and accurate results. Before using leveling equipment, inspect for signs of physical damage.

An engineer’s level is a precision instrument containing many delicate and fragile parts. All movable parts should work easily and smoothly when unlocked. When a part resists movement, do not use force; forcing a part to move will likely damage the instrument. Do not over-tighten clamps, as doing so can cause unwarranted wear and possible damage.

To ensure easy movement, lubricate the threads and bearing surfaces on movable parts, and always clean the parts before lubricating.

When oiling the parts, use only fine instrument oil. Do not use too much oil; excess oil gathers dust and also thickens, which interferes with the movement of the parts. This is especially true in cold weather where low temperatures cause oil to congeal. Use graphite powder as lubricant in cold weather conditions.

Store the level in its case when it is not in use and when transporting it to and from the job site. Tighten the level and clamp screws enough to prevent motion of the parts when it is inside the case. The case’s strong construction and padding are designed to reduce the effect of jarring and protect the level from damage. When transporting the level by vehicle, place the carrying case midway between the vehicle’s front and rear wheels. This is the point where bouncing of the wheels is minimized.

Never lift the instrument out of the carrying case by grasping the telescope. Wrenching the telescope in this manner can damage a number of delicate parts. Always lift the instrument out of the case by grasping the footplate or the level bar.

When you carry the instrument and the tripod from one setup point to another, loosen the level and clamp screws slightly. The screws should be tight enough to prevent the telescope from swinging and the instrument from sliding on the footplate, but loose enough to allow “give” in case of an accidental bump against an obstacle. You can carry the instrument over your shoulder like a rifle if the terrain to be traveled is free of obstacles, as shown in Figure 15-7.

 

Figure 15-7 – Carrying surveying instrument.

A surveyor’s umbrella should be used to avoid the effects of sunlight. If there is a great difference between the working temperature and the instrument storage temperature, the instrument should be acclimated to the actual working conditions approximately 15 minutes before observations begin.

2.1.3 Duties of the Rodman

The rodman is responsible for holding the leveling rod. The actions of a rodman in positioning and holding the rod affect the speed and accuracy of the leveling operation. The rodman is also responsible for taking care of the rod during and after the leveling operation. The rodman’s duties include the following:

  1. Clean the base (or shoe) of the rod before setting the rod on any point. Also clean the top of the point to ensure good contact between the rod and the point.
  2. Place the rod firmly on the point, and then stand facing the instrument and slightly behind the rod; hold the rod in front of you with both hands, as shown in Figure 15-8. Space your feet approximately 1 foot apart for a comfortable stance.  Ensure the rod graduations are right side up and turned towards the instrumentman.

 

Figure 15-8 – Correct stance for holding level.

  1. Hold the rod as vertical as possible. Place a rod level against the rod, and move the top end of the rod until the bubbles are centered. If a rod level is not used, balance the rod by using your fingertips to prevent it from falling. A properly balanced rod will stand for several seconds before starting to fall. This process of balancing the rod vertically is known as plumbing the rod.
  2. Plumb the rod and hold it as steady as possible during strong winds. When windy conditions exist, the instrumentman may call for the rodman, to wave the rod. Wave the rod by pivoting it on its base and swinging it in a slow arc toward the instrument and away while keeping the shoe firmly seated. The motion of the rod permits the instrumentman to read the rod when it reaches a vertical position at the top of the arc and when the lowest reading appears on the rod.
  3. Set the turning pin or pedestal firmly in contact with the ground when setting a turning point (TP). Unstable ground can sag under the weight of the rod and result in incorrect readings between the foresight (FS) and backsight (BS). During freezing and thawing weather conditions, the ground surface can heave in a short time. Pins and pedestals can be affected by the heaving between the FS and the following BS. For a higher order of accuracy in surveys, be aware of this possibility and select firm locations.
  4. Extend the leveling rod to its maximum length when the instrumentman calls for extending the rod. The standard Philadelphia leveling rod can be read to 7.100 feet (2.164 meters) when collapsed and 13.000 feet (3.962 meters) when extended. An extended leveling rod is called a long rod.

A leveling rod is a precision instrument that has to be treated with care. Most rods are made of carefully selected, kiln-dried, well-seasoned hardwood with metal scale faces on which the scale graduations are painted. A rod should be handled with care; otherwise, the painted faces become scratched, dented, or damaged. Damage rods can make readings difficult and inaccurate.

Letting an extended rod close “on the run” by allowing the extended upper section to drop tends to damage both sections of the rod and the vernier. Always close an extended rod by easing down the upper section.

A rod will read accurately only if it is perfectly straight. Do not lay it down flat unless it is supported throughout on a flat surface. Do not use it as a support or as a lever. Store the rod in a dry place to avoid warping and swelling from dampness. Always wipe a wet rod dry before stowing it away.

Rinse mud off the rod, but do not scrub it. Use a mild soap solution to remove grease. Repeated washings with strong soap solutions will eventually cause the painted graduations to fade.

2.2.0 Field Procedures for Differential Leveling

Consistently accurate and efficient leveling operations require teamwork between the instrumentman and the rodman. Survey accuracy is dependent upon many factors, including the refinement with which the line of sight can be made horizontal by the instrumentman, the ability of the rodman to hold the rod vertically, and the precision with which the rod reading is made. Some of the basic procedures and preparations applicable to direct leveling are presented below.

2.2.1 Selecting Setup Points

Terrain and atmospheric conditions are considerations that affect the selection of setup points. It is important to select a point where rod readings of the BS and FS points can be easily observed. To achieve balanced shots, a setup point should be approximately equidistant from both BS and FS. When in doubt, use shorter setup distances because they will result in smaller instrument error that can be caused by atmospheric refraction and the curvature of the earth.

The average instrument height at any setup is approximately 5 feet (1.5 meters). On even downhill slopes, the ground where the instrument is set up may not be more than 3 to 5 feet below the TP for a level BS. On the FS, the extended rod can be held on the ground about 8 feet (2.5 meters) below the instrument ground level and still permit a reading to be taken. This means that the tendency will be to make FS distances longer going downhill and to make BS distances longer going uphill.

It is good practice to conduct a reconnaissance of the terrain before starting leveling operations. Probable locations of instrument setup and TPs should be noted as a part of the reconnaissance. During the reconnaissance, look through a hand level to estimate the line of sight.

2.2.2 Setting Up a Level

To set up a tripod, first hold two tripod legs with both hands and spread the tips of the legs a convenient distance apart. Then bring the third leg to a position that approximately levels the top of the protector cap when the tripod stands on all three legs. Then unscrew the protector cap.

Next, lift the instrument out of the carrying case by the footplate or level bar, and set it gently and squarely on the tripod head threads. Rotate the footplate counterclockwise one-fourth turn or until the instrument seats. Then rotate it clockwise to engage the head nut threads to the tripod head threads. If the threads do not engage smoothly, stop; they may be cross-threaded. Do not force the head if you encounter resistance; back it off, square up the instrument, and gently try to engage the threads. When they are engaged, screw the head nut up firmly but not too tightly. Setting up the instrument too tightly causes eventual wearing of the threads, making unthreading difficult.

After attaching the instrument and assuming the tripod is on stable soil, thrust the tripod leg tips into the ground far enough to ensure stable support, taking care to keep the footplate approximately level. Some tripods have legs equipped with short metal stirrups. The stirrups are used to force the legs’ tips into the ground by foot pressure.

When setting a tripod on a hardened surface such as concrete, make sure the tripod’s legs do not accidentally spread, causing the tripod to collapse. Figure 15-9A shows the tripod’s leg tips inserted in cracks in a concrete pavement. In Figure 15-9B, the legs are held by an equilateral wooden triangle called a floor triangle.

 

Figure 15-9 – Two ways of preventing tripod legs from spreading on hard surfaces.

2.2.3 Leveling the Engineer’s Level

Just as a rodman must concentrate on keeping the rod perfectly plumb, the levelman must constantly remember that the line of sight through the telescope must be perfectly level in every direction or every reading made with the instrument will be inaccurate. After the level has been placed, the levelman performs the following procedures to level the instrument.

Align the telescope with a pair of level screws by turning them in opposite directions, as shown in Figure 15-10, until the bubble in the level vial is in the exact center.

 

Figure 15-10 – Manipulating level screws.

It is helpful to know that the bubble in the level vial moves in the direction that the instrumentman’s left thumb moves. To put this another way: Turning the lefthand screw clockwise moves the bubble to the left; turning the left-hand screw counterclockwise moves it to the right. When the bubble is centered with the telescope over one pair of screws, train the telescope over the other pair and repeat the process. As a check, swing the telescope over each pair of screws in all four possible positions to make sure the bubble is centered in each position.

2.2.4. Making Direct Readings

The instrumentman makes a direct rod reading by viewing the graduation on the rod that is in line with the horizontal cross hair. With the exception an architect’s rod, leveling rods are graduated in feet and subdivided to the nearest 0.01 foot. This means direct readings are typically read to the nearest 0.01foot. Figure 15-11 shows a direct reading of 5.76 feet on a Philadelphia rod. Each black graduation and each white interval represents 0.01 foot.

 

Figure 15-11 – Direct reading of 5.76 feet on a Philadelphia rod.

The black numeral 7 in Figure 15-11 is the only numeral of the reading 5.76 feet that appears in the view. The red numeral 5 would not be visible through the telescope unless the sight distance was farther away. For this reason, the instrumentman would signal the rodman to “raise for red,” as described in the previous lesson.

To make sure the readings for tenths and hundredths are related to the correct whole-foot red numeral, it is best to make a direct reading as follows:

2.2.5 Making Target Readings

There are situations when target readings are used instead of direct readings. The three most common situations include these:

For target readings up to 7.000 feet, the Philadelphia rod is fully closed and read on the face by the rodman. The rodman sets the target on the face by the signals from the instrumentman, who determines when the horizontal axis of the target intercepts the horizontal cross hair.

When the instrumentman signals “all right,” the rodman clamps the target in place with the target screw clamp, as shown in Figure 15-12. The rodman then reads the target vernier, shown in the same figure.

 

Figure 15-12 – Target reading on a Philadelphia rod.

The reading to the nearest 0.01 foot is indicated by the zero on the vernier. In Figure 15-12, the vernier zero indicates a reading of a few thousandths of a foot more than 5.84 feet. To determine how many thousandths over 5.84 feet, examine the graduations on the vernier to determine the one most exactly in line with a graduation on the rod. In Figure 15-12, this is the 0.003-foot graduation; therefore, the reading to the nearest 0.001 foot is 5.843 feet.

For target readings of more than 7.000 feet, the Philadelphia rod is extended and the rodman makes the reading on the back of the rod. In Figure 15-13, the back of the upper section of the rod is shown, graduated from the top down, from 7.000 feet through 13.000 feet. A rod vernier on the back also can be seen fixed to the top of the lower section of the rod, also read from the top down.

 

Figure 15-13 – Reading on the back of a Philadelphia rod.

For a target reading of more than 7.000 feet, the rodman, on receiving the signal to “extend the rod,” fixes the target on the face of the upper section all the way to the top of the upper section. While doing this, the rodman makes sure the target vernier is set at exactly the same reading indicated by the rod vernier on the back of the rod; the rodman then releases the rod screw clamp and slides the upper section of the rod slowly upwards until the instrumentman gives the signal “all right.” When the horizontal axis of the target reaches the level where it is intersected by the horizontal cross hair, the instrumentman gives the signal.

2.3.0 Fundamental Leveling Procedures

The following example explains the basic procedure for determining elevations during a leveling operation.

In Figure 15-14, there is a BM at Point A with a known elevation of 365.01 feet and a Point B whose elevation needs to be determined. To determine Point B’s elevation, first set up and level the engineer’s level approximately half-way between Points A and B. Next, level the instrument. After the instrument is leveled the instrumentman has a perfectly level line of sight that can be rotated around the horizon.

 

Figure 15-14 – Direct leveling procedure.

After the instrument is leveled, the line of sight elevation must be determined. Line of sight elevation or height of instrument (HI) is calculated by adding the known elevation (KE) and the backsight (BS) height. In this example, the known elevation of the BM (Point A) is 365.01 feet and the BS height (the rod reading) is 11.56 feet. Therefore, the BM elevation 365.01 plus the BS rod reading of 11.56 equals an HI of 376.57 feet. This means whichever direction the telescope is pointing, all points on the horizon intercepted by the horizontal cross hair have an elevation of 376.57 feet.

To determine the ground elevation at Point B, the instrumentman takes a foresight (FS) on a rod held at Point B. In this example, the rod reading is 1.42 feet. Because the elevation of the line of sight (HI) is 376.57 feet, the ground elevation at Point B is the HI minus the rod reading, or 376.57 – 1.42, which equals 375.15 feet.

2.3.1 Balancing Shots

The balancing of the FS and BS distances is important in leveling. The effect of curvature and refraction may be eliminated by balancing BS and FS distances; however, instrumental error is a far more important reason for careful balancing.

“Balancing shots” means equalizing as much as possible BS and FS distances by selecting turning points that are approximately an equal distance from both the BS and FS points.

No matter how carefully a telescope is leveled, it is likely to be slightly out of the horizontal. The possibility of inaccurate reading increases as the length of the sight increases. When the BS distance differs from the FS distance, the BS and FS errors will differ. If the distances are the same, the errors will be the same. Therefore, balancing shots eliminates the effect of instrument error.

To achieve balanced shots, pace off an equal number of steps for the BS and FS. The BS and FS distances should be kept under 300 feet except when necessary to pass or cross an obstacle.

2.3.2 Establishing Turning Points

Suppose the elevation of a point at the summit of a long slope needs to be determined, and the nearest BM is at the foot of the slope some 30 feet or so below the summit. To determine an elevation in this situation, turning points (TPs) as displayed in Figure 15-5 must be used. A turning point is defined as a point on which both a minus sight (FS) and a plus sight (BS) are taken on a line of direct levels.

 

Figure 15-15 –Turning points.

Assume the elevation of the BM in Figure 15-15 is correct. The accuracy of the summit elevation is dependent on how accurately the elevation of each intermediate TP is determined. This accuracy depends upon a number of factors, the most important of which include the following:

  1. FS and BS distances should not exceed 300 feet when leveling with ordinary precision. Therefore, the first setup point for the instrument should be not more than 300 feet from the BM, and the first TP should be not more than 300 feet from the instrument. To balance shots, place the instrument approximately the same distance from the BM as the distance to TP1.
  2. At the first setup point, a rod held on the BM and a rod held at TP1 must be viewable.
  3. Setup points should be used that make rod readings as small as possible.
  4. A TP must be visible, accessible, and stable. It must be firm enough to support the base of the rod. Using unstable ground can result in progressive errors in subsequent readings.

When the use of a point in unstable ground is unavoidable, use a turning point pin or turning point plate. Drive a pin into the ground to mark the turning point. If a regular pin is not available, you may substitute a marlinspike or a railroad spike. If the soil is too soft, use a plate to support a driven pin.

 

Test Your Knowledge

4. What type of lubricant is recommended for use on engineer’s levels in arctic regions?

A. Watch oil
B. Powdered graphite
C. Petroleum jelly
D. Mineral oil

5. When a level setup must be transferred to another point or station, what screws should be loosened slightly?

A. Leg and level
B. Leg and clamp
C. Level and clamp
D. Tangent and clamp

6. To help the instrumentman obtain accurate readings, the rodman should take which of the following actions?

A. Cleaning the top of the point and the rod shoe for a good contact
B. Plumbing with both hands
C. Making sure the rod graduations are right side up and facing the instrumentman
D. All of the above

7. The proper care of a leveling rod includes which of the following actions?

A. Supporting the entire rod on a flat surface when laying the rod down flat
B. Rinsing any mud off with water and cleaning any grease off with a mild soap solution
C. Wiping it dry before storing it in a dry place
D. All of the above

8. In determining the elevation of an unknown point, what arithmetic operation should you apply to the HI and FS?

A. Addition
B. Subtraction
C. Multiplication
D. Division

9. When turning points are located in sandy soil, you must set the level rod on a base. Which of the following bases is an acceptable choice?

A. A turning point plate
B. A turning point pin driven into the soil
C. A marlinspike driven into the soil
D. All of the above

 

3.0.0 METHODS of LEVELING

Leveling methods are subdivided into two major categories: direct and indirect. Direct leveling describes the method of measuring vertical distance (difference in elevation) directly with the use of precise or semi-precise leveling instruments. Indirect leveling is the measurement of vertical distances indirectly or by using computation. Unlike direct leveling operations, indirect leveling operations do not depend on lines of sight or visibility of points or stations. Two of the surveying instruments used for indirect leveling are the transit and the theodolite.

3.1.0 Direct Leveling

Direct leveling uses the measured vertical distance to carry elevation from a known point to an unknown point. Direct leveling is the most precise method of determining elevation, yielding accuracies of third or higher orders. When this method is specified for lower accuracy surveys, direct leveling is sometimes referred to as “spirit” or “fly” levels. Fly leveling operations are used to rerun original levels to ensure no mistakes have been made. Fly levels use a shorter route and smaller number of turning points than the original survey.

3.1.1 Differential Leveling

Differential leveling (also called direct leveling) is generally used in determining elevations of points to establish a chain or network of BMs for future use. It requires a series of instrument setups along the survey route. This type of leveling is frequently used for determining elevation during construction surveys. As shown in Figure 15-16, the basic procedure used to determine elevations in a differential leveling operation is the same as previously discussed.

 

Figure 15-16 – Differential leveling. 

After the FS is completed, leave the rod on that point and move the instrument forward. Set up the instrument approximately midway between the old and new rod positions. The new sighting on the back rod becomes a BS, and now establishes a new HI. The points other than the BMs or TBMs on which the rods are held for the BSs and FSs are called turning points (TPs). Other FSs made to points not along the main route are known as sideshots. This procedure can be used as many times as necessary to transfer a point of known elevation to another distant point of unknown elevation.

Figure 15-17 shows a sample differential leveling run. The rod is held on BM 35 (Elev. = 133.163). The level is set up midway between BM 35 and TBM 16. The BS reading of +6.659 is added to the elevation of BM 35 and gives the resulting HI (139.822). The rod is moved to Peg 16 (which later becomes TBM 16). The FS reading of - 4.971 is subtracted from the HI to get the elevation of Peg 16. Note that the distance (220 feet each way) is also recorded for balancing. The process continues until BM 19 is reached. ,

 

Figure 15-17 – Sample notes and profile of a differential-level circuit. 

3.2.0 Level Computations

When making level computations, check the notes for a level run to ensure the correct BM and elevation are used. Then, check the arithmetical accuracy where BSs are added and FSs are subtracted. The difference between the sum of the BSs taken on BMs or TPs and the sum of the FSs taken on BMs or TPs should equal the difference in elevation between the initial BM or TP and the final BM or TP.

Balanced BS and FS distances are shown in Figure 15-17. The distance used for the first instrument setup was 220 feet. The first BS (rod reading on 35) was 6.659 feet. The first FS (rod reading on 16) was 4.971. Notice that the plus sign (+) appears at the top of the BS column and that the minus sign (–) appears at the top of the FS column in the field notebook. This serves as reminder that BSs are added and FSs are subtracted as new elevations are computed.

The BS taken on a point added to the elevation of the point gives the HI. This establishes the elevation of the line of sight so that an FS can then be taken on any point (BM, TBM, or TP).

The elevation of 35 is 133.163 feet. The first HI is

133.163 + 6.659 = 139.822 feet.

The FS subtracted from the HI,

139.822 – 4.971 = 134.851 feet,

which is the elevation of 16.

Following through with a similar computation for each setup, notice the elevation of 19 is 136.457 feet.

Look now at the notes in Figure 15-17. The sum of all the BSs is 24.620 feet. The sum of all the FSs is

21.326 feet. The difference between the sum of the BSs and the sum of the FSs is

24.620 – 21.326 = 3.294 feet.

This difference should agree with the difference between the actual elevation of BM 35 and the elevation already found for BM 19, which is 136.457 – 133.163 = 3.294 feet.

This provides a check on the step-by-step computation of elevations.

3.3.0 Adjustments of Intermediate Bench Mark Elevations

Level lines that begin and end on points with fixed elevations, such as BMs, are often called level circuits. When leveling is accomplished between two previously established BMs or over a loop that closes back on the starting point, the elevation determined for the final BM seldom equals its previously established elevation. The difference between these two elevations for the same BM is known as the error of closure. The Remarks column of Figure 15-17 indicates the actual elevation of BM 19 is known to be 136.442 feet. The elevation found through differential leveling was 136.457 feet. The error of closure of the level circuit is

136.457 – 136.442 = 0.015 foot.

Based on the results recorded in Figure 15-17 it is assumed errors occurred progressively along the line over which the leveling was done so that adjustments for these errors are distributed proportionally along the line. Notice in Figure 15-17 the total distance between BM 35 and BM 19 is 2,140 feet and the elevation on the closing BM 19 is found to be 0.015 foot greater than its known elevation. Therefore, adjust the elevations found for the intermediate TBMs 16, 17, and 18.

The amount of correction is calculated as follows:

Correction = (Error of closure) x (distance between the starting BM and the intermediate BM)
distance between the starting and closing BM

TBM 16 is 440 feet from the starting BM. The total length distance between the starting and closing BMs is 2,140 feet. The error of closure is 0.015 foot.

Correction = (0.015) x (440) = −0.003 ft
2140

The adjustments for intermediate TBMs 17 and 18 are made in a similar manner.

3.3.1. Reciprocal Leveling

Reciprocal leveling is used for either differential or trigonometric leveling when a long sight across a wide river, ravine, or similar obstacle is required. Long sighting is affected by curvature and refraction and by any small error in aligning the line of sight with the bubble axis on the level. The alignment error is minimized by balancing the long sight and computing the curvature. The atmospheric conditions can vary so much over an open expanse that the refraction correction can also be quite erratic. Reciprocal leveling is used to minimize the effect of the atmosphere as well as the line of sight and curvature corrections. To reduce error using reciprocal leveling, use the following procedures:

  1. 1. Balance the BSs and FSs as carefully as possible before reaching the obstacle. In Figure 15-18, a TP, N, is selected close to the edge of the obstruction so it is visible from a proposed instrument location, B, on the other side. A second rod is held on the other side of the obstruction at F. Point F should be selected so that the distances AN and FB are approximately equivalent, and AF and NB, are approximately equivalent.

 

Figure 15-18 – Reciprocal leveling.

The instrument is set up at point A and leveled carefully. A BS reading is taken on the N rod and a FS on the F rod. These readings are repeated several times. The instrument is moved to point B, set up, and carefully leveled with the rods remaining at their respective stations. A BS is taken on the N rod and an FS on the F rod, and repeated several times. Since instrument leveling is especially critical on reciprocal leveling, the instrumentman must center and check the bubble before each reading. If it is off-center a slight amount, the procedure must be repeated. The difference in elevation between N and F is computed from the readings at A and from the readings at B separately. Because of the errors in the long sight, the two results will have slightly different values. Note, however, that the long sight is an FS from A and a BS from B. The true difference in elevation is the average of both values, since the errors have opposite signs and will cancel each other.

  1. For more accuracy, make several long sight readings for each short sight and average them. Use a target on the rod and reset it for each reading. Average each series of long sights and combine the average with corresponding short sights for the computations.
  2. Changes in atmospheric density and temperature affect the refraction of a line of sight. The longer the time interval between reciprocal long sights, the greater the chance of an atmospheric change and a variation in the refraction value. For this reason, keep the time lapse between the long sights as short as possible.
  3. Simultaneous-reciprocal observation is a method used to avoid the time lapse problem. The goal is to read both long sight values at the same time. This requires two instruments and two observers, and two rods and two rodmen. In addition, an agreed upon method of communication or sequence of operations must be established to accomplish this task.
  4. The note keeping for reciprocal leveling is identical to differential leveling. Take a series of either BS or FS readings on the far rod from one setup and take only one sighting on the rear rod. Average the series of readings, and use a single value to make the elevation computations.

3.3.2 Profile Leveling

In surveying, a profile is a vertical section of the earth measured along a predetermined or fixed line. In practice, profiles are a series of ground elevations determined by differential leveling or other methods that, when plotted along some line such as the center line of a road, can be used to determine the final grade or alignment of the road, railroad, or sewer line. Profiles are also used to compute volumes of earthwork such as determining the depth of fill or cut required to bring an existing surface up to or down to the grade elevation required for a highway.

Profile leveling provides data relative to the center line. In Figure 15-19, the top of the graph has information on the depth of cut or fill required at each station to bring the existing surface to grade. The prescribed grade line for the highway is indicated by the smoothly curved grade line shown. The cut or fill at each station is determined by counting the squares between the profile and the grade line.

 

Figure 15-19 – Plotted profile and grade lines along proposed road center line.

Figure 15-19 shows a plotted profile of the existing ground surface along a proposed highway center line. Horizontally on the graph is a succession of 100-foot stations, from 0 + 00 to19 + 00.

The elevations run vertically. Each horizontal interval between the adjacent vertical grid lines represents 25 feet. Each vertical interval between adjacent horizontal grid lines represents 2.5 feet.

The profile is plotted through a succession of points, each of which was identified from a profile elevation taken on the ground. Figure 15-20 shows field notes for the levels taken from 0 + 00 through 10 + 00.

 

Figure 15-20 – Field notes for profile levels shown in Figure 15-19.

 

The level was first set up at a point approximately equidistant from station 0 + 00 and from a BM identified as National Geodetic Survey Monument, Bradley, Missouri. The elevation of the BM was 117.51 feet. The first backsight reading on a rod held on the BM was 7.42 feet. Therefore, the HI which is entered into the HI column of the field notes is

117.51 + 7.42 = 124.93 feet.

From the first instrument setup, FSs were taken on station 0 + 00 and 1 + 00. The elevation of the station in each case was determined by subtracting the FS reading from the HI. Note that the FS taken on station 1 + 00 is entered in a column headed FS, while the one taken on station 0 + 00 is entered in a different column, headed IFS. IFS is an intermediate FS, or an FS taken on a point that is neither a BM nor a TP. Station 1 + 00 is used as a TP in shifting the instrument ahead. Only FSs taken on BMs or TPs are entered in the column headed FS.

After an FS was taken on station 1 + 00, it became necessary to shift the instrument ahead. Station 1 + 00 was used as the TP. From the new instrument setup, a BS was taken on a rod held on 1 + 00. The new HI was found by adding the BS reading to the previously determined elevation of 1 + 00.

From the new setup, an FS was taken on station 2 + 00; again, the elevation was found by subtracting the FS reading from the HI. After this sight was taken, the instrument was again shifted ahead, probably because of the steepness of the slope. This time, station 2 + 00 was used as the TP2. From the new setup, a BS was taken on station 2 + 00 and  15-24 a new HI established. From this setup, it was possible to take FSs on both station 3 + 00 and station 4 + 00. Because station 3 + 00 was not used as a TP, the FS on it was entered under IFS.

Apparently, the slope between station 4 + 00 and station 5 + 00 was so steep that sighting both stations from the same setup with the rod being used was impossible. Consequently, an intermediate TP (TP4) was established at station 4 + 75 by determining the elevation of this station. The instrument was shifted to a setup from which a BS could be obtained on a rod held on this station and from which FSs on stations 5 + 00, 6 + 00, 7 + 00, and 8 + 00 could be taken. Station 8 + 00 was then used as a TP for the last shift ahead. From this last setup, it was possible to take FSs on stations 9 + 00 and 10 + 00.

As a check on the arithmetic, recheck each page of level notes to check the difference between the sum of the FSs and the sum of the BSs against the difference in elevation between the initial BM or TP and final BM or TP. Obviously, only the BSs and FSs taken on BMs and TPs are relevant to this check. This is why intermediate FSs not taken on BMs or TPs are entered in a separate column.

If the arithmetic is correct, the two differences will be the same. As can be seen, the sum of the relevant BSs in Figure 15-20 is 39.63, the sum of the FSs is 27.70, and the difference between the two is 11.93. Note that from this difference, the BS taken on TP5 is deducted. The reason is the fact that this BS is not offset by a corresponding FS on a BM or TP. With the BS taken on TP5 deducted, the difference between the sum of the FSs and the sum of the BSs is 6.86. The difference between the elevation of TP5 and the elevation of the initial BM is 6.86, so the arithmetic checks.

Remember, this procedure provides a check on the arithmetic only. If incorrect values are recorded, the arithmetic will check out as if the correct values had been recorded.

3.3.3 Cross-section Leveling

Just as Profile leveling is used to determine the elevations of a series of points lengthwise along a highway, Cross-section leveling is used to determine the elevations of points on a succession of lines running at right angles or perpendicular to a lengthwise line of the highway.

Cross-section lines are established at regular stations, at any plus stations, and at intermediate breaks in the ground. Short cross lines are laid out by eye. Long cross lines are laid out at a 90° angle to the center line with the transit. For short cross lines, most surveyors prefer to use an angle prism for sighting 90° angles from the center line.

For cross-section leveling and strip topography, it is necessary to lay off a 90° angle at numerous points along a center line. Surveyors can often establish the 90° angle with sufficient accuracy by estimation. Straddle a point on the line and then, extending your arms sideways along the marked line, as shown in Figure 15-21, look alternately right and left, and adjust your foot position until your body is in line with AB. Then bring your hands together in front of you, pointing along an approximate 90° line from the marked line. Experienced surveyors can lay off a 90° angle using this method so that a point 100 feet away is within 1 foot of the true perpendicular.

 

Figure 15-21 –Laying off a 900 angle from the center line stakes.

Measure elevations consisting of abrupt changes or breaks in the ground with a rod and level. Use a metallic tape to measure all distances from the center line. In rough country, you can use the hand level to obtain cross sections if the center-line elevations have been determined by an engineer’s level.

Cross-section leveling is usually done with a hand level after the profile run has been made, the profile run has been established, and the center-line elevation at each station is known. The method is as follows.

Suppose cross-section elevations at 10-foot intervals for 40 feet on either side of the center line are needed. To find these elevations, first determine the vertical distance from the ground to the line of sight through the hand level while standing erect with the level to your eye. The best way to do this is to sight on a level rod held plumb in front. Suppose the vertical distance is 5.5 feet. Then the HI at any center-line station is the center line elevation (obtained in the profile level run) plus 5.5 feet.

At station 0 + 00, as shown in Figure 15-22, the elevation is 122.53 feet. The HI is 122.53 + 5.5 = 128.03 feet. With the elevation rounded off to the nearest 0.1 foot, the elevation is 128.0

 

Figure 15-22 –Sample field notes from cross-section leveling at first three stations shown in figure 15-20.

As rodman, if you hold a rod 40 feet to the left of the center line at station 0 + 00 and read 1.9 feet on the rod, then the elevation of the point plumbed by the rod is 128.0 – 1.9 = 126.1 feet.

Now if you move on to a point 30 feet from the center line at station 0 + 00 and read 3.3 feet on the rod, the elevation of the point is 128.0 – 3.3 = 124.7 feet.

This process is used to determine the elevations at all the required points on the cross section. This same process is repeated for each cross section.

Cross section notes are recorded in the field book using two basic methods. The first, and often preferred, method begins at the bottom of the page and is read upward, as shown in Figure 15-22. This method helps to keep orientation in the direction the line runs and helps to prevent confusion as to which is the right or left side of the line. It reduces the possibility of recording readings on the wrong side of the center line.

With the second method, notes are recorded in the conventional manner of reading from top to bottom of the page. Whichever method is used, the recorder must stand facing the direction in which the line runs; left and right in the notebook must correspond to left and right in the field.

Figure 15-22 shows field notes for cross-section levels taken on the first three stations shown in Figures 15-19 and 15-20. On the data side, only the station and the HI need to be listed. On the remarks side, each entry consists of a point elevation, written over the distance of the point from the center line. The computed elevation, determined by subtracting the rod reading from the HI, is written in above. Note the rod reading at the center line is the 5.5-foot vertical distance from the line of sight to the ground. Also, notice the center-line elevation written in at each station is obtained in the profile level run. The HI for each station is calculated by adding the two figures together.

3.3.4 Double Rodding

Double rodding is a form of differential leveling in which a continuous check is maintained on the accuracy of the leveling procedure. Double rodding is typically done by two rodmen; however, it is possible to carry out the procedure using only one rodman.

In double rodding, the HI is determined at each setup point by backsights taken on two different TPs. If no mistake or large error has been made, the result will be two HIs that differ slightly from each other. Elevations computed this way will also differ slightly. In each case, the average is taken as the elevation.

Figure 15-23 shows double-rodded level notes for a run from one BM to another by way of three intermediate TPs. In each case, a “higher” TP (TP1) and a “lower” (TP1L) were used, resulting in two different HIs for each. Computed by way of the higher HIs, the elevation of BM2 came to 851.98 feet. Computed by way of the lower HIs, it came to 852.00 feet. The mean (average) of 851.99 feet was taken as the correct elevation.

 

 Figure 15-23 – Sample field notes from double-rodded levels.

3.3.5 Indirect Leveling

Indirect methods of leveling include both trigonometric and barometric leveling. Trigonometric leveling uses vertical angles and a horizontal distance to compute the difference in elevation. Barometric leveling uses the difference in atmospheric pressures that are observed by a barometer or an altimeter to determine the elevation differences. Indirect methods of leveling are discussed at the advanced engineering tech level.

Test Your Knowledge

10. The original level run is rapidly rerun as a check in what type of leveling procedure?

A. Three-wire
B. Cross-section
C. Profile
D. Flying

11. Simultaneous-reciprocal leveling requires which of the following level party personnel?

A. One levelman and one rodman
B. One levelman and two rodmen
C. Two levelmen and one rodman
D. Two levelmen and two rodmen

12. At what point(s) along a proposed highway are cross sections taken?

A. Every 25 feet
B. Every 50 feet
C. At regular stations only
D. At regular stations at any point where there is a break on the ground, or at any interval desired

13. What is a form of differential leveling in which a continuous check is maintained on the accuracy of the leveling procedure?

A. Three-wire
B. Double rodding
C. Cross-section
D. Profile

 

4.0.0 PRECISION in LEVELING; MISTAKES and ERRORS in LEVELING

Like all other surveying operations, leveling is carried out by following a prescribed order of precision. This means the instruments must be properly handled and the methods used to survey must be followed in order to achieve specific standards of accuracy.

4.1.0 Precision in Leveling

First-order leveling is used to establish the main level network for an area and provides basic vertical control for the extension of level networks of the same, or lower, accuracy in support of mapping projects, cadastral (recording property boundaries, subdivision lines, buildings, etc.), and local surveys. Level lines must start and end on proven, existing BMs of the same order. New levels must be run between the starting BM being used and at least one other existing BM and must show there is no change in their relative elevations. Second-order leveling is used to subdivide nets of first-order leveling and provides basic control for the extension of levels of the same, or lower, accuracy in support of mapping projects and local surveys. Second-order levels are divided into two classes: Class I and Class II. Class I is used in remote areas where the line must be longer than 25 miles because routes are unavailable for the development of additional or higher order networks and for spur lines. Class II levels are used for the development of nets in more accessible areas. Class I leveling, requires that all lines start and close on previously established BMs of first or second order. New levels have to be run between the existing BM being used and at least one other existing BM to prove they have not  15-29 changed their relative elevations. The criteria for Class II are the same as for Class I, except Class II lines are run in one direction only. Third-order leveling is used to subdivide an area surrounded by first- and second-order leveling and to provide elevations for the immediate control of cadastral, topographic, and construction surveys for permanent structures. The following criteria should be observed in third order leveling:

  1. All lines start from and close on two previously established BMs of third or higher order of accuracy if the new leveling indicates they have not changed in their relative elevations.
  2. In the United States, third-order lines should not be extended more than 30 miles from BMs of first or second order. In foreign or remote areas, the distance may be extended according to the evaluation of the existing control and the situation. They may be single-run (one direction) lines but should always be loops or circuits that close upon BMs of an equal or a higher order.
  3. When a line from previously established third-order marks is extended, the maximum length of the new line is greatly reduced. The distance and allowable error are carried back through the existing line to the nearest tie BM of the second or higher order.
  4. Balanced sights should not be greater than 300 feet. BS and FS distances may be measured by pacing and approximately balanced between BMs.
  5. Rod readings are read to thousandths and the rod waved for extended rod readings.
  6. The bubble is checked to make sure it is centered before each sighting and reading.
  7. Turning point pins or plates or well-defined points on solid objects are used for TPs.

 Fourth-order leveling is used to subdivide an area within a third-order network. This method is used in connection with the location and construction of highways, railroads, and other engineering works that concern Seabees in advanced base projects. In practice, trying to shoot for a higher degree of accuracy is advantageous if it does not affect work progress. The following criteria should be observed in fourth-order leveling:

  1. All lines start from and close on previously established BMs of the third or fourth order of accuracy.
  2. Maximum sight distance is about 500 feet.
  3. Rod readings are read to hundredths of a foot. BS and FS distances are roughly balanced only when lines of great lengths are run, either uphill or downhill.
  4. TPs are taken on solid or any well-defined, firm objects.

The instruments commonly used in third- and fourth-order leveling are the engineer’s level and the Philadelphia rod. The adjustments of these instruments should always be checked before use.

4.1.1 Order of Precision

The precision of a level run is usually prescribed in terms of a maximum error of closure. Maximum error of closure is obtained by multiplying a constant factor by the square root of the length of the run in miles or in kilometers, depending upon the system  15-30 of measurement being used. The Federal Bureau of Surveying and Mapping specifies certain requirements and the maximum closing errors, such as those shown in Figure 15-24. Refer to this standard if the order of precision is not specified for a particular survey project.  15-31 Figure 15-24 – Federal Bureau of Surveying and Mapping requirements.  15-32

4.1.2 Calculating Error of Closure

A level run that begins at a particular BM and is carried back to the same BM is called a level loop. A run that does not close on the initial BM is called a level line. A level line closes on another BM. However, when a level line is carried back to its origin, it becomes a level loop. A level line is usually carried back to the initial BM to determine the error of closure. Error of closure is simply the difference between the known elevation of the initial BM and the elevation of the same BM as computed in a level run. The allowable error of closure depends on the precision required (first, second, or third order). The permissible (or allowable) error of closure in accuracy leveling is expressed in terms of a coefficient and the square root of the horizontal length of the actual route over which the leveling was done. Most differential leveling (plane surveying) is third-order work. In third-order leveling, the closure is usually made on surveys of higher accuracy without doubling back to the old BM at the original starting point of the level circuit. The length of the level circuit, therefore, is the actual distance leveled. For third-order leveling, the allowable error is 0.050 ft theoflength circuitlevel in miles After adding the sight distances in the sixth and seventh columns of the differential level circuit shown in Figure 15-14, the length of the level circuit is 2,140 feet. The length in miles is 2140 / 5280 = 0.405. The allowable error of closure is 0.050 ft 0.405 = 0.050(0.64) = 0.032 ft Since the actual error is only 0.015 foot, the results are sufficiently accurate. First- and second-order levels usually close on themselves. The leveling party runs a line of levels from an old BM or station to the new BM or station, and then doubles back to the old BM for closure. The actual distance leveled is twice the length of the level circuit. For second-order leveling, the allowable error is 0.035 ft theoflength circuitlevel in miles First-order leveling is still more precise. The allowable error cannot be greater than 0.017 ft theoflength circuit level in miles

4.2.0 Mistakes and Errors in Leveling

The terms “mistakes” and “errors” are not synonymous in surveying. Leveling operations, like other survey measurements, are susceptible to both. Mistakes can be avoided by a well-arranged system of operation and an attention to detail by all of the survey party members. Checking and rechecking, as described in some of the operations, eliminate many mistakes. While errors cannot be completely eliminated, errors can be minimized so their effect on survey accuracy is small and within allowable tolerances.

4.2.1 Identifying Leveling Mistakes

The leveling mistakes discussed here are not intended to include all possibilities but rather to list examples of commonly occurring mistakes. The survey party personnel should be aware of these possibilities and should be careful to avoid them. Some of the common mistakes are as follows: 1. Not setting the rod on the same point for an FS and the following BS. Using a turning pin, pedestal, or stake, or marking the location with chalk on hard surfaces helps to recover the identical point. 2. Neglecting to clamp the target or the rod when extended. Any slippage can pass unnoticed and result in an incorrect reading which may require an entire rerun of the line to discover the mistake. The rodman should watch the rod or target for any movement as the clamp is tightened. The rod extension or target should be read again after the clamp has been set. 3. Reading the wrong mark. The figures on a rod may be obscured by brush or may fall in a position in the field of view so that the instrumentman cannot see two consecutive numbers. Under these conditions, the instrumentman may read the wrong mark or even read in the wrong direction. This is particularly true when an inverting eyepiece is being used. Another possibility is miscounting the number of divisions. There is no way to check or discover these mistakes except to be aware of their possibility and to read carefully. 4. Recording a reading in the wrong column. In leveling, readings are not entered into the notebook in a normal sequence such as left to right across the page. There is always a chance that one or more values may be recorded in the wrong column. The recorder must be alert to avoid making this mistake. 5. Reading the wrong angle sign in trigonometric leveling. The instrumentman can accidentally call out a wrong sign in reading the angle. This mistake can be eliminated by the recorder watching the telescope as a pointing is made on the rod. If the wrong reading is called out, both the recorder and the instrumentman can resolve it immediately. 6. Recording the wrong sign. The sign varies depending on whether the rod reading is a BS or an FS, and whether the angle is a depression or an elevation. Also, the difference in elevation computation requires a sign reversal if the angle is read for the BS, but not for the FS. These variations can be confusing. The recorder has to be careful to avoid mistakes. This is done by recording the angle and rod reading signs as read. The sign conversion, if needed, shows up when the DE is computed. Examining the computations to see if all BS DEs have a sign opposite to the angle sign is simple. 7. Subtracting the BS or adding the FS in differential leveling. If the BS or FS is recorded properly (see Number 4 above), the mistake can be discovered when the BS column and the FS columns are added for a computation check. 8. Using the wrong horizontal cross hairs. This occurs on an instrument provided with stadia hairs.

4.2.2 Identifying Leveling Errors

Generally, errors cannot be completely eliminated; however, they can be contained within acceptable tolerances. Minimizing errors requires using prescribed methods and instruments. Reducing errors may also include applying mathematical corrections. Some of the conditions that produce errors are listed below.

1. Instrument not properly adjusted. A small amount of residual error exists in any adjustment. For the more accurate surveys, the residual error is minimized by using BS and FS balancing and, in trigonometric leveling, by taking direct and reverse (circle left and circle right) readings for the angles.

2. Instrument not leveled properly. Unlike the residual adjustment error that affects the readings one way consistently, this is a random or accidental error. It may affect the line of sight differently at each setup. This error is minimized only by careful leveling of the instrument each time it is set up and by re-centering the bubble before each reading.

3. Telescope not focused properly. Mis-focusing and parallax in the eyepiece create accidental errors that cannot be corrected. Proper focusing at each setup can minimize, even eliminate this error. The instrumentman should check and clear the parallax before the first sighting and should not readjust it until all sightings from the setup are complete.

4. Rod improperly plumbed. This is caused by a rodman not paying attention. The instrumentman can call attention to plumbing if it is at a right angle to the line of sight, but cannot see it in the direction of line of sight. The use of a rod level or waving the rod will avoid this error.

5. Unstable object used for a TP. The rodman causes this error by selecting a poor point of support, such as loose rocks or soft ground. As the rod is turned between sights, the weight of the rod can shift a loose rock or sink into soft ground. The elevation of the TP used for the next BS can change markedly from the value that had been computed from the previous FS. This error is avoidable by using the turning pin or pedestal when the ground is unstable.

6. Rod length erroneous. This error results in either too long or too short rod readings at each point. This error accumulates particularly over sloped areas. The rod length should be checked with a steel tape at intervals to locate the error.

7. Unbalanced BS and FS distances. The unbalanced distances do not cause the error. It is caused by the effect on the line of sight from residual adjustment and leveling errors, and the effect of curvature and refraction errors. Long distance readings are more susceptible to greater error than short distance readings. The unbalance may not be critical on one setup. However, unbalancing can compound into a considerable errors if it continues over several setups. Balancing sight distances at each instrument setup reduces the probability of errors.

8. Earth’s curvature. Curvature produces an error only on unbalanced sights in leveling. When the BS distances are constantly greater than FS distances, or vice versa, a greater systematic error results, especially with long sites. To eliminate this error, maintain a balanced sight distance in every BS and FS reading, not just their sum total between BMs. Note that this type of error is directly related to the square of the distance from the instrument to the rod.

9. Atmospheric refraction. The effect of atmospheric refraction is only oneseventh of that caused by the earth’s curvature. In first- and second-order leveling, the effect of refraction is minimized by taking the BS and FS readings in quick succession and avoiding readings near the ground. (They should be taken at least 2 feet from the ground.)

10.Variation in temperature. If a portion of the telescope is shaded while other parts are exposed to the sun’s rays, it produces some warping effect on the instrument that may affect its line of sight. This effect is negligible in ordinary leveling. However, in leveling of higher precision, the effect may produce appreciable error. This is one of the reasons why surveyors use an umbrella to shield the instrument when doing more refined work.

 

Test Your Knowledge

14. Recording a rod reading in the wrong column in a field book is classified as a ______

A. mistake.
B. standard error.
C. personal error.
D. natural error.

15. Between errors and mistakes, the most importance difference, if any, is that ______

A. errors can be avoided.
B. errors are caused by human negligence.
C. mistakes can be avoided.
D. there is no difference; the terms are synonymous.

 

5.0.0 BASIC ENGINEERING SURVEYS and CONSTRUCTION SITE SAFETY

An engineering survey forms the first of a chain of activities which ultimately leads to a completed structure of some kind, such as a building, a bridge, or a highway. An engineering survey is usually subdivided into a design-data survey and a construction survey. This section discusses the basic engineering surveys commonly performed by an engineering tech survey party in support of military construction activities. Various types of occupational hazards relating to specific surveying operations are also presented here, together with the precautions or applicable abatement procedures that must be carried out to deter injury to the survey crew and/or damage to surveying equipment or material.

5.1.0 Highway Surveys

Surveys for roads and streets involve both field work and office work. The extent of each type of work depends on the magnitude and complexity of the job. Some phases of the work may be done in the field or in the office. The decision as to which procedures are to be followed is influenced by the number of personnel available and by the experience and capabilities of the individuals involved. 

5.1.1 Design-Data Survey

The design-data survey is conducted to collect information essential for planning an engineering project or development and estimating its cost. A typical design-data survey, for example, is a route survey required in the design and construction of a particular road or highway. The initial activities included in a route survey are a reconnaissance survey, a preliminary location survey, and a final location survey.

5.1.1.1 Reconnaissance Survey

A reconnaissance survey provides data that enables design engineers to study the advantages and disadvantages of a variety of routes in order to determine the most feasible one. Reconnaissance begins by finding all existing maps showing the area to be reconnoitered. In reconnaissance, studying existing maps is as important as the actual fieldwork. Studying maps and aerial photographs, if any exist, often eliminates an unfavorable route from further consideration, thus saving the reconnaissance field party considerable time and effort. Contour maps provide essential information about area relief. Aerial photographs provide a quick means for preparing valuable sketches and overlays for the field party. Direct aerial observation provides an overview of an area that speeds up later ground reconnaissance if the region has already been mapped. Begin the study of a map by marking the limits of the area to be reconnoitered and the specified terminals to be connected by the highway. Note whether or not there are any existing routes. Note ridgelines, water courses, mountain gaps, and similar control features. Look for terrain that permits moderate grades without too much excavating. Use simplicity in alignment and have a good balance of cuts and fills. Use a profile arrangement that makes it possible to fill depressions with the cut taken from nearby high places. From the map study, determine grades, estimate the amount of clearing required, and locate routes that keep excavation to a minimum by taking advantage of terrain conditions. Mark stream crossings and marshy areas as possible locations for fords, bridges, or culverts. The reconnaissance field party should follow the route or routes marked earlier during the map study. Field reconnaissance is an opportunity for checking the actual conditions on the ground and for noting any discrepancies in the maps or aerial photographs. Make notes of soil conditions, availability of construction materials such as sand or gravel, unusual grade or alignment problems, and requirements for clearing and grubbing. Take photographs or make sketches of reference points, control points, structure sites, terrain obstacles, landslides, washouts, or other unusual circumstances. The reconnaissance survey party usually carries lightweight non-precision instruments. A compass is used to determine direction and angles. An aneroid barometer or altimeter is used to determine approximate elevations. An Abney hand level (clinometer) is used to estimate elevations and to project level lines. Other useful items to carry include pocket tapes, binoculars, pedometer and pace tallies, cameras, watches, maps, and field notebooks. Keep design considerations in mind while running a reconnaissance survey. Remember that future operations may require further expansion of the route system. Locate portions of the new route, whenever possible, along preexisting roads or trails. Locate routes on stable, easily drained, high-strength-bearing soils. Avoid swamps, marshes, low-bearing-strength soils, sharp curves, and routes requiring large amounts of earthmoving. Keep the need for bridges and drainage structures to a minimum. When the tactical situation permits, locate roads in forward combat zones in concealed areas and protected from enemy fire. After the field work is complete, a reconnaissance survey report is generated. The completed report provides data used to select the most feasible route or routes.

5.1.1.2 Preliminary Survey

A preliminary survey is a more detailed study of one or more routes tentatively selected on the basis of a reconnaissance survey report. It consists of surveying and mapping a strip of land along the center line of a tentatively selected route. Some of the activities associated with preliminary survey include running a traverse (sometimes called a Pline or survey baseline), establishing BMs, running profiles, and taking cross sections. For many projects, the preliminary survey is conducted by a transit-tape party alone. Other projects may require a level party and a topographic party. Normally, the data gathered from a preliminary survey is plotted while the party is in the field. This practice gives a more accurate representation of the terrain, reduces the possibility of error, and assists in resolving any doubtful situations while actually observing the terrain.

5.1.1.3 Final Location Survey

The final location survey, also called the location, is a continuous operation that goes on from the start of the project through to the end of the actual construction. The final location survey consists of establishing the approved layout in the field, such as providing the alignment, grades, and locations to guide the construction crew. The engineering techs tasked with the final location survey normally start (in both time and distance) ahead of the construction crew in order to save construction time and to avoid delay of scheduled activities. Their activities include setting stakes to mark the limits of final earthmoving operations, locating structures, and establishing final grades and alignment. The final location in the field is carefully established by the transit party, using the paper location prepared from the preliminary survey. The center line may vary from the paper location because of objects or conditions that were not previously considered. If variations are detected and changes are required, the changes must be approved by the engineering officer.

5.1.2 Office Work A

fter the type and general location of a highway are decided and the necessary design data is obtained in the field, a number of office tasks must be performed. The tasks include the following:

  1. Plotting the plan view
  2. Plotting the profile
  3. Plotting the alignment
  4. Designing the gradients
  5. Plotting the cross sections 
  6. Determining end areas
  7. Computing the volumes of cut and fill

Repeat these operations one or more times as trial designs are developed and revised. Plot a highway plan and profile view on the same sheet. Figure 15-25 shows a plotted highway plan and profile view.

 

Figure 15-25 – Profile of highway.

5.1.2.1 Plotting the Plan View

Plotting the plan view of a highway is similar to a traverse except for the introduction of topographic details, curves, and curve data.

5.1.2.2 Profile Plotting

Profile plotting is done on regular profile paper that has ruled horizontal and vertical parallel lines, as shown in Figure15-25. The vertical lines are spaced 1/4 or 1/2 inch apart and the horizontal lines are spaced 1/20 or 1/10 inch apart. The first consideration when conducting profile plotting is the selection of suitable horizontal and vertical scales for the profile paper. The selection of the scale varies with the character of the ground and other factors. In Figure 15-25, the horizontal scale used was 1 inch = 400 feet, and the vertical scale used was 1 inch = 20 feet. Normally, choose scales that are proportional numbers in multiples of ten. To plot a profile, use profile level notes or use the elevations obtained from the contour lines. For the example in Figure 15-25, assume the profile level notes indicate the center line elevations at the indicated stations from 5 + 00 through 15 + 00. Also for this example, the notes would show an elevation was taken at every full station and also at every station where a significant change in elevation occurs. This is true for station 8 + 75 where a significant elevation change occurs. If an elevation had not been taken at 8 + 75, the drop that exists between 8 + 00 and 9 + 00 would be indicated on the profile. Notice at listed elevations that each was plotted as a point located where a vertical line that indicates the station intersected a horizontal line indicating the elevation of that station. Also note that usually stations are labeled where the line crosses highways, streams, and railroads. Besides the profile of the existing terrain, the vertical tangents of the proposed highway center line are also plotted in Figure15-25. The end elevation for each of these (the elevations of points of vertical intersection (PVI) was determined by the design  15-39 engineers. Various circumstances were considered when developing the proposed highway center line. One of the important considerations was the filling of each depression with an approximately equal volume of cut taken from a nearby hump or from two nearby humps. The gradient, in terms of percentage of slope (total rise or fall in feet per 100 horizontal feet), is marked on each of the vertical tangents, as shown in Figure15-25. The percentage of slope is computed for a tangent as follows. For the tangent running from station 6 + 00 to station 18 + 00, the total rise is the difference in elevation, or 417.0 – 413.3, or + 3.7 feet. The horizontal distance between the stations is 1,200 feet. The percentage of slope, then, is the value of x in the equation 0.31 31% x 100 3.7 1200.00 == or For a tangent running from station 18 + 00 to station 26 + 00, the total slope downward is the difference in elevation, or 412.0 – 417.0, or – 5.0 feet. The distance between the stations is 800 feet. The percentage of slope then is the value of x in the equation 0.6 62% x 100 5.0 800 −−== − 2 or

5.1.2.3 Types of Cross Sections

Figure 15-26 shows information found in a typical design cross section including the materials to be used along with their thicknesses. Figure 15-26 – Typical design cross section. For the purpose of staking out and for earthmoving calculations, the cross-section line of the existing ground at each successive station must be plotted. After each station is plotted, the design-data cross section (typical section of the highway) is then superimposed

Figure 15-27 shows a designed cross section of a 40-foot-wide road taken from a station or point along the road center line. The elevation of the existing surface is 237.4 feet all the way across, which makes it a level section. The finished grade for the highway at the station is 220.4 feet. The prescribed side-slope ratio is 1.5:1, or a 1.5 horizontal unit for every one unit of vertical rise. Figure 15-27 – Level section in cut. Because the ground line across the cross section is level and the side-slope ratio is the same on both sides, the horizontal distance from the center line to the point where the side slope meets the natural surface is the same on both sides. Slope stakes are used to guide the earthmovers. The horizontal distance from the center line to a slope stake can be computed by methods that will be explained later. In the case of this designed cross section, the data available includes the following: 1. Width of the highway 2. Slide-slope ratio 3. Proposed finished grade Because the elevation of the level section in Figure 15-27 is the same on both sides, only a single-level shot elevation is needed. This type of section is called a one-level section, or a level section. Because the entire sectional area consists of material to be excavated or cut, it is called a section in cut. In the section shown in Figure 15-28, the ground line across the section is sloping. To plot this section, three different elevations are needed: one for the left slope stake, one for the center-line grade stake, and one for the right slope stake. If these three levels are taken, the section is called a three-level section in cut. If additional levels are taken midway between the center line and the slope stake on either side, it is called a five level section in cut. It is a section in cut because the entire cross-sectional area consists of cut. Level, three-level, and five-level sections are called regular sections.  15-41 Figure 15-29 shows a level section in fill. Figure 15-30 illustrates a three-level section in fill. The section shown in Figure 15-31 consisting of a cut and a fill is called a side hill section. Figure 15-28 – Three-level section in cut. Figure 15-29 – Level section in fill. Figure 15-30 – Three-level section in fill.  15-42 Cross sections may be preliminary or final. Preliminary cross sections are irregular sections plotted before the finished grade is determined. Preliminary cross sections may be identified by levels run in the field or by elevations found on the contour lines of a topographic map. Final cross sections are sections of the final road design. They may be prepared in the same manner as preliminary sections, or they may be regular sections plotted from field data obtained after the finished grade is set. The term “final cross section” is also applied to as-built sections taken after construction is completed.

5.1.2.4 Plotting Cross Sections

Cross sections are usually plotted on cross-section paper. Commonly called 10 x10- inch paper, it is ruled into 1-inch squares with heavy orange or green lines, and with lighter lines into 1/10-inch squares. Each cross section is plotted separately. The station number appears below each cross section. The first cross section is placed at the top of a sheet and continued downward until all sections are plotted. Two or more sections may be plotted on the same sheet. For a major highway project, the cross sections can be plotted on a continuous roll of cross-section paper. Some surveyors prefer to plot the cross sections from the bottom to the top of the paper. They may also prefer to record cross-section notes in the same manner. If you follow these methods of plotting and recording, you are properly oriented with the actual direction of the highway. This means your left is also towards the left of the highway. It is also to the left of the cross section notes and the plotted cross section. It does not matter which method is used as long as proper orientation is maintained. Unlike profile plotting, in cross-section plotting, the same scale is often used for both the vertical and the horizontal distance. Common scales are 1 inch = 5 feet and 1 inch = 10 feet. When sections are shallow, it is best to exaggerate the vertical scale, making it from two to ten times the horizontal scale. For the center line for a row of sections, use one of the heavier vertical lines on the paper far enough away from the margin so plotted points will not run off the paper. Note the depths indicated for the first section to be plotted, and select a horizontal line for the base approximately centered between the top and bottom margins. Mark this with the base elevation. Then lay off the horizontal distances of the section surface elevations on either side of the center line, and plot the elevations by using the level data. Finally, connect the plotted points by using a straightedge or by drawing freehand lines. Figure 15-31 – Side hill section.  15-43 In Figure 15-32, cross-section notes are shown for the existing ground along a proposed road. In Figure 15-33, the sections at stations 11 + 00 and 11 + 43 have been plotted. Figure 15-32 – Cross section notes. Figure 15-33 – Cross section plotted. For each station the field party took the ground elevation 40 feet to the right and to the left of the center line. For each station, however, the center-line distance of the intermediate elevations varies making these irregular sections.  15-44 The HI for both plotted stations is 76.70 feet. For the point 6 feet left of the center line at station 11 + 00, note the 4.2 written below the 6. This reading was obtained from a rod held on this point. The number 72.5 shown in the parentheses right below the number 4.2 is the elevation of this point. You obtain the elevation by subtracting from the HI, the rod reading FS: 76.70 – 4.20, or 72.50 This point is plotted 6 feet to the left of the center line at an elevation of 72.5 feet, as shown in Figure 15-33. Notes are reduced in the office. The general practice is to print the elevations in RED. The elevation just computed (72.5) appears in red in the cross-section notes, as shown in Figure 15-32. After the road gradients, either preliminary or final, are designed, plot the design-data cross section on the existing ground line section plot at each station to complete the picture of the end-area as it will be in the finished highway. Obtain the finished grade elevation for each station from the profile. Plot the finished grade point, usually located on the center at each cross section. Then draw in the outline of the pavement surface, ditches, and cut or fill slopes as they show on the typical design section. Plotting may be done with triangles. However, a faster method uses templates made of plastic, thin wood, sturdy cardboard, or other suitable material. Prepare templates for a cut section, a fill section, and a side hill section that may be flipped over to accommodate the direction of hillside slope. The procedures just described are the most common and pertain to irregular sections. If regular sections are taken in the field after the gradients have been designed, then both the existing and the finished surfaces are plotted. Field notes for simplified three-level sections on a highway are shown in Figure 15-34. On the data side, the profile elevation and the grade elevation at each station are listed. In the columns headed Left and Right on the remarks side, the upper numbers and letter symbols (C for cut, F for fill) indicate the amount of material to be removed or added. The numbers under the lines indicate the distance measured out from the center line. These points also indicate slope stake locations. If a five-level or irregular section is being recorded, additional points must be written between those for the center and for the slope stakes to indicate the changing elevations.  15-45 Figure 15-34 – Field notes for three-level cross section.

5.1.3 Layout/Stakeout Procedures

The design-data survey is followed by the construction survey, which consists of the layout or stakeout survey and the as-built survey. In a layout survey, both horizontal and vertical control points are located and marked to guide the construction crews. Figure 15-35 illustrates a typical arrangement of stakes and hubs used in highway or road construction. The functions of the stakes and hubs include the following:

1. Center-line stakes indicate the exact center of the roadway construction.

2. Shoulder stakes indicate the inside edge of the roadway shoulders. These stakes are set opposite each center-line stake.

3. Reference stakes, as the name implies, provide a reference for other stakes or aid in establishing or reestablishing other stakes.

4. Slope stakes mark the intersection of side slopes with the natural ground surface. They indicate the earthwork limits on each side of the center line.

5. Right-of-way stakes indicate the legal right of passage and outmost bounds of construction.

6. Grade stakes indicate required grade elevations to the construction crews. During the final grading stage of construction, hubs called “blue tops” are used in lieu of stakes. The blue tops are driven so that the top of the hub is set at the required grade elevation.

7. Guard stakes identify and protect hubs. The face of the stake is marked with station identification and placed so the stake faces the hub it identifies. Sometimes more than one guard stake is used to protect a hub.

8. Offset stakes are additional stakes that are offset a known distance from other stakes that will likely be disturbed during construction. The offset stake is marked with the same information as the stake it offsets. It is also marked to show the offset distance. Often, stakes are offset a known distance from their true location. This eliminates the requirement for additional stakes.

5.1.3.1 Center-Line Layout

The first major step in highway construction is usually the rough grading or earthmoving which brings the surface up to or down to the approximate elevation prescribed for the sub-grade. The sub-grade is the surface of natural soil, or the place where the pavement will be laid. The sub-grade elevation, therefore, equals the grade (finished surface) elevation minus the thickness of the pavement. In rough grading, the equipment operators are usually guided by grade stakes set along the center line by the transit-tape survey party at center-line stations. The center-line stations (stakes) are usually set at intervals of 100 feet or more on straight-line stretches and intervals of 50 feet or less on roads with horizontal and vertical curvatures. On a small-radius, street-corner curve, a center-line hub stake might be set at the center of the circle of which the curve is a part. This is done so the construction crew may outline the curve by swinging the radius with a tape. Reference stakes or hubs are also set on one or both sides of the center line to reestablish the center line at any time. Each center-line stake is marked with the vertical depth of cut or fill required to bring the surface to grade elevation. The surveyor must indicate the station markings and the cut and fill directions on stakes. The starting point is the first station in the survey is numbered 0 + 00. The next station is normally 100 feet farther and is marked 1 + 00; the third station is another 100 feet farther and is marked 2 + 00, and so on. On sharp curves or on rough ground, the stakes may be closer together, as shown in Figure 15- Figure 15-35 – Typical arrangement of hubs and stakes on a road section (final grading).  15-47 36. Generally, the station markings face the starting point. The mark on the side facing the starting point is used to indicate the stake is a center-line stake. The A cut is designated by the letter C, and the fill is indicated by the letter F. Numerals follow the letters to indicate the amount that the ground should be cut or filled. The symbol C15 indicates the existing ground should be cut 1.5 feet, as measured from the Figure 15-36 – Center-line layout.  15-48 reference mark. During rough grading, the cut and fill are generally carried just up to the nearest half foot. Exact grade elevations are later marked with hubs (blue tops).The mark V is called a crowfoot. The apex of the V indicates the direction of the required change in elevation; so a cut is indicated by V, and a fill is indicated by upside down V. In some cases, surveyors mark the grade stake only with a negative or a positive number and the crowfoot, indicating the cut or fill. Figure 15-37 shows a cut stake which is also a center-line marker. Note the station mark is written on the front of the stake and the construction information on the back. On grade stakes other than the center-line stakes, the construction information should be written on the front and the station marked on the back. The stake shown in Figure 15-38 indicates fill is required. The letter F at the top of the stake stands for fill. The numerals indicate 2 feet of fill are required to bring the construction up to grade. Some stakes indicate that no cutting or filling is required. Figure 15-39 illustrates a grade stake on a proper grade on a center line. The word GRADE (or GRD) is on the back of the stake, and the crowfoot mark may not be indicated. Some surveyors prefer to use a crowfoot mark on all grade stakes. If this grade stake was not a center-line stake, the GRD mark would be written on the front of the stake. Figure 15-37 – Cut stake. Figure 15-38 – Fill stake (not on center line). Figure 15-39 – Stake on proper grade.  15-49

5.1.3.2 Setting Grade Stakes

Points with the same ground and grade elevation are set by grade stakes. They are usually set after the center line is laid out and marked with hubs and guard stakes. They can be reestablished if the markers are disturbed. Elevations are usually determined by an engineer’s level and level rod. One procedure used for setting grade stakes is as follows: 1. From BMs, turn levels on the center-line hubs or on the ground next to a grade stake at each station. 2. Reduce the notes to obtain hub-top or ground elevation. 3. Obtain the finished grade elevation for each station from the construction plans. 4. Compute the difference between the finished grade and the hub or ground elevation to determine the cut or fill at each station. 5. Go back down the line and mark the cut or fill on each grade stake or guard stake. The elevations and the cuts or fills may be recorded in the level notes, or they may be set down on a construction sheet, as explained later in this lesson. Another procedure may be used that combines the method listed above so that the computations may be completed while at each station. The cut or fill can be marked on the stake immediately. As before, levels are run from BMs. The procedure at each station is as follows: 1. Determine the ground elevation of the station from the level notes to obtain HI. 2. Obtain the finished grade for the station from the plans. 3. Compute the difference between the HI and the finished grade. This vertical distance is called grade rod. 4. Read a rod held on the hub top or ground point for which the cut or fill is desired. This rod reading is called the ground rod. 5. Determine the cut or fill by adding or subtracting the grade rod and the ground rod, according to the circumstances, as shown in Figure 15-40. 6. Mark the cut or fill on the stake.  15-50 Blue top hubs are used during the final grading. These hubs are driven into the ground until the top is at the exact elevation of the finished grade as determined by the surveying crew. When the top of the stake is at the desired finish grade elevation, it is colored with blue lumber crayon (keel) to identify it as a finished grade stake. Other colors may be used, but be consistent and use the same color keel throughout the project so as not to confuse the equipment operators. Blue tops are normally provided with a guard stake to avoid displacement during construction work. The guard stake usually shows the station and the elevation of the top of the hub. Setting blue tops is primarily conducted during final grading operations. The procedure is as follows:

1. Study the construction plans and center-line profiles for each station to determine the exact profile elevation and the horizontal distance from center line to the edge of the shoulder.

2. Measure the horizontal distance from the center line to the shoulder edge at each station, and drive a grade stake at this point on each side. It is advisable to offset the stakes a few feet to avoid displacement during construction.

3. Set the top of the stake even with the grade elevation, using both the level and the rod. This is accomplished by measuring down from the HI a distance equal to the grade rod (determined by subtracting grade elevation from the HI). The target on the rod is set at the grade-rod reading and the rod is held on the top of the stake. After a few trials, the stake is driven into the ground until the horizontal hair of the level intersects the rod level indicated by the target. Then color the top of a stake with blue crayon (keel). 4. Where the tops of stakes cannot be set to grade because grade elevation is too far below or above the ground line, set in ordinary grade stakes marked with the Figure 15-40 – Determining cut or fill from grade rod and ground rod.  15-51 cut or fill as in rough grading. However, for final grading, it is usually possible to set most of the blue tops. Where grade stakes cannot be driven, for example in hard coral or rock areas, use ingenuity to set and preserve grade markings. Markings may often be made on the rock with a chisel or a keel.

5.1.3.3 Setting Slope Stakes

Slope stakes are driven at the intersection of the ground and each side slope or offset a short distance. They indicate the earthwork limits on each side of the center line. The minimum areas to be cleared and grubbed extend outward about 6 feet from the slope stakes. Refer back to Figure 15-31 and take a close look at the position of the slope stakes. The horizontal distance of a slope stake from the center line varies. Three variables must be known to determine this distance:

1. The width of the roadbed, including widths of shoulders and ditches, if any

2. The side-slope ratio (expressed in units of horizontal run in feet per foot of vertical rise or fall)

3. The difference in elevation between the grade for the road and the point on the natural ground line where the slope stake will be set In Figure 15-41, d is the horizontal distance from the center line to the slope stake, W/2 is the horizontal distance from the center line to the top of the slope, h is the difference in elevation between the finished grade and the ground at the slope stake, and s is the slope ratio. The product of h x s gives the run of the slope or the horizontal distance the slope covers. The horizontal distance (d) of the slope stake from the center line, then, equals the sum of W/2 plus hs. For example, suppose W/2 is 20 feet, h is 10 feet, and the bank is a 4:1 slope. Figure 15-41 – Fill section level.  15-52 Then hs = 10 x 4, or 40 and d = 20 feet + 40 feet, or 60 feet In practice other factors must be considered, such as a transverse slope or the crossfall of the pavement (sometimes called the crown), ditches, and other factors. In Figure 15- 42, for example, there is a crossfall (h=) across W/2 so that the run (horizontal distance covered) of the bank (hbs) is the product of s x hb instead of hs, as in Figure 15-37, view A. The crossfall is usually constant and may be obtained from the typical design sect ion shown on the plans. Figure 15-43 shows a cut section in which W/2 varies with crossfall, side slope, ditch depth, and back slope. For example, assume that the distance from the center line to the beginning of the side slope is 20 feet, the cross fall totals 1 foot, the ditch depth is 1.5 feet, and both the side slope and back slope ratios are 2:1. The distance W/2, then, comprises horizontal segments as follows: 1. From the center line to the top of the slope, which is 20 feet 2. Then to the ditch flow line, which equals the product of slope ratio 2 times ditch depth (1.5), or 3 feet. 3. Then to the point on the back slope that is level with the finished center line, which equals slope ratio 2 times the difference in elevation crossfall plus ditch depth, 2(1 + 1.5), or 5 feet. 4. The total distance of W/2, is the sum of 20 + 3 + 5 or 28 feet. Figure 15-42 – Fill section with cross fall.  15-53

 5.1.3.4 Slope-Stake Procedure

Slope stakes are usually set with an engineer’s or automatic level, a level rod, and a metallic or nonmetallic tape. In rough terrain, a hand level is generally used instead of an engineer’s level. If the engineer’s level is used, three crew members are generally employed for fieldwork. The three crew members include the instrumentman, the rodman, and one person to hold the zero end of the tape at the center line. When a hand level is used, two persons can do the job. The instrumentman uses the hand level and holds the zero end of the tape and is positioned at the center-line station as the rod reading is taken. The procedure is a trial and error process. Under field conditions, the rodman is at times as much as 200 or 300 feet away from the instrumentman. If power equipment is operating nearby or a wind is blowing, oral instructions cannot be given to the rodman about where to take trial shots. In other instances there may not be a clear view of the ground slope at the station being worked. Consequently, the rodman must know as much as the instrumentman does about the theory and practice of setting slope stakes. The speed and efficiency of the party depend on the rodman more than on any other member. The rodman must always be mentally alert. The most practical field procedure requires the rodman to know the value of W/2 and of s (the slope ratio). This is not difficult, since these values are usually constant for several stations, and the rodman can be informed when they change. A typical procedure for setting slope stakes is as follows:

1. The instrumentman computes the center-line cut or fill, using the HI, finished grade, and the existing ground elevation. Refer back to Figure 15-36.

2. The instrumentman calls or signals the center-line cut or fill to the rodman.

3. The rodman mentally computes the approximate value of d by multiplying h x s and adding W/2. The rodman pulls the tape taut while holding the tape at the computed distances.

4. Noting the approximate rise or fall of the ground, the rodman adjusts the approximate value of d, moves to the d point, and sets up the rod for a trial shot.

Figure 15-43 – Cut section. 

5. The instrumentman quickly calculates the cut or fill at this point and calls the value to the rodman.

6. The rodman compares the information with the estimated cut or fill. The rodman should be fairly close and should know at once whether to move toward or away from the center line. Having a much shorter distance over which to estimate ground slope, the rodman again estimates new cut or fill and hs + W/2, and moves the rod to the new d value.

7. The instrumentman again gives the cut or fill; if the value checks, the rodman calls or signals back the cut or fill and the distance.

8. The instrumentman quickly checks the two values mentally, and if the values are correct, records the values in the field book, signaling “Good” to the rodman.

9. The rodman marks and drives the stake. With practice and on fairly smooth ground, a good rodman will seldom miss the first trial by more than 0.2 foot vertically and will, quite often, hit the correct value on the first trial. Figure 15-44 shows the application of these procedures to an actual situation. The following data is known for this slope-stake stakeout:

1. The station is 15 + 00.

2. The W/2 (from the typical design section) is 20 feet.

3. The slope ratio is 1:1; therefore, s = 1.

4. The existing ground elevation at the center line (from the previously run profile) is 364.00 feet.

5. The HI is determined to be 369.30 feet at that setup. 

 

Figure 15-44 – Setting slope stakes.

The steps taken by the instrumentman and the rodman are as follows:

1. The instrumentman determines the center-line cut by subtracting 350.7 feet from 364.0 feet to get the cut, or 13.3 feet.

2. The rodman holds at the center line for a check. The rod should read 369.3 (the HI) minus 364.0, or 5.3 feet.

3. The instrumentman calls to the rodman, “Cut 13.3 feet.”

4. The rodman computes d= 20+(1 x 13.3) = 33.3 while walking to the left.

5. As the rodman approaches about 30.0 feet from the center line, he/she estimates that the ground has a fall of 4 feet, and therefore computes the new cut as 13.3 – 4.0, or 9.3 feet. This means a new d of 20 + (1 x 9.3) = 29.3 feet. 6. The rodman sets up the rod 29.3 feet from the center line, as measured by metallic tape. 7. The instrumentman reads 10.1 on the rod and computes the new cut as 369.3 – (350.7 + 10.1), or 8.5 feet. Note that the grade rod and ground rod values can be used here as explained earlier; the new cut then will be 18.6 – 10.1 = 8.5 feet. Refer back to Figure 15-36. 8. The instrumentman calls, “Cut 8.5,” to the rodman. 9. The rodman computes d = 20 + (1 x 8.5) = 28.5 feet. The rodman knows, therefore, that 29.3 feet from the center line is too far out. 10.Figuring that the ground rises about 0.1 foot between 29.3 left and 28.5 left, the rodman calculates that the more nearly correct cut will be 8.5 + 0.1, or 8.6 feet. 11.By using this cut, the rodman calculates the new d as 20 + (1 x 8.6), and sets the rod at 28.6 feet left. 12.The instrumentman reads and computes the new cut as 369.3 – (350.7 + 10.0) = 10.0 on the rod 8.6 feet. 13.The instrumentman calls, “Cut 8.6,” to the rodman. 14.The rodman sees that the actual cut of 8.6 feet agrees with his estimated cut of the same, and calls, “Cut 8.6 at 28.6,” to the instrumentman. 15.The instrumentman checks d = 20 + (1 x 8.6) = 28.6, signals the rodman, “Good,” and makes the following entry into the field book: 28 86 c 16.The rodman marks a stake with 15 + 00 and C86 and drives it in the ground at 28.6 feet left. More often, slope stakes may be set by using a hand level. The distances out are generally measured to the nearest half or tenth of a foot. If a slope stake is placed in an offset position, the offset distance is also marked on the stake so the equipment operator is not confused about its actual location. Slope stakes are seldom used in areas requiring less than 2 feet of cut or fill.  15-56

5.1.4 Curb and Gutter Stakeout

Generally curbs and gutters are usually constructed before the finish grading is done. The curb constructors acquire their line and grade from offset hubs like those described previously. Guided by the offset hubs, the earthmovers make the excavation for the curb, form-setters set the forms, and the concrete crew members pour, finish, and cure the curb. After the curb is constructed, shaping the sub-grade to the correct sub-grade elevation and laying the pavement to correct finished grade is simply a matter of measuring down the correct distance from a cord stretched from the top of one curb to the top of the opposite curb.

5.1.5 Pavement Stakeout

Pavement stakeout depends on the type of paving equipment used. The steps commonly used for paving concrete highways are as follows: 1. Set a double line of steel side forms, equipped with flanges that serve as tracts for traveling paving equipment. 2. Fill the space between the forms with concrete poured from a concrete paving machine (commonly called a paver). 3. Spread the concrete with a mechanical spreader that travels on the flanges of the side forms. 4. Finish the surface with a finisher, a machine that also travels on the side forms. The line-and-grade or layout/stakeout problem consists principally of setting the side forms in line with the upper edges of the flanges for the prescribed highway grade. If the finished grade shown on the plans is the center-line grade, then the forms are set with tops at the center-line grade less the crossfall. If the design elevations are shown for points other than those on the center line, the form elevation is related to the design points as indicated by the typical section. Concrete paving is also done by the slip form method, which uses a sliding or traveling section of formwork to spread and finish the concrete. The machinery is kept on line and the pavement is finished at grade by a control device or devices. The line control device usually follows a wire stretched between rods offset from the pavement edge. Forms are not usually used in asphalt paving. Asphalt paving equipment, in general, is designed to lay the pavement at a given thickness, following the fine-graded sub-grade surface.

5.2.0 Structural Surveys

A structural survey is part of the chain of human activities that brings a structure such as a building, a bridge, or a pier into existence.

5.2.1 Earthwork

The first major step in highway construction is usually the rough grading or earthmoving which brings the surface up to, or down to, the approximate elevation specified for the rough grade. The stakeout for rough grading is commonly done by the grid method. The area to be graded and the prescribed finish grade elevation on the site or plot plan are laid off in 25-, 50-, or 100-foot grid squares. The elevation at each corner point is determined by the following process:  15-57

5.2.2 Building Stakeout

The next major step after the rough grading is completed is the building stakeout. Building stakeout involves locating and staking the main horizontal control points of a building. These are usually the principal corner points plus any other points of intersection between building lines. Figure 15-45 shows a simple building stakeout. The site plan shows a 40 x 20-foot rectangular structure, with one of the long sides parallel to, and 35 feet away from, a base line. The base line is indicated at the site and on the plans by Monuments A and B. One of the short sides of the building lies on a line running from C, a point on AB 15 feet from A, perpendicular to AB. The other short side lies on a similar line running from D, a point on AB 40 feet from C and therefore 40 + 15, or 55 feet from A, perpendicular to AB. The steps in the stakeout procedure are as follows: 1. Set up the transit at Monument A. Train the telescope on a marker held on Monument B. Then drive hubs on the line of sight, one at C 15 feet from A, the other at D 55 feet from A and 40 feet from C. 2. Shift the transit to C, train on B, match the zeros, and turn 900 left. Measure off 35 feet from C on the line of sight and drive a stake to locate E. Measure off 55 feet from C (or 20 feet from E) and drive another stake to locate F. 3. Shift the transit to D and repeat the procedure described in Step 2 to locate and stake points G and H. The accuracy of a rectangular stakeout can be check by measuring the diagonals of the rectangle. The diagonals should be equal. The correct length of each diagonal can be checked by applying the Pythagorean Theorem, as shown in Figure 15-45. For a large rectangle, checking the accuracy of the stakeout by angular measurement with the transit may be more convenient. For example: Determine the correct size of angle GEH in Figure 15-45 by a convenient right-triangle solution, such as Figure 15-45 – Building stakeout.  15-58 0.50000 40 20 tan a == The angle with tangent 0.50000 measures (to the nearest minute) 26°34´. Therefore, angle FEH should measure 90º 00’ – 26º 34’, or 63º26’. The corresponding angles at the other three corners should have the same dimensions. If the sizes as actually measured vary at any corner, the stakeout is inaccurate. Batter boards are marks placed for use as references or guides during the initial excavation and rough grading of building and/or a sewer line construction. Batter boards are temporary devices used to support stretched cords that mark the outline and grade of the structure. Batter boards consist of 2 x 4- inch stakes driven into the ground. Each stake has a crosspiece of 1 x 6-inch lumber nailed to it. The stakes are driven approximately 3 to 4 feet away from the building line where they will not be disturbed by the construction. They are driven far enough apart to straddle the line to be marked. Note in Figure 15- 46, only three stakes are driven on outside corners because one is a common post for two directions. The length of the stakes is determined by the required grade line. They must be long enough to accept the 1 x 6-inch crosspiece to mark the grade. The 1 x 6-inch crosspiece is cut long enough to join both stakes and is nailed firmly to them after the grade has been established. The top of the crosspiece becomes the mark from which the grade will be measured. All batter boards for one structure are set to the same grade or level line. A transit is used to locate the building lines and to mark them on the top edge of the crosspiece. A nail is driven at each of these marked points, or a V notch is carved at the top outer edge of the crosspiece towards the marked point and the nail is driven on the outer face of the board. When a string is stretched over the top edge of the two batter boards and is held against the nails or against the bottom of the notch, the string defines the outside building line and grade elevation. Batter boards are set and marked as follows: 1. After laying out the corner stakes, drive 2 x 4-inch stakes 3 to 4 feet outside of each corner. These are selected to bring all crosspieces to the same elevation. Figure 15-46 – Batter boards.  15-59 2. Mark the stakes at the grade of the top of the foundation or at some whole number of inches or feet above or below the top of the foundation. Use a level to mark the same grade or elevation on all stakes. 3. Nail 1 x 6-inch boards to the stakes so the edges of the boards are flush with the grade marks. 4. Locate the prolongation of the building lines on the batter boards by using a transit or by using a line and plumb bob. 5. Drive nails into the top edges of the batter boards or notch the boards to mark the building line.

5.3.0 Utilities Stakeout

Utilities is a general term applied to pipelines such as sewer, water, gas, and oil pipelines, and communications lines such as telephone or telegraph lines and electric power lines.

5.3.1 Above-ground Utilities

For an above-ground utility, such as a pole-mounted telephone or power line, the survey problem consists of locating the line horizontally and marking the stations where poles or towers are to be erected. Often, the directions of guys and anchors maybe staked. Occasionally, pole height for vertical clearance of obstructions is determined.

5.3.2 Underground Utilities

For an underground utility, often both line and grade must be determined. For pressure lines, such as water lines, it is usually necessary to stake out only the line, since the only grade requirement is that the prescribed depth of soil cover be maintained. However, staking elevations may be necessary for any pressure lines being installed in an area that is to be graded downward or has conflicting underground utilities. Gravity flow lines, such as storm sewer lines, require staking for grade to be sure the pipe is installed at the design elevation and gradient (slope) needed for gravity flow through the pipe. Grade for an underground sewer pipe is given in terms of the elevation of the invert. The invert of the pipe is the elevation of the lowest part of the inner surface of the pipe. Figure 15-47 illustrates a common method of staking out an underground pipe. Both alignment and elevation are facilitated by a line of batter boards and battens (small pieces of wood) set at about 25- to 50-foot intervals. The battens, nailed to the batter boards, determine the horizontal alignment of the pipe when placed vertically on the same side of the batter boards and with the same edges directly over the center line of the pipe. The alignment of the battens must be checked as work progresses. Use a sighting cord, stretched parallel to the center line of the pipe at a uniform distance above the invert grade, to transfer line and grade into the trench. The center line of the pipe should be directly below the cord, and the sewer invert grade should be at the selected distance below the cord. A measuring stick, also called a grade pole, is used to transfer the grade from the sighting cord to the pipe, as shown in Figure 15-47. The grade pole, with markings of feet and inches, is placed on the invert of the pipe and held plumbed. The pipe is then lowered into the trench until the mark on the grade pole is on a horizontal line with the cord.  15-60 Figure 15-48 shows another method of staking out an underground sewer pipe without the use of battens. Nails are driven directly into the tops of the batter boards so a string stretched tightly between them defines the pipe center line. The string or cord can be kept taut by wrapping it around the nails and hanging a weight on each end. Similarly, the string (or cord) gives both line and grade. Figure 15-47 – Use of batter boards (with battens) for utility stakeout.  15-61

5.4.0 As-Built Survey

A finished structure seldom matches to the original plans in every detail. Unforeseeable difficulties often make variations from the plans necessary. The purpose of an as-built survey is to record the variations. The as-built survey begins as soon as it becomes feasible. This means the actual horizontal and vertical locations of features in the completed structure should be determined as soon as the features are erected. At times, variations from the original plans are recorded on new tracings of the working drawings. When differences are identified, the as-built data is recorded in the place of the original design data. Sometimes, reproductions of the original drawings are used with variations recorded by crossing out the original design data and writing in the asbuilt data. In either case, the term “as-built survey,” together with the date of revision, is written in or near the title block.

5.5.0 Construction Site Safety WARNING

A survey party working at a construction site is always in a dangerous situation. Where blasting or logging is going on, inform the powder crew or logging crew of the location of the area where surveyors are working. Also, instruct the individual crew members of the survey party to be alert at all times—particularly listening for the Figure 15-48 – Batter boards (without battens) for utility stakeout.  15-62 warning signal given by a crew using powder to set off a charge or a logger felling a tree. When surveying near highways, railroads, or airstrips, use red flagging generously. Do not use flagging in a combat area, however. Place flagging on the legs of the surveying equipment and at a few places along the measuring tape. Put flags on rods and range poles. Attach flagging to hats and to the back of shirts or jackets. Constantly think of personal safety when working near heavy construction equipment. Inform equipment operators when surveyors are in the vicinity. Alert the surveying crew that an equipment operator's vision is often obscured by dust or by the equipment itself. Do not climb directly behind another crew member when ascending steep, rocky slopes. If the crew member were to fall, loosen a rock, or drop something, serious injury could result to the crew below.

5.5.1 Excavations WARNING

When work involves excavation, observe precautions to prevent accidents. To avoid slides or cave-ins, support the sides of the excavations 5 feet or more deep by substantial bracing, shoring, or sheet piling if the sides are steeper than the angle of repose. The angle of repose is the maximum angle at which material will repose without sliding. Trenches in partly saturated or otherwise highly unstable soil should be stabilized with vertical sheet piling or suitable braces. Shore, brace, or underpin foundations of structures adjacent to excavations as long as the excavation remains open. Do not allow excavated or other material to accumulate closer than 2 feet from the edge of an excavation. In a traffic area use barricades, safety signs, danger signals, red lights, or red flagging on at least two sides. Walk at least 2 feet away from the edge of a vertical excavation. Near thoroughfares or walkways, excavations should have temporary guardrails or barricades and if permissible, depending on combat conditions, red lights or torches should be illuminated from sunset to sunrise. Do not enter a manhole until certain it is free from dangerous gases. Do not guess. Wait for clearance from a competent authority if there is any question as to whether a sewer is free of gas. Do not smoke in manholes. If illumination is required, use a safety flashlight or lantern. Avoid contact with all electric wiring. Never throw a metal tape across electric wires. Use breaking chain if crossing wiring is required. Avoid placing your body over wiring to reduce the likelihood of falling onto dangerous wiring.

5.5.2 Tree Climbing

Before climbing a tree, ensure it is safe to climb, and carefully check the condition of the branches that you might use for standing. Different kinds of wood vary greatly in strength. Oak, hickory, and elm trees are strong, flexible wood safe for climbing. Limbs of all trees become brittle at low temperature, and have a tendency to break easier in cold weather. Dead branches or those containing many knots or fungus are weaker. When standing on a limb, place your feet as close to the parent trunk as possible. Climb with care when limbs are wet or icy. To prevent an eye injury, wear goggles when working in bushy trees.  15-63 WARNING Before climbing a tree, be sure there are no overhead wires passing through its foliage. If you must take a position in a tree within reach of live wire, place some sort of insulating safety equipment between yourself and the wire. Do not allow tree limbs to contact live wires. Moisture in a limb may cause a short circuit. When cutting tools are required to clear a working space in a tree, raise and lower them with a hand line. Never throw tools up into a tree or down onto the ground.

5.5.3 Underground and Overhead Lines

When a structure has an access opening and is below the street, such as a manhole or a transformer vault, it should be protected by a barrier or other suitable guard when the cover to the access opening is removed.

5.5.4 Crossing Ice

Make certain ice will support your weight before crossing. The thickness and the nature of ice are important in determining its carrying capacity. Because part of the supporting power of ice is derived from the water below it, a layer of ice that is in contact with the water surface is safer than one that has no contact with the water surface. An ice layer usually becomes thinner over current, near banks of streams or lakes, over warm springs, and over swampy ground. "Rotten ice" us identifiable by its dull color and a honeycomb texture that has little supporting power.

 

Test Your Knowledge

16. Fieldwork on the construction of a road being built on a 5-year-old airport would very likely begin with what type of survey?

A. Final location
B. Topographic
C. Reconnaissance
D. As-built

17. Direct air observation of an area to be reconnoitered offers what main advantage?

A. Acquiring information about the relief of the area
B. Providing a quick means of preparing sketches of the area
C. Speeding subsequent ground reconnaissance of the area
D. Providing a quick means of preparing maps of the area

18. Which of the following tasks in constructing a highway is part of the preliminary survey?

A. Establishing final grades and alignments
B. Computing the highway right-of-way
C. Running the traverse
D. Setting grade stakes

19. Which of the following details must be shown on a plan view of a proposed highway?

A. Curve design data
B. Gradient
C. Spot elevations
D. Typical cross section of the highway

20. On the cross-section paper most widely used in surveying offices, the horizontal lines are spaced how far apart?

A. 1/20 inch
B. 1/10 inch
C. 1/5 inch
D. 1/4 inch

21. The batter boards should be placed how many feet from the building lines so as not to interfere with construction?

A. 1 to 2
B. 2 to 3
C. 3 to 4
D. 4 to 5

22. Red flagging should be used on the legs of your instrument when you are surveying in the vicinity of which of the following areas?

A. Airstrips
B. Excavations
C. Logging operations
D. Blasting operations

 

Summary

This lesson addressed the leveling operations used to determine elevations of points or the differences in elevation between points on the earth’s surface. The data gathered from leveling operations is used for engineering designs, mapping, and construction projects. This lesson discussed the basic principles of and the methods used in direct leveling. The duties and responsibilities of the leveling crew were also addressed. Finally, the lesson included a general description of basic engineering surveys and the various construction-site hazards commonly associated with conducting a survey.

Review Questions

  1. To be used as elevation references in the development or expansion of a permanent naval station, you should establish monument BMs in which of the following locations? A. On all important structures, such as buildings and piers B. At all road intersections C. In a grid system 1 mile apart D. In a grid system 1/2 mile apart 2. Mean sea level (MSL) differs from mean tide level (MTL) in what way? A. MSL is the mean of tides observed in the open sea; MTL is the mean of inland tidewater observations. B. MSL is the result of averaging tabulated tide readings; MTL is taken from the tidal curve. C. MSL is the mean of a large number of points along a tidal curve; MTL is the mean of only the high and low points along the tidal curve. D. MSL is the datum used primarily in hydrographic surveys; MTL is used as a datum in any type of survey. 3. The correct way to obtain the MSL value for a month’s tide tabulated record is to add all daily sums for the month and to divide this total by the sum of what specific units of time in that month? A. Minutes B. Days C. Hours D. Weeks 4. Assume you are engaged in a hydrographic survey of the water approaches to Naval Air Station, Adak, Alaska. Your soundings should refer to what datum? A. MLLW B. MWL C. MTL D. MLWS 5. The proper way to remove an engineer’s level from its carrying case is to grasp it firmly by what part(s)? A. The telescope B. The footplate C. The leveling head D. The wye rings  15-67 6. You are setting up an engineer’s level on a concrete surface. You mount the instrument on a tripod placed inside a floor triangle. This precaution will protect the tripod from which of the following accidents? A. Turning B. Moving laterally C. Tipping over D. Collapsing 7. The whole foot numbers on a Philadelphia rod are what color? A. Red B. White C. Black D. Yellow 8. In leveling, which of the following statements best defines height of instrument (HI)? A. The elevation of the horizontal line of sight B. The vertical distance from the horizontal axis of the telescope to a point on the ground directly below the instrument C. The vertical distance between the reference datum and the horizontal line of sight D. The elevation of the reference datum minus the backsight rod reading 9. By using the technique of balancing shots, you can eliminate which of the following effect(s) in differential leveling? A. Instrumental error B. Curvature of the earth’s surface C. Atmospheric refraction D. All of the above 10. In profile leveling, rod readings taken from points that are neither BMs nor TPs are entered under what heading in the field notebook? A. BS B. FS C. IFS D. Remarks 11. You are doing cross-section leveling for a highway road survey. The profile center-line elevation at station 25 + 00 is 112.5 feet and eye height is 5.3 feet. On a rod held 20 feet from the center line you read 11.2 feet. What is the elevation, in feet, at this point? A. 96.0 B. 106.6 C. 118.4 D. 129.0  15-68 12. In third-order leveling, the starting and closing BMs must be of which of the following orders accuracy? A. First B. Second or higher C. Third or higher D. Fourth or higher 13. What is the first step in a reconnaissance survey? A. A field trip to the desired location B. A study of existing maps and aerial photographs C. An instrument survey of the desired location D. An inventory of available construction equipment 14. A field reconnaissance party follows the route previously marked on a map to verify actual conditions on the ground. Which of the following conditions, relative to an engineering study, should be noted? A. Soil conditions and washout areas B. Vegetation and obstacles C. Quarry sites and sand or gravel deposits D. All of the above 15. Your survey party is assigned the task of completing a reconnaissance survey of a 3-mile road in hilly, wooded terrain. For this survey, your party should carry which of the following equipment? A. Lensatic compass B. Brush hook C. Hand level D. All of the above 16. As the lead surveyor laying out the final location of a roadway center line, you suspect that the preliminary survey was in error regarding the exact location of the center line. Which of the following actions should you take? A. Lay out the center line according to the preliminary data. B. Lay out the center line the way you know it should be. C. Lay out the center line and then report the reason for making the necessary change. D. Report the problem and receive authorization before making the location change. 17. After the surface elevations have been plotted on the cross-section paper, the points should be connected in which of the following ways? A. By freehand curves B. By freehand straight lines C. By lines drawn with a straightedge D. Either B or C  15-69 18. In the plotting of cross sections, the vertical scale relates to the horizontal scale in which of the following manners? A. The vertical scale must be equal to the horizontal scale. B. The vertical scale must be exaggerated from the horizontal scale. C. The vertical scale may be equal to the horizontal scale, or it may be exaggerated for clarity. D. The vertical scale is usually less than the horizontal scale, but it may be equal or exaggerated for clarity. 19. During what stage of a road construction project are “blue tops” used? A. Rough grading B. Clearing and grubbing C. Final grading D. Paving 20. What term is used for the natural earth surface below the pavement of a highway? A. Final grade B. Finish grade C. Rough grade D. Sub-grade 21. In curb construction, construction crews should obtain line and grade from which of the following sources? A. Center-line stakes B. Blue tops C. Shoulder stakes D. Offset hubs 22. Pavement stakeout is primarily dependent upon which of the following factors? A. Type of instruments used to perform the stakeout B. Type of equipment used for paving C. Finish grade elevations D. Directions from the construction crew leader 23. The invert elevation of an underground sewer pipe is taken at what point on the pipe? A. Lowest outside surface B. Highest inside surface C. Lowest inside surface D. Highest outside surface  15-70 24. For any construction project, what is the optimum time for the as-built survey to begin? A. During the layout survey B. As soon as stakeout is completed C. Upon final project completion D. During construction as the individual features are completed 25. Which of the following actions should you take when you are running a tapetransit traverse that crosses electric wires? A. Stretch the tape above the wires. B. Ground one end of the tape. C. Break chain at the wires. D. Wear rubber gloves. 26. Excavations that are what minimum depth, in feet, must be suitably braced and shored to prevent cave-ins? A. 2 B. 3 C. 4 D. 5

 

 

 

 

Chapter 16 Materials Testing: Soil and Concrete

Natural earth is the ultimate foundation for any road, airfield, building, or other structure. Regardless of their designated purpose, all structures are supported by one of the earth’s construction materials: soil. Because soil is the ultimate foundation for any project, it may be the most important of all building materials. Just as a poorly constructed and weak concrete foundation will not support a building, neither will a poorly “constructed” and weak soil foundation support a well-constructed concrete foundation. This lesson will offer the definition of soil, and introduce you to the different types of soil you may encounter during the wide range of projects Seabees undertake. It will also present the basic properties and characteristics of soil and explain the importance those characteristics play in determining adequacy and classification for use as a construction material. As an engineering tech, you will be responsible for collecting soil samples and performing certain testing .This lesson will provide guidance on those procedures as well as explain their importance in properly and correctly identifying and classifying the many types of soil that exist in nature. Finally, this lesson will also acquaint you with various tests for concrete and explain their purposes and importance as well. You will learn how to perform certain tests yourself and how to prepare concrete samples for other tests that will be performed by engineering techs that are more senior. Whether the project is a structure with concrete or a road or revetment without concrete, soil is the foundation, and you as an engineering tech, must gain the skills to determine its usefulness.

When you have completed this lesson, you will be able to:

1. Identify the different types of soil origins.
2. Identify the physical characteristics of soils.
3. Describe the different classifications of soil.
4. Describe the procedures associated with soil sampling.
5. Describe the procedures associated with soil testing.
6. Describe the procedures associated with concrete testing. 

Contents

1.0.0 Soil Origin

2.0.0 Physical Characteristics of Soils

3.0.0 Soil Classification

4.0.0 Soil Sampling

5.0.0 Soil Testing

6.0.0 Concrete Testing

 

 

1.0.0 SOIL ORIGIN

One entry in Merriam-Webster’s Online Dictionary defines soil as “the upper layer of earth that may be dug or plowed and in which plants grow.” While that may be one correct definition and perfectly satisfactory to many groups of people, it does not address the precision required by civil engineers and soil technicians. For engineering and construction purposes, a more precise definition is this one, found in Maintenance and Operation Manual 330 (MO-330) “Soil is a heterogeneous aggregation of uncemented or weakly cemented mineral grains enclosing voids of various sizes. These voids may contain air, water, organic matter, or different combinations of these materials.” As you progress through this lesson, the aptness of this definition for construction will become obvious, but let us consider where soil comes from first.

1.1.0 Soil Formation Soil formation is a continuous and evolutionary process still in action today. The Earth’s crust consists of rock, which geologists classify into three groups:  Igneous — formed by cooling from a molten state  Sedimentary — formed by the accumulation and cementing of the particles and remains of plants and animals  Metamorphic — formed from existing rocks that have been subjected to heat and pressure Exposed to the atmosphere, rock undergoes a physical and chemical process called weathering, which decomposes the rock into a loose, incoherent mixture of gravel, sand, and finer material. This process over a sufficient length of time disintegrates the three rock types and produces soils of various designations.

1.2.0 Residual Soil Residual soil is any soil that remains in place during the weathering process. A mantle of residual soil will reflect the characteristics of the underlying parent rock from which it was derived.

1.3.0 Transported Soil Transported soil is any soil that moved to a place other than its original location during the weathering process. Transported soils often bear properties induced by its mode of transportation such as water, wind, ice, and the force of gravity. 1.3.1 Alluvial Soil Alluvial [uh-loo-vee-uhl] soil is formed when a river or stream with decreasing velocity gradually loses its soil-transporting capacity. As a river’s velocity diminishes, it does not have sufficient power to keep the large soil particles in suspension, and they settle to the riverbed. Typically, over time this further decreases the river’s velocity, which causes smaller particles to settle. As the river becomes slow and sluggish (as in the lowlands where the gradient becomes small), it transports only the extremely fine particles in suspension. These finite particles settle at the mouth of the river where they form deltas of fineNAVEDTRA 14069A 16-4 grained soil. Prime examples of this are the Mississippi, Nile, Ganges, and Mekong Deltas. (Figure 16-1) Figure 16-1 — Example of alluvial soils transported to form deltas. 1.3.2 Marine Soil Marine soil is also formed from materials carried into the seas by streams, but it includes material eroded from the beaches by the tidal action of the waves. This tidal and wave action carries part of the marine soil material out into deep water deposits while another part of it is heaped back upon the beaches along the coast. 1.3.3 Lacustrine Soil Lacustrine [luh-kuhs-trin] soils are transported soils deposited in freshwater lakes. They are typically fine-grained soils, the result of being brought into freshwater lakes by streams or rivers. 1.3.4 Aeolian Soil Aeolian [ee-oh-lee-uhn] soils are transported by wind rather than water. The build up of heavier sand grain deposits from wind are called “dunes,” and the finer particles (generally transported farther) are deposited to form a material called loess [loh-es]. Dune deposits seldom contain material larger than sand size while loess is a finegrained, unstratified accumulation of clay and silt.  16-5 1.3.5 Glacial Soil Glacial soil (or drift) is material transported by an advancing ice sheet. It could have been pushed ahead, carried upon, or carried within the ice. As glaciers melt, deposits of various forms occur, such as these:  Moraine [muh-reyn] — a mass of till (boulders, pebbles, sand, and mud) deposited by a glacier, often in the form of a long ridge. Moraines typically form because of the plowing effect of a moving glacier.  Kame [keym] terrace — an irregularly shaped hill or mound composed of sand, gravel and till that accumulates in a depression on a retreating glacier.  Esker [es-ker] — a long, narrow, steep-sided ridge of coarse sand and gravel deposited by a stream flowing in or under a melting sheet of glacial ice.  Outwash plane — a glacial outwash plain formed of sediments deposited by melting water at the terminus of a glacier. 1.3.6 Colluvial Soil Colluvial [kuh-loo-vee-ahl] soil consists of mixed loose earth material that has accumulated at the base of a hill through the action of gravity, such as piles of talus, avalanche debris, and sheets of detritus moved by soil creep or frost action.

 

Test Your Knowledge

1. What source provides a more precise definition of soil for engineering and construction purposes?

A. Merriam-Webster’s Online Dictionary
B. American Society for Testing and Materials
C. Maintenance and Operation Manual 330
D. American Society of Civil Engineers

 

 

2.0.0 PHYSICAL CHARACTERISTICS OF SOILS

The physical characteristics of soils aid in determining their engineering characteristics and are the basis of any soil classification system. In North America, the most common engineering classification systems for soils are the Unified Soil Classification System (USCS) and the American Association of State Highway and Transportation Officials (AASHTO). The Seabees, the military in general, and civilian engineering each use a system of soil classification to identify and determine the suitability of soils for both vertical and horizontal construction projects. As an engineering tech, your knowledge of these physical characteristics will aid in determining the degree to which local soils can be used in engineering projects to support traffic loads or to serve as a subgrade or foundation material.

2.1.0 Particle Size The size of the particle grains in the soil mass determines how the soils are divided into groups. An engineering tech identifies the particle grain sizes by using sieves. A sieve is a screen attached across the end of a shallow cylindrical frame. (Figure 16-2) The screen permits particles smaller than the openings to fall through while retaining larger ones. When sieves of different sizes are stacked so the largest screen openings  16-6 are at the top and the smallest at the bottom, soil can be separated into particle groups based on size. The amount remaining on each sieve can then be measured and described as a percentage by weight of the entire sample. Table 16-1 shows only four of many size groups used in the Unified Soil Classification System. Finer particles passing the No. 200 sieve that exhibit plasticity and strength when dry are called clays; those exhibiting nonplasticity and little strength when dry are called silt. Figure 16-2 — Typical sieves used for particle size identification. Table 16-1 — Sample of Four Size Groups Used in the Unified Soil Classification System (USCS). Sieve Size Size groups Passing Retained on Cobbles---------------- Gravels----------------- Sands------------------- Fines-------------------- No Maximum size*--------------- 3 in.------------------------------------ No. 4---------------------------------- No. 200------------------------------- 3 in. No. 4 No. 200 No minimum size *In military engineering, maximum size of cobbles is accepted as 40 inches, based upon maximum jaw opening of the crushing unit.

2.2.0 Particle Shape The shape of the particles influences the strength and stability of a soil. Bulky and platy (Figure 16-3) are two general shapes recognized in the USCS and they may be located within the same geological area.  16-7 Figure 16-3 — Examples of bulky and platy particle shapes. 2.2.1 Bulky Cobbles, gravel, sand, and silt particles cover a large range of sizes; however, they are all bulky in shape. The term “bulky” is confined to particles that are relatively large in all three dimensions, as contrasted to platy particles, in which one dimension is small as compared to the other two. The bulky shape has the following four subdivisions listed in descending order of desirability for construction:  Angular —recently broken up particles characterized by jagged projections, sharp ridges, and flat surfaces. Seldom found in nature because of weathering, angular gravels and sands are generally the best materials for construction because of their interlocking characteristics but must usually be produced artificially by crushing.  Subangular — particles that have been weathered to the extent that the sharper points and ridges have been worn off.  Subrounded — particles that have been further weathered and are still somewhat irregular in shape but have no sharp corners and few flat areas. Frequently found in streambeds, if composed of hard, durable particles, subrounded material is adequate for most construction needs.  16-8  Rounded — particles weathered to the point that all projections have been removed, with few irregularities in shape remaining. Usually found in or near streambeds or beaches, they resemble spheres of varying sizes. 2.2.2 Platy Platy (or flaky) particles have flat, plate-like grains with two dimensions much larger than the third. Clay is a common example. Because of their shape, platy particles have a greater contact area for moisture and are undesirable for construction purposes.

2.3.0 Gradation The sizes and shapes of soil particles deal with properties of the individual grains in a soil mass. Gradation describes the distribution of the different size groups within a soil sample. (Figure 16-4) The soil may be well-graded, or poorly-graded. Well-graded soils (Figure 16-4, view A) must have a good range of all representative particle sizes between the largest and the smallest. All sizes must be represented, and no one size should be either overabundant or missing. Poorly-graded soils (Figure 16- 4, view B) contain a narrow range of particle sizes or lack some intermediate sizes. Figure 16-4 — Examples of well-graded and poorly-graded graduations. Uniformly graded soils are those with a limited range of particle sizes. Soils with some intermediate sizes not well represented or missing are called gap, step, or skip graded.

2.4.0 Compactness Compactness refers to how closely a mass of soil particles are packed together; for a given unit of volume, the closer the packing, the greater its compactness and weight. In a dense structure with a high degree of compactness, closely packed soil particles interlock with smaller grains filling the voids between the larger particles. With each particle closely surrounded by other particles, grain-to-grain contact is increased. This lessens the tendency for individual grain displacement under load, and the soil is capable of supporting heavier loads. Usually, well-graded coarse materials are dense and exhibit strength and stability under load.  16-9 In a loose structure, the particles lack compactness and are not packed as closely together as possible. Loose, open structures have voids, which will lead to foundation settlement or to road disintegration when traffic loads are applied.

2.5.0 Specific Gravity Specific gravity, designated by the symbol is defined as the ratio between the weight per unit volume of a material and the weight per unit volume of water at a stated temperature—usually 20°C. Using the system international (SI) (metric) system, you can determine specific gravity by the following formula: Gs Specific gravity    sampleofweightgairinsampleofweight submerged g gairinsampleofweight Gs   Specific gravity varies between 2.60 and 2.80 for most inorganic soils. While tropical, iron-rich laterite [lat-uh-rahyt], as well as some other lateritic soils, can have a specific gravity of 3.0 or more, sand particles (composed of quartz) have a specific gravity of about 2.65 and clays can have values as high as 3.50. The solids of soil particles are composed of minerals with a specific gravity greater than 2.60. Any specific gravity values smaller than that are an indication of the possible presence of organic matter.

2.6.0 Soil Moisture A soil’s moisture content is often the most important factor affecting its engineering characteristics. Water may enter from the surface or move through the subsurface layers by gravitational pull, capillary action, or absorption. Moisture to some degree is present in most cases and it influences the various soils differently. Moisture probably has the greatest effect upon soil behavior when the soil is subjected to loading. 2.6.1 Sources of Water in Soils Soil moisture may come from surface or subsurface water, gravity, capillary action, or absorption.  Surface water — from precipitation or runoff, which enters the soil through openings between particles. It may adhere to the particles or penetrate the soil to some lower layer.  Subsurface water — collected or held in pools or layers beneath the surface by a restricting layer of soil or rock and constantly acted upon by one or more external forces.  Gravity-controlled water — seeks a lower layer and moves through the voids or spaces until it reaches some restriction such as bedrock or an impervious layer of soil with openings or voids are so small it prevents water passage.  Capillary moisture — voids or spaces form continuous tunnels or tubes causing the water to rise in the tubes by capillary action; the smaller the tube, the stronger the capillary action. Water rises higher in finer soils which have smaller interconnected voids. The area of moisture above a free water layer or pool is called the capillary fringe.  Atmosphere absorption moisture — moisture evaporates from the soil surface, which draws more moisture from the soil below that also evaporates. This process continues until the soil is in an air-dry condition (the moisture in the soil  16-10 is in equilibrium with the moisture vapor in the air). In an air-dry state, the moisture in the soil is in the form of thin films of water surrounding individual soil particles. This is called hydroscopic moisture. Hydroscopic moisture is the result of naturally occurring electrical forces binding the water molecules to the soil particles. This moisture may be removed from air-dried soil by heating the material in an oven at a controlled temperature for 24 hours or until attaining a constant weight. The term “moisture content” (symbol W ) is used to define the amount of water present in a soil sample. It is the ratio of the weight of water to the weight of the solid mineral grains (weight of dry soil) expressed as a percentage. Moisture content x 100 soildryofweight waterofweight W  When a wet soil is air-dried in the laboratory without the use of controlled heating, the amount of hydroscopic moisture remaining in the air-dried soil is called the hydroscopic moisture content, also expressed as a percentage of the weight of the dry soil. 2.6.2 Plasticity Plasticity is a property of the fine-grained portion of a soil that allows it to be deformed beyond the point of recovery without cracking or changing volume appreciably. Some minerals (quartz powder for example) cannot be made plastic no matter how fine the particles or how much water is added. On the other hand, all clay minerals are plastic and can be rolled into thin threads at certain moisture contents without crumbling. Since practically all fine-grained soils contain some clay, most of them are plastic and the degree of plasticity is a general index to the clay content of a soil. “Fat” and “lean” are terms sometimes used to distinguish between highly plastic and slightly plastic soils. For example, fat clay is highly plastic while lean clay is only slightly plastic. Plasticity is determined by observing the different physical states that a plastic soil passes through as moisture conditions change. The boundaries between the different states (described by the moisture content at the time of change) are called consistency limits or Atterberg limits. The liquid limit  is the moisture content corresponding to the arbitrary limit between the liquid and plastic state of a soil. Above this value, the soil is presumed to be a liquid and behaves as such by flowing freely under its own weight. Below this value, provided the soil exhibits a plastic state, it deforms under pressure without crumbling.  LL The plastic limit  is the moisture content corresponding to the arbitrary limit between the plastic and semisolid state. Above this value, the soil is no longer pliable and crumbles under pressure. PL The plasticity index  is the numerical difference in moisture content between the two limits, or the plastic range. It defines the range of moisture content within which the soil is in a plastic state. The equation is PI I   PLLLP . The shrinkage limit  is the water content boundary where further loss of moisture will not result in any more volume reduction. Beyond this point, further drying does not reduce the volume but may cause cracking. SL  16-11 2.6.3 Effects of Soil Moisture Moisture affects coarse-grained soils much less than fine-grained soils. Coarser soils have larger void openings, which drain more rapidly, and capillary action is practically nonexistent in gravels and sands containing few fines. If coarse soils are above the groundwater table, they will not retain large amounts of water. Also, since the particles in gravelly and sandy soils are relatively large (compared to clay and silt particles), they are heavy in comparison to the films of moisture that might surround them. On the other hand, moisture in the voids of fine-grained soil has considerable effect on the light, small, sometimes microscopic, particles. Clays often undergo large volume changes with variations in moisture content, as the shrinkage cracks in a dry lakebed can demonstrate. Consequently, unpaved clay roads that may be solid enough when sun-baked will often lose stability and turn into slick mud during rainy weather. (Figure 16-5) Figure 16-5 — Examples of clay road under dry and wet conditions. Besides swelling and losing stability when wet, clays retard water drainage due to their flat, platy shapes and small size. Since drainage is of the greatest importance, especially in horizontal construction such as airfield pavement for example, design engineers must know if subsurface clay exists at the project site. As addressed earlier, plasticity is the characteristic by which you can identify clay in the project’s soil particles.

2.7.0 Organic Soils Organic soils contain mineral grains but with a conspicuous admixture of vegetable matter. Soils of organic origin are formed by the growth and subsequent decay of plant life, by an accumulation of inorganic particles such as skeletons or shells of organisms, or by a combination of both. An organic soil may be organic silt, organic clay, or it may be a highly organic soil, such as peat or meadow mat with little silt or clay particles. Organic soils are most often black in color, and usually have a characteristic musty odor. Organic soils are usually easily compressible with poor load-bearing properties.  16-12

2.8.0 Effects of Soil Characteristics Soil characteristics are a definitive measure of the soil’s suitability to serve some intended construction purpose. An understanding of these characteristics is essential for determining the first step in preparing the earth’s foundation for a structure’s foundation, or the subgrade for road or other horizontal project. 1. Dense, solid soil withstands greater applied loads (has greater load-bearing capacity) than loose soil. 2. Particle size has a definite relation to load-bearing capacity. Coarse-grained soils can be compacted to a greater density than fine-grained soils because the smaller particles tend to fill the spaces between the larger ones. 3. The shape of the grains affects the bearing capacity. Angular particles tend to interlock, form a denser mass, and become more stable than rounded particles, which can roll or slide past one another. 4. Well-graded soils with a good range of particle sizes minimize voids. Poorlygraded soils, with their lack of one or more sizes, leave more or greater voids and comprise a less dense mass. 5. Moisture content and consistency limits aid in describing the suitability of a soil. Typically, coarse-grained sandy or gravelly soil has good drainage characteristics for use in its natural state. Fine-grained clayey soil with a high plasticity index may require considerable treatment, especially if used in a moist location.

 

Test Your Knowledge

2. What initially determines how soils are divided into groups?

A. Gradation of the soil particles
B. Moisture of the soil particles
C. Shape of the soil particles
D. Size of the particle grains in the soil mass

 

 

3.0.0 SOIL CLASSIFICATION

Soil type is an important factor when selecting the proper location on which to construct any structure or facility, or when determining any necessary soil import amendment to a predetermined location. With the existing soil accurately identified and described, its suitability as foundation material or for supporting traffic as a subgrade base can be determined, or it can be evaluated for use as an aggregate, filler, or binder for an engineered compaction mixture. 3.1.0 Classifying Soils The Unified Soil Classification System (USCS) is a common soil classification and reference system that has a universal interpretation. In this system, all soils are divided into three major divisions. 3.1.1 Coarse-Grained Soils Coarse-grained soils have a soil mass where at least half of the material, by weight, is larger than (retained on) a No. 200 sieve. (Table 16-2) This division is further divided as gravels and sands. If more than half of the coarse fraction, by weight, is retained on a  16-13 No. 4 sieve, it is classified as a gravel. If less than half is retained on a No. 4 sieve, then it is a sand. Gravels and sands are further subdivided into additional categories dependent upon the amount and characteristics of any plastic fines the soil sample contains. Table 16-2 — USCS Classification for Coarse-Grained Soils. clean gravel <5% smaller than #200 Sieve Gravel > 50% of coarse fraction retained on No.4 (4.75 mm) sieve gravel with >12% fines clean sand Coarse grained soils At least 50% retained on No.200 (0.075 mm) sieve Sand < 50% of coarse fraction retained No.4 (4.75 mm) sieve sand with >12% fines 3.1.2 Fine-Grained Soils Fine-grained soils have a soil mass where more than half of the material, by weight, is smaller than (passes) a No. 200 sieve. (Table 16-3) The fine-grained soils are not classified by grain size distribution but according to plasticity and compressibility. Table 16-3 — USCS Classification for Fine-Grained Soils. inorganic silt and clay liquid limit < 50 organic inorganic Fine grained soils More than 50% passes No.200 (0.075 mm) sieve silt and clay liquid limit ≥ 50 organic 3.1.3 Highly Organic Soils Highly organic soils, such as peat, have too many undesirable characteristics for consideration as foundations or use as construction material. The USCS has reserved a special classification for these soils but without any further laboratory criteria. These soils are usually readily identifiable in the field by their distinctive color, odor, spongy feel, and frequently fibrous textures from their common components: decomposed or decomposing leaves, grass, branches, or other fibrous vegetable matter. 3.2.0 Classification Tests These three basic classifications, or divisions, are not the complete description of the USCS or the methods used to classify soils. There are further and more detailed descriptors of soils within the Unified Soil Classification System and in the American Society for Testing and Materials (ASTM) International ASTM D2487 - 06e1, and ASTM D2488. However, as an engineering tech, you will be performing some of the basic tests (sieve analysis and Atterberg limits) and you need to understand why you are performing the tests and how the results are used. You must also know the importance of ensuring that your test results are correct and reliable. Additional soil testing information is available  16-14 in engineering tech Advanced, NAVFAC MO-330, Materials Testing, or one of numerous commercial publications on soil mechanics.

 

Test Your Knowledge

3.  Existing project site soil may be identified for its construction suitability or for use as an engineered compaction mixture.

A. True
B. False

 

 

4.0.0 SOIL SAMPLING

In construction, for both the planning and building phases, it is vital to have as much engineering information as possible about the subsurface conditions at the site area. That information includes:  Location, extent, and condition of the soil layers  Elevation of the groundwater table and bedrock  Drainage characteristics of the surface and subsurface soils  Location of possible borrow areas from which soil and other mineral-product materials may be “borrowed” for a construction operation This information is gathered through soil survey exploration of the proposed area. These multifaceted surveys consist of:  Collecting soil samples  Soil testing by laboratory or field procedures, or both  Soil classification  Development of soil profiles In the full scope of soil surveying, your primary concern, as an engineering tech, is gathering soil samples and conducting certain of the laboratory soils tests.

4.1.0 Sampling Methods Collecting soil samples in the field for testing is called soil sampling. There are three principal methods of soil sampling. They include taking samples from: 1. the surface 2. already existing excavations 3. test pits and test holes Depending on the project’s scope, expediency, and permanency, available time for soil sampling will determine which method is used and the extent to which sampling is done. Soil sampling from test pits provides the most satisfactory results for studying the natural soil conditions as well as collecting undisturbed soil samples.  16-15 A test pit is an open excavation large enough for a person to enter. (Figure 16-6) Usually dug by hand, digging can be expedited by power equipment (clamshell, dragline, bulldozer, backhoe, powerdriven auger) when available. Excavations below the groundwater table require using caissons or lowering the water table. Excavations to 5 feet or more may require shoring and bracing to prevent cave-ins. Load-bearing tests can also be performed on the soil in the bottom of the pit. Figure 16-6 — Example of a soil sampling test pit. The most common method of test hole exploration is by hand auger. (Figure 16-7) Best suited to cohesive soils, it can also be used on less cohesive soils above the water table providing the individual aggregate diameter is smaller than the auger’s bit clearance. Usually used for work at shallow depths, with pipe extensions a powered earth auger may be used to a depth of about 30 feet in relatively soft soils. These samples are completely disturbed but satisfactory for determining soil profile, classification, moisture content, compaction capabilities, and similar soil properties. Figure 16-7 — Examples of hand augers for test hole soil sampling.  16-16 In a hasty soil survey, under expedient conditions or limited time, the number of test pits and test holes is kept to a minimum by using existing excavations for soil sampling. In a deliberate survey, where time and conditions allow a more thorough soil sampling operation, test holes are used extensively and augmented by test pits, governed by the judgment of the engineering officer. Table 16-4 shows various methods of soil exploration and sampling in a condensed form. Table 16-4 — Methods of Soil Exploration and Sampling. Common name of method Materials in which used Method of advancing the hole Method of sampling Value for foundation purposes Auger boring Cohesive soils and less cohesive soils above groundwater elevation Augers rotated until filled with soil and then removed to surface Samples recovered from material brought up in augers Satisfactory for highway exploration at shallow depths Well drilling All soils, rock, and boulders Churn drilling with power machine Bailed sample of churned material or clay socket Clay socket samples are dry samples. Bailed samples are valueless. Rotary drilling All soils, rock, and boulders Rotating bits operating in a heavy circulating liquid Samples recovered from circulating liquid Samples are of no value. Test pits All soils. Lowering of groundwater may be necessary. Hand digging or power excavation Samples taken by hand from original position in ground Materials can be inspected in natural condition and place.

4.2.0 Tagging Samples For gathering information and compiling an accurate interpretation of the collected soil data, you must label your soil samples correctly and systematically. Review the following scenario for soil in a given area that is to be tested (such as a proposed structure’s site). The officer in charge of soil exploration decides how many soil sampling points are needed and where they must be located to produce a representative test of the soil in the area. This information is recorded in a sketch like the one shown in Figure 16-8. Refer to this figure often to follow the scenario.  16-17 Figure 16-8 — Example of a sketch identifying soil sampling points. This sketch shows the locations of the designated exploratory points along a highway’s centerline with the point locations referenced by the centerline stations and the distances from the centerline. Left of the centerline, between stations 2 + 80 and 4 + 60, there is a proposed borrow pit from which soil will be taken for fill. Five samples are taken from there.  Trench T1, a 75-foot trench located at station 3 + 20, 300 feet left of the highway centerline  Pit P1, a 20-foot-square pit at station 3 + 40, 425 feet left of the centerline  Boring B1 at station 3 + 60, 250 feet left of the centerline  Boring B2 at station 3 + 80, 400 feet left of the centerline  Pit P2, a 20-foot-square pit at station 4 + 20, 300 feet left of the centerline In addition to the borrow pit exploration, the officer in charge of the soil exploration designated other locations.  Boring B3 at station 4 + 80, 225 feet to the right of the centerline  Boring B4 at station 6 + 00, 200 feet to the left of the centerline  Pit P3, a 20-foot-square pit at station 6 + 40 on the centerline  16-18 Each sample is tagged according to the location from which it was taken and the locations are given in consecutive numbers. For the scenario in Figure 16-8, the numbers might run from the bottom up, with T1 being No. 1; P 1 as No. 2; B1 as No. 3; and so on. A sample is tagged with the project symbol (in this case PFB 7) and the location symbol such as T1, P2, or B4, for example. If more than one sample is taken from the same location, you need to use additional numbers. For example, a sample taken from B2 may be tagged ‘‘PFB 7-B2-4, bag 1 of 6.” This means the soil sample came from Boring pit No. 2, at location No. 4, as the first of six bags. The sample’s identification should be printed on two tags with a marking pencil or pen, one placed inside the bag, the other tied on the outside. Gummed labels may be similarly used to identify samples placed in moisture content boxes, cylinders, or jars.

4.3.0 Disturbed Samples Disturbed samples are those taken by hand scoops, auger borings, shovels, or any other convenient hand tool but with no attempt to obtain or maintain the material in its natural state of structure or density. These samples can be used for mechanical analysis, plasticity, specific gravity, frost susceptibility, compaction, and laboratory compacted California Bearing Ratio (CBR) tests. (Figure 16-9) The size of the sample taken will depend upon the tests to be performed. Figure 16-9 — California Bearing Ratio (CBR) test equipment.  16-19 4.3.1 Individual Samples When taking individual samples from a pit, trench, or exposed face, first shave off any loose and dried soil to obtain a fresh surface and clearly expose any soil variations. (Figure 16-10) Then take a typical sample of each type of soil or any soil requiring additional investigation while being sure to label the sample number by layer. Figure 16-10 — Example of collecting soil samples from an exposed face. When taking individual samples from hand auger holes, place typical portions of the collected soil along a row in the correct order according to depth and retrieval, as shown in Figure 16-11. Figure 16-11 — Example of collecting individual soil samples with a hand auger. 4.3.2 Composite Samples A composite sample is a representative mixture of all soil within:  A soil mass to be investigated  An existing stockpiled material  A windrow of soil excavated from a trench A test sample is taken in the laboratory from a composite sample by quartering, which will be explained later in this lesson.  16-20 To take composite samples from test pits, trenches, or power shovel cuts, take the following steps: 1. Remove any overburden or surface soil intended for waste. 2. Shave off any loose and dried soil to obtain a fresh surface for taking the sample. 3. Excavate a channel of uniform cross section from top to bottom, depositing the soil onto a quartering cloth, canvas, or tarpaulin, as shown in Figure 16-12. Collect and bag all the removed material to ensure that the sample contains the correct cross sectional proportions. Figure 16-12 — Example of taking a composite soil sample from an exposed face. To take composite samples from auger holes, remove the overburden and then collect all the material excavated from the hole without bothering to “place typical portions of the collected soil along a row” as done for individual soil sampling. To take composite samples from stockpiles or windrows, take particular care. When excavated material is placed in piles or rows, the coarse material tends to roll to the bottom, leaving the finer material on the top. To compensate for this in a stockpile, after clearing the surface, take the sample from a full height strip. To collect a sample from a small windrow, excavate and bag material from a short section, as shown in Figure 16-13. Figure 16-13 — Example of taking a composite soil sample from a windrow.  16-21 4.3.3 Moisture Content Samples To draw a complete soil profile and accurately ascertain the physical properties of soils obtained from test borings or pits, planners need to know the natural moisture content of the soil samples. The natural moisture content is determined from samples taken in the field and placed in a container, which is then sealed to prevent loss of moisture by evaporation. Generally, 100 grams of soil are enough to determine the moisture content of finegrained soils, but soils containing gravel require larger samples. Normally, moisture content samples are placed in metal dishes (canisters) with tight-fitting covers. However, any clean, sealable container may be used. If the moisture content test will be performed within 1 day of the sample collection, sealing the container is not required. If a longer interval will elapse between sampling and testing, the containers should be sealed. (Figure 16-14) Figure 16-14 — Example of sealing a sample container to retain moisture content.

4.4.0 Undisturbed Samples Soil samples that are cut, removed, and packed with the least possible disturbance are termed “undisturbed samples.” (Figure 16-15) As carefully as possible, these samples are taken in their natural structures with layers, void ratio, and moisture content preserved. Figure 16-15 — Example of undisturbed soil sample with surface layer.  16-22 Undisturbed samples are used for determining the in-place density (unit weight) and investigating the strength by the CBR (or unconfined compression) tests in the laboratory. These samples may be shipped to more completely equipped laboratories for shear, consolidation, or other strength tests. An undisturbed sample can be taken as a:  chunk sample — cut by hand with a shovel and knife  cylinder sample — obtained by a CBR mold equipped with a sampling cutter, or by using a cylindrical sampler in an alternate expedient method The method chosen will depend on the available equipment, the tests required, and the type of soil being sampled. Frequently it will require a great deal of ingenuity in adapting the sampling devices and their usage to the job conditions. Cohesionless samples must be kept in the sample container (cylinder method whenever possible) and handled without jarring or vibration until ready for testing. However, some soils are too hard or contain too many stones to permit cylinder sampling and can be taken only by cutting out chunk samples by hand. Whatever method is used, all undisturbed samples must be handled with care. The sample must be packed in the container for shipment without allowing its structure to change, including its moisture content during sampling and shipment 4.4.1 Chunk Samples The chunk sample is the simplest type of undisturbed sample. However, chunk samples can be obtained only from soils that will not deform, break, or crumble while being removed. Figure 16-16 shows the process of taking a chunk sample from a level surface, such as a subgrade or the bottom of a test pit. After smoothing the ground surface and marking the outline of the chunk, the first step is to excavate a trench around the chunk. Then deepen the excavation and trim the sides of the chunk with a knife. Finally, using a knife, trowel, or hacksaw blade, cut off the chunk at the bottom and carefully remove it from the hole. Figure 16-16 — Example of taking a chunk sample from a level surface.  16-23 When taking a chunk sample from the vertical face of a test pit or trench, the process is similar except for the extra work effort and care needed to remove the soil from behind the intended sample. (Figure 16-17) Smooth the surface of the face and mark the chunk outline. Excavate the soil from the top, sides, and back of the chunk. Shape the chunk with a knife Cut it off and carefully remove it. Figure 16-17 — Example of taking a chunk sample from a vertical surface. After removing a chunk sample from a hole or wall, you need to seal it. One method is to apply three coats of melted paraffin. (Figure 16-18) Allow each coat to cool and become firm before applying the next coat. This gives adequate protection for strong samples that will be used within a few days. Figure 16-18 — Example of applying paraffin layers in coats.  16-24 For chunk samples that are weak, or may not be used within a few days, additional protection is required. Wrap them with cheesecloth or other soft cloth, and then seal them with paraffin. (Figure 16-19) If no cloth is available, reinforce the sample with several loops of friction tape or twine, taking extra precautions in this operation so the sample is not damaged. Then apply three additional coats of paraffin. Figure 16-19 — Example of applying additional cloth and twine protection. After wrapping the sample and applying the first brush coat, as an alternative to applying the three additional coats of paraffin, you can dip the entire sample in melted paraffin. (Figure 16-20) Of course, this requires a larger container and more paraffin, but this method also provides a more uniform coating that can be built up to 1/8 inch or more in thickness by repeatedly dipping the sample. Figure 16-20 — Example of applying layers of paraffin protection by dipping.  16-25 For shipping a chunk sample to a laboratory, for example from a battalion’s remote detail site to the main body site, still further protection is required. This can be accomplished by applying multiple layers and coats of cloth and paraffin or by packing the paraffinthickened chunk sample in a cardboard box with excelsior or sawdust and shipping it in a wooden box. (Figure 16-21) Figure 16-21 — Example of packaging a chunk sample for shipment to a laboratory. 4.4.2 Cylinder Samples by CBR Mold To collect undisturbed samples for CBR or density tests, the cylinder method may be used for samples from soft, fine-grained soils. A CBR compaction mold is fitted with an extension collar, a sampling collar, and a cutting edge. (Figure 16-22) Figure 16-22 — Example of a cylinder CBR compaction mold.  16-26 Figure 16-23 demonstrates how to obtain a cylinder sample by using the CBR mold.  Smooth the ground surface, and press the sampling collar and mold into the soil with moderate pressure.  Excavate a trench around the cylinder and press the mold down over the soil again using a hand driver or loading bar if necessary. (Improvise a loading bar from any suitably sized piece of timber.)  Carefully trim the soil away from the sampling collar with a knife, cutting downward and outward to avoid cutting into the sample. The sampling collar does the actual cutting to size. You can use the field CBR jack to force the sampler down, but it has only about 2 inches of travel, so if available, you would do better to use a truck jack. In either case, do not force the sampler down ahead of the trimming on the outside of the cylinder.  Excavate the trench deeper and repeat the process until the soil penetrates well into the extension collar.  Cut off the sample at the bottom of the mold with a shovel, knife, or wire, and remove the mold and sample from the hole. Figure 16-23 — Example of collecting an undisturbed cylinder sample by CBR compaction mold.  16-27 Undisturbed samples taken by cylinder method need to be protected similar to the chunk samples. (Figure 16-24)  Remove the mold and sample from the hole.  Remove the upper collar of the mold and trim the top surface of the sample down to approximately 1/2 inch from the top of the mold.  Fill this recess with paraffin to seal the end of the sample.  Turn the mold over and remove the cutting edge, creating a similar recess in the bottom of the sample.  Fill this recess with paraffin. If the sample is to be handled a great deal, you should overfill the ends with paraffin and trim them exactly flush using a straightedge.  Place boards over both ends and clamp in place, using bolts, string, or wire. If the samples are to be transported some distance or handled quite a bit before testing, wrap the cylinders in cloth and soak them in paraffin layers. Figure 16-24 — Example of sealing and protecting a CBR cylinder mold.

4.5.0 Quartering Samples Quartering is the process of ensuring a soil sample’s representation while reducing it to a convenient size or dividing it into two or more smaller samples for testing. The objectives are the same, but the procedures vary somewhat, depending upon the size of the sample. 4.5.1 Samples Weighing Over 100 Pounds To quarter a sample of over 100 pounds, using a shovel, pile and thoroughly mix the sample on a canvas. (Figure 16-25)  16-28  Place each new shovelful on the top-center of the preceding one so that the soil will be distributed evenly in all directions.  Flatten the sample into a circular layer of approximately uniform thickness.  Insert a stick or length of pipe under the canvas and then lift it at both ends to divide the sample into two equal parts.  Remove the stick, leaving a fold in the canvas, and then reinsert it under the sample at right angles to the first division.  Lift the stick again dividing the sample into four parts.  Discard two diagonally opposite quarters taking care to clean the fines from the canvas.  Remix the remaining material by taking an alternate shovelful from each quarter.  Repeat the quartering process as necessary to reduce the sample to the desired size. Figure 16-25 — Example of quartering and reducing a large sample to desired size.  16-29 4.5.2 Samples Weighing Between 25 and 100 Pounds In quartering a sample between 25 and 100 pounds, you can pile the soil on the canvas and mix it by alternately lifting the corners of the canvas and pulling the sample over as if preparing to fold the canvas diagonally. (Figure 16-26) Flatten and quarter the sample as done with the larger, over 100-pound example. Repeat until the sample is the desired size. Figure 16-26 — Example of quartering a soil sample of 25-100 pounds. 4.5.3 Samples Weighing Less Than 25 Pounds For samples less than 25 pounds, the process is the same but on a smaller scale. (Figure 16-27) Place the sample on canvas or a clean sheet of paper. With a trowel, mix it thoroughly, form it into a conical shape, and flatten it. Divide the sample into quarters, and discard two diagonally opposite quarters. Remix the remaining material and repeat the process until the sample is the size needed for the test. Figure 16-27 — Example of quartering a soil sample of less than 25 pounds.

 

Test Your Knowledge

4.  Only soil samplings taken from test pits and holes are valid.

A. True
B. False

 

 

5.0.0 SOIL TESTING

To test the representative soil samples, disturbed or undisturbed, the Navy follows procedures laid down by the American Society for Testing Materials (ASTM). A complete soil test typically proceeds according to the following steps: 1. Determine moisture content. 2. Determine soil particle sizes (grains) and the percentage distribution of sizes with a mechanical analysis. 3. Determine specific gravity.  Specific gravity is expressed in terms of ratio: the weight of a given volume of substance relative to the weight of an equal volume of water. A cubic foot of water weighs 62.43 pounds. o For soil, determine the absolute specific gravity, that is, determine the ratio of the weight of a dense volume, which is a volume exclusive of air spaces. o For example, a cubic foot of dry sand weighs about 100 pounds, but with air exhausted, a cubic foot of sand weighs about 165.44 pounds. Therefore, the specific gravity of sand equals 165.44 divided by 62.43 (1 ft. 3 water), or about 2.65. 4. Determine Atterberg limits if the soil is clay or a similar fine-grained soil.  A fine-grained soil remains plastic over a certain range of moisture content. The upper moisture content is called the liquid limit; the lower is called the plastic limit. Above the range, the soil becomes fluid; below the range, the soil becomes semisolid. 5. Determine moisture-density relationship.  Compaction is used to determine the moisture-density relationship; in other words, with a given compaction energy, determining what moisture content will result in the maximum compaction. Compaction testing is not included in this course but will be discussed in engineering tech Advanced. 6. Determine by field control testing:  the field moisture content (with an eye to reducing or increasing it to the optimum, if feasible).  the point at which the specified density has been obtained by compaction. Field control testing is not included in this course but will be discussed in engineering tech Advanced.

5.1.0 Determining Moisture Content A soil’s moisture content (also referred to as water content) is an indicator of the amount of water present. By definition, moisture content in a sample is the ratio of the weight of water to the weight of solids (oven-dried), expressed as a percentage ( w ).  16-31 Where: w  moisture content of the soil (expresses as a percentage) Ww  weight of water in the soil sample x 100 W W w s w  Ws  weight of oven-dried solids in the sample With many soils, close control of moisture content during compaction is necessary to develop a required density and strength in the soil mass. The amount of compaction effort to obtain a specified density depends on having the moisture content at or very close to optimum. Specified density is expressed in terms of dry unit weight, so moisture content must be determined with a wet unit weight to determine whether moisture must be added or removed from the soil mass at the construction site to achieve the optimum moisture content (OMC) for compaction. There are several methods for determining moisture content of soil but the most accurate is the oven-drying method with an electric or portable gasoline oven to dry the samples. The calcium carbide gas pressure method is a more expedient method, but it is less accurate and should always be approved by your supervisor. The Nuclear Moisture-Density Meter method is a third option, but it requires special training, along with operator certification, and will not be covered in this course. 5.1.1 Oven-drying Method To use the oven-drying method (ASTM D 2216-05), again the most accurate method, use the following apparatus and procedures. 5.1.1.1 Apparatus Figure 16-28 shows the laboratory apparatus needed for determining moisture content.  16-32  A balance for weighing material to 0.01 grams (453.6 g = 1 pound)  Several small circular moisture boxes (called cans) for placing samples in to weigh and dry  An electric oven or a portable gasoline oven to dry samples  Crucible tongs Figure 16-28 — Apparatus for determining moisture content in the oven-drying method. If an electric or gasoline oven is not available, the materials can be dried in a frying pan held over an ordinary stove or hot plate. However, the frying pan substitute has a disadvantage. Whereas the electric oven thermostat can be set to a desired temperature, with a frying pan, the temperature is hard to control and any organic material in the sample may be burned causing a slight to moderate inaccuracy in the result. 5.1.1.2 Procedure Perform the following steps to determine the moisture content. Refer to Figure 16-29 for entries on DD Form 1205.  Record all identifying sample information (blocks 1 - 5).  Label and weigh clean, dry, moisture boxes (cans); record as Weight of Tare (block d).  Place required soil sample in can and cover with lid. o When conducting this test as part of another test method, use the specimen mass stated in that test method. o When conducting this test with no minimum specimen mass provided, use the values provided in Table 16-5, depending on the degree of accuracy of the reported water content.  Weigh soil sample and tare to the nearest 0.01 gram; record as Weight of Tare + Wet Soil (block a).  Oven-dry sample, with lid removed, at 110°C ± 5° until sample weight becomes constant.  16-33 o Oven-drying time will vary depending on the type of soil, the size of the sample, and other factors. For routine water-content determination, ovendry a sample of clean sands and gravel for a minimum of 4 hours. For most other soils, a minimum drying time of 16 hours is adequate.  Remove sample from oven; replace lid and allow to cool until it can be handled comfortably with bare hands.  Weigh dried soil sample and tare; record as Weight of Tare + Dry Soil (block b).  Determine weight of water (Ww ) by subtracting Weight of Tare + Dry Soil (block b) from Weight of Tare + Wet Soil (block a); record as Weight of Water (Ww ) (block c).  Determine weight of dry soil (Ws ) by subtracting Weight of Tare (block d) from Weight of Tare + Dry Soil (block b); record as Weight of Dry Soil (Ws ) (block e).  Determine water content (w ), in percent, and record it using the formula: x 100 W W w s w  When determining the average water content, the individual tests must be within ± 1 percent. Any individual tests that do not meet this requirement will not be used. If none of the individual tests meet this requirement, then additional testing is required. Refer again to Figure 16-29 to note an invalidated test.  16-34 Figure 16-29 — Example of data sheet for soil moisture content. DD Form 1205.  16-35 Table 16-5 — Recommended Minimum Test Specimen for Reporting Water Content. Maximum Particle Size(100% Passing) Standard Sieve Size Minimum Moist Mass for Reporting to ± 0.1% Minimum Moist Mass for Reporting to ± 1% 2.0 mm or less No. 10 20.0 g 20 g* 4.75 mm No. 4 100.0 g 20 g* 9.50 mm 3/8 in 500.0 g 50 g 19.00 mm 3/4 in 2.5 kg 250 g 37.50 mm 1 1/2 in 10.0 kg 1 kg 75.00 mm 3 in 50.0 kg 5 kg * To be representative, not less than 20 grams shall be used. 5.1.2 Calcium Carbide Gas Pressure Method (AASHTO T 217-1986) The chemical reaction of calcium carbide with water produces acetylene gas, which is extremely flammable. Exercise extreme caution to avoid open flame when releasing the gas from the speedy moisture tester. Perform the test in a well-ventilated area, as asphyxiation could occur if performed in a confined area. A typical Calcium Carbide Gas Pressure method uses a 26 gram, SPEEDY® moisture tester to determine the moisture content of soils, fine aggregates, sand, and clay. Determination can be made in the laboratory or field to within ± 0.5 percent, in from 45 seconds to 3 minutes depending upon the material being tested. If another tester is to be used, consult the user’s manual for the tester before conducting the moisture-content determination. The tester operates on the principle of introducing a calcium carbide reagent (reactive agent) to the free moisture of the soil sample inside a sealed then shaken chamber. The resulting chemical reaction creates a gas that is contained in the sealed chamber. The resulting gas pressure is displayed on a built-in gas pressure gauge. CAUTION  16-36 5.1.2.1 Apparatus The SPEEDY® Moisture Tester set (Figure 16-30) includes:  SPEEDY® tester  Balance  Half-weight reagent  Measuring scoop  Brushes  Cleaning cloth  Two 1 1/4-in. steel balls Figure 16-30 — Example of a SPEEDY® Moisture Tester. 5.1.2.2 Procedure  Weigh a specified gram sample of soil (26g on SPEEDY® Moisture Tester model).  Place soil sample and two 1 1/4-inch steel balls in large chamber.  Hold pressure vessel in a horizontal position to prevent soil from contacting reagent before tester is sealed.  Place three scoops (24g) of reagent in cap. While still horizontal, insert cap into pressure vessel and tighten clamp to seal cap.  Raise moisture tester to a vertical position so reagent falls into vessel.  Return tester to horizontal and vigorously shake with a rotating motion for 10 seconds to put steel balls into orbit around inside circumference to break down soil. o Rest for 20 seconds; repeat shake-rest cycle for a total of 3 minutes. o Do not allow steel balls to fall against either cap or orifice leading to the dial; this may cause damage.  Hold the tester horizontal at eye level, read and record dial reading as percent of moisture by wet mass.  Point cap away and release gas pressure slowly.  Empty pressure vessel and examine for lumps. If soil sample is not completely broken down, retest another sample and increase time limit (shaking unit) by 1 minute.  16-37 o The limit of the tester is 12 percent moisture for aggregate, or 20 percent moisture for soil. If the limit is exceeded, then the test must be run again using a half-sized sample (13 grams) and the dial reading must be multiplied by 2.  Determine percentage of moisture by dry mass (oven-dry moisture percentage), by converting direct wet mass reading into a calibration curve supplied with test set.

5.2.0 Mechanical Analysis

Determining grain sizes and the percentage distribution of each size is done with mechanical analysis. A complete mechanical analysis is accomplished in two parts: sieve analysis and hydrometer analysis. 5.2.1 Sieve Analysis Sieve analysis applies to soils that are larger than the No. 200 sieve or contain small amounts of material passing the No. 200 sieve. Sieve analysis can be done on the entire sample or on the sample after the fines are removed by prewashing. To conduct a mechanical analysis, use the following apparatus and procedures. 5.2.1.1 Apparatus A typical sieve analysis apparatus includes:  Gram weighing balance  Sieves with apertures of varying sizes used to determine grain sizes (Figure 16-31)  Sieves may be: o Circular sifter type (usually about 8 inches in diameter) o Rocker type, a rocker frame in which screens with apertures of various sizes can be placed Figure 16-31 — Typical sieve set apparatus. The sieve used for analysis is the so-called standard sieve. A standard sieve has a square aperture. Sieve screen sizes have two types of identifying systems:  16-38  A sieve with fewer than four apertures to the linear inch is designated by the size of an aperture, for example, a 1/4-inch, 1/2-inch, 3/4-inch, or 1-inch sieve.  A sieve with four or more apertures to the linear inch is designated by a number representing the number of apertures per linear inch. A No. 4 sieve has four apertures to the linear inch; No. 6 has six apertures; and so on. The finest sieve used is a No. 200, which is slightly smaller than th 200 1 of an inch square. To conduct a sieve analysis, you also need an electric or hand-operated sieve shaker. (Figure 16-32) Shakers come in a variety of styles and functional operation. Figure 16-32 — Example of types of sieve shakers. 5.2.1.2 Procedure-Sieve Analysis, Dry To conduct a mechanical dry sieve analysis you must have a minimum amount of soil sample. (Table 16-6) Table 16-6 — Minimum Amount of Soil Sample for Grain-Size Analysis. Maximum particle size (sieve opening) Minimum dry weight of test specimen 3 in. 5,000 g 2 in. 4,000 g 1 1/2 in. 3,000 g 1 in. 2,000 g 3/4 in. 1,000 g 3/8 in. (No. 4) 500 g The minimum sample weight depends on the maximum particle size in the sample.  16-39 Samples are analyzed by the following procedure. Refer to Figure 16-33 for entries on DD Form 1206. Samples that contain cohesive soils such as clays or silts, which form hard lumps, must be prewashed. Look for the 4 additional operations.  16-40 Figure 16- — Example of JUDLQVL]HDQDO\VLV DD Form 120.  16-41  Prepare sample. o Spread out and air dry. o Break up aggregate with fingers or mortar and pestle (usually a part of the laboratory apparatus). Take care not to crush individual grains. The object is to separate aggregations of clustering grains.  Obtain representative size. (Table 16-6)  Record identifying sample information on form (blocks 1 through 7).  Oven-dry material at 110°C ± 5° until a constant weight is obtained; allow cooling.  Weigh oven-dried sample to the nearest gram; record as original weight on form (block 8).  If only a dry sieve is to be performed, check “No” in block 9 and enter 0 in blocks 10 and 11 and proceed with selecting sieves. o If sample will be prewashed, check “Yes” in block 9 and add the following 4 operations: 1. Place sample in clean container; cover completely with water; allow soaking until any adhering and lumpy particles are completely disintegrated, 2 to 24 hours. 2. Wash sample over a No. 200 sieve into a 2 x 2 foot concrete pan until all – 200 materials have been washed through. a. If sample contains an appreciable amount of coarse particles, combine No. 4 and No. 200 sieves. b. Take care not to overload No. 200 sieve. If necessary, transfer sample in increments. (This process may take up to 6 different pans and as long as 8 hours.) 3. Process +200 material. a. Oven-dry washed + 200 material at 110°C ± 5° until constant weight is obtained and allow cooling. b. Weigh to nearest tenth of a gram, record + #200 Sample Weight, Washed (block 10). 4. Process –200 material. a. Allow the –200 material to settle in pan until surface water becomes clear (16 to 24 hours). b. Decant surface water (use siphon or syringe) ensuring settled material is not disturbed. c. Use a trowel to transfer as much material as possible from pan to pudding pans. d. Rinse remainder of material from 2 x 2 pans to pudding pans with as little water as possible. e. Oven-dry washed –200 material and determine weight to nearest tenth of a gram; record as — #200 Sample Weight, Washed (block 11).  16-42 o Retain material from these 4 additional steps for prewashed material for use in hydrometer analysis.  Select a nest of sieves to accommodate largest particle size of soil; ensure all material will pass through largest sieve.  Record weight of each selected sieve (to nearest tenth of a gram) on form (column 13). o Sieve selection varies according to type of soil being tested. The following is recommended as a minimum: 2 inch 1 1/2 inch 1 inch 3/4 inch 3/8 inch No. 4 No. 10 No. 16 No. 30 No. 40 No. 50 No. 100 Stack (nest) sieves on top of each other with the largest sieve on top. The coarsest sieve recorded is the sieve above the first one that retains any material. The “retained” weight recorded for this sieve is 0 g. The passing weight recorded through this sieve is the total weight of the sample. No. 200  Weigh and place a pan on bottom.  Cover sample. o If sample was prewashed, place only +200 material onto top sieve of nest and cover. o If sample was not prewashed, place entire sample on top sieve of nest and cover.  Place nest of sieves in sieve shaker and shake for 5 to 15 minutes. o Shaking interval depends on quantity of fine material. - Five minutes-for most coarse-grained soils. - Fifteen minutes-for most fine-grained soils.  Remove cover and sieves from shaker in descending order.  Weigh each sieve-sample and record on form (column 14).  16-43  Determine weight of material retained on each sieve by subtracting weight of sieve (column 13) from weight of sieve and retained sample (column 14); record as weight retained (column 15).  Add weights retained on all sieves and record as total weight retained in sieves (block 19).  Weigh pan with material passing No. 200 sieve; subtract weight of pan; record as weight sieved through No. 200 (block 20).  Complete form blocks 21 through 25 using formulas provided on sheet; if error percentage is 1 percent or greater, rerun test.  Compute cumulative weight retained (column 16) for each sieve by adding weight retained (column 15) to the previous cumulative weight retained (column 16) with starting point being 0.  Compute percent retained (column 17) for each sieve by dividing weight retained by total weight of fractions as follows: 100 23 15 x block column  Compute percent passing for each sieve size by subtracting cumulative weight retained (column 16) from total weight of fractions (block 23) and dividing by total weight of fractions as follows: 100 23 23 16 18 x block block column Column   Determine percentages for gravel, sand, and fines; record as: o Gravel is material retained on No. 4 sieve (block 26). o Sand is material passing No. 4 sieve, retained on No. 200 sieve (block 27). o Fines are material passing No. 200 sieve (block 28).  Prepare Grain-Size Distribution graph, DD Form 1207. (Figure 16-34) o Record identifying sample information in remarks blocks. o Use sieve-analysis data to plot sieve size and percentage passing sieve. o Use a french curve to connect plotted points forming a smooth, free-flowing curve (grain-size distribution curve).  16-44 5.2.1.3 Procedure-Sieve Analysis with Prewashing (recap) If grain-size sample will be prewashed, and “Yes” in block 9 of DD Form 1206 (Figure 16-33) is checked, perform the following 4 operations:  Place sample in clean container; cover completely with water; allow soaking until any adhering and lumpy particles are completely disintegrated, 2 to 24 hours.  Wash sample over a No. 200 sieve into a 2 x 2 foot concrete pan until all –200 materials have been washed through. o If sample contains an appreciable amount of coarse particles, combine No. 4 and No. 200 sieves. o Take care not to overload No. 200 sieve. If necessary, transfer sample in increments. (This process may take up to 6 different pans and as long as 8 hours.)  Process + 200 material. o Oven-dry washed + 200 material at 110°C ± 5° until constant weight is obtained and allow cooling. o Weigh to nearest tenth of a gram, record as + #200 Sample Weight, Washed (block 10).  Process — 200 material. o Allow the — 200 material to settle in pan until surface water becomes clear (16 to 24 hours). o Decant surface water (use siphon or syringe) ensuring settled material is not disturbed. o Use a trowel to transfer as much material as possible from pan to pudding pans. o Rinse remainder of material from 2 x 2 pans to pudding pans with as little water as possible. o Oven-dry washed — 200 material and determine weight to nearest tenth of a gram; record as — #200 Sample Weight, Washed (block 11).  Retain material from these 4 additional steps for prewashed material for use in hydrometer analysis. 5.2.2 Hydrometer Analysis The determination of grain size distribution by sieve analysis is limited to materials larger than the No. 200 (0.074-mm) sieve. For soil classification, this is sufficient since grain size distribution is not used to classify fine-grained soils that pass through the No. 200 sieve. However, when appropriate to the geographical area, an analysis of the distribution of particles smaller than the No. 200 sieve is necessary for frost susceptibility. Frost susceptibility should always be considered in areas subject to substantially freezing temperatures, since repeated freezing and subsequent thawing of water in the soil can seriously affect the ability of the soil to support a structure. A soil is considered frost susceptible if it contains 3 percent or more by weight of particles smaller than 0.020 mm in diameter, and hydrometer analysis is the test used to determine the grain size distribution of soils passing the No. 200 sieve. Figure 16-35 shows an example of a grain-size analysis using the hydrometer method.  16-46 Figure 16-35 — Grain-size analysis (Hydrometer Method). DD Form 1794.  16-47 Hydrometer analysis is based on Stokes’ law, which relates the terminal velocity of a free-falling sphere in a liquid to its diameter. The relation is expressed by the following equation: Where: V  terminal velocity Gs  specific gravity of solids Gw  specific gravity of the liquid in which the sphere is falling n viscosity of the liquid 2 18 Dx n GG V  ws  D diameter of the sphere Larger particles settle more rapidly than smaller ones and it is assumed that Stokes’ law can be applied to a mass of dispersed soil particles of various shapes and sizes. The hydrometer analysis is an application of Stokes’ law that permits the calculation of grain size distribution in silts and clays. For the analysis, the soil particles are given the sizes of equivalent spherical particles as in Stokes’ Law. The density of a soil-water suspension depends upon the concentration and specific gravity of the soil particles. If the suspension is allowed to stand, the particles will gradually settle out of the suspension, and the density will be decreased. A hydrometer is an instrument used to measure the density of the suspension at a known depth below the surface. The density measurement, together with knowledge of the specific gravity of soil particles, determines the percentage of dispersed soil particles in suspension at the time and depth of measurement. Stokes’ law is used to calculate the maximum equivalent particle diameter for the material in suspension (at depth and elapsed time of settlement). A series of density measurements (at known depth of suspension and times of settlement) gives the percentages of particles finer than the diameters given by Stokes’ law. Thus, the series of readings will reflect the amount of different sizes of particles in the fine-grained soils. The particle diameter ( ) is calculated from Stokes’ equation using corrected hydrometer readings and a nomographic chart. Hydrometer analysis procedures are not discussed in this course but are contained in ASTM D 422. D

5.3.0 Specific Gravity Testing

Specific gravity is the ratio of the weight of a solid substance to the weight of an equal volume of water. In dealing with soils, determining specific gravity is necessary for certain tests, such as hydrometer analysis, and for computations involving volume and weight relationships. The specific gravity of solids is normally applied only to soil that passes the No. 4 sieve. Generally, geotechnical engineers need a soil’s specific gravity to perform additional testing of that particular soil. In some cases though, there may be different soil fractions used when performing this test. For example, a –10 sample’s resulting specific gravity is applicable to hydrometer  16-48 analysis, while determining the zero-air-voids curve in soils-compaction testing (laboratory) uses the –4 sample’s specific gravity. A soil’s specific gravity largely depends on the density of the minerals making up the individual soil particles. Some typical specific gravity values for specific soil types are:  Solid substance of most inorganic soils — 2.60 to 2.80  Tropical iron-rich laterite, as well as some lateritic soils — 2.75 to 3.0 +  Sand particles composed of quartz — 2.65 to 2.67  Inorganic clays — 2.70 to 2.80  Soils with large amounts of organic matter or porous particles (such as diatomaceous earth) — 2.00 to 2.60 There are three different formats for expressing the specific gravity of a soil mass.  Specific Gravity of Solids (Gs ) — the ratio of the weight in air of a given volume of soil particles to the weight of an equal volume of distilled water, both at a stated temperature. o The specific gravity of solids is applied only to that fraction of a soil that passes a No. 4 sieve.  Apparent Specific Gravity (Ga ) — the ratio of the weight in air of a given volume of the impermeable portion of soil particles to the weight in air of an equal volume of distilled water, both at a stated temperature. o The impermeable portion of a porous material, such as most large soil grains, includes the solid material plus impermeable pores or voids within the particles.  Bulk Specific Gravity (Gm ) — the ratio of the weight in air of a given volume of permeable material (including permeable and impermeable voids) to the weight of an equal volume of distilled water, both at a stated temperature. 5.3.1 Sample Selection For specific gravity tests, soil samples may be disturbed or undisturbed. However, take care to ensure that a sample is a representative sample. When selecting a sample containing both large and small particles, separate it on a No. 4 sieve; discard any particles not passing. It is easier to begin the test with an oven-dried sample. However, some soils, particularly those with high organic content, should be tested at their natural water content with the oven-dried weight determined at the end of the test. 5.3.2 Specific Gravity of Solids As presented earlier, determining the specific gravity of solids applies only to soil that passes a No. 4 sieve. However, when used in conjunction with a hydrometer analysis, specific gravity is determined only on the fraction that passes a No. 200 sieve.  16-49 5.3.2.1 Apparatus  500-milliliter (ml) volumetric flask o For course discussion, assume the flask has been calibrated; the weight of the flask and water has been calibrated over a range of temperatures likely encountered in the laboratory. Calibration procedures are located in ASTM D 854.  Balance, 2,000-gram capacity  Balance, 200-gram capacity  Cans, moisture content  Dishes, evaporating  Funnel  Mortar and pestle  Pump, vacuum (optional)  Stirrer, soil dispersion (optional)  Thermometer, general laboratory Figure 16-36 — Example of apparatus for determining specific gravity. 5.3.2.2 Procedure To perform a specific gravity of solids test, use the following procedures. Refer to Figure 16-37 for entries on DD Form 1208.  16-50 Figure 16-37 — Example of data sheet for specific gravity. DD Form 1208.  16-51  Calibrate volumetric flask (for course discussion, flask has been calibrated). o Record basic sample information and flask number (blocks 1-5; 6a). o Weigh clean, dry, flask to nearest 0.01 gram; record as Clean, Dry Weight Wb (block 6b). o Fill flask with room-temperature distilled water; ensure bottom of meniscus is even with calibration mark. o Weigh flask plus water; record as Flask + Water Weight Wbw (block 6c). o Determine water temperature to nearest whole degree, record as Observed Temperature Ti (block 6d). o Create graph or table for flask being used if additional specific-gravity determinations are to be made. (NAVFAC MO 330 provides additional guidance).  Obtain soil sample for testing. o Separate sample over No. 4 sieve to obtain 100-gram sample passing sieve, or over No. 10 sieve to obtain 20-gram sample. o Discard material retained on sieve.  Prepare sample for testing. o Record identifying sample information (blocks 6e, 6f). o Place – 4 or –10 sample into evaporating dish. o Perform following procedures for soil at natural water content or moisture; otherwise, go to next procedure for oven-dried sample: - Add distilled water to sample and mix to slurry. - Transfer slurry to flask and add distilled water until about three-fourths full. o Perform following procedures for oven-dried soil sample: - Oven-dry sample to a constant weight at temperature of 110°± 5°C.; allow cooling and weigh to nearest 0.01 gram; record as Weight of Dish + Dry Soil (block 6g). - Transfer dried sample to volumetric flask; avoid any particle loss. Fill flask three-fourths full with distilled water and allow to soak for 12 hours. - Weigh empty, dry evaporating dish; record as Weight of Dish (block 6h).  Process sample through test method. o Remove entrapped air by bringing solution to a slow, rolling boil for 10 minutes, occasionally rolling flask to assist in air removal (ensure no loss of material occurs while boiling); cool to room temperature. o Fill flask with distilled water until bottom of meniscus is level with calibration mark. o Dry outside; thoroughly remove any moisture adhering to neck.  16-52 o Weigh flask and contents to nearest 0.01 gram; record as Weight of Flask + Water + Immersed Soil (Wbws ) (block 6j). o Shake flask immediately after weighing (put contents in suspension); determine water temperature at mid-depth to nearest degree; record as Temperature of Water (Tx ) (block 6k). o Determine dry unit weight for soil processed at natural moisture content: - Transfer soil solution from flask to pre-weighed pudding pan; record as Weight of Dish (block 6h). Use care when transferring all grains. - Oven-dry to constant weight at temperature of 110° ± 5°C; allow cooling; record as Weight of Dish + Dry Soil (block 6g).  Compute results on DD Form 1208.(Figure 16-37) o Compute weight of dry soil (Ws ) by subtracting weight of dish (block 6h) from weight of dish + dry soil (block 6g); record as Weight Of Dry Soil Ws (block 6i). o Determine weight of flask and water (Wbw ) by plotting temperature of water (Tx ) (block 6k) on calibration curve; record as Calculated Weight of Flask + Water at Tx , Wbw (block 6L). (If the calibration curve and graph were not produced, use the formula as indicated and record the result on the form.)        bbibw iw xw bw WWTatWx TP TP W      Where: TP xw   density of water identified by temperature   Tx TP iw   density of water identified by temperature   Ti Wbw  weight of flask and water in grams Wb  weight of flask in grams Ti  observed/recorded temperature of water in ºC Tx  any other desired temperature, in ºC Figure 16-38 — Example of calibration curve for a volumetric flask. o Determine correction factor ( K ). - Locate temperature of water ( ) (block 6k) in Table 16-7. Tx - Read across to correction factor column; record as Correction Factor for , Tx K (block 6m).  16-53 Table 16-7 — Relative Density of Water and Correction Factor (K) at Various Temperatures. TEMP ºC RELATIVE DENSITY CORRECTION FACTOR, K TEMP ºC RELATIVE DENSITY CORRECTION FACTOR, K TEMP ºC RELATIVE DENSITY CORRECTION FACTOR, K 18.0 18.5 19.0 19.5 20.0 20.5 21.0 21.5 22.0 22.5 0.99862 0.99852 0.99843 0.99833 0.99823 0.99813 0.99802 0.99791 0.99780 0.99768 1.0004 1.0003 1.0002 1.0001 1.0000 0.9999 0.9998 0.9997 0.9996 0.9995 23.0 23.5 24.0 24.5 25.0 25.5 26.0 26.5 27.0 27.5 0.99756 0.99744 0.99732 0.99720 0.99707 0.99694 0.99681 0.99668 0.99654 0.99640 0.9993 0.9992 0.9991 0.9990 0.9988 0.9987 0.9986 0.9984 0.9983 0.9982 28.0 28.5 29.0 29.5 30.0 30.5 31.0 31.5 32.0 32.5 0.99626 0.99611 0.99597 0.99582 0.99567 0.99552 0.99537 0.99521 0.99505 0.99490 0.9980 0.9979 0.9977 0.9976 0.9974 0.9973 0.9971 0.9970 0.9968 0.9967 o Compute specific gravity of solids to two decimal places using the following formula; record as Specific Gravity of Solids Gs (block 6n). Where: Ws  dry weight of the sample K correction factor based on the density of water at 20ºC Obtain the factor by selecting the correction factor corresponding the recorded temperature. (Table 16-6) Wbw  weight of the flask filled with water only at test temperature Obtain this value from a calibration curve, or table, previously prepared for the flask used. bws bws s s WWW KW G   Wbws weight of the flask, water, and sample at test temperature 5.3.3 Bulk and Apparent Specific Gravity The specific gravity of solids is not applied to coarse particles because they normally contain voids from which air cannot be displaced unless the particles are ground into finer particles so as to eliminate the voids. Thus, when dealing with coarser particles, it is more convenient to work with the apparent specific gravity of the particle mass or to determine the bulk specific gravity. To recap the definitions of Apparent Specific Gravity ( ) and Bulk Specific Gravity ( ): Ga Gm Apparent Specific Gravity ( ) — the ratio of the weight in air of a given volume of the Ga impermeable portion of soil particles to the weight in air of an equal volume of distilled water, both at a stated temperature.  16-54  The impermeable portion of a porous material, such as most large soil grains, includes the solid material plus impermeable pores or voids within the particles. Bulk Specific Gravity ( ) — the ratio of the weight in air of a given volume of permeable material (including permeable and impermeable voids) Gm to the weight of an equal volume of distilled water, both at a stated temperature. The following applies to the determination of both bulk and apparent specific gravity. Bulk specific gravity is usually determined for the coarser materials retained on a No. 4 sieve. Large stones may be determined individually. For aggregates used in Portland-cement concrete, measure to determine the bulk specific gravity of the aggregates in a saturated, surface dry (SSD) condition. This is the condition in which the pores in each aggregate particle are filled with water and no excess water is on the particle surface. This test method covers the specific gravity and absorption of coarse aggregate. The specific gravity may be expressed as apparent specific gravity, bulk specific gravity, bulk specific gravity SSD. 5.3.3.1 Sample Preparation Prepare a representative sample by washing the material over the No. 4 sieve to remove dust and coatings and obtain a sample size; approximately 2 kilograms are required. Ensure the sample is representative. 5.3.3.2 Apparatus  Balance, sensitive to 0.5 gram, capable of suspending the sample container in water from the center of the weighing platform or pan of the weighing device  Wire sample basket or a bucket with a 4- to 7-liter capacity for 1 1/2-inch or smaller aggregate and a larger basket or bucket for larger aggregate sizes.  Water tank large enough to hold the basket  Volumetric Flask, 2 to 3 cubic feet  Heat source (oven or hot plate)  Metal sample container  Metal spatula  Absorbent towel 5.3.3.3 Procedure Perform the test in the following order, recording weights to the nearest 0.5 gram. Refer to Figure 16-37 again.  Obtain representative sample.  Record basic sample information (block 7a).  Dry the sample to a constant weight at 110°C + 5°.  Weigh container and record as Tare (block 7j).  Weigh container and dry sample; record as Tare and Dry Soil (block 7i).  16-55  Determine weight of dry soil by subtracting Tare (block 7j) from Tare and Dry Soil (block 7i); record as Dry Soil (A) (block 7k).  Allow cooling to 50°C; immerse in water; soak at room temperature for 24 hours.  Remove sample from water and roll in a large, absorbent cloth until all visible films of water are removed. o The surfaces of the particles will still appear to be slightly damp. The larger fragments may be wiped individually. When saturated surface is dry, the surface may still appear damp but take care to avoid excessive evaporation during the surface drying. o The aggregate sample is now in an SSD condition.  Weigh saturated surface dry container and record as Tare (block 7d).  Weigh container with saturated surface dry sample; record as Tare + Saturated Surface Dry Soil (block 7c).  Determine weight of saturated surface dry sample by subtracting Tare (block 7d) from Tare + Saturated Surface-Dry Soil (block 7c); record as Saturated SurfaceDry Soil (B) (block 7e).  Weigh wire basket in water; record as Wire Basket In Water (block 7g).  Place sample in basket and immerse in water; hang basket and sample from balance and support so it hangs freely in water; record as (Wire Basket + Soil) in Water (block 7f).  Determine weight of saturated soil sample by subtracting Wire Basket In Water (block 7g) from (Wire Basket + Soil) in Water (block 7f); record as Saturated Soil in Water (C) (block 7h).  Measure temperature of water and soil; record in (block 7b).  Compute Apparent Specific Gravity using following formula; record as Apparent Specific Gravity Ga (block 7l). CA A Ga   Compute Bulk Specific Gravity using following formula; record as Bulk Specific Gravity Gm (block 7m). CB A Gm   Compute Bulk Specific Gravity (SSD) using following formula; record as Bulk Specific Gravity, Saturated Surface Dry (SSD) Gm (block 7n). CB B Gm   Where : waterinsampleSSDofweightC airinsampleSSDofweightB airinsoildryofweightA  5.3.4 Specific Gravity of Composite Sample After determining the specific gravity of solids (G ) and the apparent specific gravity (G ), the specific gravity of an entire soil sample (both larger and smaller than a No. 4 sieve) can be calculated with the following formula: s a  16-56 s Ga sieveNoontained G sieveNogPas G Re%4.sin% 4. 100  Enter this composite specific gravity, along with the percent of materials retained on, or passed through the No. 4 sieve, in the remarks block of the data sheet. 5.3.5 Comment Regarding Correction Factor (K) Refer again to Figure 16-37. There you will see the K value used (0.9993) from Table 16-6 and the results obtained by using the correction factor in calculating (block 6n). Carried to four decimal places, Gs Gs  6256.2 . If you were to disregard   K and recalculate, you would obtain Gs  6238.2 . The value obtained without the correction factor is hardly different from the value obtained with the correction factor. Therefore, unless unusually accurate precision is required, you may disregard the correction factor.

5.4.0 (Atterberg Limits) Liquid Limit, Plastic Limit, Plasticity Index Determination (ASTM 4318-95A) If the proper amount of water is present, clays and some other fine-grained soils exhibit plasticity. A plastic soil can be deformed beyond the point of recovery without cracking or exhibiting a change in volume and be remolded. The liquid limit (LL) is that point at which the material contains the greatest water content and remains plastic; additional water causes it to become a thick liquid. The plastic limit (PL) is that point at which the material contains the lowest water content and remains plastic; less water causes it to become brittle and break into fragments if remolding is attempted. The plasticity index (PI) is the numerical difference between the LL and the PL, expresses as: I   PLLLP A large PI indicates a very plastic soil; a small PI denotes a soil with little plasticity. As water content decreases below the PL, the soil mass shrinks and becomes stiffer. The shrinkage limit (SL) is that point at which, with further drying, shrinkage stops. No sharp distinction identifies the liquid, plastic, and solid brittle states of consistency, so standardized procedures have been established for determining the LL and PL. These consistency limits, as well as the shrinkage limit, are called the Atterberg limits, named for Albert Atterberg, a Swedish chemist who did the initial work on soil plasticity. However, since tests in this course determine only the LLs and PLs and not the SLs, they are not identified as the Atterberg limits.  16-57 Research with large numbers of clay soils established the soil plasticity chart for laboratory classification of fine-grained soils, an example of which is shown in Figure 16-39. The LL and PI values are coordinates that locate a particular soil sample on the chart. The region on the chart in which the sample falls gives the classification based on the behavioral characteristics of the particular soil. Figure 16-39 — Example of a plasticity chart. Take particular care when performing tests. Some soils, particularly those with a high organic content, can provide inconsistent readings or drastic differences between an oven-dried sample and a sample at natural moisture content. Conduct the following tests on samples of natural moisture content. Determine the moisture content at the end of the test. 5.4.1 Apparatus-Test Equipment A Liquid Limit testing device consists of a brass bowl mounted on a box type apparatus with a crank. (Figure 16-40) When the crank is turned, the device elevates and drops the bowl (containing a sample) a specific distance onto a hard rubber anvil centered under the bowl. Each drop is called a “blow.” Figure 16-40 — Example of apparatus for LL & PL testing.  16-58 The test requires the standard support equipment of scale, moisture-content (tare) cans, and evaporating dish, as well as the LL device. Figure 16-41 provides a more detailed description of an LL device. Figure 16-41 — Example of Liquid Limit device with grooving tools. 5.4.2 Procedure (Liquid Limit LL)  Prepare soil sample. o Sieve soil sample (at natural moisture content) over No. 40 sieve; obtain at least 250 grams. o If little or no material is retained on No. 40 sieve: - Collect 200 to 250 grams of –40 material for testing. - Mix material with distilled water until water content is slightly below LL, about peanut butter consistency. (The goal is to have the material fall in the 25- to 35-blow range for the first test.) - Place mixture in airtight plastic bag for at least 16 hours (overnight) so moisture content can become consistent throughout; remix material thoroughly before testing. o If material is retained on No. 40 sieve: - Place –40 material in airtight plastic bag to maintain natural moisture content.  16-59 - Soak coarse material retained on No. 40 sieve. (Soaking time is variable.) - Rub colloidal [kuh-loid-l] material from surfaces of large particles until clean, placing fines in suspension. - Pour off suspended fines slowly into another pan; be careful not to pour off coarse material. - Add clean water to coarse material and repeat wash process until poured off water is sufficiently clear to indicate majority of fines in suspension have been poured off. - Remove excess water from pan containing suspended fines after fines have settled by decantation and evaporation. (Do not oven-dry or add chemical substances to speed dry or hasten the settlement.) - Oven-dry coarse material that was soaked and washed. - Sieve oven-dried coarse material over No. 40 sieve. - Combine –40 material obtained from plastic bag, decanted and evaporated fines, oven dried material sieved over No. 40.  If combined material is too moist, air-dry until water content is slightly below LL.  If combined material is too dry, add small quantities of water until water content is slightly below LL (peanut butter consistency). - Place combined mixture in airtight plastic bag for at least 16 hours (overnight) so the moisture content can become consistent throughout; remix material thoroughly before testing.  Inspect LL device. o Ensure pin connecting cup is not worn permitting side play. o Ensure screws connecting cup to hanger arm are tight. o Check cup for wear; if grooved from use, replace it. o Check contact between cup and base; if flat on cup or dent in base can be felt, replace or repair. o Check grooving tool for wear. o Check cup drop height so point on cup meeting base (not lowest point of the cup) rises to a height of 1 centimeter; use gauge on handle of grooving tool to assist. (The height of the drop must be 1 centimeter. Use the thumbscrew at the rear of the device to make an adjustment.)  Perform LL test. Refer to Figure 16-42 DD Form 1209. o Obtain about 50 grams of 200- to 250-gram prepared sample; place in airtight container for use in PL test. o Record all identifying sample information on DD Form 1209 (blocks 1-5).  16-60 Figure 16-42 — Example of data sheet for LL & PL determinations. DD Form 1209.  16-61 o Label and pre-weigh three empty moisture-determination tares (boxes); record as Weight of Tare (block 6d). o Place 20 to 25 grams of thoroughly mixed sample into brass cup, and level it off with a maximum depth of 1 centimeter. (Figure 16-43) Figure 16-43 — Example of leveling LL sample into cup. o Divide sample in cup with grooving tool so a clean, sharp groove is formed. (Figure 16- 44) Hold cup with cam follower upward and draw grooving tool (beveled edge forward) through specimen downward away from cam follower. Use more than one stroke but no more than six; clean grooving tool’s cutting edge after each stroke. Avoid tearing side of groove; replace sample and regroove if side tears. Figure 16-44 — Example of cup and grooving tool.  16-62 With some sandy and highly organic soils, it is impossible to draw the grooving tool through the specimen without tearing the sides of the groove. In such cases, the groove should be made with a spatula, using the grooving tool only for a final check of the groove). (Figure 16-45) Figure 16-45 — Example of cutting groove with spatula in sandy soil. o Attach cup to device; ensure height of drop is 1 centimeter. o Turn crank of LL device at two revolutions per second; count blows until sample’s halves make contact at bottom of groove along a distance of 13 millimeters (1/2 inch.) (Figure 16-46) Figure 16-46 — Example of sample contact.  16-63 o Record number of blows to close groove 13 millimeters. o Obtain 5 to 10 grams from cup to determine moisture content; take sample perpendicular to groove from edge of cup through portion that has closed in bottom of groove, as shown in Figure 16- 47. Place in preweighed box; cover with lid; weigh and record as Weight of Wet Soil + Tare (block 6a). Figure 16-47 — Example of removing sample for moisture determination. o Transfer remaining cup soil to mixing dish; wash and dry cup and grooving tool. o Remix entire soil specimen; add a little water to increase water content of sample and decrease number of blows required to close groove. Repeat steps for at least two additional trials, producing successively lower number of blows to close groove. o Oven-dry moisture-determination samples (3 minimum); allow to cool, reweigh and record as Weight of Dry Soil + Tare (block 6b). o Determine weight of water   Ww by subtracting Weight of Dry Soil + Tare (block 6b) from Weight of Wet Soil + Tare (block 6a); record as Weight of Water baW (block 6c). w  o Determine weight of dry soil   Ws by subtracting Weight of Tare (block 6d) from Weight of Dry Soil + Tare (block 6b); record as Weight of Dry Soil W db (block 6e). s  o Determine and record water content for each specimen by computing following formula: x100 W W W s w  o Plot water-content points on Form 1209 semilog graph (water versus number of blows); draw a straight line (flow line) representative of sample (3 minimum) points.  16-64 o Determine LL by interpreting the graph where the flow line intersects the 25- blow line. Record LL to nearest whole number (block 8 LL). 5.4.3 Procedure (Plastic Limit PL) The PL of a soil is the water content, expressed as a percentage of weight of oven-dried soil, at which the soil begins to crumble when rolled into a thread millimeters in diameter. About 50 grams of material are required for the PL test. Perform the following steps to determine the PL. Refer again to Figure 16-42 DD Form 1209  Label and pre-weigh two empty moisture-determination tares (boxes); record as Weight of Tare (block 7d).  Obtain 50-gram sample set aside during LL test; reduce water content (if required) to obtain consistency whereby the sample can be rolled without sticking to hands while spreading or mixing continuously on glass plate. Drying process may be accelerated by air-drying only.  Select about 2 grams (marble size) from 50-gram mass; form test specimen into ellipsoidal mass; roll on a finely ground glass plate with fingers or palm of hand to a uniform thread diameter of 3.2 millimeters (1/8 inch), taking no more than 2 minutes. (Figure 16-48) o Rolling rate should be 80 to 90 strokes per minute; count a stroke as one complete motion forward and back to starting position; rate may have to decrease for very fragile soil. Figure 16-48 — Example of rolling Plastic Limit (PL) sample by fingers or palm.  16-65  Remold and roll again to 3.2 millimeters diameter; repeat until total sample crumbles before reaching the 3.2-millimetersdiameter thread. (Figure 16-49) o Rolled sample may not crumble at same time; if thread breaks into smaller lengths, roll each length to 3.2 millimeters; continue until sample can no longer be remolded and rolled to 3.2- millimeter thread without total break-up. Figure 16-49 — Example of PL sample roll/thread test before and after crumbling.  Collect and place crumbled portions into pre-weighed moisture-determination box and cover with lid.  Repeat until crumbled threads in box weigh at least 6 grams.  Repeat steps to obtain a second box of at least 6 grams of material.  Weigh boxes with crumbled threads; record as Weight of Wet Soil + Tare (block 7a).  Determine water content by following steps of LL test. o Oven-dry moisture-determination samples (2 minimum); allow to cool, reweigh and record as Weight of Dry Soil + Tare (block 7b). o Determine weight of water   Ww by subtracting Weight of Dry Soil + Tare (block 7b) from Weight of Wet Soil + Tare (block 7a); record as Weight Of Water baW (block 7c). w  o Determine weight of dry soil   Ws by subtracting Weight of Tare (block 7d) from Weight of Dry Soil + Tare (block 7b); record as Weight of Dry Soil W db (block 7e). s  o Determine and record water content for each specimen by computing following formula: x100 W W W s w  Determine average water content of samples and record to nearest tenth as PL.  16-66 o When determining average water content, individual tests must be within ± 1 percent of mean; any individual test not meeting this requirement will not be used (Figure 16-42 Tare Number 5-P); if no individual test meets this requirement, additional testing is required 5.4.4 Plasticity Index (PI) Determination  Compute plasticity index using following formula: I   PLLLP o Record as    PIPLLL  (block 8 PI)  Classify soil by plotting LL versus PI on plasticity chart as follows, referring to Figure 16-50. o Material plotted on or above A line is classified as clay; material plotted below A line is classified as silt. o Material plotted on or right of 50 percent line has a high LL (H); material plotted left of 50 percent line has a low LL (L). o Upper, or U, line is an approximate upper boundary; although not impossible, any results plotted above U line should be considered suspect and tests rechecked. Figure 16-50 — Example of USCS Plasticity Index chart for soil classification. 

 

 

5. The Navy follows _____ procedures to test representative soil samples. A. American National Standards Institute (ANSI) B. National Institute for Standards and Technology (NIST) C. National Standards Body (NSB) D. American Society for Testing Materials (ASTM)

6.0.0 CONCRETE TESTING

Chapter 8 of this course provides information about concrete and its use in the construction industry. You may recall that concrete is one of the most economical, versatile, and universally used construction materials, as well as one of the few building materials that a user can produce directly on the job to meet the specific requirements. To combine the ingredients correctly (on the job site or nearby), you must know the required physical properties of both the plastic and the hardened concrete. The hardened concrete must have the following:

• Strength

• Workability

• Uniformity

• Durability

• Watertightness

• Consistency The quality and character of the hardened concrete is greatly influenced by the properties of the mix when it is plastic. To attain optimum quality, the plastic mix must be uniform, consistent, and workable while meeting the specified requirements. Concrete testing is directed toward those properties and specified requirements.

6.1.0 Concrete Tests In concrete testing, as in soils testing, no single test can provide all of the required information. Therefore, an array of tests must be performed to gather specific data. The following describes common tests that you may perform as an engineering technician. 6.1.1 Aggregate Tests An aggregate must provide maximum strength and durability in a concrete mixture. Fineness, coarseness, and aggregate gradation are factors considered when deriving the correct concrete mix for a specific construction purpose. Specific gravity, absorption, and moisture also affect the aggregate’s ability to bind well with cement and water in a concrete mix. The components of the final mix (cement, water, and aggregate) must bond adequately for structural strength and must resist weather and loads. Correct aggregate selection also reduces the project’s cost. An engineering analysis determines the aggregate best suited for a particular purpose. (Table 16-8)  16-68 Table 16-8 — Example of Maximum Recommended Sizes of Coarse Aggregate. Minimum Dimension (Inches) Structure 2 1/2 to 5 6 to 11 12 to 29 30 or More Reinforced walls, beams, and columns 1/2 to 3/4 3/4 to 1 1/2 1 1/2 to 3 1 1/2 to 3 Unreinforced walls 3/4 1 1/2 3 6 Slabs, heavily reinforced 3/4 to 1 1 1/2 1 1/2 to 3 1 1/2 to 3 Slabs, lightly reinforced 3/4 to 1 1/2 1 1/2 to 3 3 3 to 6 NOTE: Maximum size not to exceed 1/5 of minimum dimension of a wall or similar structure, 1/3 of slab thickness for horizontal slab, or 3/4 of minimum clear spacing between reinforcing bars. In order to provide the strongest and most durable concrete, the aggregate contained in the mixture must be the best possible in terms of gradation, shape, strength, and cleanliness. Testing allows the best selection. These include tests for stockpile sampling, gradation, specific gravity, absorption, and surface moisture. These tests are not included in this course, but you can learn more about aggregate testing in NAVFAC MO-330 Materials Testing. 6.1.2 Slump Tests “Workability” describes the relative ease or difficulty of placing and consolidating concrete. During placing, concrete should be as stiff as possible as a homogeneous, voidless mass. However, too much stiffness makes it too difficult or impossible to work into forms and around reinforcing steel. Too fluid a mixture is also detrimental. The measure of concrete’s workability is its slump, which is a design consideration inversely proportional to the stiffness of the mix. As shown in Table 16-9, recommended values for slump vary for different types of construction. Table 16-9 — Recommended Slumps for Various Types of Construction. Slump, inches* Types of construction Maximum Minimum Reinforced foundation walls and footings 5 2 Plain footings, caissons, and substructure walls 4 1 Reinforced slabs, beams, and walls 6 3 Building columns 6 3 Pavements 3 2 Heavy mass construction 3 2 Bridge decks 4 3 Sidewalks, driveways, and slabs on ground 6 3 *When high-frequency vibrators are used, the values may be decreased approximately one-third; in no case should the slump exceed 6 inches. To measure this designed inverse proportion between stiffness and workability, testers typically perform slump tests during project preparation as concrete mix trial batches  16-69 and as quality control during construction. Procedures for performing slump tests will be explained later in this lesson. 6.1.3 Strength Tests Engineers, by a combination of concrete design mix and reinforcing (if necessary), must balance the strength of concrete (compressibility) with its weakness (flexibility). A project’s design mix must meet the structure’s intended force loading on a given element. Often, trial batches are prepared for a mix design test and as the project progresses, for a quality control (QC) measure to ensure that concrete mixed on site or delivered to the field satisfies those specified strengths. These mix design and QC trial batches are then subjected to the following tests. 6.1.3.1 Compression Test (ASTM C39 / C39M) Compression tests are conducted to determine a mix design’s ability to resist a crushing force. In a standard compression test, a load is applied parallel to the longitudinal axis of a premolded and properly cured concrete cylinder of a specified standard size. (Figure 16-51) A properly conducted test calculates the maximum compression load in pounds per square inch (psi) that the mix design, or QC sample, can obtain at the point the cylinder ruptures. Figure 16-51 — Example of concrete cylinder compression test. The test procedures themselves will be covered in engineering tech Advanced, but the procedures for preparing the cylinders for testing will be discussed later in this lesson. 6.1.3.2 Flexural Strength Test (ASTM C 78) Flexural strength (modulus of rupture) tests are conducted to determine a concrete’s ability to resist a breaking force.  16-70 In a standard flexural test, a load is applied perpendicular to the longitudinal axis of a standard size, pre-molded, and properly cured concrete beam. (Figure 16-52) From this test, the flexural strength, expressed in terms of modulus of rupture and given in psi, can be readily calculated. Figure 16-52 — Example of flexural strength test. As with the compression test, only the procedures to prepare the test beams will be discussed in this course.

6.2.0 Slump Tests The slump test is performed on newly mixed concrete. To perform the test, you need a slump cone and a tamping rod. (Figure 16-53) The slump cone should be galvanized steel, 12 inches in height, with a base opening 8 inches in diameter and top opening 4 inches in diameter. The top and bottom openings are perpendicular to the vertical axis of the cone. The tamping rod is a straight steel rod 5/8 inches in diameter and approximately 24 inches in length. One end of the rod is rounded to a diameter of 5/8 inches. (Do not substitute a piece of rebar.) Figure 16-53 — Example of sump test equipment.  16-71 6.2.1 Sampling Procedures (ASTM C172) Obtaining a concrete sample for a slump test should be accomplished according to ASTM C172 Standard Practice for Sampling Freshly Mixed Concrete. This course will present only the procedure for sampling from a revolving drum transit mixer (TM) or agitator. If you ever need to obtain a sample from a paving mixer, opentop truck mixer, or other type of equipment, refer to the most recent ASTM C 172. Samples taken for the test specimens must be representative of the entire batch. Accomplish this by taking partial samples at two or more regularly spaced intervals during discharge of the middle portion of the batch. Pass a scoop or pail repeatedly through the entire discharge stream and combine the partials into one sample for testing purposes. Be sure the first and last portions of the combined samples are taken as quickly as possible while still representing the entire batch, but never exceeding 15 minutes to gather the combined samples. If it is necessary to transport samples away from the mixer to another location where the slump test is to be performed, combine the samples and remix them with a shovel to ensure uniformity. 6.2.2 Testing Procedures (ASTM C 143) Perform slump tests according to ASTM C143 / C143M Standard Test Method for Slump of Hydraulic-Cement Concrete. Be sure to start the test within 5 minutes after obtaining the final portion of the composite sample. Perform the following steps to determine the slump:  Moisten inside of slump cone and place it on a flat, moist, nonabsorbent (rigid) surface. Hold in place during filling by standing on two foot pieces. NOTE: Complete the following steps in an elapsed time of no more than 2 1/2 minutes.  Fill slump cone to one-third volume (2 5/8 inches high) with plastic concrete.  Rod concrete by applying 25 evenly distributed strokes; penetrate full depth of first layer.  Add second layer until two-thirds volume filled (about 6 1/8 inches high).  Rod second layer as first with rod just penetrating underlying first layer.  Add third and last layer; overfill if possible.  Rod third layer as second with rod just penetrating underlying second layer; if height subsides below top of cone, add concrete to keep above top of mold.  Strike off excess concrete with tamping rod in screeding and rolling motion so cone is completely filled.  Remove slump cone from concrete. o Place hands on handles and press downward. o Step off footholds. o Raise cone carefully and quickly in vertical direction. - Raise cone a distance of 12 inches within 5 to 7 seconds by a steady upward lift with no lateral or twisting motion.  16-72 o Place cone directly beside slumped concrete. - At this point, about 2 1/2 minutes should have elapsed since start of filling.  Measure and record slump immediately, as shown in Figures 16-54 and 16-55. o Place tamping rod along top of cone so it projects over concrete. o Measure slump from bottom of rod to top center of concrete with a ruler. o Record slump to nearest ¼ inch. Figure 16-54 — Example of measuring slump. If a decided falling away or shearing off occurs from one side or portion of the specimen mass, disregard the measurement and make a new test on another portion of the sample. If two consecutive tests show falling away or shearing off, the concrete probably lacks the necessary plasticity and cohesiveness for the slump test to be applicable. Figure 16-55 — Seabee performing slump test.  16-73 After measuring and recording to the nearest ¼ inch, the slump test is complete. However, as a supplementary procedure, tap the sides of the specimen gently with the tamping rod. The reaction of the concrete will indicate its cohesiveness and workability. A well-proportioned, workable mix gradually slumps to lower elevations and retains its original identity. A poor mix crumbles, segregates, and falls apart. If a slump test is for a mix design’s trial batch, then too little or too much slump indicates the need for a new trial batch with revised mix proportions. When the test is for a quality control measure, the slump obtained by testing will be compared to the slump specified for that particular project or element of that project. If QC testing reveals too little or too much slump, the quality control inspector or other appropriate authority will need to determine whether to accept or reject the concrete.

6.3.0 Preparation of Concrete Specimens Concrete specimens representative of a distinct batch of concrete must be sampled and analyzed for quality control. The number of specimens tested depends on the job specifications. If no requirement is listed in the specifications, a minimum of 2 will be molded for each test age for each 100 cubic yards, or fraction thereof, of each class of concrete placed in any one day. A third specimen may be taken to assist in determining when forms may be removed. The test specimens must remain on site and undisturbed for an initial curing period (the first 16 to 48 hours after molding). Normally the test ages are 7 and 28 days for compressive strength tests. 6.3.1 Cylinder Specimens Concrete cylinder specimens are taken to perform tests evaluating the compressive strength of the concrete. (Figure 16-56) Compressive strength is defined as the average of the strengths of all cylinders of the same age made from a sample taken from a single batch of concrete. At least two cylinders are required to constitute a test. Therefore, a minimum of four specimens are required if tests are to be made at 7 and 28 days. The test results will be the average of the strengths of the two specimens tested at 28 days. The standard cylindrical specimen is 6 inches in diameter by 12 inches long. Figure 16-56 — Typical concrete cylinder mold.  16-74 6.3.1.1 Standards for Cylinder Molds Cylinder molds should be made of steel, cast iron, or other nonabsorbent material that does not react with concrete containing Portland cement or other hydraulic cements. Molds should hold their dimensions and shapes under severe use. They should hold water poured into them without leakage. (Figure 16-57) Figure 16-57 — Seabee making typical concrete cylinder molds. 6.3.1.2 Filling Cylinder Molds Place the molds on a level, rigid surface, free of vibration or other disturbances, at a place as near as possible to the location where they are to be stored for the first 24 hours. Perform the following steps to produce and label a concrete cylinder for testing:  Prepare mold. o Clean and dry. o Oil lightly. o Assemble.  Make cylinder. o Fill mold one-third full with fresh concrete. o Consolidate concrete by applying 25 evenly distributed strokes over mold’s surface area with tamping rod; rod must totally penetrate layer. o Tap side of mold 8 to 10 times with tamping rod. o Add concrete to two-thirds full. o Apply 25 evenly distributed strokes to mold’s surface area using rounded end of tamping rod; rod must pass through second layer and 1 inch into first layer. o Tap side of mold 8 to 10 times with tamping rod. o Add concrete to slightly overfill.  16-75 o Apply 25 strokes; rod must pass entirely through and 1 inch into second layer. o Tap side of mold 8 to 10 times with tamping rod. o Trowel off concrete so it is flush with top of mold and smoothly finished.  Label mold; as a minimum, label should include: o Specimen number. o Date cylinder was made. o Project or placement concrete came from. - The system of labeling is optional. The information should be recorded on a paper tag or gummed label and attached to the mold.  Cover cylinder with plastic or wet burlap to maintain moisture; covering should be tight around cylinder but not make contact with fresh concrete.  Allow cylinder to cure undisturbed for 24 hours.  Remove covering and mold from cylinder after 24 (  8) hours.  Transfer label from mold to concrete cylinder; label may be transferred or information recorded directly on cylinder with grease pencil.  Cure cylinder. 6.3.1.3 Curing and Storing Cylinders During the initial curing period of test specimens, be sure to take precautions to prevent the evaporation and loss of water in the specimens. After an initial curing period of16 to 48 hours, remove specimens from the job site that are intended for checking the strength of trial design mixtures or QC of field concrete. Take them to the testing laboratory, moist-cure them at 73.4°F, and store them in moist rooms, damp sand or sawdust, or limewater to maintain free water on all surfaces of the specimen at all times. Occasionally, some test specimens are made in the field to determine when forms may be removed. These specimens are in addition to the required number of specimens formed for strength determination. Give these specimens (as much as possible) the same protection as the specimens for compression testing. Store them in or on the structure as near as possible to the point of use. Test them in the moist condition resulting from the specified curing treatment. Specimens intended for testing to determine when a structure may be put into use are removed from the molds at the same time the forms are removed from the structure. To ship specimens to a laboratory, pack them in a sturdy wooden box or other suitable container surrounded by wet sawdust or wet sand. Provide protection from freezing during storage or shipment. Moist curing is continued when the specimens are received in the laboratory. 6.3.1.4 Capping Cylinders To prepare cylinders for testing, plane the ends of compression-test specimens within 0.002 inch and within 0.5 degree of being perpendicular to the axis of the cylinder.  2 to 4 hours after molding, cap specimens formed in strong metal molds having accurately flat baseplates.  16-76  Make a stiff paste of Portland cement and water at time cylinder is molded so capping mixture will shrink before application.  Remove any free water or laitance (layer of fine particles on surface) from end of specimen.  Apply paste to top of concrete and work with a flat plate until smooth and level with top of mold. Grind hardened concrete specimens to smooth the ends or cap them with a material having greater compressive strength than the concrete.  Prepared mixtures of sulfur and granular materials, special high-strength gypsum plasters, and neat high-early strength cement are satisfactory capping materials.  Ordinary low-strength plaster of paris, compressible rubber, or fibrous materials are not suitable for caps.  Apply selected material in a plastic state and finish to desired plane surface by applying glass or metal plates and squeezing out excess material to provide a cap that is as thin as possible. Apply sulfur caps in time to harden at least 2 hours before testing. Plaster caps cannot be stored over 4 hours in the moist room. Age neat cement caps 6 days or more in the moist room (2 days when Type II cement is used). During capping, protect moist-cured specimens against drying by covering them with wet burlap. There are numerous alternatives to sulfur caps listed in ASTM C 617 Standard Practice for Capping Cylindrical Concrete Specimens. If you must use sulfur caps, ensure that sulfur vapors are not inhaled while heating the capping compound. Ensure there is adequate ventilation and respiratory protection is used. Used sulfur capping compound is a hazardous material and must be properly disposed of. 6.3.2 Beam Specimens The flexural strength of hardened concrete is measured by using a simple concrete beam and third-point loading mechanism. The flexural strength is determined by calculating measured breaks of the beam and is expressed as a modulus of rupture in psi. The standard beam specimen is 6 x 6 x 21 inch (152 x 152 x 532 mm.) for concrete in which the maximum size of the coarse aggregate is 2 in. (50 mm). When the maximum size of the coarse aggregate exceeds 2 in. (50 mm), the smaller cross-sectional dimension is to be increased to at least three times the nominal maximum size of the coarse aggregate. All beam specimens prepared in the field are to be the standard beam size (6 in. wide by 6 in. deep by 21 in. long) unless required otherwise by project specifications. 6.3.2.1 Standards for Beam Molds Beam molds are to be smooth on all interior surfaces and free from warpage. The molds are to produce specimens that do not exceed the required cross-sectional dimensions by 1/8 inches. The length of a specimen is not to be more than 1/16 inches shorter than the specified length, but may exceed that length.  16-77 6.3.2.2 Rodding Assemble a standard 6- x 6- x 21-inch concrete-beam mold and lightly oil the inside. Fill the mold with two layers of concrete from the production batches, each about 3 inches deep. Consolidate each layer by rodding, using one stroke per 2 square inches (63 per layer), evenly distributed over the layer’s surface. Tap the sides lightly 10 to 15 times with a rubber mallet to close the voids left by rodding. Lightly spade the concrete along the mold’s sides with a trowel to help remove surface voids. When rodding the second layer, penetrate the first layer about 1/2 inch. Strike off the top surface with a straightedge, finish it with a wood or magnesium float. 6.3.2.3 Curing Place a suitable identifying label on the finished surface of the specimens. Cover the entire specimens—still in the mold—with a double thickness of wet burlap. Ensure that the specimens remain on site and are undisturbed for an initial curing period (the first 16 to 48 hours after molding). After this curing period, move them to the testing laboratory and remove them from the molds for further curing. The most satisfactory curing range for concrete is 68° to 86°F, with 73.4°F being the most favorable temperature. Moist-cure the beams in saturated lime water, totally submerged in a wet-tank humidity room, or keep them wet until they are tested. When transporting specimens from the field to the laboratory, be sure they are sufficiently cushioned to protect them from damage by jarring. Additional measures are required to prevent damage by freezing temperatures and moisture loss. You can prevent moisture loss by covering the specimens with plastic or surrounding them by wet sand or wet sawdust.  16-78 Summary Engineering techs are part of a project from its initial stages. (Figure 16-58) Proper testing and analysis of local soil and available aggregate can determine the feasibility of a project at a proposed site. As an engineering tech, the data and information you garner will allow design engineers to make decisions about the foundation (earth) under a foundation, and determine the viability of aggregate use in a concrete mix design. Each decision has its associated cost impact, so your accurate calculations are important in multiple ways. Figure 16-58 — Materials testing applies to soils, aggregate, and concrete.  16-79

Review Questions

  1. Soil is a mixture of mineral grains enclosing various sizes of voids that contain _____. A. air (or other gases) B. water C. organic matter D. air (or other gases), water, and organic matter 2. Into how many groups do geologists classify rock? A. Two B. Three C. Four D. Five 3. What classification of rock is formed by cooling from a molten state? A. Igneous B. Sedimentary C. Metamorphic D. Organic 4. What classification of rock is formed by accumulation of particles and remains of plants and animals? A. Igneous B. Sedimentary C. Metamorphic D. Organic 5. What classification of rock is formed by pressure and heat applied to existing rock? A. Igneous B. Sedimentary C. Metamorphic D. Organic 6. What is the term for the physical and chemical process that transforms rock into a loose, incoherent mixture? A. Atmospheric exposure B. Decomposition C. Disintegration D. Weathering  16-80 7.  Transported soil will reflect the characteristics of the underlying parent rock from which it was derived. A. True B. False 8. Examples of alluvial soil can be found in _____. A. mouths of river deltas B. freshwater lakes and rivers C. dunes D. eskers, kames, and moraines 9. Examples of lacustrine soil can be found in _____. A. mouths of river deltas B. freshwater lakes and rivers C. dunes D. eskers, kames, and moraines 10. Examples of aeolian soil can be found in _____. A. mouths of river deltas B. freshwater lakes and rivers C. dunes D. eskers, kames, and moraines 11. Examples of glacial soil can be found in _____. A. mouths of river deltas B. freshwater lakes and rivers C. dunes D. eskers, kames, and moraines 12. What is the term for fine particles that pass the No. 200 sieve and exhibit plasticity and strength? A. Marine soil B. Clay C. Silt D. Colluvial soil 13. What is the term for fine particles that pass the No. 200 sieve and exhibit little plasticity and strength? A. Marine soil B. Clay C. Silt D. Colluvial soil  16-81 14. According to the Unified Soil Classification System, materials retained on a 3- inch sieve are classified as _____. A. sands B. fines C. gravels D. cobbles 15. Which bulky particle shape is considered the most desirable for construction purposes? A. Angular B. Subangular C. Rounded D. Subrounded 16. Well-graded soils consist of _____ particle sizes. A. uniformly graded large B. uniformly graded small C. uniformly graded intermediate D. a good representation of all 17. In a dense structure with a high degree of compactness, _____. A. closely packed soil particles interlock with smaller grains B. uniformly graded large particles compact together C. uniformly graded small particles compact together D. uniformly graded intermediate particles compact together 18. What is the minimum-maximum specific gravity range of most inorganic soils? A. 2.60 -- 2.65 B. 2.60 -- 2.80 C. 2.65 – 3.00 D. 3.00 -- 3.50 19. Which soil property has the greatest effect on soil when subject to loading? A. Specific gravity B. Gradation C. Moisture Content D. Plasticity 20. Which of the following best describes the term “hydroscopic moisture”? A. Soil water absorbed by the atmosphere B. Absorbed moisture in soil at any time C. Absorbed moisture in air-dried soil D. Thin films of water surrounding soil particles  16-82 21. Which of the following factors does the term “moisture content” (symbol W ) refer to? A. The amount of free water in a soil sample B. The proportion of the weight of water to the weight of wet soil expressed as a percentage C. The amount of hydroscopic moisture in a soil sample D. The proportion of the weight of water to the weight of dry soil expressed as a percentage 22. Which of the following properties of fine-grained soil permits clay to be rolled into thin threads at certain moisture contents without crumbling? A. Liquidity B. Consistency C. Plasticity D. Cohesiveness 23. Which of the following terms is used to describe the boundary where further loss of moisture does not change a soil’s volume? A. Liquid Limit B. Plastic Limit C. Plasticity Index D. Shrinkage Limit 24. Which of the following terms is used to describe the moisture content corresponding to the arbitrary limit between the liquid and plastic state of a soil? A. Liquid Limit B. Plastic Limit C. Plasticity Index D. Shrinkage Limit 25. Which of the following terms is used to describe the moisture content corresponding to the arbitrary limit between the plastic and semisolid state? A. Liquid Limit B. Plastic Limit C. Plasticity Index D. Shrinkage Limit 26. Which of the following constructions would be least affected by soil moisture? A. An asphaltic-cement road laid on a sand-clay admixture B. A concrete building foundation laid on a base of fine-grained soil C. A concrete building foundation laid on a gravel base D. An asphaltic-cement runway laid on a gravel-clay admixture  16-83 27. What soil classification often undergoes large volume changes with variations in moisture content? A. Gravel B. Sand C. Silt D. Clay 28. According to the United Soil Classification System, what are the three major divisions of soil classifications? A. Course-grained, Fine-grained, Organic B. Course-grained, Fine-grained, Sand C. Course-grained, Peat, Organic D. Cobble, Fine-grained, Organic 29. What is the soil classification when less than half of the coarse-grained portion of a soil sample is retained on a No. 4 sieve? A. Gravel B. Sand C. Clay D. Silt 30. When samples are taken by test holes with the hand auger, the samples may be completely disturbed, but they are satisfactory for determining which of the following information? A. Compaction capabilities B. Moisture content C. Soil profile D. All of the above 31. From which of the following locations was a soil sample tagged CB-P3-1 taken? A. Project CB, bag No. P3, pit No. 1 B. Project CB, pit No. 3, location No. 1 C. Construction battalion pit No. 3, area No. 1 D. Construction borrow pit No. P3, bag No. 1 32. For which of the following tests are disturbed samples satisfactory for use? A. Mechanical analysis B. Frost susceptibility C. Specific gravity D. All of the above  16-84 33. How large a sample is enough to determine the moisture content of fine-grained soils? A. 50 grams B. 75 grams C. 100 grams D. 200 grams 34. A moisture content sample taken at 0730 will not be tested until 1430. At a minimum, what action, if any, should be taken to prevent the evaporation of moisture from the soil? A. Seal the canister with friction tape. B. Dip the canister in paraffin. C. Wrap the canister with a paraffin-coated cloth. D. None, since the test will be performed within 1 day. 35. For which of the following soil properties are undisturbed soil samples tested? A. In-place density B. Shear strength C. Compressive strength D. All of the above 36. For which of the following soil types would an undisturbed chunk sample be best suited for sampling? A. Highly plastic B. Cohesionless C. Slightly plastic D. Moderately cohesive 37. Which of the following steps should be taken next after removing a CBR mold and undisturbed sample from a hole? A. Remove the cutting edge. B. Coat the top of the sample with paraffin. C. Remove the upper collar and trim a ½-inch recess in the top of the mold. D. Place boards over both ends. 38. Which of the following methods is one way to be certain that a soil sample is representative of the whole sample? A. Soaking B. Straining C. Quartering D. Halving  16-85 39. What quarter(s) should you discard when quartering a sample? A. Any single quarter B. Two adjacent quarters C. Two diagonally opposite quarters D. Any three quarters 40. What is the identified sequence of a complete soil test as laid down by the American Society for Testing Materials (ASTM)? A Determine specific gravity B Determine moisture content C Determine moisture-density relationship D Determine grain size and distribution E Determine the field moisture content F Determine Atterberg limits A. A, B, F, C, E, D B. B, C, A, D, F, E C. B, D, A, F, C, E D. B, D, C, A, E, F Refer to Figure PC 16-1 for questions 41-44 Table of Values from DD Form 1205 Compute water content for each run. Test Natural Soil Moisture Content Run Number 1 2 3 Tare Weight 6 7 9 A. Weight of Tare + Wet Soil 196.4 187.3 209.6 grams B. Weight of Tare + Dry Soil 176.8 169.9 190.2 grams C. Weight of Water, w    BAW grams D. Weight of Tare 43.6 44.0 46.4 grams E. Weight of Dry Soil, s    DBW grams Water Content, x100 W W w s w  % % % Figure PC 16-1 41. What is the dry weight in grams of the soil in run number 1? A. 176.8 B. 152.8 C. 143.6 D. 133.2  16-86 42. What is the weight of water in grams in run number 2? A. 17.4 B. 17.6 C. 18.4 D. 18.6 43. What is the water content of run number 3? A. 13.0% B. 13.2% C. 13.5% D. 17.4% 44. What is the average moisture content of the three runs? A. 13.4% B. 14.0% C. 31.1% D. 41.9% 45. Sieve analysis applies to soils that are larger than the _____ sieve. A. ½ inch B. No.4 C. No.40 D. No. 200 46. When is it necessary to prewash a sample before proceeding with a normal dry sieve analysis? A. When the sample is too dry B. When the sample has an undesirable water content C. When the sample contains too little superfine materials D. When the sample contains cohesive soil forming hard lumps 47. _____ retain on a No. 4 sieve. A. Sands B. Fines C. Gravels 48. _____ pass a No. 4 sieve and retain on a No. 200 sieve. A. Sands B. Fines C. Gravels  16-87 49. _____ pass a No. 200 sieve. A. Sands B. Fines C. Gravels 50. During a sieve analysis, 2% of the material passed the No. 200 sieve. What subsequent test should you perform on the sample to determine this soil’s susceptibility to frost? A. Hydroscopic moisture content B. Hydrometer analysis C. Specific gravity D. Moisture-density relationship 51. Which of the following materials should you test for specific gravity of solids after a sieve analysis has been performed? A. Only those larger than the No. 40 sieve B. Only those retained on the No. 4 sieve C. Only those passing the No. 4 sieve D. Materials passing the No. 200 sieve 52. Which factor in the calculation for Specific Gravity of Solids has the least impact on the outcome? bws bws s s WWW KW G   A. Ws  dry weight of the sample B. K correction factor based on the density of water at 20ºC C. Wbw  weight of the flask filled with water only D. Wbws weight of the flask, water, and sample 53. How should the surface of a saturated-surface-dry (SSD) sample appear? A. Very wet B. Very dry C. Damp D. Pitted 54. The _____ is the point at which the material contains the greatest water content and remains plastic. A. plasticity index (PI) B. plastic limit (PL) C. liquid limit (LL) D. shrinkage limit (SL)  16-88 55. The _____ is the point at which the material contains the lowest water content and remains plastic. A. plasticity index (PI) B. plastic limit (PL) C. liquid limit (LL) D. shrinkage limit (SL) 56. The _____ is the point at which, with further drying, shrinkage stops. A. plasticity index (PI) B. plastic limit (PL) C. liquid limit (LL) D. shrinkage limit (SL) 57. Beyond what limit should you consider results suspect when entering data on a USCS Plasticity Chart? A. Below 50 LL B. Above 51 LL C. Below A line D. Above U line 58. What property of concrete does the slump test measure? A. Compressibility B. Workability C. Durability D. Strength 59. From which portion of a batch should a slump test be taken at 2 or more regularly spaced intervals? A. First and middle B. Middle only C. First and last D. Middle and last 60. How many times is each layer of a slump test rodded? A. 10 B. 15 C. 25 D. 30 61. For a slump test, what should the elapsed time be from beginning of fill to lifting the cone? A. 2 ½ minutes B. 5 minutes C. 7 ½ minutes D. 10 minutes  16-89 62. What are the dimensions of a standard concrete cylinder specimen? A. 6 in. diameter by 6 in. long B. 6 in. diameter by 12 in. long C. 8 in. diameter by 6 in. long D. 8 in. diameter by 12 in. long 63. A standard size cylinder specimen should be filled in _____ layers and rodded _____ times at each layer. A. 2, 25 B. 2, 50 C. 3, 25 D. 3, 50  16-90 Trade Terms Introduced in this Chapter Atterberg Albert Mauritz Atterberg (1846–1916). Swedish chemist and agricultural scientist who created the Atterberg limits commonly referred to by geotechnical engineers and engineering geologists. California Bearing Ratio (CBR) A penetration test for evaluation of the mechanical strength of road subgrades and basecourses. Colloidal Of a mixture in which very small particles of one substance are distributed evenly throughout another substance. The particles are generally larger than those in a solution and smaller than those in a suspension. Hydrometer An instrument used to measure the specific gravity (or relative density) of liquids, that is, the ratio of the density of the liquid to the density of water. Laterite A red, porous, claylike soil formed by the leaching of silica-rich components and enrichment of aluminum and iron hydroxides. Nomographic chart A chart representing numerical relationships. Weathering The physical disintegration and chemical decomposition of earth materials at or near the earth's surface.

Chapter 17 Care and Adjustment of Survey Equipment

The accuracy and quality of any survey will depend upon the skills and abilities of the survey crew. However, the underlying foundation for a crew’s accurate survey is the quality and condition of the surveying equipment. Equipment that has not been cared for and maintained becomes inaccurate, and inaccurate equipment will negatively affect a survey regardless of the skills of the crew. Taking proper care of your survey equipment cannot be overemphasized; therefore, the first part of this lesson will address proper instrument handling, stowing, and maintenance practices. The second part of this lesson will address instrument adjustment and repair. As used in this lesson, the term “adjustment” means bringing the various fixed parts of an instrument into proper relationship with one another. It is different from the ordinary operations of leveling the instrument, aligning the telescope, and so forth. As an engineering tech, you need to be able to correctly maintain the equipment and adjust the fixed elements into sync as a matter of routine.

When you have completed this lesson, you will be able to:

1. Describe the care and maintenance of surveying equipment.
2. Describe the methods for conducting instrument adjustment and repairs.

Contents

1.0.0 Care of Instruments

2.0.0 Instrument Adjustments and Repairs

 

1.0.0 CARE of INSTRUMENTS

A user’s manual accompanies every survey instrument in the Table of Allowance (TOA). Each manual provides information on the appropriate care and maintenance of a specific instrument as well as instructions on the functions, operations, and adjustments of its various components. You should thoroughly study each user’s manual, such as the one shown in Figure 17-1, before you attempt to use that instrument. Some suggestions for the care and maintenance of surveying equipment are discussed in the following paragraphs.

1.1.0 Handling, Carrying, and Stowing When you handle any surveying instrument, such as the transit, level, theodolite, or plane table, always exercise great care. Each is a precision instrument intended for operation in the robust world of construction. CAUTION NEVER leave an instrument unattended while set up on a street, near construction work, or in any other place where it can be damaged. CAUTION NEVER grasp the telescope to remove an instrument from its carrying case. Wrenching the telescope could damage a number of delicate parts. When you set up an instrument, make sure it is securely fastened to the tripod head. However, only tighten the various clamp screws, leveling screws, and adjustment screws to a firm bearing; overtightening could strip the threads, twist off the screw, bend the connecting part, or place undue stresses on the instrument. When you carry an instrument, ensure that all clamp screws are only lightly clamped so that the parts will move if the instrument is struck. When you carry a tripod-mounted instrument, place it on one shoulder with the tripod legs pointing forward, and hold them together with your hand and forearm. If you are walking on the side of a hill, carry the instrument on the downhill shoulder; this leaves the uphill arm and hand free to catch yourself if you trip or stumble. Do not carry an instrument on your shoulder through doorways or beneath low-hanging branches; under those circumstances, carry it under your arm with the head of the instrument to the front. Figure 17-1 — Typical theodolite user’s manual. NAVEDTRA 10469A 17-4 If you need to climb over a fence, first place the instrument on the other side with the tripod legs well spread. Every transit, theodolite, or level comes equipped with a carrying box or case so the instrument and its accessories can be stowed in a manner that ensures a minimum of motion during transportation. Always stow an instrument in its carrying case when not in use. (Figure 17-2) For carrying stakes and hubs, canvas bags with shoulder straps are usually provided. They closely resemble a newsboy’s bag. In fact, a newsboy’s bag makes an excellent carrying bag for stakes and hubs, as does a Navy seabag equipped with a shoulder strap. (Figure 17-3) Also provided are various other types of leather or canvas bags and sheaths for items such as chaining-pin quivers, plumb-bobs, and Abney and Locke levels. Most of these can be attached to the belt. In addition, leather pouches, also usually attachable to the belt, are available for carrying small hand tools, marking equipment, turning-point pins, and the like. In time, you will learn various conveniences, such as carrying your supply of surveyor’s tacks by sticking them in a rubber ball or a piece of softwood attached to your belt.

1.2.0 Cleaning and Lubrication You must clean all surveying instruments, equipment, or tools immediately after you use them. Dust off the transit or theodolite and wipe it dry before you place it back in its case. Remove all dust with a soft brush before wiping dirty components with a clean Figure 17-2 — Examples of typical instrument cases. Figure 17-3 — Typical bags for stakes and hubs. NAVEDTRA 10469A 17-5 cloth. If the instrument becomes wet, remove it from its carrying case and dry it thoroughly at room temperature once you get back to your workstation. CAUTION NEVER leave a wet instrument stored in the carrying case. CAUTION NEVER rub the lenses of a telescope with your fingers or a rough cloth. Use a lint-free soft cloth or clean chamois leather instead. Occasionally, you may need to clean the lenses with a soft cloth dampened with a mixture of equal parts water and alcohol. Immediately after each use, always remove mud and dirt from tripods, range poles, leveling rods, and so forth, especially when the surveying gear is made of a material susceptible to rust or decay. When lubricating instruments, always use the right lubricant recommended for the climatic condition in your area. For instance, in sub-zero temperatures, graphite is the recommended lubricant for a transit’s moving parts, while a light film of oil (preferably watch oil) is the recommendation in warmer climates. If you are ever in doubt, before doing anything to an instrument, consult the manufacturer’s manual or your senior engineering tech.

2.0.0 INSTRUMENT ADJUSTMENTS and REPAIRS

Properly maintaining equipment to inspection standards facilitates quality work and accurate surveys. As part of their tasking, Engineering techs make minor adjustments and repairs to surveying instruments, that is, those that can generally be done in the field using simple tools. Major adjustments and major repairs generally need to be done in the factory. If the instrument’s defect cannot be corrected by a minor adjustment or minor repair, do not attempt to disassemble it; instead, arrange to send the instrument to the manufacturer. Most surveying instruments are precision instruments that require special skills and tools for major adjustments and recalibration. Only the instrument company or its subsidiaries can provide these.

2.1.0 Instrument Adjustments As stated previously, in this lesson, adjustment means the process of bringing the various parts of an instrument into proper relationship with one another. To be a qualified surveyor, you must have the ability to make these adjustments. To make proper adjustments, a qualified surveyor must: 1. Be familiar with the principles upon which the adjustments are based. 2. Know the methods or tests used to determine if an instrument is out of adjustment. 3. Know the procedure and sequence for making adjustments. 4. Be able to tell what effect an adjustment of one element will have on other parts. 5. Understand the effect of each adjustment when it is actually used for measurement. NAVEDTRA 10469A 17-6 Generally, instrument adjustments involve the level tubes, the telescope, and the reticle [ret-i-kuhl]; for example, if one or both of the plate-level bubbles of an engineer’s transit are centered when the plate is, in fact, not level, the instrument is out of adjustment. An optical instrument equipped with vertical and horizontal cross hairs is out of adjustment if the point of intersection between the cross hairs does not coincide with the optical axis. If the reflected bubble on a Locke or Abney level is centered when the optical axis is other than horizontal, the instrument is out of adjustment. Adjustment chiefly involves a step or a sequence of steps necessary to bring a bubble to center when it should be at center, or bring a crosshair point of intersection into coincidence with the optical axis. Instrument manufacturers publish handbooks detailing recommended adjustment procedures, usually as small pamphlets, obtainable free of charge. The following topics are intended to give you a general overview of instrument adjustment procedures. However, for adjusting a particular instrument, you need to follow the appropriate manufacturer’s instructions. 2.1.1 General Adjustment Procedures Carefully check your instruments periodically to determine whether they need adjustment. A modern adage advises, “An instrument should be checked frequently but adjusted rarely.” The basis for this saying lies in the fact that modern quality instruments get out of adjustment much less frequently than generally believed. The need for an adjustment is often caused by a previous adjustment that was unnecessary but occurred because of errors in checking. Before assuming that adjustment is necessary, you must positively ascertain that maladjustment actually exists. In general, apply the following procedures to all tripod-mounted optical instruments: (Figure 17-4) 1. Check the instrument on a cloudy day, if possible. 2. Ensure that the tripod shoes are tight and that the instrument is screwed all the way down on the tripod. 3. Set the tripod up on firm ground in the shade but in a good light where you can sight at least 200 feet in opposite directions. 4. Spread the tripod feet well apart and place them so that the plate is approximately level. Press the shoes in firmly, or set them in cracks or chipped depressions if on a hardened surface. (Avoid setting up on asphalt pavement in warm weather.) 5. After the tripod feet are set, loosen and retighten the wing nuts to release any possible residual friction that, if not released, might cause an eventual shift in the legs. Figure 17-4 — Typical surveyor’s tripod. NAVEDTRA 10469A 17-7 6. Level the instrument with particular care, then loosen all level screws slightly (again to release residual friction) and relevel. Tighten all screws with equal firmness but do not over tighten. Too much tightness will eventually deform the centers, causing both friction and play. 7. Carry out all checks in the prescribed sequence for the instrument. Repeat the check sequence at least three times but do NOT make an adjustment unless the same check indicates the same amount of error every time. 8. Remember that most tests show an error that is double the actual displacement error in the instrument. Be especially watchful for creep, that is, a change in position caused by settlement or by temperature change in the instrument. To detect any possible creep, allow every set bubble or line of sight to stand for a few seconds and ensure that no movement occurs during the interval. Before making an adjustment, consider whether any error discovered will have a material effect on field results. Make any adjustments in a prescribed order. After making an adjustment, retighten the adjusting parts firmly but not too tightly, then repeat the original check, and readjust if necessary. After making all contemplated adjustments, repeat the entire round of checks in the proper order. This will indicate whether an initial adjustment has been disturbed by a subsequent adjustment. The following sections will address field tests and adjustments for the engineer’s level and the transit. While the principles of performing adjustments are nearly the same for one manufacturer’s level or transit as compared to another manufacturer’s, there are some differences in detail. Therefore, when preparing to adjust an instrument, always consult the operator’s manual for that particular instrument. When a particular surveying requires a high degree of accuracy, the level or transit you use must be in perfect adjustment. In this event, you must perform the tests presented in the following sections and make any necessary adjustments. However, when the survey can tolerate lower accuracy, you can usually compensate for maladjustment until a proper adjustment can be made. Following each of the next instrument-adjustment discussions, a note will present a method of compensating for maladjustment. Keep in mind, however, that if you frequently check your instruments and keep them in good adjustment, these compensations should seldom be necessary. 2.1.2 Self-Leveling Level Adjustments The self-leveling level (also called automatic level) shown is Figure 17-5 is a precise, time-saving development in leveling instruments. It did away with the tubular spirit level, whose bubble takes time in centering as well as in resetting its correct position from time to time during operation. The self-leveling level is equipped with a small bull’s-eye level and three leveling screws. The leveling screws, which are on a triangular foot plate, are used to center the bubble of the bull’s-eye level approximately. The line of sight automatically becomes horizontal and remains horizontal as long as the bubble remains approximately centered. A prismatic device called a compensator makes this possible. The compensator is suspended on fine, nonmagnetic wires. The action of gravity on the NAVEDTRA 10469A 17-8 compensator causes the optical system to swing into the position that defines a horizontal sight. This horizontal line of sight is maintained despite a slight out of level of the telescope or even when a slight disturbance occurs on the instrument. 2.1.3 Theodolite A theodolite is essentially a transit of high precision. Theodolites come in different sizes and weights and from different manufacturers. Although theodolites may differ in appearance, they are basically alike in their essential parts and operation. Some of the models currently available for use in the military are WILD® (Herrbrugg), BRUNSON®, K&E® (Keuffel & Esser), PATH®, and Trimble® theodolites. To give you an idea of how a theodolite differs from a transit, we will discuss some of the most commonly used theodolites in the U.S. Armed Forces. 2.1.3.1 One-Minute Theodolite The one-minute directional theodolite is essentially a directional type of instrument. This type of instrument can be used, however to observe horizontal and vertical angles as a transit does. The theodolite shown in Figure 17-6 is a compact, lightweight, dustproof, optical reading instrument. The scales read directly to the nearest minute or 0.2 mil and are illuminated by either natural or artificial light. The main or essential parts of this type of theodolite are discussed in the next several paragraphs. Figure 17-5 – Example of self-leveling level. NAVEDTRA 10469A 17-9

• Horizontal Motion – Located on the lower portion of the alidade, and adjacent to each other, are the horizontal motion clamp and tangent screw used for moving the theodolite in azimuth. Located on the horizontal circle casting is a horizontal circle clamp that fastens the circle to the alidade. When this horizontal (repeating) circle clamp is in the lever-down position, the horizontal circle turns with the telescope. With the circle clamp in the lever-up position, the circle is unclamped and the telescope turns independently. This combination permits use of the theodolite as a repeating instrument. To use the theodolite as a directional type of instrument, you should use the circle clamp only to set the initial reading. You should set an initial reading of 0°30´ on the plates when a direct or reverse (D/R) pointing is required. This will minimize the possibility of ending the D/R pointing with a negative value.

• Vertical Motion – Located on the standard opposite the vertical circle are the vertical motion clamp and tangent screw. The tangent screw is located on the lower left and at right angles to the clamp. The telescope can be rotated in the vertical plane completely around the axis (360°).

• Levels – The level vials on a theodolite are the circular, the plate, the vertical circle, and the telescope level. The circular level is located on the tribrach of the instrument and is used to roughly level the instrument. The plate level, located between the two standards, is used for leveling the instrument in the horizontal plane. The vertical circle level (vertical collimation) vial is often referred to as a split bubble. This level vial is completely built in, adjacent to the vertical circle, and viewed through a prism and 45° mirror system from the eyepiece end of the telescope. This results in the viewing of one-half of each end of the bubble at the same time. Leveling consists of bringing the two halves together into exact coincidence, as shown in Figure 17-7. The telescope level, mounted below the telescope, uses a prism system and a 45° mirror for leveling operations. When a telescope is plunged to the reverse position, the level assembly is brought to the top. Figure 17-6 — Wild® oneminute theodolite. NAVEDTRA 10469A 17-10

• Telescope – The telescope of a theodolite can be rotated around the horizontal axis for direct and reverse readings. It is a 28-power instrument with the shortest focusing distance of 1.4 meters.

• The cross wires are focused by turning the eyepiece; the image, by turning the focusing ring. The reticle has horizontal and vertical cross wires, a set of vertical and horizontal ticks (at a stadia ratio of 1:100), and a solar circle on the reticle for making solar observations (Figure 17-8). This circle covers 31 min of arc and can be imposed on the sun’s image (32 min of arc) to make the pointing refer to the sun’s center. One-half of the vertical line is split for finer centering on small distant objects. The telescope of the theodolite is an inverted image type. Its cross wires can be illuminated by either sunlight reflected by mirrors or by battery source. The amount of illumination for the telescope can be adjusted by changing the position of the illumination mirror. Figure 17-7 – Coincidence type level. Figure 17-8 – Theodolite reticle. Figure 17-9 – Three-screw leveling head. NAVEDTRA 10469A 17-11

• Tribrach – The tribrach assembly found on most makes and models is a detachable part of the theodolite that contains the leveling screw, the circular level, and the optical plumbing device (Figure 17-9). A locking device holds the alidade and the tribrach together and permits interchanging of instruments without moving the tripod. In a “leapfrog” method, the instrument (alidade) is detached after observations are completed. It is then moved to the next station and another tribrach. This procedure reduces the amount of instrument setup time by half.

• Circles – The theodolite circles are read through an optical microscope. The eyepiece is located to the right of the telescope in the direct position, and to the left, in the reverse. The microscope consists of a series of lenses and prisms that bring both the horizontal and the vertical circle images into a single field of view. In the degree-graduated scales the images of both circles are shown as they would appear through the microscope of the one-minute theodolite (Figure 17- 10). Both circles are graduated from 0° to 360° with an index graduation for each degree on the main scales. This scales graduation appears to be superimposed over an auxiliary that is graduated in minutes to cover a span of 60 min (1°). The position of the degree mark on the auxiliary scale is used as an index to get a direct reading the degrees and minutes. If necessary, these scales can be interpolated to the nearest 0.2 min of arc. The vertical circle reads 0° when the theodolite’s telescope is pointed at the zenith and 180° when it is pointed straight down. A level line reads 90° in the direct position and 270° in the reverse. The values read from the vertical circle are referred to a zenith distances and not vertical angles. Figure 17-11 shows how these zenith distances can be converted into vertical angles. In the mil-graduated scales, the images of both circles are shown as they would appear through the reading microscope of the 0.2-mil theodolite (Figure 17-12). Both circles are graduated from 0 to 6,400 mils. The main scales are marked and numbered every 10 mils, with the last zero dropped. The auxiliary scales are graduated from 0 to 10 roils in 0.2-mil increments. Readings on the Figure 17-11 – Converting zenith distances into vertical angles (degrees). Figure 17-10 – Degree-graduated scales. NAVEDTRA 10469A 17-12 auxiliary scale can be interpolated to 0.1 mil. The vertical circle reads 0 mil when the telescope is pointed at the zenith, and 3,200 mils when it is pointed straight down. A level line reads 1,600 roils in the direct position and 4,800 roils in the reverse. The values read are zenith distances. These zenith distances can be converted into vertical angles as shown in Figure 17-13. 2.1.3.2 One-Second Theodolite The one-second theodolite is a precision direction type of instrument for observing horizontal and vertical directions. This instrument is similar to, but slightly larger than the one-minute theodolite. The WILD® theodolite is compact, lightweight, dustproof, optical reading, and tripod-mounted (Figure 17-14). It is one spindle, one plate level, a circular level, horizontal and vertical circles read by an optical microscope directly to 1 sec (0.002 roil), clamping and tangent screws for controlling the motion, and a leveling head with three foot screws. The circles are read using the coincidence method rather than the direct method. There is an inverter knob for reading the horizontal and vertical circles independently. The essential parts of a one-second theodolite are very similar to that of the one-minute theodolite, including the horizontal and vertical motions, the levels, the telescope, the tribrach, and the optical system shown in Figure 17-15. The main difference between the two types, besides precision, is the manner in which the circles are read. The circle to be viewed in the one-second theodolite is selected by turning the inverter knob on the right standard. The field of the circle-reading microscope shows the image of the circle with lines spaced at 20-min intervals, every third line numbered to indicate a degree, and the image of the micrometer scale on which the unit minutes and seconds are read Figure 17-16. The numbers increase in value 0° to 360°, clockwise around the circle. The coincidence knob on the right side of, and near the top of, the right standard is used in reading either of the circles. The collimation level and its tangent screw are used when the vertical circle is read. Figure 17-12 – Mil-graduated scales. Figure 17-13 – Vertical angles from zenith distances (mils). NAVEDTRA 10469A 17-13 Figure 17-14 — One-second theodolite. Figure 17-15 — Circle-reading optical system. NAVEDTRA 10469A 17-14 The circles of the theodolite are read by the coincidence method in which optical coincidence is obtained between diametrically opposite graduations of the circle by turning the micrometer or coincidence knob. When this knob is turned, the images of the opposite sides of the circle appear to move in opposite directions across the field of the circle-reading microscope. The graduations can be brought into optical coincidence and appear to form continuous lines crossing the dividing line. An index mark indicates the circle graduations that are to be used in making the coincidence. The index mark will be either in line with a circle graduation or midway between two graduations. The final coincidence adjustment should be made between the graduations in line with the index mark or when this index mark is halfway between the two closest graduations.

• Horizontal Circle – To read the horizontal circle, turn the inverter or circleselector knob until its black line is horizontal. Adjust the illuminating mirror to give uniform lighting to both sections of the horizontal circle; the micrometer scale is viewed through the circle reading microscope. Focus the microscope eyepiece so that the graduations are sharply defined. The view through the microscope should then be similar to Figure 17-16, view A. From this point continue the following way: o Turn the coincidence knob until the images of the opposite sides of the circle are moved into coincidence. Turning this knob also moves the micrometer scale. The view through the microscope now appears as shown in Figure 17-16, view B. o Read the degrees and tens of minutes from the image of the circle. The nearest upright number to the left of the index mark is the number of degrees (105). The diametrically opposite number (the number ± 180°) is 285. The number of divisions of the circle between the upright 105 and inverted 285 gives the number of tens of minutes. In Figure 17-16, view B, there are five divisions between 105 and 285; and the reading, therefore, is 105°50´. The index may also be used for direct reading of the tens of minutes. Each graduation is treated as 20 min. Thus, the number of Figure 17-16 — View of a one-second theodolite circle. NAVEDTRA 10469A 17-15 graduations from the degree value to the index mark multiplied by 20 min is the value. If the index falls between graduations, another 10 min is added when the tens of minutes is read directly. o Read the unit minutes and seconds below from the image of the micrometer scale. This scale has two rows of numbers below the graduations; the bottom row is the unit minutes and the top row, seconds. In Figure 17-16, view B, the unit minutes and seconds are read as 7´23.5˝. o Add the values determined in steps 2 and 3 above. This gives 105°57´23.5˝ as the final reading.

• Vertical Circle – When reading the vertical circle, turn the circle-selector knob until its black line is vertical. Adjust the mirror on the left standard and focus the microscope eyepiece. You then go on in the following way: o Use the vertical circle tangent screw to move the collimation level until the ends of its bubble appear in coincidence in the collimation level viewer on the left standard (Figure 17-17). o Read the vertical circle and micrometer scale as described before. Be sure to have proper coincidence before you take the reading. o The vertical circle graduations are numbered to give a 0° reading with the telescope pointing to the zenith. Consequently, the vertical circle reading will be 90° for a horizontal sight with the telescope direct and 270° for a horizontal sight with the telescope reversed. Figure 17-17 shows the view in the circle-reading microscope for direct and reversed pointings on a target. These readings are converted to vertical angles as follows: Telescope Direct Telescope Reversed Circle Reading 86°17´43.5˝ 273°42´21.5˝ Zenith Distance 86°17´43.5˝ 86°17´38.5˝ Mean Zenith Distance 86°17´41.0˝ Mean Vertical Angle + 3°42´19.0˝ NAVEDTRA 10469A 17-16 There are two separate occasions for setting the horizontal circle of the theodolite. In the first case, the circle is set to read a given value with the telescope pointed at a target. With the theodolite pointed at the target and with the azimuth clamp tightened, the circle is set as follows: Set the micrometer scale to read the unit minutes and the seconds of the given values. Then, with the circle-setting knob, you turn the circle until coincidence is obtained at the degree and tens of minutes value of the given reading. This setting normally can be made accurately to plus or minus 5 sec. After the circle is set in this manner, the actual reading should be determined. In the second case, the circle is set to a value of a given angle. When a predetermined angle is measured, you first point the instrument along the initial line from which the angle is to be measured and read the circle. Add the value of the angle to the circle reading to determine the circle reading for the second pointing. Set the micrometer scale to read the unit minutes and the seconds of the value to be set on the circle. Then, you turn the instrument in azimuth and make coincidence at the degrees and tens of minutes value that is to be set. The predetermined value can usually be set on the circle in this way to plus or minus 2 sec. 2.1.4 Total Station (Trimble® 5600) Adjustment The Trimble® 5600 Total Station when used with the Trimble® Alphanumeric Control Unit (ACU) and Trimble® Integrated Survey Rover (ISR) gives you the best and most productive measuring method available today for every measuring situation. In this section you will be introduced to the components of the Total Station and their adjustments. The Trimble® 5600 Total Station, Trimble® ACU, and ISR are used with the Terramodel programs which are loaded to a base computer and can be downloaded to the ACU for known or unknown control points. Upon completion of your survey or measurements the data can be downloaded from the Trimble® ACU back to the base computer for creation of linework or other layout as desired (Figure 17-18). Figure 17-17 – View of a vertical circle for direct and reversal pointings. NAVEDTRA 10469A 17-17 2.1.4.1 Tripod Adjustment The following steps are to be followed when setting up the tripod over a control point and making adjustments:

• Unwrap the tripod and extend its legs so that the tripod head is at approximately chin level (higher is better for more precise work, so that you can get maximum leg spread). Spread the tripod legs over the initial occupied point so that the tripod head is approximately level. Make sure the legs are spread as widely as practical for maximum stability.

• Attach the instrument tribrach to the tripod head and ensure that the tribrach’s leveling foot screws are centered half way between their range of movement (for ease of leveling). Hand tighten the bayonet screw at the base of the tribrach. Step or “set” one leg into the ground securely (usually the leg opposite the sight on your tribrach), sight through the optical plummet, and pick up and move the other two tripod legs until the cross hairs are centered over your occupied point nail or marker. (You can place the toe of your shoe near the point for reference.) NOTE If the tribrach crosshairs are out of focus, adjust the crosshairs ring first until the crosshairs appear clear and crisp. Then, adjust the focus ring until the image is in focus. To check for parallax, slowly move your head around while looking Figure 17-18 – Data flow using Trimble® 5600 Total Station. NAVEDTRA 10469A 17-18 through the optical plummet. You should see not movement between the crosshairs and the focused background (this is known as being out of parallax), nor should the crosshairs move apart.

• Once the crosshairs are within one centimeter of the point (1/2”), step the remaining two legs into the ground.

• Precisely position the tribrach crosshairs over the point by using the leveling foot screws on the tribrach.

• Level the bull’s-eye bubble on the tribrach by using two tripod legs. Do NOT level using the tribrach foot screws. At this point you are leveling the tripod head. When the bubble is within the circle of the bull’s-eye. Use the tribrach leveling foot screws to precisely center the bubble.

• Once the bull’s-eye bubble is precisely level, look through the optical plummet to ensure that the crosshairs are over the point or at least within a couple of centimeters (1”). Center the crosshairs precisely over the point by loosening the tripod bridge screw and gently slide the tribrach and adapter over the point. Be sure not to rotate the tribrach. When the crosshairs are centered on the point, tighten the tripod head screw. If the tribrach overhangs the tripod head, return to the step where the tripod legs were spread over the initial occupied point and adjust. NOTE You can check the set up and calibration of your tribrach by attaching a plumb bob to the tripod head screw so it hangs over the point. It should hang precisely over the point ± the plumb bob string width. If the wind is blowing, you may want to perform this tribrach check indoors.

• Check the level bubble. If the level is out just a little, return to the step where the bubble is within the circle of the bull’s-eye and use the tribrach leveling foot screws to precisely center the bubble. If it is out more than a couple of millimeters, redo the step where you precisely positioned the tribach crosshairs over the point by using the leveling foot screw on the tribach. 2.1.4.2 Attaching and Leveling the Trimble®/Geodimeter Total Station The following steps should be followed when attaching and leveling the Trimble®/Geodimeter Total Station (Figure 17-19):

• Remove the instrument from its case and loosen the horizontal motion lock. Rotate the base of the instrument until the RS-232 port aligns with the notch in the tribrach. Gently place the instrument in the tribrach and be sure to lock it in place by turning the tribrach locking knob clockwise until it stops.

• Check the bubble on the optical plummet and re-level if needed. Then, recheck to be sure the crosshair of Figure 17-19 – Trimble®/Geodimeter Total Station with ACU NAVEDTRA 10469A 17-19 the optical plummet is still centered over the point. If required, loosen the bayonet screw of the tribrach and move it over the point (again, taking care not to rotate the tribrach as you move it). Rotate the instrument so its keyboard is parallel to two of the tribrach foot screws.

• Turn on the instrument by pressing the power key at the lower left corner of the keyboard.

• Use the tribrach’s two foot screws to center the cursor between the two of the display lines. Remember that the bubble goes in the direction of your left thumb. Without rotating the instrument, use the third foot screw to center the top cursor between the other two display lines. When both cursors are centered, the instrument is correctly leveled in coarse mode.

• Press the Aim/Measure (A/M) button. The instrument will now automatically adjust and engage its dual axis compensator. You should have a prompt of “Temp =. Use your thermometer and input the current temperature. At the “Press =” prompt, use your barometer and input the correct barometric pressure. At the “Offset =” prompt, input 0 (zero) if you are using standard Geodimeter/Trimble® glass of prisms. Use an offset of 2mm or 0.00656 feet for a 360° prism.

• At the “HA Ref =” prompt, simply press the Enter (ENT) key. You will most likely be inputting an actual value.

• The instrument is now in Program 0 mode and the top of the display should read STD P0 TIME and is ready for fine leveling, collimation, or to run a program.

• Adjust the display contrast for the best possible viewing for current lighting conditions by using the Menu (MNU 13) Key. NOTE Continue with the next steps only if you are going to do a precise survey. If you are just running a topo survey, for example, you are finished with this setup procedure.

• For a precise survey you would turn the instrument so it is parallel to two of the tribrach foot screws and fine level it by pressing the fine level button which is marked with a level symbol; which is the same key as button “N” in alpha mode.

• Once the indicators are both centered, using the fine leveling, press the fine level button again. As long as your measurement units are correct and the instrument has been collimated, you are now ready to begin collecting survey data by running precise survey programs which will be discussed later. 2.1.4.3 Trimble® Alphanumeric Control Unit (ACU) If you want to switch between using the Trimble® ACU and another control unit Trimble® strongly recommends that before each switch you perform the following adjustments which are described in detail in the Trimble® 5600 user manual:

• Horizontal collimation

• Vertical collimation

• Compensator run center The internal battery of the Trimble® ACU can provide up to one hour of stand-by time to avoid any potential data loss should your external power source expire. The internal battery powers the Trimble® ACU only. It does not power any device that may be NAVEDTRA 10469A 17-20 connected. The Trimble® ACU is configured by default not to run on internal battery power for users with the Windows CE operating system version 4.0.9 or later. To enable the Trimble® ACU to run from internal battery power perform the following steps:

• From the start menu, select “Settings/Control Panel” and then click the power icon.

• In the “Run On Battery” tab, select the “Enable running on Internal Battery” check box.

• Now the Trimble® ACU will run from internal battery power. NOTE Under no circumstances should you rely on the internal battery for extended periods, especially during data collection. When the Trimble® ACU is running on its internal battery (when enabled), Trimble® recommends that you connect an external power source immediately. External power sources include the Trimble® ACU mains charger, the Trimble® 5600 Total Station and the CU holder for robotic surveying. To toggle the backlight on and off, press the “Shift” button, and then press the “Trimble®” button. To access the backlight settings, from the “Start” menu select “Settings/Control Panel” and then click on the “Display” icon. Use the “Alpha” key to enter alphabetic characters on the Trimble® ACU. Press this key to switch between alpha and numeric modes. To enter an upper case character in the preview panel, press the “Shift” key while in alpha mode. To use the Trimble® ACU with a Trimble® 5600 Total Station, the instrument must have firmware version 696-03.05 or later installed. To start the system, use the following procedure:

• Set up the instrument and ensure that the Trimble® ACU is turned off, and then attach it to the front of the instrument. Connect a power suppkly to the footconnector of the instrument.

• Press the green power button on the Trimble® ACU to start the system. The instrument should beep indicating that it has been turned on. You will then be able to use the survey application software installed on the Trimble® ACU to connect to the instrument and start your survey. To use the Trimble® ACU with a Trimble® Integrated Survey Rover (ISR) (Figure 17- 20) the following procedures should be used:

• Attach the Trimble® 5800 RTK Rover and the Trimble® ACU holder to the rod. Insert a freshly charged battery in the Trimble® 5800 GPS Rover, and then press the green power button to turn it on.

• Attach two freshly charged batteries to the Trimble® ACU holder. Ensure that the Trimble® ACU is turned off, Figure 17-20 – Trimble® 5800 RTK Rover with ACU NAVEDTRA 10469A 17-21 and then attach it to the Trimble® ACU holder.

• Press the green power button on the Trimble® ACU to start the system. You will then be able to use the survey application software installed on the Trimble® ACU to connect to the receiver and start your survey.

2.2.0 Minor Repairs and Replacement Procedures Minor repairs to surveying instruments and equipment are those that can be done in the field with the use of simple tools. Major repairs must be done by instrument specialists generally employed by the manufacturers of the instruments. Never attempt to make a major repair yourself. 2.2.1 Repair It or Replace It? Whether you or someone else in the unit should attempt to repair a damaged item of equipment will depend on the nature of the damage and the character of the item. For example, you can easily splice a broken tape, but should you attempt to straighten a bent compass needle? That decision would depend on the type of compass: an ordinary pocket compass, perhaps yes, the compass on a transit, probably no. Damage to articles such as range poles, tripod legs, and the like may be easily repaired in a battalion or PWD shop, and minor damage to instruments may be repaired occasionally as well. However, major repairs to instruments, if economically worthwhile, should be done by manufacturers, their authorized representatives, or competent Navy instrument repairmen. If the senior engineering tech or engineering officer deems an instrument beyond economical repair, it must be surveyed (properly disposed of) using standard survey procedures. Then a replacement instrument can be ordered through the Navy supply system. Expendable items are procured in the same manner. 2.2.2 Navy Supply System The Navy supply system lists, identifies by a stock number, and describes in a stock catalog each item of equipment or supply that is available. A battalion allowance list identifies items that may be drawn from supply, and indicates the maximum number permissible. When a battalion’s inventory falls short of the allowance due to expenditure, wear, casualty, loss, or some other type of attrition, the shortage must be replaced. The battalion or PWD shop personnel may be able to replace some items such as range poles, chaining pins, bull-points, turning-point pins, targets, stake bags, equipment boxes, and the like, but most items are replaced by supply from the nearest available naval supply depot. To replenish an item, you must order it by stock number and follow a prescribed procedure. To learn the correct procedures, contact one of the supply petty officers in the unit or study the chapters on the Navy supply system in Military Requirements for Petty Officers Third and Second Class, NAVEDTRA 14504. 2.2.3 NMCB Surveyor’s Kit Every NMCB is outfitted with adequate surveying supplies and equipment. They are listed in the NMCB Table of Allowance (TOA) and contained in Surveyor Kit #80010. Normally, four complete kits are carried in the battalion allowance and available for checkout to the surveyor section supervisor or the senior engineering tech. NAVEDTRA 10469A 17-22 Each survey party chief is responsible for making sure the kit assigned to the crew is complete. In addition, the kits must be inventoried during turnover and at twice-monthly intervals throughout deployment. The purpose of these inventories is to ensure both 100% accountability and a proper state of good repair of the items in the kit. Remember, if you have custody of the kit, you can be held financially accountable for items missing or damaged through negligence. Most consumable items in the kit, such as pencils, pencil leads, lumber crayon, and surveyor’s flagging, are stocked in the battalion supply department for kit replenishment. Additional supplies and equipment are also stocked in the engineering office surveyor’s locker to supplement the kits. Summary Seabees operate in many different environments under a wide range of circumstances while upholding the “Can Do” motto. The engineering survey is often the first step in beginning a project, and the quality of the survey will depend on the skill of the survey crew functioning with properly maintained and adjusted equipment. As an engineering technician, being familiar with equipment maintenance and comfortable with adjustments after a thorough systematic check will enable you to support both your unit and the tradition. (Figure 17-21) Figure 17-21 — Seabees operating multiple survey equipment under varied environments. NAVEDTRA 10469A 17-23

Review Questions

6HOHFWWKH&RUUHFW5HVSRQVH 1. Which of the following definitions best describes “adjustment” as presented in Chapter 17? A. Aligning the fixed parts of the instrument B. Aligning the telescope for leveling work C. Aligning the instrument for a level run D. Aligning a transit scope for use with a level 2. Which, if any, of the following items comes with an instrument to assist you with care and maintenance? A. A tool kit to repair the instrument B. A prepaid shipping box to return it to the manufacturer for repairs C. A user’s manual D. None of the above 3. Which of the following situations should you avoid when handling or caring for your instrument? A. Setting up the instrument in a street B. Removing the instrument from the case by the telescope C. Tightening the instrument to the tripod head during setup D. Tightening all screws to a firm bearing 4. What is the preferred method for carrying an instrument on a sidehill? A. On the uphill shoulder B. In front of you with the tripod legs extended C. Under the arm on the downhill side D. On the downhill shoulder 5.  All clamp screws should be firmly tightened when an instrument is transported. A. True B. False 6. In what manner should you store an instrument when not in use? A. In the carrying case B. On a shelf in the survey locker C. Mounted on the tripod D. Any place that is convenient NAVEDTRA 10469A 17-24 7. Which of the following bags may be used to carry stakes and hubs? A. Canvas bag with a shoulder strap B. Newsboy’s bag C. Seabag D. All of the above 8. What is the recommended method for carrying surveyor’s tacks? A. In the tack box B. In a pocket on the surveyor’s bag C. Stuck in a rubber ball or piece of soft wood D. In your shirt pocket for quick access 9.  You should NEVER carry any equipment in sheaths or pouches, or on your belt. A. True B. False 10. You have been surveying and caught in the rain. What should you do with the instrument upon return to the office? A. Store the instrument in the carrying case. B. Blow-dry the instrument with a hair dryer. C. Wipe it down with a cloth. D. Remove it from the case and dry the instrument at room temperature. 11.  You should clean the lens of the telescope with a chamois or lintfree cloth only. A. True B. False 12. What type of lubricant is recommended for lubricating transits in subzero temperature? A. Watch oil B. Whale oil C. Graphite D. 10W-30 13. Which of the following sources should you consult before doing anything to an instrument? A. Tech library B. Senior engineering tech C. Manufacturer’s manual D. Either B or C NAVEDTRA 10469A 17-25 14. Why is it important to clean mud and dirt from your equipment after use? A. To prevent rust or decay B. To ensure neatness C. To keep the Chief happy 15. Why is it important to take good care of your equipment? A. For inspection purposes B. For quality work and accurate surveys C. Both A and B above D. For safety 16.  Major repairs and major adjustments are among the responsibilities of the engineering tech. A. True B. False 17. Recalibration should be done by whom? A. Senior engineering tech B. Manufacturer C. Supply department D. Instrumentman 18. Which of the following skills should the surveyor possess in order to make proper adjustments? A. Ability to tell the effect of the adjustment on other parts B. Ability to perform tests used to determine when the instrument is out of adjustment C. Knowledge of the proper sequence for making adjustments D. All of the above 19. Which of the following instrument parts is/are used to make instrument adjustments for levels? A. Tripod head B. Cross hairs C. Level tubes D. Both B and C above 20. The cross hairs on a telescope are out of adjustment when they fail to align with _____. A. the object being sited B. one another C. the optical axis D. the alignment points NAVEDTRA 10469A 17-26 21. How do you determine if an Abney or Locke level is out of adjustment? A. Check the reflected bubble with the instrument in a horizontal plane. B. Check the reflected bubble with the instrument in a vertical plane. C. Check the plate level bubbles. 22. What is a general rule regarding the frequency of adjustment? A. Check and adjust often. B. Check rarely and adjust rarely. C. Check often and adjust rarely. D. Check rarely and never adjust. 23. You feel your instrument is out of adjustment. Which of the following procedures should you do before making any adjustments? A. Ensure the instrument is screwed down on the tripod. B. Set the instrument up in the shade. C. Repeat the checks at least three times. D. All of the above 24. What type of surface should you use to set up an instrument for adjustment? A. Asphalt B. Chipped hardened surface C. Sand D. Plywood 25. What purpose, if any, does retightening the wing nuts on the tripod legs accomplish? A. To prevent a possible shifting of the legs B. To ensure the nuts did not loosen themselves C. To keep the tripod head from moving D. None 26. What amount of the actual displacement error do most tests show an error equal to? A. Half the actual error B. Double the actual error C. Equal to the actual error D. Three times the actual error 27. What is creep in relation to the instrument? A. Position shift due to heat B. Settlement of the instrument C. Position shift due to cold D. All of the above NAVEDTRA 10469A 17-27 28.  The operator’s manual is your first source of information when instruments need adjustment. A. True B. False 29. You are performing a survey requiring a high degree of accuracy. Which, if any, of the following procedures should be one of the first steps you perform? A. Check your instrument for maladjustment. B. Figure the compensation for adjustments to the instrument. C. Oil the tripod head. D. None of the above 30. You are assigned to a survey party. You get the level along with your other equipment. What procedure, if any, should you perform on the instrument before starting work? A. Check the instrument for proper adjustment. B. Adjust all the bubble tubes to the maximum angle. C. Perform a two–peg test. D. None 31.  When adjusting a level, you should follow an exact order for making all the adjustments. A. True B. False 32. You have found the level tube out of adjustment on a level. You set the instrument up and then level the bubble over each set of leveling screws. What is your next step? A. Rotate the instrument 90° and adjust the bubble half the distance to the center of the tube. B. Rotate the instrument 180°, check the bubble, and adjust the bubble to the center of the tube. C. Rotate the instrument 180° and adjust the bubble half the distance to the center of the tube. D. Rotate the instrument 180°, loosen the capstan screws, and rotate the reticle until the bubble is half the distance of the tube. 33. In what order should adjustments on a level be made? A. Vertical cross hair, level tube, and line of sight B. Horizontal cross hair, line of sight, and level tube C. Level tube, line of sight, and horizontal cross hair D. Level tube, horizontal cross hair, and line of sight NAVEDTRA 10469A 17-28 34.  The telescope of the one-minute theodolite is an inverted image type. A. True B. False 35. The tribrach assembly found on most one-minute theodolite units contains which of the following parts? A. Leveling screw B. Circular level C. Optical plumbing device D. All of the above 36. What degree does the vertical circle read when the theodolite’s telescope is pointed straight down? A. 0° B. 90° C. 180° D. 270° 37. What method of reading the circles is used on the one-second theodolite? A. Direct B. Coincidence C. Horizontal D. Vertical 38. Which of the following activities may perform minor repairs? A. Navy cal lab B. Local PWD C. Battalion machine shop D. All of the above 39. When a piece of equipment is damaged beyond repair, it must be replaced. From what source may you obtain a replacement? A. PWD B. Equipment manufacturer C. Army/Navy surplus store D. Navy supply system 40. What source/reference determines the maximum number of any item allowed in a battalion? A. Supply department B. Table of Allowance C. Authorization list D. Naval supply depot NAVEDTRA 10469A 17-29 41. Which of the following sources should you refer to when checking on the quantity of surveying kits in a battalion? A. Table of Allowance B. 80010 inventory list C. Military Requirements for Petty Officer Third Class D. NAVFAC P-315 NAVEDTRA 10469A 17-30 Trade Terms Introduced in this Chapter Reticle A grid or pattern placed in the eyepiece of an optical instrument, used to establish scale or position. NAVEDTRA 10469A

Chapter 18 Indirect Leveling/Level and Traverse Computations

Leveling is the surveying operation that determines the difference in elevation between points on the earth’s surface. The operation is divided into two major categories: direct leveling and indirect leveling. From your earlier studies, you should be familiar with the methods and procedures used in direct leveling.

This lesson introduces the theory and basic procedures used in indirect leveling. You also learned in earier lessons that perfect closure in level nets and traverses is seldom, obtained. Typically, a certain amount of linear or angular error occurs. When this error exceeds a prescribed amount, the level net or traverse must be rerun. However, when the error is within the specified allowable limits, then certain adjustments can be made. This lesson provides information on the adjustments and the calculations needed to make the adjustments for the methods used to determine the area of traverses.

When you have completed this lesson, you will be able to:

1. Describe the different types of indirect leveling.
2. Describe the methods for conducting level and traverse computations.

Contents

1.0.0 Indirect Leveling

2.0.0 Level and Traverse Computations

Summary

Review Quiz


1.0.0 INDIRECT LEVELING

Indirect methods of leveling include barometric leveling and trigonometric leveling. These methods are discussed in the following paragraphs.

1.1.0 Barometric Leveling

Barometric leveling makes use of the fact that differences in elevation are proportional to differences in the atmospheric pressure. Therefore, when the atmospheric pressure of a barometer is read at various points on the earth’s surface, you have a measurement of the relative elevation of these points. A mercurial barometer, aneroid barometer, or sensitive altimeter may be used for this purpose. However, the mercurial barometer is too cumbersome to take out into the field. Barometric leveling is used mostly in reconnaissance surveys where differences in elevations are large, such as in mountainous regions. Elevations determined by barometric leveling are typically several feet in error even after they are corrected for the effects of temperature and humidity. These errors are caused by day-to-day pressure fluctuations, even by fluctuations from hour to hour. Because of these fluctuations, barometric observations are usually taken at a fixed station during the same period that observations are made on a second barometer that is carried from point to point in the field. The use of two barometers enables you to correct for atmospheric disturbances that could not be readily detected if only one barometer were used. This method is not normally used in construction surveying, except when a construction surveyor may need to run his or her own preliminary topographic control. Barometric or altimeter surveys are run by one of three methods: the single-base, the two-base, and the leapfrog. The single-base method requires a minimum number of observers and the least equipment. However, this method needs a series of corrections and is neither as practical nor as accurate as the other two. The two-base method is generally accepted as the standard method for accuracy and is the one most widely used. It requires fewer corrections than the single-base method. The leapfrog method uses the same type of corrections as the single-base, but the altimeters are always in close relationship to each other and are operating under reasonably similar atmospheric conditions. The results of the leapfrog method are more accurate than the single-base method and compare favorably with the two-base method. There are several factors and limitations that must be observed in barometric leveling which are beyond the scope of this training manual. For actual barometric leveling, consult the instruction manual for the instrument being consulted. The theory of twobase barometric leveling is explained below. The two-base method is described here only to provide an idea of how the system works. This method uses at least three altimeters, one at each lower and upper base where elevations are initially known, and one or more roving where elevations are needed between the upper and lower base elevations. In this operation, points of unknown elevations to be determined must lie within the range of the elevations of the lower and upper base stations. The readings of the altimeters at the unknown elevations are taken at the same instant that both the upper and the lower base altimeters are read. If radio communication is not available, a timepiece is needed for each altimeter.  18-4 All of the timepieces need to be synchronized and the altimeter readings taken at prearranged intervals. Figure 18-1 – Diagram of a two-base altimeter survey. Figure 18-1 shows a diagram of the two-base method using three altimeters. The figure shows the known elevations of the lower (Sta. A) and upper (Sta. B) base stations. Altimeter readings at each of the base stations and at field station C are shown. The difference in elevation is computed by direct proportion, using either the lower base or the upper base as reference. For example, to find the differences in elevation between Sta. A and Sta. C, perform the following steps: 105 40 100 = .. ACElDiff ACElDiff 38 feet 105 40 x 100 .. = = Then the result is added to the elevation of Sta. A, as seen below: Elevation C = 100 + 40/105 x 100 = 100 + 38 = 138 feet When the upper base is used as a reference, compute the difference in elevation by using the same method. However, to compute from Sta. B, subtract the result, as shown below: Elevation C = 200 – 65/105 x 100 = 200 – 62 = 138 feet For a more accurate result, do not make altimeter surveys on days when there is not much variation in barometric pressure. Avoid windy days with rapidly moving detached clouds, as the alternating sunlight and shade over the survey area can cause fluctuations in the altimeter reading. Steady barometric pressures generally occur on days with gentle winds and an overcast sky. The recommended time for observations is 2 to 4 hours after sunrise and 2 to 4 hours before sunset. When possible, avoid midday observations. Remember to shade the instrument at all times, and avoid jarring the instrument suddenly during its transfer from one station to another.  18-5

1.2.0 Trigonometric Leveling

When the vertical angle and either the horizontal or slope distance between two points is known, the fundamentals of trigonometry can be applied to calculate the difference in elevation between points. This is the basic principle of trigonometric leveling. This method of indirect leveling is particularly adaptable to rough, uneven terrain where direct leveling methods are impracticable or time-consuming. As in any survey, the equipment used in trigonometric leveling depends on the precision required. For most trigonometric-leveling surveys of ordinary precision, angles are measured with a transit, or alidade, and distances are measured either with a tape or by stadia. On reconnaissance surveys the vertical angles may be measured with a clinometer, and distances may be obtained by pacing. The method used in trigonometric leveling is described in the following paragraphs: In Figure 18-2, a transit is set up and leveled at A, which is also point O. The rodman holds the rod at point B. The instrumentman trains the telescope on C, which is an easily read value (usually a full foot) on the rod. With the telescope trained on C, the vertical angle (a) is read. Then either the horizontal distance or the slope distance between the instrument and the rod is determined. Now one side and one angle of the right triangle (OCD) are known. From your knowledge of trigonometry, you know that the other sides and angle can be computed. However, in trigonometric leveling, you are concerned only with determining the length of the side opposite the measured angle (side CD). The length of this side is the difference in elevation (DE). As seen in Figure 18-2 the DE is the distance between the height of instrument (HI) and the intersection of the line of sight with the rod (point C). Computing the DE consists of multiplying the measured distance by the proper trigonometric function of the measured angle: sine, when slope distance (OC) is measured; tangent, when horizontal distance (OD) is measured. Figure 18-2 – Difference in elevation in trigonometry leveling.  18-6 The following paragraphs discuss typical situations encountered in trigonometric leveling. 1. Depression angle backsight, shown in Figure 18-3. The rod is on point B below the instrument. The measured vertical angle (a) is a depression (minus) angle. To compute the HI, the rod reading RB and the DE are added to the elevation of B, or HI = RB + DE + Elev. B. 2. Depression angle foresight, shown in Figure 18-4. The rod is below the instrument, and the vertical angle is minus. The elevation at C equals the HI minus the DE and minus the rod reading RC, or Elev. C = HI – DE – RC. 3. Elevation angle backsight, shown in Figure 18-5. The rod is above the instrument, and the vertical angle is plus. The HI at F equals the elevation at C plus the rod reading (RC) and minus the DE, or HI = Elev. C + RC – DE. Figure 18-3 – Backsight Depression (Minus) Angle. Figure 18-4 – Foresight Depression (Minus) Angle.  18-7 4. Elevation angle foresight, shown in Figure 18-6. The rod is above the instrument and the angle is plus. The elevation of G equals the HI plus the DE and minus the rod reading (RG), or Elev. G = HI + DE – RG. As mentioned earlier in this section, the horizontal or slope distances used for calculating the DE may be obtained using various methods. For each method, there are requirements and limitations, which are discussed below. 1. Measured distances obtained by horizontal chaining should be corrected for standard error, temperature, and sag before computing the DE. These corrections are discussed in Chapter 12 of this NRTC. Under ordinary circumstances in the Seabees, corrections for earth curvature and refraction are not necessary. However, methods to perform these corrections can be found in commercial publications, such as Surveying Theory and Practice by Davis, Foote, Anderson, and Mikhail. 2. Measured distances obtained by slope chaining also should be corrected as discussed above. In addition, the slope distance must be converted to a horizontal distance before computing the DE. As an aid in computations, tables have been developed that provide the following data: a. Inclination corrections for 100-foot tape Figure 18-5 – Backsight Elevation (Plus) Angle. Figure 18-6 – Foresight Elevation (Plus) Angle.  18-8 b. Differences in elevation for given horizontal distances and gradients from 0° to 45° c. Differences in elevation for given slope distances and gradients from 0° to 45° d. Horizontal distances for given slope distances and gradients from 0° to 45° 3. When using stadia, refer to the stadia procedures and formulas described in Chapter 12 of this NRTC. With practice, these provide a rapid means of determining horizontal distances and elevations. 4. Electronic distance-measuring devices measure the straight-line horizontal or slope distance between instruments. When the same setups slopes is used, replace the electronic equipment with a theodolite and either a target or a rod to measure the vertical angle. The measured vertical angle can be used to convert the measured slope distance to DE by multiplying by the sine of the vertical angle.

Test Your Knowledge

1. Barometric leveling computes the difference in elevations by which of the following measurements?

A. Slope angle
B. Atmospheric pressure
C. Slope distance
D. Vertical offset

2. Barometric leveling is used mostly in which of the following types of surveys?

A. Layout
B. Route
C. Reconnaissance
D. Navigational

3. Barometric leveling should be performed at what time of day?

A. Midday
B. 2 to 4 hours before sunrise or 2 to 4 hours after sunset
C. 2 to 4 hours after sunrise or 2 to 4 hours before sunset
D. 2 to 4 hours before sunset or 2 to 4 hours after sunset

4. When the horizontal or slope distance is measured by chaining, which of the following must be computed before you determine the difference of elevation?

A. Repair adjustment, sag, and temperature
B. Standard error, sag, and tension
C. Sag, temperature, and standard error
D. Tension, heat, and number of movements

 

2.0.0 LEVEL and TRAVERSE COMPUTATIONS

This section contains information on procedures used in making level and traverse computations. This section also discusses methods of differential leveling, including steps to follow in checking level notes and information on adjusting intermediate bench marks as well as level nets. In addition, this section addresses several methods of plotting horizontal controls used in determining the bearing of the traverses. These methods include plotting angles by protractor and scale, plotting angles from tangents, and plotting by coordinates. Additional information includes the common mistakes an engineering tech may encounter in making or checking computations.

2.1.0 Preliminaries to Computations

Before starting computations, closely check the field data for completeness and accuracy. This includes checking the field notes to ensure they accurately reflect what was actually measured. A field measurement may itself require transformation (called reduction) before it can be applied as a value in computations. For example, field notes may show plate readings for two-, four-, or six-time angles. Each of these must be reduced to the mean angle, as explained earlier. In another example, field notes may show a succession of chained slope distances. Unless the order of precision of the survey permits slope corrections to be ignored, each of these slope distances must be reduced to the corresponding horizontal distance. In a closed traverse you must attain a ratio of linear error of closure and a ratio of angular error of closure that are within the maximums specified for, or implied from, the nature of the survey. An error that is within the maximum allowable is eliminated by “adjustment,” which means the equal distribution of a sum total of allowable error over the separate values that contribute to the total. Suppose, for example, that for a triangular closed traverse with interior angles approximately equal in size, the sum of the measured interior angles comes to 179°57´. The angular error of closure is 03´. Because there are three interior angles about equal in size, 01´ would be added to the measured value of each angle.

2.2.0 Level Computations

In making level computations, be sure to check the notes for a level run by verifying the beginning bench mark (BM). This checking includes making sure the correct BM was used and its correct elevation was properly recorded. Then check the arithmetical accuracy to ensure backlights are added and foresights are subtracted. The difference between the sum of the foresights taken on BMs or turning points (TPs) and the sum of the backlights taken on BMs or TPs should equal the difference in elevation between the initial BM or TP and the final BM or TP. This fact is shown in Figure 18-7.  18-10 This procedure only checks the arithmetic. It does not indicate the accuracy of the measurement made in the field. Figure 18-7 – Differential-level circuit and notes for differential leveling. 2.2.1 Adjusting Intermediate Bench Mark Elevations Level lines that begin and end on points that have fixed elevations, such as bench marks, are often called level circuits. When leveling is accomplished between two previously established bench marks or over a loop that closes back on the starting point, the elevation determined for the final bench mark is seldom equal to its previously established elevation. The difference between these two elevations for the same bench mark is known as the error of closure. The remarks column in Figure 18-7 indicates the actual elevation of BM 19 is known to be 136.442 feet. The elevation found through differential leveling was 136.457 feet. The error of closure of the level circuit is 136.457 – 136.442 = 0.015 feet. Assume that errors have occurred progressively along the line over which the leveling was conducted. To adjust for this error, the error is equally distributed along the line as shown by the following example. Refer to Figure 18-7, and notice the total distance between BM 35 and BM 19, over which the line of levels was run, is 2,140 feet. The elevation on the closing BM 19 is found to be 0.015 foot greater than its known elevation. Therefore adjustments must be made for the intermediate BMs 16, 17, and 18. The amount of correction is calculated as follows: Correction = Error of closure [distance between the starting BM and the intermediate BM] distance between the starting and closing BM  18-11 BM 16 is 440 feet from the starting BM. The total length distance between the starting and closing BMs is 2,140 feet. The error of closure is 0.015 foot. By substituting these values into the above formula, the correction is as follows: Correction 0.003 ft 2140 440 = 0.015 x −= Since the observed elevation of the closing BM is greater than its known elevation, the adjustments are subtracted from the intermediate BMs. Therefore, for BM 16, the adjusted elevation is 134.851 – 0.003 = 134.848. The adjustments for intermediate BMs 17 and 18 are made in a similar manner. 2.2.2 Calculating the Allowable Error The allowable error of closure depends on the precision required (first, second, or third order). The allowable error of closure in leveling is expressed in terms of a coefficient times the square root of the horizontal length of the actual route over which the leveling was accomplished. Most differential leveling (plane surveying) is third-order work. In third-order leveling, the closure is usually made on surveys of higher accuracy without doubling back to the bench mark at the original starting point of the level circuit. The length of the level circuit, therefore, is the actual distance leveled. For third-order leveling, the allowable error is: 050.0 ft theoflength circuitlevel in miles Refer again to Figure 18-7. By adding the sight distances in the sixth and seventh columns of the figure, you will find that the length of the level circuit is 2,140 feet (or 0.405 miles). The allowable error of closure, then, is ft = = 032.0)64.0(050.0405.0050.0 ft Since the actual error is only 0.015 foot, the results are sufficiently accurate for thirdorder precision. First- and second-order levels usually close on themselves. This means the leveling party runs a line of levels from an old BM or station to the new BM or station, and then doubles back to the old BM for closure. The actual distance leveled is twice the length of the level circuit. For second-order leveling, the allowable error is 035.0 ft theoflength circuitlevel in miles First-order leveling is even more precise. The allowable error cannot be greater than 017.0 ft theoflength circuitlevel in miles 2.2.3 Adjusting Level Nets When a level survey system covers a large area, you, in turn, adjust the interconnecting network in the whole system. Adjustment of an interconnecting network of level circuits consists of adjusting, in turn, each separate figure in the net, with the adjusted values for each circuit used in the adjustment of adjacent circuits. This process is repeated for as many cycles as necessary to balance the values for the whole net. Within each circuit the error of closure is normally distributed to the various sides in proportion to  18-12 their lengths. Figure 18-8 represents a level net made up of circuits BCDEB, AEDA, and engineering techBE. Along each side of the circuit is shown the length of the side in miles and the observed difference in elevation in feet between terminal BMs. The difference in elevation (plus or minus) is in the direction indicated by the arrows. Within each circuit is shown its total length (L) and the error of closure (Ec) which is determined by summing up the differences in elevation in a clockwise direction. Figure 18-9 shows the computations required to balance the net. The circuits, sides, distances (expressed in miles and in percentages of the total), and differences in elevation (DE) are listed. Figure 18-8 – Adjustment of level nets. Figure 18-9 – Computations required to balance the level net.  18-13 For circuit BCDEB, the error of closure is –0.40 foot. This is distributed among the lines in proportion to their lengths. Thus, for the line BC, the correction is 0.07 feet 70 12 0.40 x = Notice that the sign is opposite to that of the error of closure. The correction of +0.07 foot is entered on the first line of the column headed CORR and is added to the difference in elevation (10.94 + 0.07 = +11.01). The sum is entered on the first line under the heading CORR DE (corrected difference in elevation). The same procedure is followed for the remaining lines CD, DE, and EB of circuit BCDEB. The sum of the corrections must have the opposite sign and be equal to the error of closure. The algebraic sum of the corrected differences in elevation must equal zero. The lines in circuit AEDA are corrected in the same manner as BCDEB, except that the corrected value of ED (+27.08 instead of +27.15) is used. The lines of engineering techBE are corrected using the corrected value of engineering tech (+17.97 instead of +17.91) and BE (+5.13 instead of +5.23). In the column Cycle II, the procedure of Cycle I is repeated. You should always list the latest corrected value from previously adjusted circuits before computing the new error of closure. The cycles are continued until the corrections become zero. The sequence in which the circuits are taken is immaterial as long as they are repeated in the same order for each cycle. Computations may be based on corrections rather than differences in elevation.

2.3.0 Traverse Computations

Traverse operations are conducted for mapping large construction projects, such as a military post or an air base, road railroad and pipeline alignment projects, and for many other projects. A traverse is always classified as either a closed traverse or an open traverse. A closed traverse starts and ends at the same point or at points whose relative horizontal positions are known. An open traverse ends at the station whose relative position is previously unknown and, unlike a closed traverse, provides no check against mistakes and large errors. In the Chapter 12, you studied field procedures for laying out traverses. In this lesson you will study computations that are necessary for adjusting and determining the areas of traverses.

2.3.1 Checking and Reducing Angles

The beginning traverse computations start with checking to make sure all the required angles (including closing angles) were turned and that the notes correctly indicate their sizes. For deflection angles, check to make sure that angles marked L or R were actually turned and have been turned in those directions. Check to make sure sketches agree with your field notes. Next, reduce repeated angles to mean angles using the procedures learned in Chapter 12.

2.3.2 Checking and Reducing Distances

Check to make sure that all required linear distances have been chained. Reduce slope distances when needed. If you broke chain on the slopes, check to make sure that the sums of break distances were correctly added. Finally, apply standard error, tension, and temperature corrections if needed.

2.3.3 Adjusting Angles

From your study of the Chapter 14, you should recall the following three conditions for a closed traverse: 1. The theoretical or geometrical sum of the interior angles is 180° x (n – 2), n being the number of angles measured. 2. The sum of the exterior angles is 180° x (n + 2), where n = number of angles measured. 3. The difference between the sum of the right deflection angles and the sum of the left deflection angles is 360°. Any discrepancy between one of these sums and the actual sum of the angles as turned or measured constitutes the angular error of closure. You adjust the angles in a closed traverse by distributing an angular error of closure that is within the allowable maximum equally among the angles. Figure 18-10 shows a traverse in which one of the deflection angles was turned to the left, all others to the right. The sum of the right deflection angles is 444°59'. By subtracting the left deflection angle (85°01'), the angular error of closure of 02' is determined, which is an average of 20" per deflection angle. This average angular error of closure is then added to each right deflection angle and subtracted from each left deflection angle. After applying this adjustment to each deflection angle in this example, you find, then, that the sum of the adjusted angles to the right equals 445°00'40" and that the sum of the left angles (of which there is only one) is 85°00'40". The difference between these values is 360°00'00", as it should be. Remember that in adjusting the angles in a deflection-angle traverse, apply the adjustments to right and left angles in opposite direction.

2.3.4 Adjusting for Linear Error of Closure

The procedure for distributing a linear error of closure (one within the allowable maximum) over the directions and distances in a closed traverse is called balancing or closing the traverse. However, before this information can be calculated you must understand the concept of latitude and departure. Figure 18-10 – Close traverse by deflection-angle method.

2.3.4.1 Latitude and Departure

Latitude and departure are values used in the method of locating a point horizontally by its plane coordinates. In the plane coordinate system, a point of origin is arbitrarily selected for convenience. The location of a point is given in terms of its distance north or south and its distance east or west of the point of origin. The plane coordinate system will be explained later in this lesson. The latitude of a traverse line means the length of the line as projected on the northto-south meridian running through the point of origin. The departure of a traverse line means the length of the line as projected on the east-to-west parallel running through the point of origin, as shown in Figure 18-11). The point of origin is at O. The line NS is the meridian through the point of origin, and the line EW is the parallel through the point of origin. The latitude of AB is the length of AB as projected on NS and the departure of AB is the length of AB as projected on EW. If a traverse line was running due north and south, the latitude would equal the length of the line and the departure would be zero. For a line running due east and west the departure would equal the length of the line and the latitude would be zero. Now, for a line running other than north to south or east to west, the latitude or departure can be determined by simple triangle solution. Figure 18-12 shows a traverse line 520.16 feet long bearing S61°25'E. To determine the latitude, you solve the triangle ABC for the length of the side AC. From the bearing, you know that the size of angle CAB (the angle of bearing) is 61°25'. The triangle is a right triangle; therefore AC = 520.16 cos 61°25' = 248.86 feet. The latitude of a traverse line, then, equals the product of the length of the line times the cosine of the angle of bearing. To determine the departure, solve the length of the side CB shown in Figure 18-13. CB = 520.16 sin 61°25' = 456.76 feet. The departure of a traverse line, then, equals the length of the line times the sine of the angle of bearing. The latitude of a traverse line is designated north or south and the departure is designated east or west following the compass direction of the bearing of the line. A line bearing northeast, for example, has a north latitude and east departure. In Figure 18-12 – Latitude equals length of traverse line times cosine of angle of bearing. Figure 18-11 – Latitude and departure.  18-16 computations, north latitudes are designated plus and south latitudes minus; east departures are designated plus and west departures minus. Figure 18-14 demonstrates that in a closed traverse, the algebraic sum of the plus and minus latitudes is zero and the algebraic sum of the plus and minus departures is zero. The plus latitude of CA is equal in length to the sum of the two minus latitudes of AB and BC. The minus departure of BC is equal in length to the sum of the two plus departures of CA and AB. Figure 18-13 – Departure equals length of traverse line times sine of angle of bearing. Figure 18-14 – Graphic solution of a closed  traverse by latitude and departure.

2.3.4.2 Linear Error of Closure

In practice, the sum of the north latitudes usually differs from the sum of the south latitudes. The difference is called the error of closure in latitude. Similarly, the sum of the east departures usually differs from the sum of the west departures. The difference is called error of closure in departure. From the error of closure in latitude and the error of closure in departure, the linear error of closure can be determined. This is the horizontal linear distance between the location of the end of the last traverse line (as computed from the measured angles and distances) and the actual point of beginning of the closed traverse. For example, you come up with an error of closure in latitude of 5.23 feet and an error of closure in departure of 3.18 feet. These two linear intervals form the sides of a right triangle. The length of the hypotenuse of this triangle constitutes the linear error of closure in the traverse. By the Pythagorean Theorem, the length of the hypotenuse equals approximately 6.12 feet. Suppose the total length of the traverse was 12,000.00 feet. Then your ratio of linear error of closure would be 6.12:12,000.00, which approximately equates to 1:2,000.

2.3.4.3 Closing a Traverse

A traverse is closed or balanced by distributing the linear error of closure (one within the allowable maximum, of course) over the traverse. There are several methods of doing this, but the one most generally applied is based on the compass rule. This rule adjusts the latitude and departure of each traverse line as follows: 1. Correction in latitude equals the linear error of closure in latitude times the length of the traverse line divided by the total length of traverse. 2. Correction in departure equals the linear error of closure in departure times the length of the traverse line divided by the total length of traverse. Figure 18-15 shows a closed traverse with bearings and distances notes. Figure 18-15 – Closed traverse by bearings and distance.  18-18 Figure 18-16 shows the computation of the latitudes and departures for the traverse entered on the form commonly used for this purpose. As you can see, the error in latitude is +0.33 foot, and the error in departure is +2.24 feet. The linear error of closure, then, is (0.33 2.24 ) 2.26 feet 2 2 =+ Figure 18-16 – Form for computing latitudes and departures. The total length of the traverse is 2614.85 feet; therefore, the ratio of error of closure is 2.26:2614.85, or about 1:1157. Assume this ratio is within the allowable maximum. Proceed now to adjust the latitudes and departures by the compass rule. Set down the latitudes and departures on a form like the one shown in Figure 18-17 with the error of closure in latitude at the foot of the latitudes column and the error of closure in departure at the foot of the departures column. Next, use the compass rule to determine the latitude correction and departure correction for each line. For all, the latitude correction equals 0.07 feet 2614.85 584.21 0.33 x = The error of closure in latitude is plus; therefore, the correction is minus. Note that the sum of the applied latitude corrections equals the error of closure in latitude and the sum of the applied departure corrections equals the error of closure in departure. The corrections, however, are opposite in sign to the error of closure.

2.3.5 Traverse Tables/Adjusting Bearings and Distances

In computing latitudes and departures, arithmetical calculations can be greatly expedited by the use of a traverse table. The latitudes and departures for any bearing and distance can be determined mostly by using the tables. Figure 18-17 – Form for adjusting latitudes and departures.  18-20 Figure 18-18 shows sample pages from a table that gives angle-of-bearing values to the nearest quarter degree (15'). More precise tables give angular values to the nearest 01'. Figure 18-18 – Sample pages from traverse table. Under each of the bearing values at the head of the page, a double column gives latitudes and departures for distances of from 1 to 100 feet. For a particular traverse line, you determine the latitudes and departures by breaking down the distance, moving decimal points, and adding up results as in the following example. Suppose you want to determine the latitude and departure for a traverse line 725.32 feet long, bearing N15°30'E. Perform the following steps to find the latitude. In the latitude column 15 1/2°, identify the latitude for 70 feet. You read 67.45 feet. If the latitude for 70 feet is 67.45 feet, the latitude for 700 feet is 674.50 feet. Note this in your notes. Next, you look up the latitude for 25 feet under the same 15 1/2° latitude column, which is 24.09 feet. The latitude for 725 feet, then, is 674.50+ 24.09= 698.59 feet. Finally, for the 0.32 foot, look up the latitude for 32 feet, which is 30.84 feet. If the latitude for 32 feet is 30.84 feet, the latitude for 0.32 foot must be 0.3084 foot, which rounds off at 0.31 foot. The numerical value of the latitude then is 698.59 + 0.31 = 698.90 feet. Because the line AB bears northeast, the latitude is positive. Departure is calculated in the same way by using the departure column. Finally, enter the adjusted latitudes and adjusted departures in the last two columns. Determine the values in each case by applying the correction to the original latitude or departure. Note that the negative latitudes now equal the positive latitudes and the negative departures equal the positive departures. This indicates the errors of closure have been entirely distributed. With the adjusted latitudes and departures, you can now adjust the original bearings and distances by the method called inversing. Inversing simply means computing the bearing and length of a traverse line from the latitude and departure. Again the process is one of simple triangle solution. Figure 18-19 shows traverse line AB with the adjusted latitude and departure noted. To determine the adjusted angle of bearing, you solve the triangle AA'B for angle A'AB as follows: 0.06468 583.88 37.70 tan A′ AB = = A′AB °− 243 ′ The adjusted bearing of AB, then, is N3°42'E. For the adjusted distance, solve the triangle for AB as follows: AB 584.22 feet 0.06453 37.70 sin 243 37.70 = = ° ′ = The adjusted length of AB, then, is 584.22 feet.

2.3.6 Plane Coordinates

The location of a point by plane coordinates means to describe the location of the point in terms of its distance north or south and east or west from a point of origin. Figure 18-20 shows how coordinate distances are measured on an axis (called the Y axis) running north to south through the point of origin. East to west coordinates are measured on an X axis running east to west through the point of origin. Values on the Y axis north of the point of origin are plus and values south of the point of origin are minus. Values on the X axis east of the point of origin are plus and values west of the point of origin are minus.

Figure 18-19 – Adjusted bearing and distance from adjusted latitude and departure.

Figure 18-20 – Location by plane coordinates. 

2.3.6.1 Plane Coordinates from Latitude and Departure

Figure 18-20 also shows the relationship between the plane coordinates of the end stations on a traverse line and the latitude and departure of the line. You can see the difference between the Y coordinate of A and the Y coordinate of B (which is 200.00 feet) equals the latitude of AB. You can also see the difference between the X coordinate of A and the X coordinate of B (which is 600.00 feet) equals the departure of AB. Therefore, if you know the coordinates of one of the stations in a traverse, you can determine the coordinates of the others from the latitudes and departures. Figure 18-21 shows a closed traverse with adjusted latitudes and departures notes. You want to assign plane coordinates to the traverse stations. To avoid the necessity of working with negative coordinates, you select as point of origin a point O that is west of the most westerly traverse station and south of the most southerly traverse station. You determine the bearing and length of dotted line OD and compute from these values the latitude and departure of OD. You can see that the Y coordinate of station D must equal the latitude of OD, or 150.70 feet. Also the X coordinate of D must equal the departure of OD or 556.30 feet. The Y coordinate of station A equals the Y coordinate of D plus the latitude of AD or 150.70 + 591.64 = 742.34 feet. The X coordinate of station A equals the X coordinate of D minus the departure of AD or 556.30 – 523.62 = 32.68 feet. The Y coordinate of station B equals the Y coordinate of station A plus the latitude of AB or 742.34 + 255.96 = 998.30 feet. The X coordinate of station B equals the X coordinate of station A plus the departure of AB or 32.68 + 125.66 = 158.34 feet. The Y coordinate of station C equals the Y coordinate of station B minus the latitude of C or 998.30 – 153.53 = 844.77 feet. The X coordinate of station C equals the X coordinate of station B plus the departure of BC or 158.34 + 590.65 = 748.99 feet. Figure 18-21 – Closed traverse with adjusted latitudes and departures.  18-23 The Y coordinate of station D equals the Y coordinate of station C minus the latitude of CD or 844.77 – 694.07 = 150.70 feet. The X coordinate of station D equals the X coordinate of station C minus the departure of CD or 748.99 – 192.69 = 556.30 feet. These are the same coordinates originally computed for station D, a fact that serves as a check on accuracy. You enter these values on a form that is similar to the one shown in Figure 18-22. In actual practice, however, a wider form is used on which all values and computations from the original station through bearing and distance, latitude and departure, and coordinates can be entered.

2.3.6.2 Latitude and Departure from Plane Coordinates

The numerical values of latitude and departure of a traverse line are easily computed from the coordinates of the end stations of the line. For traverse line AB, for example, the numerical value of latitude equals the difference between the Y coordinate of A and the Y coordinate of B, while the numerical value of departure equals the difference between the X coordinate of A and the X coordinate of B. To determine whether a latitude or departure computed this way is positive or negative, the best method is to examine a sketch of the traverse to determine the compass Figure 18-22 – Form for computing coordinates.  18-24 direction of the bearing of the line in question. If the line bears northeast, the latitude is positive, or north, and the departure is positive, or east. If the line bears southwest, both latitude and departure are negative.

2.3.7 Computing Areas

Various methods are used in computing areas. Some of the common methods are discussed below.

2.3.7.1 Area by Double Meridian Distance

The meridian distance of a traverse line is equal to the length of a line running east to west from the midpoint of the traverse line to a reference meridian. The reference meridian is the meridian that passes through the most westerly traverse station. In Figure 18-23, the dotted lines indicate the meridian distances of the traverse lines to which they extend from the reference meridians. You can see that the meridian distance of the initial line AB equals one half of the departure of AB. The meridian distance of the next line BC equals the meridian distance of AB, plus one half of the departure of AB, plus one half of the departure of BC. Figure 18-23 shows that the meridian distance of CD equals the meridian distance of BC, plus one half of the departure of BC, minus one half of the departure of DC. Similarly, the meridian distance of AD equals the meridian distance of DC, minus one half of the departure of DC, minus one half of the departure of AD. You should now understand the basis for the following rules for determining meridian distance: 1. For the initial traverse line in a closed traverse, the meridian distance equals one half of the departure. 2. For each subsequent traverse line, the meridian distance equals the meridian distance of the preceding line, plus one half of the departure of the preceding line, plus one half of the departure of the line itself. However, it is the algebraic sum that results—meaning that plus departures are added but minus departures are subtracted. It is customary to use double meridian distance (DMD) rather than meridian distance in calculations. When the meridian distance of the initial traverse line in a closed traverse equals one-half of the departure of the line, the DMD of the line equals its departure. Again, from the rule for meridian distance of the next line, the DMD of that line equals Figure 18-23 – Meridian distances.  18-25 the DMD of the preceding line, plus the departure of the preceding line, plus the departure of the line itself. It can be shown geometrically that the area contained within a straight-sided closed traverse equals the sum of the areas obtained by multiplying the meridian distance of each traverse line by the latitude of that line. Again the result is the algebraic sum. If you multiply a positive meridian distance (when the reference meridian runs through the most westerly station, all meridian distances are positive) by a plus or north latitude, you get a plus result that you add. If you multiply a positive meridian distance by a minus or south latitude, however, you get a minus result that you subtract. Therefore, if you multiply for each traverse line the double meridian distance by latitude instead of meridian distance by latitude, the sum of the results will equal twice the area, or the double area. To get the area, divide the double area by 2. Figure 18-24 shows entries for the computations of the DMD of the area of the traverse ABCD. Because AB is the initial traverse line, the DMD of AB equals the departure. The DMD of BC equals the DMD of AB (125.66), plus the departure of AB (125.66), plus the departure of BC (590.65), or 841.97 feet. The DMD of CD equals the DMD of BC (841.97), plus the departure of BC (590.65), plus the departure of CD (which is minus 192.69, and therefore is subtracted), or 1239.93 feet. The DMD of DA equals the DMD of CD (1239.93), plus the departure of CD (–192.69), plus the departure of DA (–523.62), or 523.62 feet. Note that the DMD of this last traverse line equals the departure of the line, but with an opposite sign. This fact serves as a check on the computations. The double area for AB equals the DMD times the latitude or 125.66 x 255.96 = 32,163.93 square feet. The double area for BC equals 841.97 (the DMD) times minus 153.53 (the latitude), or minus 129,267.65 square feet. The double area of CD is 1,239.93 x (-694.07) = –860,598.21 square feet. The double area of DA is 523.62 x 591.64 = 309,794.54 square feet. The difference between the sum of the minus double areas and the sum of the plus double areas is the double area which is 647,907.39 square feet. The area is one half, or 323,953.69 square feet. Land area is generally expressed in acres. There are 43,560 square feet in 1 acre; therefore, the area in acres is .44.7 43560 69.323953 = A  18-26

2.3.7.2 Area by Double Parallel Distance

The accuracy of the area computation of a DMD can be checked by computing the same area from double parallel distances (DPD). As shown in Figure 18-25, the parallel distance of a traverse line is the north-tosouth distance from the midpoint of the line to a reference parallel. The reference parallel is the parallel passing through the most southerly traverse station. The solution for parallel distance is the same as the one used for meridian distance, except that to compute parallel distance, the latitude is used instead of departure. The parallel distance of the initial traverse line (which is DA in this case) equals one half of the latitude. The parallel distance of the next line, AB, equals the parallel distance of the preceding line, DA, plus one half of the latitude of the preceding line DA, plus one half of the latitude of line AB itself. It follows from the above that the DPD of the initial traverse line DA equals the latitude of the line. The DPD of the next line, AB, equals the DPD of the preceding line, DA, plus the latitude of the preceding line, DA, plus the latitude of the line AB itself. The solution for area is the same as for area by meridian distance except that, for the double area of each traverse line, you multiply the DPD by the departure instead of multiplying the DMD by the latitude. Figure 18-26 shows entries for the computation of the area of DPD for the traverse ABCD. Note that the result is identical to that obtained by the computation of the DMD. Figure 18-25 – Parallel distances. Figure 18-24 – Area from double meridian distances.

2.3.7.3 Area from Coordinates B

efore we explain the method of computing area from coordinates, let us set coordinates for the stations of the traverse ABCD. To avoid using negative coordinates, we will measure Y coordinates from an X axis passing through the most southerly station and X coordinates from a Y axis passing through the most westerly station, as shown in Figure 18-27. Figure 18-27 – Closed traverse by coordinate method. Figure 18-26 – Area from double parallel distances.  18-28 Figure 18-28 shows the coordinate entries. It shows that the Y coordinate of A equals the latitude of DA, or 591.64 feet, and the X coordinate of A is zero. The Y coordinate of B equals the Y coordinate of A plus the latitude of AB or 591.64 + 255.96 = 847.60 feet. Figure 18-28 – Coordinate entries for computation of Figure 18-27. The X coordinate of B equals the departure of AB, or 125.66 feet. The Y coordinate of C equals the Y coordinate of B minus the latitude of BC or 847.60 – 153.53 = 694.07 feet. The X coordinate of C equals the X coordinate of B plus the departure of BC or 125.66 + 590.65 = 716.31 feet. The Y coordinate of D obviously is zero; however, it computes as the Y coordinate of C minus the latitude of CD of 694.07 – 694.07, which serves as a check. The X coordinate of D equals the X coordinate of C minus the departure of CD or 716.31 – 192.69 = 523.62 feet. This is the same as the departure of DA, but with an opposite sign—a fact which serves as another check.  18-29 Figures 18-29 and 18-30 show the method of determining the double area from the coordinates. First, multiply pairs of diagonally opposite X and Y coordinates, as shown in Figure 18-29, and determine the sum of the products. Then, multiply pairs diagonally in the opposite direction, as shown in Figure 18-30, and determine the sum of the products. The difference between the sums (shown in Figure 18-29) is the double area or 1,044,918.76 – 397,011.37 = 647,90.39 square feet. The symbol shown beside the sum of the coordinate products is the capital Greek letter (Σ) sigma. In this case, it means sum. Figure 18-29 – First step for tabulated computation of Figure 18-27.  18-30 Figure 18-30 – Second step for tabulated computation of Figure 18-27.

2.3.7.4 Area by Trapezoidal Formula

It is often necessary to compute the area of an irregular figure, when one or more of its sides do not form a straight line. For illustration purposes, assume Figure 18-31 is a parcel of land in which the south, east, and west boundaries are straight lines perpendicular to each other, but the north boundary is a meandering shoreline. Figure 18-31 – Area of irregular figure by trapezoidal rule.  18-31 To determine the area of this figure, first lay off conveniently equal intervals (in this case, 50.0-foot intervals) from the west boundary and erect perpendiculars as shown. Measure the perpendiculars. Call the equal interval “d” and the perpendiculars (beginning with the west boundary and ending with the east boundary) h1 through h6. You can see that for any segment lying between two perpendiculars, the approximate area, by the rule for determining the area of a trapezoid, equals the product of “d” times the average between the perpendiculars. For the most westerly segment, for example, the area is . 2 21   + hh d The total area equals the sum of the areas of the segments. Therefore, since “d” is a factor common to each segment, the formula for the total area may be expressed as follows:   + + + + + + + + + = 22222 hh 21 hhhhhhhh 65544332 dA This works out to   +++++ = 2 22222 hhhhhh 654321 dA In turn, this reduces to   ++++ + = 5432 61 2 hhhh hh dA Substituting in the formula the data from Figure 18-31, you have   ++++ + = 1091219280 2 129105 A 50 When the calculation is completed the result is 25,950 square feet or approximately 0.6 acre.

2.3.7.5 Area by Counting the Squares

Another method of computing the area of an irregular figure is to plot the figure on a sheet of graph paper. The area is then determined by counting the squares within the figure outline and multiplying the result by the area represented by each square. Figure 18-32 shows the same figure shown in Figure 18-31 but plotted to scale on a sheet of graph paper on which each of the small squares is 5 feet x 5 feet or 25 square feet. When squares within the outline are counted, they total 1,038 squares which means 1,038 x 25 = 25,950 square feet.  18-32 Figure 18-32 – Computing area by counting the squares.

2.3.7.6 Parcels That Include Curves

Not all parcels of land are bounded entirely by straight lines. It is often necessary to compute the area of a construction site that is bounded in part by the center lines or edges of curved roads or the right-of-way lines of curved roads. Figure 18-33 shows a construction site with a shape similar to the traverse used in the previous examples. In this site, however, the traverse lines AB and CD are the chords of circular curves, and the boundary lines AB and CD are the arcs intercepted by the chords. The following sections explain the method of determining the area lying within the straight-line and curved-line boundaries. The data for each of the curves is inscribed on Figure 18-33, that is, the radius R, the central angle ∆, the arc length A, the tangent length T and the chord bearing and distance CH. The crosshatched areas lying between the chord and arc are called segmental areas. To determine the area of this parcel, you must take the following steps. 1. Determine the area lying within the straight-line and chord (also straight-line) boundaries. 2. Determine the segmental areas. 3. Subtract the segmental area for Curve 1 from the straight-line boundary area. 4. Add the segmental area for Curve 2 to the straight-line boundary area. The method of determining a segmental area was explained in the engineering tech Basic Chapter 2. The straight-line area may be determined by the coordinate method, as explained in this lesson. For Figure 18-33, the segmental area for Curve 1 works out to be 5,151 square feet; for Curve 2, it is 29,276 square feet.  18-33 Figure 18-33 – Area within straight-line and curved-line boundaries (curved segments). Figure 18-34 shows a typical computation sheet for the area problem shown in Figure 18-33. Included with the station letter designations in the station column are designations (Chord #1 and Chord #2) showing the bearings and distances that constitute the chords of Curves 1 and 2. The remainder of the upper part of the form shows the process (with which you are now familiar) of determining latitudes and departures from the bearings and distances, coordinates from the latitudes and departures, double areas from cross multiplication of coordinates, double areas from the difference between the sums of north and sums of east coordinates, and areas from half of the double areas. As you can see in Figure 18-34, the area within the straight-line boundaries is 324,757 square feet. From this area, segmental area No. 1 is subtracted. Then segmental area No. 2 is added. To calculate the area of the parcel as bounded by the arcs of the curves, add or subtract the segmental areas depending on whether the particular area in question lies inside or outside of the actual curved boundary. In Figure 18-33, the segmental area for Curve 1 lies outside and must be subtracted from the straight-line area, while Curve 2 lies inside and must be added. With the segmental areas accounted for, the area comes to 348,882 square feet or 8.01 acres.  18-34 Figure 18-34 – Computation of area which includes curve segments. The second method of determining a curved boundary area uses the external areas rather than the segmental areas of the curves, as shown in Figure 18-35. The straightline figure is defined by the tangents of the curves, rather than by the chords. This method may be used as an alternative to the chord method or to check the result obtained by the chord method. The computation sheet shown in Figure 18-36 follows the same pattern as Figure 18- 34. However, there are two more straight-line boundaries, because each curve has two tangents rather than a single long chord. The coordinates of A, B, C, and D are the same as in the first example, but the coordinates of the points of intersection (PIs) must be established from the latitudes and departures of the tangents. The computations for determining the tangent bearings are shown in the lower left of Figure 18-36. When the chord bearing is known, the tangent bearing can be computed by adding or subtracting one-half of delta (∆) as appropriate. The angle between the tangent and the chord equals ∆2. After setting coordinates on the PIs, cross-multiply, accumulate the products, subtract the smaller from the larger, and divide by 2, as before, to get the area of the straight-line figure running around the tangents. Then add or subtract each external area as appropriate. In Figure 18-35, the external area for Curve 1 is inside the parcel boundary and must be added, while Curve 2 is outside and must be subtracted. The area comes to 348,881 square feet, which is an acceptable check on the area calculated by using the segmental areas.  18-35 Figure 18-35 – Area within the curve and its tangents. Figure 18-36 – Computation of area which includes external area of curves.

2.3.8 Plotting Horizontal Control

Computations for horizontal control become clarified when a plot or scaled graphic representation of the traverse can be viewed. For example, looking at a plot can tell you whether you should add or subtract the departure or the latitude of a traverse line in computing the departure or latitude of an adjacent line or in computing the coordinates of a station. For linear distances that are given in feet and decimals of feet, use the correct scale on an engineer’s scale for laying off linear distances on a plot. For plotting traverses, there are three common methods: by protractor and scale, by tangents, and by coordinates.

2.3.8.1 Plotting Angles by Protractor and Scale

The adjusted bearings and distances for closed traverse ABCD are as follows: Figure 18-37 shows the plotting method of traverse ABCD using a scale and protractor. First select a scale that will make the plot fit on the size of the paper. Select a convenient point on the paper for station A and draw a light line NS, representing the meridian through the station. AB bears N26°9'E. Set the protractor with the central hole on A and the 00 line at NS, and lay off 26°09'E. The minutes must be estimated. Draw a line in this direction from A, and on the line measure off the length of AB (285.14 feet) to scale. This locates station B on the plot. Draw a light line NS through B parallel to NS through A, representing the meridian through station B. BC bears S75°26'E. Set the protractor with the central hole on B and the 00 line on NS, lay off 75°26' from the S leg of NS to the E, and measure off the length of BC (610.26 feet) to scale to locate C. Proceed to locate D in the same manner. This procedure produces a number of light meridian lines through stations on the plot. Figure 18-38 illustrates a procedure that eliminates these lines. A single meridian NS is drawn clear of the area of the paper on which you intend to plot the Figure 18-37 – Traverse plotted by protractor and scale method. Traverse Line DA CD BC AB Bearing WN WS ES EN 1341 1315 6275 9026 ° ′ ° ′ ° ′ ° ′ Distance feet feet feet feet 96.789 28.720 26.610 14.285  18-37 traverse. From a convenient point O, lay off each of the traverse lines in the proper direction. Then transfer the directions to the plot by one of the methods for drawing parallel lines.

2.3.8.2 Plotting Angles from Tangents

Sometimes instead of having bearing angles to plot from, you might want to plot the traverse from deflection angles turned in the field. The deflection angles for the traverse are as follows: AB to BC 78º25’R BC to CD 90º57’R CD to DA 122º58’R DA to AB 67º40’R You could plot from these angles by protractor. Lay off one of the traverse lines to scale. Then lay off the direction of the next line by turning the deflection angle to the right of the first line extension by protractor and so on. However, the fact that you can read a protractor directly to only the nearest 30 minutes presents a problem. When you plot from bearings, the error in estimation of minutes applies only to a single traverse line. When you plot from deflection angles, however, the error carries on cumulatively all the way around. For this reason, you should use the tangent method when you are plotting deflection angles. Figure 18-39 shows the procedure of plotting deflection angles larger than 45°. The direction of the starting line is called the meridian, following a conventional procedure that the north side of the figure being plotted is situated toward the top of the drawing paper. In doing this, you might have to plot the appropriate traverse to a small scale using a protractor Figure 18-38 – Plotting traverse lines by parallel method from a single meridian. Figure 18-39 – Plotting by tangent-offset method from deflection angles larger than 45 degrees.  18-38 and an engineer’s scale, just to have a general idea of where to start. Make sure that the figure will fit proportionately on the paper of the desired size. Starting at point A, you draw the meridian line lightly. Then you lay off AO, 10 inches (or any convenient roundfigure length) along the referenced meridian. Now, from O you draw a line OP perpendicular to AO. Draw a light line OP as shown. In a trigonometric table, look for the natural tangent of the bearing angle 26°90', which equals to 0.49098. Find the distance OP as follows: OP = AO tan 26°09' = 4.9098, or 4.91 inches. You know that OP is equal to 4.91 inches. Draw AP extended and then lay off the distance AB to scale along AP. Remember that unless a closed traverse is plotted, it is always advantageous to start offsets from the referenced meridian, the reason being that, after you have plotted three or more lines, you can always use this referenced meridian line for checking the bearing of the last line plotted to find any discrepancy. The bearing angle, used as a check, should also be found by the same method (tangent-offset method). To plot the directions of lines from deflection angles larger than 45°, the complementary angle (90° minus the deflection angle) must be used. To plot the direction of line BC in Figure 18-39, draw a light perpendicular line towards the right from point B. Measure off a length of approximately 10 inches, which represents BOJ. The complement of the deflection angle of BC is 90° – 78°25' = 11°35'. The natural tangent value of 11°35’ is equal to 0.20497. From O1 draw O1P1 perpendicular to BO1. Solving for O1P1, you will have O1P1 = BO1 tan 11°35' = 2.0497, or 2.05 inches. Now lay off the distance O1P1. Draw a line from B through P1 extended; lay off the distance BC to scale along this line. The remaining sides, CD and DA, are plotted the same way. Make sure that the angles used for your computations are the correct ones. A rough sketch of your next line will always help to avoid major mistakes. When the deflection angle is less than 45°, the procedure of plotting by tangent is as shown in Figure 18-40. Here you measure off a convenient round-figure length (say 500.00 feet) on the extension of the initial traverse line to locate point O, and from O, draw OP perpendicular to AO. The angle between BO and BC is, in this case, the deflection angle. Assume that 23°21'. The formula for the length of OP is this is OP = BO tan 23°21' = 500 x 0.43170= 215.85 feet. Figure 18-40 – Plotting by tangent-offset method from deflection angles smaller than 45 degrees

2.3.8.3 Plotting by Coordinates

A common and accurate method of plotting by coordinates is shown in Figure 18-41. Each station is located by its coordinate and without angular measurements. To plot station B, for instance, you would lay off from O on the Y axis a distance equal to the Y coordinate of B (847.60 feet). Draw a light line from this point perpendicular to the Y axis, and measure off on this line a distance equal to the X coordinate of B (125.66 feet). The remaining points are plotted in the same way.

2.3.9 Mistakes in Computations

An involved computation, such as determining an area by DMDs, involves a large number of calculations and thus the possibility of a large number of errors. Some of the most common types of mistakes are discussed below.

2.3.9.1 Mistakes with Signs

Be careful to give a value such as a latitude or departure its correct sign (+ or -) and apply the sign correctly in addition, subtraction, multiplication, and division. To prevent not including the correct sign, do not write a value without including the sign. The practice of omitting plus signs is a correct procedure, but it is safer to write in the plus signs.

2.3.9.2 Wrong Column

A wrong column mistake may be an entry made in a wrong column or a reading taken from a wrong column. To avoid column mistakes, make both entries and readings with deliberation.

2.3.9.3 Wrong Quadrant

When you mistake the quadrant in which a line lies, you get a bearing that may have the correct angular value but that has the wrong compass direction. A common cause of this mistake is viewing the direction of a line from the wrong station. In Figure 18-42, the direction of AB is northeast and the direction of BA is southwest. However, AB and BA are the same traverse line. To minimize direction errors, place arrows on the diagram showing the direction of the line.

2.3.9.4 Wrong Azimuth

The same mistake that applies to quadrants also applies to azimuths. Suppose that the bearing of AB in Figure 18-42 is N46°E. Then the azimuth of AB is (measured from north) 46°. While AB and BA are the same traverse line, the azimuth of BA is 226°. Figure 18-41 – Plotting by coordinates.

2.3.9.5 Leaving Out a Traverse Line

A common source of mistakes is leaving out (commonly called dropping) a traverse line, either in the field notes or in computations. If an outsized angular and linear error of closure occurs, check to make sure one of the traverse lines has not been dropped.

2.3.9.6 Wrong Decimal Place

The incorrect placement of a decimal point is a common mistake. Suppose, for example, you are determining an approximate double area by multiplying a DMD of +841.97 feet by latitude of –153.53 feet. If the value of –1535.3 is used instead of the correct –153.53, the result will not be correct.

2.3.10 Locating Mistakes

If a mistake cannot be located and corrected, the whole traverse must be rerun to find the mistake. This may be avoided by using of the following solutions to identifying mistakes.

2.3.10.1 Outsized Angular Error of Closure

The size of an outsized angular error of closure may be a clue to the location of the particular mistake. Suppose, for example, that a six-sided closed traverse has the following measured interior angles: 81612 128101 81147 214154 84118 8190 ° ′ ′ ° ° ′ ° ′ ° ′ ° ′ The interior angles in a six-sided closed traverse should add up to 720°00'. The difference between 720°00' and 612°18' is 107°42'. This large difference suggests that measuring about 107°42' was dropped along the way. You should look for an angle of about this size in the traverse. Suppose that in a four-sided traverse, the difference between the sum of the Rdeflection angles and the sum of the L-deflection angles comes to 180°. For a foursided traverse, this difference should be 360°. This large angle sum difference (180°) suggests one of the angles is the wrong direction. Look for an angle measuring about Figure 18-42 – Proper compass direction of a closed traverse.  18-41 half the error of closure (in this case, measuring half of 180°, or 90°), and see whether this angle is the wrong direction. If an angle has not been dropped, a large interior-angle error of closure probably means a large mistake in measuring or in recording the measuring of one of the angles. You may be able to locate the suspect angle by plotting the traverse from the measured angles. Then draw in the line of the linear error of closure and erect a perpendicular bisector from this line. The bisector may point to the suspect angle. For example, in Figure 18-43, all the bearings are correct except the bearing of CD, which should be S15°31'W for closure, but inadvertently is S05°31'W. Because of this error, the traverse fails to close by the length of the dashed line AA'. A perpendicular bisector from AA' points directly to the faulty angle C. If a perpendicular bisector from the line of linear error of closure does not point at any angle, the faulty angle may lie at the point of the beginning of the traverse. In Figure 18- 44, the bearings of all lines are correct for closure except that of the initial line AB. Line AB should be N29°09'E for closure but was plotted N16°09'E. A perpendicular from AA' does not point at any angle in the traverse.

2.3.10.2 Outsized Latitude and/or Departure Error of Closure

When both the latitudes and departures fail to close by large amounts, there is probably a mistake in an angle or a distance. When one closure is satisfactory and the other is not, a computational mistake is probably the cause of the outsized closure error.

2.3.10.3 Outsized Linear Error of Closure

Check for the following mistakes when an angular error of closure is within allowable limits and there is an outsized linear error of closure. 1. Ensure traverse lines have not been dropped. 2. Ensure each latitude and departure is in the correct column. 3. When computing latitudes and departures, ensure the correct cosine and correct sine are used. The latitude of a traverse line equals the product of the length Figure 18-44 – Graphical method to locate angular mistakes in a closed circuit (angle A). Figure 18-43 – Graphical method to locate angular mistakes in a closed circuit (angle C).  18-42 times the cosine of the bearing. The departure equals the product of the length times the sine of the bearing. 4. Ensure each bearing has the proper compass direction. Ensure the front bearing is used, not the back bearing. 5. Ensure all bearings and distances are copied correctly. 6. Ensure all cosines and sines are copied correctly. 7. Check for arithmetical errors. If these procedures do not identify the mistake, the traverse will have to be rerun. If a rerun is required, examine the direction of the line of linear error of closure on the plot. Often, the traverse line that contains the mistake is parallel to this line. If there is a line that is parallel, start the rerun at that point.

Test Your Knowledge

 5. Before beginning computations based on your field notes, you should perform which of the following actions?

A. Reduce slope measurements
B. Reduce angles to mean angles
C. Check notes for completeness
D. All of the above

6. When you are discussing computations, the term “adjustment” refers to ______.

A. fudging of the numbers
B. alignment of columns
C. level computations
D. equal distribution of the total error

7.  Level lines that begin and end on points that have fixed elevations, such as bench marks, are often called plane coordinates.

A. True
B. False

8. You have just completed a level circuit run of 2,640 feet. The error of closure was .021 feet. What order of precision is this leveling work?

A. First
B. Second
C. Third
D. Fourth

9. What is the first step in traverse computations?

A. Calculating mean angles
B. Checking notes for all data
C. Correcting distance measurements
D. Verifying the crew members

10. You are giving the location by plane coordinates of a point. In what terms should you give the location of that point in relation to the point of origin?

A. Its distance east
B. Its distance south
C. Its distance north or south and the distance east or west
D. Its distance south and west

11. A positive latitude and a negative departure characterize a traverse line bearing ______.

A. NE
B. NW
C. SE
D. SW

12. The term “inversing”refers to computing the ____.

A. latitude and departure of a traverse line from its bearing and length
B. bearing and length of a traverse line from its latitude and departure
C. ratio of linear error of closure of a traverse from its length and error of closure
D. latitude and departure from the corrected angles and distances

13. What is the initial step in finding the area of the figure by counting squares?

A. Plot it to scale on graph paper
B. Use a planimeter to determine the area
C. Divide it into 100-foot squares
D. Determine the bearings of the lines

14. A bearing that has the correct angular value, but the wrong compass direction is usually caused by which of the following surveying mistakes?

A. Viewing the direction of a traverse line from the wrong station
B. Dropping a traverse line
C. Taking a reading from a wrong column of a traverse table
D. Omitting the plus or minus sign of a written value

15. When you have an outsized error of closure for latitudes but not departures, what should you check?

A. Mistake in an angle
B. Mistake in a distance
C. Error in arithmetic
D. Dropped traverse line

 

 

Summary

This lesson introduced you to the theory and basic procedures used for indirect leveling, including barometric and trigonometric leveling. This lesson also detailed the procedures used to make level and traverse computations. The section on level computations addressed the adjusting of intermediate bench mark elevations, calculating allowable error, and adjusting level nets. The traverse computations section addressed open and closed traverses and the procedures used for adjusting and determining the areas of traverses. Finally, the lesson detailed some of the mistakes made when calculating the traverse areas. 

Review Questions

  1. What is the minimum number of altimeters required for a two-base method of barometric leveling? A. Five B. Two C. Three D. Four 2.  The basic principle of trigonometric leveling is when the vertical angle and either the horizontal or slope distance between two points is known, the fundamentals of trigonometry can be applied to calculate the difference in elevation between points. A. True B. False 3. In making level computations, be sure to check the notes for a level run by verifying the ______________. A. turning point B. beginning bench mark C. turning point and beginning bench mark D. none of the above 4. When the horizontal or slope distance is measured by chaining, which of the following corrections must be computed before you determine the difference of elevation? A. Repair adjustment, sag, and temperature B. Standard error, sag, and tension C. Sag, temperature, and standard error D. Tension, heat, and number of movements 5. When you do trigonometric leveling with an electronic distance-measuring device, what other instrument do you use to measure your angles? A. Transit B. Theodolite C. Level D. Alidade 6. What are you verifying by checking the difference in foresights and backsights? A. Balanced foresights and backsights B. Arithmetic accuracy C. Error of closure D. BM elevation  18-46 7. Most differential leveling (plane surveying) is ________ order work. A. First B. Second C. Third D. Fourth 8.  When adjusting a level net, you adjust each leg only once, regardless of a leg being in more than one circuit. A. True B. False 9. The terms “elevation angle” and “depression angle” refer to which of the following situations? A. Rod location in relation to the instrument B. Value of the vertical angle C. Instrument location in relation to the rod D. All of the above 10. How is distribution of angular error of closure performed? A. Proportionally by angle size B. Proportionally by distance between angles C. Equally among all angles D. By subtracting the error from all angles 11. Traverse operations are conducted for mapping large construction projects, such as a A. military post B. grocery store C. school D. mall 12.  In computing latitudes and departures, calculations can be greatly expedited by the use of a traverse table. A. True B. False 13. The linear error of closure is determined by the __________________. A. sum of the departures. B. difference in the departures and latitudes. C. error of latitude. D. use of the Pythagorean theorem with error of closure in latitude and departure.  18-47 14. What is the most common method of balancing a traverse? A. Rule of thumb B. Compass rule C. Closure rule D. Grid rule 15. Plane coordinates describe the location of a point in what manner? A. By a distance north or south and east or west from a point of origin B. By the bearing north or south and east or west from a point of origin C. By the bearing and distance from a point of origin D. By the line of sight from a point of origin 16. What is the major difference between the DMD method of determining area and the DPD method? A. The DPD of the initial traverse line is twice the departure. B. A reference parallel is used instead of a reference meridian. C. The distances are calculated using latitude instead of departure. D. Both B and C 17. After you have determined the segmental areas, what do you do with this information to find the area of the whole parcel? A. Always subtract the areas from the area of the parcel. B. Always add the areas to the area of the parcel. C. Determine if the segmental areas are inside or outside the parcel straightline and chord boundaries, then add or subtract as required. 18. How may you prevent direction error? A. By placing directional arrows on the traverse diagram B. By quickly adding up the angles to ensure the traverse lines were not dropped C. By making both readings and field note entries with deliberation D. By never writing a value without including the appropriate sign 19. Which of the following errors uses the same prevention method as direction error prevention? A. Dropped signs B. Dropped traverse lines C. Wrong azimuths D. Missing decimal points 20. When you have an outsized linear error of closure, what should you check first? A. Accuracy of latitudes and departures B. A dropped traverse line C. Your arithmetic D. Bearings computations  18-48 21. After you check computations and ensure that no angle was dropped in the process, you still have a large error of closure. What further check, if any, should you attempt at this time? A. See if an angle is exactly equal to the error of closure; if so, there is a deflection angle error. B. Construct a perpendicular bisector from the line of the linear error of closure to indicate a possible erroneous measurement. C. Construct a line parallel to the suspected erroneous line to find the error. D. None; you must return to the field. 22. When you have an outsized linear error of closure but an acceptable angular error of closure, you should check to see whether you used the _____________________. A. sine of the bearing when finding the latitude of the course. B. sine of the bearing when finding the departure of the course. C. cosine of the bearing when finding the departure of the course. D. tangent of the bearing when finding the latitude of the course. 23. You cannot locate your error and the traverse will not close; therefore, you must rerun the traverse. With which line should you begin? A. Traverse line parallel to the linear error of closure B. Initial traverse line C. Final traverse line D. Line perpendicular to the line of linear closure at its midpoint  18-49 Trade Terms Introduced in this Chapter Clinometer An instrument used to establish angles, usually on a hillslope and more rarely along bedding planes.

Chapter 19 Topographic Surveying and Mapping

Topography refers to the characteristics of the land surface. These characteristics include relief, natural and artificial (or man-made) features. Relief is the configuration of the earth’s surface and includes such features as hills, valleys, plains, summits, depressions, trees, streams, and lakes. Man-made features are highways, bridges, dams, wharfs, buildings, and so forth. This lesson introduces the methods and procedures used to perform topographic surveying and to prepare topographic maps. A topographic map is a drawing that shows the natural and artificial features of an area. A topographic survey is conducted to obtain the data needed for the preparation of a topographic map.

When you have completed this lesson, you will be able to:

1. Describe the different types of topographic surveying control mechanisms.
2. Describe the methods for conducting topographic mapping.

Contents

1.0.0 Topographic Surveying

2.0.0 Topographic Mapping

 

1.0.0 TOPOGRAPHIC SURVEYING

The field work in a topographic survey has two aspects:

• The establishment of a basic framework of horizontally and vertically located control points (called instrument points or stations)

• The determination of the horizontal and vertical locations of details in the vicinity of each instrument point.

1.1.0 Topographic Control

Topographic control consists of two parts: horizontal control, which locates the horizontally fixed position of specified control points, and vertical control, which establishes the elevations of specified bench marks. This control provides the framework from which topographic details, such as roads, buildings, rivers, and the elevation of ground points, are located. 1.1.1 Horizontal Control Locating primary and secondary horizontal control points or stations may be accomplished by traversing, by triangulation, or by the combination of both methods. On an important, large-area survey, there may be both primary control, in which a number of widely separated primary control points are located with a high degree of precision, and secondary control points, where stations are located with less precision within the framework of the primary control points. The routing of a primary traverse should be considered carefully. It should follow routes that will produce conveniently located stations. Such routes might run along roads, ridges, valleys, edges of wooded areas, public land lines, or near the perimeter of tracts of land. This latter route is particularly important for small areas. When all the details in the area can be conveniently located from stations on the primary traverse, secondary traverses are not needed. However, the size or character of the terrain usually makes secondary traverses necessary. Consider, for example, the situation shown in Figure 19 -1. This figure shows a tract bounded on three sides by highways and on the fourth side by a fence. For simplification, the figure shows only the items to be discussed. An actual complete plan would include a title, date, scale, north arrow, etc. Figure 19-1 – Primary and Secondary Traverse. The primary traverse ABCD runs around the perimeter of the tract. If this tract was sufficiently small and level, then details within the whole tract could be located from only the primary control points which includes stations A, A1, B, B1, C, C1, D, and D 1.  19-4 However, in this example the size or perhaps the character of the terrain made it necessary to establish additional control points inside the perimeter of the tract. The additional controls points are D2, A2, and B2. These points were established by running traverse lines (called crossties) across the area from one primary traverse station to another. It should be noted that, since each secondary traverse closes on a primary control point, errors cannot accumulate any farther than the distance between the primary stations. Field notes for the survey sketched in Figure 19 -1 must contain notes showing the horizontal locations of the stations and level notes for determining the elevations of the stations. 1.1.2 Vertical Control In topographic surveying, bench marks serve as starting and closing points for the leveling operations when locating details. Although for some surveys the datum may be assumed, it is preferable that all elevations be tied to bench marks which are referred to the sea-level datum. In many areas, particularly in the United States, series of permanent and precisely established bench marks are available. A surveyor must make an effort to tie surveys to these bench marks to ensure proper location and identification. Often, the established horizontal control marks are used as the bench marks because the level routes generally follow the traverse lines. Vertical control is usually carried out by direct leveling; however, trigonometric leveling may be used for a limited area or in rough terrain. Topographic maps for construction projects must be based on accurate horizontal and vertical data. The degree of precision of a topographic map is related to the scale of the land area depicted in the map. When establishing the primary vertical control to use in a topographic survey for an intermediate-scale map, four degrees of precision are used as follows: First - 0.05 foot distance in miles. This order is used as the standard for surveys in flat regions when the contour interval is 1 foot or less. It is also used to determine the gradient of streams or to establish the grades for proposed drainage and irrigation systems. Second- 0.1 foot distance in miles. This order is used in a survey when the contour interval of the map is 2 feet. Third- 0.3 foot distance in miles. This order is used for a contour interval of 5 feet. Fourth- 0.5 foot distance in miles. This order is used for a contour interval of 10 feet and may be done by stadia leveling, a method that is very advantageous in hilly terrain. Stadia will be discussed later in this lesson. The third or fourth order of precision is used for a large-scale map that generally has a contour interval of 1 or 2 feet. For an extensive survey of a large area, the third order is used. Surveys of smaller areas use the fourth order. Once the topographic control has been established, the next major step in a topographic survey is to locate the details horizontally and vertically in the vicinity of each control point or station. These details consist of (1) all natural or artificial features that appear on the map and (2) enough ground points and spot elevations to make the drawing of contour lines possible. The methods and the instruments used in topographic surveys depend upon the purpose of the survey, the degree of precision needed, the nature of the terrain to be covered, the map scale, and the contour interval. For a high degree of accuracy,  19-5 azimuths should be located with a theodolite or transit. Horizontal distances should be measured with a chain or an electronic distance measurement (EDM) device. Elevations are determined with a level. The following sections discuss two methods commonly used to locate topographic details.

1.2.0 Locating Details by Transit and Tape In Chapter 14, you learned the procedures used to tie in and locate points using a transit and tape. These same procedures are used for tying in and locating topographic details. To begin, determine the vertical location (or elevation) of the detail points by using direct or trigonometric leveling procedures. Then horizontally locate the details either by directions or distances or a combination of both. Use a method or a combination of methods that requires the least time in a particular situation. Directly measure the dimensions of structures, such as buildings, with tapes. When many details exist, assign each one a number in the sketch and key the detail to a legend to avoid overcrowding. For directions, use azimuths instead of deflection angles to minimize confusion. Locate details as follows: 1. Measure the angle and distance from transit stations. 2. Measure angles from two transit stations. 3. Measure distances from two known points. 4. Measure an angle from one station and distance from another station. 5. Measure swing offsets and range ties. Detailing by transit and tape is a time-consuming process that requires chaining many distances and taking many level shots. This is necessary when a high degree of accuracy is required. For lower-precision (third and fourth order) surveys, a less timeconsuming method is to locate the details by transit and stadia.

1.3.0 Locating Details by Transit and Stadia Most of the topographic surveying conducted by an engineering tech requires a lower degree of accuracy, and thus is well suited to the transit and stadia method. In this method, horizontal distances and differences in elevation are indirectly determined by using subtended intervals and angles observed with a transition and a leveling rod or stadia board. The following sections discuss the principles of stadia and then examine field procedures used in stadia work. 1.3.1 Stadia Equipment Terms, and Principles This section addresses the equipment, terminology, and principles used in stadia surveying. Although the discussion of stadia surveying is included here,, as an engineering tech, you should be aware that stadia can be used in any situation where horizontal distances and differences in elevation must be determined indirectly. The results, though, are of a lower order of precision than is obtainable by taping, EDM, or differential leveling. However, the results are adequate for many purposes, such as lower -order trigonometric leveling. A thorough understanding of stadia is important to any surveyor. To supplement the knowledge gained from this section, read other books, such as Surveying Theory and Practice, by Davis, Foote, Anderson, and Mikhail.  19-6 1.3.1.1 Stadia Rods Where sight distances do not exceed 200 feet, a conventional rod such as a Philadelphia rod is adequate for stadia work. A stadia rod is used for longer distances. Stadia rods usually have large geometric designs on them so they may be read at distances of 1,000 to 1,500 feet or even farther. Some rods do not have any numerals on them. From the geometric pattern on the rod, intervals of a tenth of a foot and sometimes a hundredth of a foot can be seen. 1.3.1.2 Stadia Hairs The telescope of transits (as well as theodolites, plane-table alidades, and many levels) is equipped with two hairs (called stadia hairs) that are in addition to the regular vertical and horizontal cross hairs. Figure 19-2 shows two types of stadia hairs as viewed through a telescope. As shown in this figure, one stadia hair is located above and the other an equal distance below the horizontal (or middle) cross hair. On most equipment, the stadia hairs are not adjustable and remain equally spaced. 1.3.1.3 Stadia Interval When viewed through a transit telescope, the stadia hairs appear to intercept an interval on the stadia rod. The stadia interval or stadia reading is the distance on the rod between the apparent positions of the two stadia hairs. Determine stadia intervals by sighting the lower stadia hair at a convenient foot mark and then observing the position of the upper stadia hair. For example, the lower hair might be sighted on the 2.00 foot mark and the upper hair might be in line with 6.37. After subtraction (6.37 -2.00), the stadia reading is 4.37. When a stadia reading is more than the length of the rod, you should take the observed half-interval and multiply it by 2 to get the stadia reading. 1.3.1.4 Stadia Constant Light rays that pass through the lens (objective) of a telescope come together at a point called the principal focus of the lens. Then these light rays continue in straight-line paths, as shown in Figure 19-3. Figure 19-2 – Stadia Hairs.  19-7 The distance between the principal focus and the center of the lens is called the focal length (f) of the lens. For any particular lens, the focal length does not change. Dividing the focal length by the distance between the stadia hairs (i), yields the stadia constant (k). The stadia constant is also called the stadia factor or stadia interval factor. A convenient value to use for the stadia constant is 100. Stadia hairs are usually spaced so that the interval between them makes the stadia constant equal to 100. 1.3.1.5 Stadia Distance The distance from the principal focus to the stadia rod is called the stadia distance. As shown in Figure 19-3, this distance is equal to the stadia constant (k) times the stadia reading (s). 1.3.1.6 Instrument Constant The distance from the center of the Transit telescope instrument to the principal focus is the instrument constant. This constant is determined by the manufacturer of the instrument. This information is typically stated on the inside of the instrument box. Externally focusing telescopes are manufactured so that the instrument constant may be considered equal to 1. For internally focusing telescopes, the objective in the telescope is so near the center of the instrument that the instrument constant may be considered zero. This is a distinct advantage of internally focusing telescopes. Most modern instruments are equipped with internally focusing telescopes. 1.3.1.7 Stadia Reduction Formulas Stadia work is concerned with finding two values: 1. The horizontal distance from the center of the instrument to the stadia rod 2. The vertical distance or difference in elevation between the center of the instrument and middle-hair reading on the rod. Stadia reduction formulas are used to find these values. 1.3.1.7.1 Stadia Formula for Horizontal Sights To calculate a horizontal sight, first determine the horizontal distance between the center of the instrument and the stadia rod. Find this distance by adding the stadia distance to the instrument constant as follows: Write ks for the stadia distance and (f + c) for the instrument constant. Then the formula for computing horizontal distances when the sights are horizontal becomes the following: Figure 19-3 – Light rays converge at principal focus of a lens.  19-8 h = ks + (f + c) Where: h = horizontal distance from the center of the instrument to a vertical stadia rod k = stadia constant, usually 100 s = stadia interval f + c = instrument constant (zero for internally focusing telescopes, approximately 1 foot for externally focusing telescopes) f = focal lengths of the lens c = distance from the center of the instrument to the center of the lens The instrument constant is the same for all readings. Using an externally focusing instrument with an instrument constant of 1.0 and a stadia interval of 1 foot, the horizontal distance would be as follows: h = (100) (1) + 1 = 101 feet. If the stadia interval is 2 feet, the horizontal distance is as follows: h = (100) (2) + 1 = 201 feet. If you are using an internally focusing instrument, the instrument constant is zero and can be disregarded. This is the advantage of an internally focusing telescope. So, if the stadia interval is 1 foot, the horizontal distance is simply the stadia distance, which is 100 feet. For a stadia reading of 2 feet, the horizontal distance is 200 feet. Horizontal distance usually is stated to the nearest foot. Occasionally for short distances under 300 feet it may be specified that tenths of a foot be used. 1.3.1.7.2 Stadia Formulas for Inclined Sights Since most often the sights needed in stadia work are not horizontal, it is necessary to incline the telescope upward or downward to acquire a vertical angle. This vertical angle (α) may be either an angle of elevation or an angle of depression, as shown in Figure 19-4. When the line of sight is elevated above the horizontal, it is an angle of elevation. If the line of sight is below the horizontal, the vertical angle is an angle of depression. In either case, use the following formulas to find the horizontal and vertical distances: h = ks cos2 α + (f +c) cos α Figure 19-4 – (A) Angle of elevation and (B) Angle of depression.  19-9 v = 1/2 ks sin 2α+ (f + c) sin α These two expressions are called the stadia formulas for inclined sights in which h = horizontal distance v = vertical distance h = stadia distance a = vertical angle f + c = instrument constant Refer to Figure 19-5 for clarification of the terms in the stadia formulas for inclined sights. 1.3.1.8 Distance and Elevation for Inclined Sights The following example describes the use of the stadia reduction formulas for inclined sights. Assume a stadia interval of 8.45 and an angle of elevation of 25º 14’, as shown in Figure 19-6. Let the instrument constant be 1.0. Substituting the known values in the stadia formula for the horizontal distance yields the following: h=ks cos2α + (f + c) cos α h = 100 (8.45) (0.90458)2 + (1) (0.90458) = 692.34 The horizontal distance is 692 feet. Substituting the known values in the formula for the vertical distance yields the following: v = 1/2 ks sin 2α + (f + c) sin α v = 50 (8.45) (0.77125) + (1) (0.42631) v = 326.28 The vertical distance to the middle-hair reading on the rod is 326.28 feet. Figure 19-5 – Stadia interval – inclined sight.  19-10 To find the elevation of the ground at the base of the rod, subtract the center-hair rod reading from this vertical distance and add the height of instrument (HI) as depicted in the example in Figure 19-6. If the HI is 384.20 feet and the center-hair rod reading is 4.50 feet, then the ground elevation is 326.28 - 4.5 + 384.20 = 705.98 feet. If the angle of inclination was depressed, the center-hair rod reading is added to the vertical distance. The sum is then subtracted from the HI. Using this equation, the ground elevation of Figure 19-7, would be: 384.2 - (326.28 + 4.5) = 53.42 feet. 1.3.1.9 Stadia Tables Horizontal distance and the vertical distance (difference in elevation between two points) can also be determined by using the stadia reduction tables. (Table 19-1 is used for following example.) Figure 19-6 – Ground elevations – telescope raised. Figure 19-7 – Ground elevation – telescope depressed.  19-11 The values of 100 cos2a and 1/2(100) sin 2a are computed at 2-minute intervals for angles up to 30°. The values in the table are multiplied by the stadia reading, and then added to the value of the instrument constant given at the bottom of the page. To find the values from the stadia table for the example previously discussed, read under 25° and opposite 14’. Under Hor. Dist. to find 100 COS2 25°14’ = 81.83. Under Diff. Elev. to find 1/2 (100) sin 2 (25°14’) = 38.56. The values of the term containing the instrument constant are given at the bottom of the page. For: (f + c) = C = 1.00 Find: (f + c) cos α = 0.90 Therefore: (f + c) sin α = 0.43 Table 19-1 – Stadia reduction table for 24 - 27 minutes.  19-12 Using these values in the formulas, find: h = 8.45 (81.83) + .090 h = 692.4 or 692 feet and v = 8.45 (38.56) + 0.43 v = 326.23 or 326 feet 1.3.1.10 Approximate Forms of Stadia Formulas Because of the errors inherent in stadia surveying, it has been found that approximate stadia formulas are precise enough for most stadia work. Refer again to Figures 19-5, 19-6 and 19-7, and notice that it is customary to hold the stadia rod plumb rather than inclined at right angles to the line of sight. Failure to hold the rod plumb introduces an error causing the observed readings to be longer than the true readings. Another error inherent in stadia surveying is caused by the unequal refraction of light rays in the layers of air close to the earth’s surface. The refraction error is smallest when the day is cloudy or during the early morning or late afternoon hours on a sunny day. Unequal refraction also causes the observed readings to be longer than the true readings. To compensate for these errors, topographers often regard the instrument constant as zero in stadia surveying of ordinary precision, even if the instrument has an externally focusing telescope. In this way, the last terms in the stadia formulas for inclined sights vanish, that is, become zero. Then the approximate expressions for horizontal and vertical distance are h = ks cos2 α v = 1/2ks sin 2α  19-13 1.3.2 Field Procedures Figure 19-8 illustrates a situation where the difference in elevation between an instrument station of known elevation and a ground point of unknown elevation needs to be determined. In Figure 19-8, (A) The elevation of instrument station P is known and the difference in elevation between P and the rod station P1 needs to be determined. The horizontal center-line height of the instrument (H.I.) above point P is equal to PA. This H.I. is different than the H.I. typically used in direct leveling. The rod reading is P1B. The difference in elevation (DE) between P and P1 can be expressed as follows: DE = PA = BC – P1b or, DE = h.i. = BC – P1B Therefore, the ground elevation at P1 can be expressed as follows: Elev. P1 = Elev. P + (h.i. + BC – P1B) Figure 19-8 – Difference in elevation.  19-14 Now sight on the rod such that P1B = PA = h.i. In this case, a similar triangle (PC1P1) is formed at the instrument station P. From observation of these similar triangles, it be can seen that the DE= P1C1 = BC. Therefore, the ground elevation at P1 can be expressed as follows: Elev. P1 = Elev. P + BC This is an important concept to understand when shooting stadia from a station of known elevation. It illustrates that when the center cross hair is sighted on a rod graduation that is equal to the h.i. before reading the vertical angle, then calculating the difference in elevation is greatly simplified. However, if the line of sight is obstructed and you cannot sight on a rod graduation that is equal to the h.i., then you must sight on some other graduation. In addition, in Figure 19-8, (B) The difference in elevation between two points on the ground (P1 and P2) from an instrument station (E) that is located between the two points needs to be determined. Assume in this case that a backsight is taken on a rod held at P1 and then a foresight is taken to P2. Now the difference in elevation (DE) between the two points can be written as follows: DE = P1A + AB + CD – P2D In reverse, if a backsight was taken to P2 with a foresight to P1, then the expression for DE can be written as follows: DE = CD – P2D – AB – P1A Figure 19-9 shows field notes for locating topographic details by transit and stadia. The details shown by numbers in the sketch on the Remarks side are listed on the data side by numbers in the column headed Obj. At the top of the page on the data side, control point D1 was used as the instrument station. Immediately below this, from instrument station D1, the transit was backsighted to point A and that all horizontal angles were measured to the right from the backsight on A.  19-15 In the third line from the top on the data side, the known elevation of D1 is 532.4 feet and the vertical distance (h.i.) from the point or marker at D1 to the center of the instrument above D1 is 4.8 feet. This vertical distance was carefully determined by measurement with a tape or rod held next to the instrument. Begin with point 1 to see how each of the objective points was detailed. Remember, in this example D1 is the instrument station from which all observations are made. To determine the direction of point 1, train the transit telescope on A and match the zeros. Next, turn the telescope right to train on point 1 and read the horizontal angle (30º10’). For the horizontal distance and elevation of point 1, set a rod on the point, and train the lower stadia hair of the transit telescope on a whole-foot mark on the rod so the center hair is near the 4.8 graduation. (This is a common practice in stadia work that makes reading the stadia interval easier.) Then read and record the stadia interval (in this case 6.23 feet). Next, rotate the telescope about the horizontal axis until the center hair is on the 4.8 rod graduation. Lock the vertical motion and read and record the vertical angle (-3026’). Be sure to record each vertical angle correctly as plus or minus. While you are reading and recording the vertical angle, the rodman can be moving to the next point. This will help speed up the survey. From the stadia interval and the vertical angle reading, the horizontal distance (entered in the fifth column of Figure 19-11) and the difference in elevation (in the sixth column) are determined from a stadia reduction table. Table 19-2 shows the page from a stadia reduction table that applies to the data for point 1 in Figure 19-9. Figure 19-9 – Notes for locating topographic details by transit and stadia.  19-16 For this point, the vertical angle is –3026’, and the stadia interval is 6.23 feet. In the table under 3° and opposite 26’, note that the multiplier for horizontal distance is 99.64, while the one for difference in elevation is 5.98. If the final distance is ignored, the horizontal distance is 6.23 X 99.64 = 620.75 (or 621feet). The difference is elevation is 6.23 X 5.98 = 37.3 feet. Add the corrections for focal distance given at the bottom of the page to these figures. For an instrument with a focal distance of 1 foot, add 1 foot to the horizontal difference (making a total horizontal distance of 622 feet) and 0.06 foot to the difference in elevation. This makes the difference in elevation round off to 37.4 feet, and since the vertical angle has a negative (-) sign, the difference in elevation is recorded as –37.4 feet. In the first column on the remarks side of Figure 19-9, enter the elevation of each point, computed as follows. For point 1, the elevation equals the elevation of instrument station D1 (532.4 feet) minus the difference in elevation (37.4 feet), or 495.0 feet. Subtract the difference in elevation, in this case, because the vertical angle you read for point 1 was negative. For a positive vertical angle (as in the cases of points 12 and 13 through 17 of your notes), add the difference in elevation. The remainder of the points in this example are detailed in a similar manner except for point 13. When a detail point is at the same, or nearly the same, elevation as the instrument station, the elevation can be determined more readily by direct leveling. This is the case for point 13. As seen in the vertical-angle column of the notes, the vertical Table 19-2 – Horizontal distances and elevations from stadia.  19-17 angle was 0° at a rod reading of 5.6 feet. Therefore, the elevation of point 13 is equal to the elevation of the instrument station (532.4 feet) plus the H.I. (4.8 feet) minus the rod reading (5.6 feet), or 531.6 feet. In the above example the transit was initially backsighted to point A and the zeros were matched. This was because the azimuth of D1A was not known. However, if you knew the azimuth of D1A, you could indicate your directions in azimuths instead of in angles right from D1A. Suppose, for example, that the azimuth of D1A was 26°10’. You would train the telescope on A and set the horizontal limb to read 26°10’. Then when you train on any detail point, read the azimuth of the line from D1 to the detail point. Test your Knowledge  1. Which of the following elements is representative of topographic maps? A. Earth’s surface. B. Earth’s natural features C. Man-made features D. All of the above 2. By what manner are control points located? A. Triangulation only B. Traversing only C. Both A and B D. Indirect leveling 3. When topographic maps require a high degree of accuracy, what method of finding details is recommended? A. Transit and tape B. Transit and stadia C. Transit and trigonometric leveling D. EDM and level 4. Which of the following actions should you take to avoid overcrowding and confusion when sketching details during fieldwork? A. Use azimuths instead of deflection angles. B. Use numbers and legends for a large number of details. C. Both A and B D. Estimate distances and angles. 5.  Philadelphia rods should be used for stadia work for distances up to 1,500 feet. A. True B. False  19-18 6. When your stadia reading is more than the length of the rod, what procedure should you use? A. Read a half-interval using the middle cross hair; then multiply by 2. B. Hold two rods together. C. Make a rod in the BU shop that will be long enough. D. Shorten your sighting. 7. Unequal refraction caused by the sun’s rays will affect your data by causing what differences in readings? A. Longer distances than actual. B. Shorter distances than actual C. Reversed vertical angles D. Smaller vertical angles than actual

2.0.0 TOPOGRAPHIC MAPPING

The following sections address how a draftsman prepares a topographic map. Additional field methods used by surveyors are also presented.

2.1.0 Representation of Relief

One of the purposes of a topographic map is to depict relief. Relief is the term for variance in the vertical configuration of the earth’s surface. You have seen how relief can be shown in a plotted profile or cross section. These, however, are views on a vertical plane, but a topographic map is a view on a horizontal plane. On a map of this type, relief may be indicated by the following methods, shown in Figure 19-10. A relief model is a three-dimensional relief presentation of a molded or sculptured model, developed in suitable horizontal and vertical scales, of the hills and valleys in the area. Shading is a pictorial method of showing relief by the use of light and dark areas to suggest the shadows that would be created by parallel rays of light shining across the area at a given angle. Hachures are a pictorial method similar to shading except that the light-and-dark pattern is created by short hachure lines drawn parallel to the steepest slopes. Relative steepness or flatness is suggested by varying the lengths and weights of the lines. Contour lines are lines of equal elevation. Each contour line on a map is drawn through a succession of points that are the same elevation. Figure 19-10 – Methods of indicating relief.  19-19 The contour-line method is the most commonly used topographic map.

2.2.0 Contour Lines

Contour lines indicate a vertical distance above or below a datum plane. Contours begin at sea level, normally the zero contour, and each contour line represents an elevation above (or below) sea level. The vertical distance between adjacent contour lines is known as the contour interval. Starting at zero elevation, the topographer draws every fifth contour line with a heavier line. These are known as index contours. At some place along each index contour, the line is broken and its elevation is given. The contour lines falling between index contours are called intermediate contours. They are drawn with a finer line than the index contours and usually do not have their elevations given. Examples of index contours and intermediate contours are shown in Figure 19-11.

2.3.0 Ground Point Systems

The essential data for showing relief by contour lines consists of the elevation of a sufficient number of ground points in the area. Methods of determining the horizontal and vertical locations of these ground points are called ground point systems. The systems most frequently used are the following:

In practice, combinations of these methods may be used in one survey. 2.3.1 Tracing Contours In the tracing contours system, points on a given contour are plotted on the map, and the contour line is drawn through the plotted points. The method may be illustrated by the following simple example. Refer to the traverse shown in Figure 19-11. In this figure, assume that the traverse runs around the perimeter of a small field. The elevations at corners A, B, C, and D are as shown. The ground slopes downward from AB toward DC and from AD toward BC. In this example the contour interval is 1 foot. Figure 19-11 – Traverse with contour lines.  19-20 Therefore, the 112-foot contour line is plotted, the 111-foot contour line, the 110-foot contour line, and so forth. Also in this example, assume that the required order of precision is low, as encountered in a reconnaissance survey, for example, and therefore a hand level is used. The elevation of station A is determined to be 112.5 feet. Assume that the vertical distance from the level to the ground is 5.7 feet. Then, the H.I. at station A is 112.5 + 5.7= 118.2 feet. If a level rod is set up anywhere on the 112.0-foot contour, the reading from station A would be 118.2 – 112.0= 6.2 feet. Therefore, to determine the point where the 112.0-foot contour crosses AB, the rodman backs out from point A along AB until reaching the point where 6.2 feet is read on the rod. The point where the 112.0-foot contour crosses AD can be determined the same way. You can measure the distance from A to each point and then record the distance from A to the 112.0-foot contour on AB and AD. When all of the contours have been located on AB and AD, shift to station C and carry out the same procedure to locate the contours along BC and CD. Now all the points are located where contours at a one-foot interval intersect the traverse lines. If the slope of the ground is uniform (as it is presumed to be in Figure 19-11), the contour lines can be plotted by simply drawing lines between points of equal elevation, as shown in the figure. If the slope has irregularities, send the rodman out along one or more lines laid across the irregular ground, to locate the contours on these lines as you located them on the traverse lines. 2.3.2 Grid Coordinate System In the grid coordinate system, the area is laid out in squares of convenient size, and the elevation of each corner point is determined. While this method lends itself to use on relatively level ground, ridge or valley lines must be located by spot elevations taken along the lines. The locations of the desired contours are then determined on the ridge and valley lines and on the sides of the squares by interpolation. This gives a series of points through which the contour lines may be drawn. Figure 19-12 illustrates this method. Assume that the squares in Figure 19-12 measure 200.0 feet on each side. Points a, b, and c are points on a ridge line, also 200.0 feet apart. You need to locate and draw the 260.0-foot contour line. By inspection, you can see that the 260.0-foot contour must Figure 19-12 – Grid system of ground points.  19-21 cross AD since the elevation of A is 255.2 feet and the elevation of D is 263.3 feet. However, at what point does the 260.0-foot contour cross AD? This can be determined by using a proportional equation as follows. Assume that the slope from A to D is uniform. The difference in elevation is 8.1 feet (263.3 – 255.2) for 200.0 feet. The difference in elevation between 255.2 and 260.0 feet (elevation of the desired contour) is 4.8 feet. The distance from A to the point where the 260.0-foot contour crosses AD is the value of x in the proportional equation: 8.1:200 = 4.8:x or x = 118.5 feet. Lay off 118.5 feet from A on AD and make a mark. In the same manner, you locate and mark the points where the 260.0-foot contour crosses BE, EF, EH, and GH. The 260.0-foot contour crosses the ridge between point b (elevation 266.1 feet) and point c (elevation 258.3 feet). The distance between b and c is again 200.0 feet. Therefore, you obtain the location of the point of crossing by the same procedure just described. You now have six plotted points: one on the ridge line between b and c and the others on AD, BE, EF, EH, and GH. A line sketched by hand through these points is the 260.0- foot contour line. Note that the line is, in effect, the line that would be formed by a horizontal plane that passed through the ridge at an elevation of 260.0 feet. Note, too, that a contour line changes direction at a ridge summit. 2.3.3 Control Points This explanation illustrates the fact that any contour line may be located by interpolation on a uniform slope between two points of known elevation a known distance apart. The example also demonstrates how a ridge line is located in the same manner. By locating and plotting all the important irregularities in an area (ridges, valleys, and any other points where elevation changes radically), a contour map of an area can be drawn by the desired contours between the control points. A very elementary application of the method is shown in Figure 19-13. Point A is the summit of a more or less conical hill. A spot elevation is taken here, and then also at points B, C, D, E, and F, which are points at the foot of the hill. It is desired to draw the 340.0-foot contour. Point a on the contour line is interpolated on the line from A to B, point b is interpolated on the line from A to C, point c is interpolated on the line from A to D, and so on. Figure 19-14 shows a more complicated example in which contours are interpolated and sketched between controlling spot elevations taken along a stream. Figure 19-13 – Control point method of locating contour.  19-22 interpolating Figure 19-14 – Sketching contours by interpolation. 2.3.4 Cross Profiles In the cross-profile system, elevations are taken along selected lines that are at right angles to a traverse line. Shots are taken at regular intervals or at breaks, or both, in the ground slope. The method is illustrated in Figure 19-15. The line AB is a traverse along which 100-foot stations are shown. On each of the dotted cross-section lines, contours are located. The particular contour located at a particular station depends on (1) the ground elevations and (2) the specified contour interval. In this instance, it is 2 feet. The method used to locate the contours is the one described earlier for tracing a contour system. Figure 19-15 – Cross profiles. When the even-numbered 2-foot interval contours are located on all the cross-profiles lines, the contour lines are drawn through the points of equal elevation.  19-23

2.4.0 Characteristics of Contour Lines

A contour line is a line of equal elevation; therefore, two different lines must indicate two different elevations. Two different contour lines cannot intersect or otherwise contact each other except at a point where a vertical or overhanging surface, such as a vertical or overhanging face of a cliff, exists on the ground. Figure 19-16 shows an overhanging cliff. The segments of contour lines on the cliff are made as dotted (or hidden) lines. Aside from the exception mentioned, any point where two different contour lines intersect would be a point with two different elevations. When you are forming a mental image of the surface configuration from a study of contour lines, it is helpful to remember that a contour line is a level line, that is, a line that would be formed by a horizontal plane passing through the earth at the indicated elevation. A contour line must close on itself somewhere, either within or beyond the boundaries of the map. A line that appears on the map completely closed may indicate either a summit or a depression. If the line indicates a depression, this fact is sometimes shown by a succession of short hachure lines drawn perpendicular to the inner side of the line. An example of a depression is shown in Figure 19-16. A contour line marked in this fashion is called a depression contour. On a horizontal or level plane surface, the elevations of all points on the surface are the same. Therefore, since different contour lines indicate different elevations, there can be no contour lines on a level surface. On an inclined plane surface, contour lines at a given equal interval will be straight, parallel to each other, and equidistant.  19-24 Figure 19-16 – Typical contour formations.  19-25 Generally, the spacing of the contour lines indicates the nature of the slope. Contour lines that are evenly spaced and wide apart indicate a uniform, gentle slope, as shown in Figure 19-17. Figure 19-17 – Uniform gentle slope. Contour lines that are evenly spaced and close together indicate a uniform, steep slope, as shown in Figure 19-18. Figure 19-18 – Uniform steep slope.  19-26 The closer the contour lines are to each other, the steeper the slope. Contour lines closely spaced at the top and widely spaced at the bottom indicate a concave slope, as shown in Figure 19-19. Figure 19-19 – Concave slope. Contour lines widely spaced at the bottom indicate a convex slope, as shown in Figure 19-20. Figure 19-20 – Convex slope.  19-27 A panoramic sketch is a pictorial representation of the terrain in elevation and perspective as seen from one point of observation. This type of map shows the horizon, which is always of military importance, with intervening features, such as crests, woods, structures, roads, and fences. Figures 19-21 through 19-27 show panoramic sketches and maps. Each figure shows a different relief feature and its characteristic contour pattern. Each relief feature illustrated is defined in the following paragraphs. A hill is a point or small area of high ground, as shown in Figure 19-21. When you are on a hilltop, the ground slopes down in all directions. A stream course that has at least a limited extent of reasonably level ground and is bordered on the sides by higher ground is a valley, as shown in Figure 19-22. The valley generally has maneuvering room within it. Contours indicating a valley are U-shaped and tend to parallel a major stream before crossing it. The more gradual the fall of a stream, the farther apart are the parallel contour lines. The curve of the contour crossing always points upstream. A draw is a less-developed stream course where there is essentially no level ground and, therefore, little or no maneuvering room within its sides and towards the head of the draw. Draws occur frequently along the sides of ridges at right angles to the valley between them. Contours indicating a draw are V-shaped with the point of the V toward the head of the draw. Figure 19-21 – Hill. Figure 19-22 – Valley and draw.  19-28 A ridge is a line of high ground that normally has minor variations along its crest, as shown in Figure 19-23. The ridge is not simply a line of hills. All points of the ridge crest are appreciably higher than the ground on both sides of the ridge. Figure 19-23 also shows a spur, which is usually a short continuously sloping line of higher ground normally jutting out from the side of a ridge. A spur is often formed by two roughly parallel streams that cut draws down the side of the ridge. A saddle is a dip or low point along the crest of a ridge, as shown in Figure 19-24. A saddle is not necessarily the lower ground between the two hilltops; it may be simply a dip or break along an otherwise level ridge crest. Figure 19-23 – Ridge and spur. Figure 19-24 – Saddle.  19-29 A depression is a low point or sinkhole surrounded on all sides by higher ground, as shown in Figure 19-25. Cuts and fills are man-made features that result when the bed of a road or railroad is graded or leveled off by cutting through high areas and filling in low areas along the right-of-way, as shown in Figure 19-26. F Figure 19-25 – Depression. Figure 19-26 – Contour cut and fill.  19-30 A vertical or near vertical slope is a cliff. As described previously, when the slope of an inclined surface increases, the contour lines become closer together. In the case of a cliff, the contour lines can actually join, as shown in Figure 19-27. Notice the tick marks shown in this figure. These tick marks always point downgrade.

2.5.0 Map Scales and Contour Intervals

A topographic map is called either large scale, intermediate scale, or small scale by the use of the following criteria:

• Large scale: 1inch = 100 feet or less

• Intermediate scale: any scale from 1 inch = 100 feet to 1 inch = 1,000 feet

• Small scale:1 inch = 1,000 feet or more The designated contour interval varies with the purpose and scale of the map and the character of the terrain. Table 19-3 shows the recommended contour intervals used to prepare a topographic map. Types of Topographic Map Nature or Terrain Recommended Contour Interval in Feet Large Scale Flat 0.5 or 1 Rolling 1 or 2 Hilly 2 or 5 Intermediate Scale Flat 1,2 or 5 Rolling 2 or 5 Hilly 5 or 10 Small Scale Flat 2,5 or 10 Rolling 10 or 20 Hilly 20 or 50 Mountainous 50, 100 or 200 Figure 19-27 – Cliff. Table 19-3 – Recommended Contour.  19-31

2.6.0 Contour Map Construction

If engineering techs can perform ordinary engineering drafting chores, they will not have any difficulty in constructing a topographic map. To some degree, topographers must draw contour lines by estimation. Their knowledge of contour line characteristics and the configuration of the terrain that the contour lines represent is a great help. Topographers must use their skill and judgment to draw the contour lines so that the lines are the best representation of the actual configuration of the ground surface. Basically, the construction of a contour map consists of three operations: 1. Plot horizontal control that will serve as the framework of the map. 2. Plot details, including the map location of ground points of known ground elevation. These ground points or contour points will be used as guides for the proper location of the contour lines. 3. Construct contour lines at given contour intervals. Take special care in the field to locate ridge and valley lines because these lines are usually drawn first on the map before plotting the actual contour points, as shown in Figure 19-28, View A. Since contours ordinarily change direction sharply where they cross these lines and the slopes of ridges and valleys are fairly uniform, these lines aid in drawing the correct contour lines. After plotting the ridge and valley lines, space contour crossings (by interpolation) along them before making any attempt to interpolate or to draw the complete contour lines, as shown in Figure 19-28, View B. Draw contour lines freehand with a contour pen to yield uniform widths. Leave breaks in the lines to provide spaces for the elevations. Write the elevation numbers so they may be read from one or two sides of the map. Some authorities prefer that elevations also be written in a way that the highest elevation numbers are arranged from the lowest to the highest uphill. Show spot elevations at important points, such as road intersections. Figure 19-28, View C shows the completed contour map. For more refined work, the engineering tech must trace the map using a contour pen on tracing paper or other appropriate medium, to allow reproduction of more copies. The true shape of features to scale can be better represented on a large-scale map. On small-scale maps, however, symbols are used to represent buildings and other features. Center the symbol on the true position, but draw it larger than the scale of the map. Figure 19-28 – Plotting detail and contouring.  19-32 Detail of this type is portrayed on the map by means of standardized topographic symbols, such as shown in Figure 19-29. When plotting contours, remember that streams and ridge lines have a primary influence on the direction of the contour lines. Remember also that the slope of the terrain controls the spacing of the contour lines. Contour lines crossing a stream follow the general direction of the stream on both sides, then cross the stream in a fairly sharp V that points upstream. Finally, remember that contour lines curve around the nose of ridges in the form of a U pointing downhill and cross ridge lines at approximate right angles.

2.7.0 Interpolating Contour Lines

In the examples of interpolation previously given, a single contour line was interpolated between two points of known elevation a known horizontal distance apart, by mathematical computation. In actual practice, usually more than one line must be interpolated between a pair of points, and large numbers of lines must be interpolated between many pairs of points. Mathematical computation for the location of each line would be time-consuming and would be used only in a situation where contour lines had to be located with an unusually high degree of accuracy. For most ordinary contour-line drawings, one of several rapid methods of interpolation is used. In each case it is assumed that the slope between the two points of known elevation is uniform. Figure 19-30 shows the use of an engineer’s scale to interpolate the contours at 2-foot intervals between A and B. The difference in elevation between A and B is between 11 and 12 feet. Select the scale on the engineer’s scale that has 12 graduations for a distance and comes close to matching the distance between A and B on the map. In Figure 19-30 this is the 20 scale. Let the 0 mark on the 20 scale represent 530.0 feet. Then the 0.2 mark on the scale will represent 530.2 feet, the elevation of A. Place this mark on A, as shown. If the 0 mark on the scale represents 530.0 feet, then the 11.7 mark represents 530.0 + 11.7, or 541.7 feet, the elevation of B. Place the scale at a convenient angle to the line from A to B, as shown, and draw a line from the 11.7 mark to B. You can now project the desired contour line locations from the scale to the line from A to B by drawing lines from the appropriate scale graduations (2, 4, 6, and so on) parallel to the line from the 11.7 mark to B. Figure 19-29 – Commonly used map symbols.  19-33 Figure 19-31 shows a graphic method of interpolating contour lines. On a transparent sheet, draw a succession of equidistant parallel lines. Number the lines as shown in the left margin. The 10th line is number 1, the 20th, number 2, and so on. Then the interval between each pair of adjacent lines represents 0.1 feet. Figure 19-31 shows how to use this sheet to interpolate contour lines at a 1-foot interval between point A and point B. Place the sheet on the map so that the line representing 1.7 feet (elevation of A is 500.0 + 1.7, or 501.7 feet) is on A, and the line representing 6.2 feet (elevation of B is 500.0 + 1.7, or 506.2 feet) is on B. You can see how you can then locate the 1-foot contours between A and B. For a steeper slope, the contour lines would be closer together. If the contour lines are too close, it is advisable to give the numbers on the graphic sheet different values, as indicated by the numerals in the right-hand margin. The space between each pair of lines represents 0.2 foot. Points A´ and B´ have the same elevations as points A and B, but Figure 19-31 – Graphic method of interpolating contour lines. Figure 19-30 – Interpolating contour lines with a scale.  19-34 the fact that the horizontal distance between them is much shorter shows that the slope between them is much steeper. You can see how the 1-foot contours between A´ and B´ can be located using the line values shown in the right margin. A third method of rapid interpolation involves the use of a rubber band marked with the correct, equal decimal intervals. The band is stretched to bring the correct graduations on the points.

2.8.0 General Requirements for Topographic Maps

The scale and contour interval of a map are specified according to the purpose for which the map will be used. A map used for rough design planning of a rural dirt road would be on a smaller scale and have a larger contour interval than one to be used by builders to erect a structure on a small tract in a built-up area. The following guidelines suggest the nature of typical map specifications. A map should present legibly, clearly, and concisely a summation of all information needed for the use intended, such as planning, design, construction, or record. Topographic maps for preliminary site planning should have a scale of 1 inch = 200 feet and a contour interval of 5 feet. These maps should show all topographic features and structures with particular attention given to boundary lines, highways, railroads, power lines, cemeteries, large buildings or groups of buildings, shorelines, docking facilities, large rock strata, marshlands, and wooded areas. Secondary roads, small isolated buildings, small streams, and similar minor features are generally less important. Topographic maps for detailed design for construction drawings should show all physical features, both natural and artificial, including underground structures. Scales commonly used are 1 inch= 20 feet, 1 inch= 40 feet, and 1 inch = 50 feet. The contour interval is 1 foot or 2 feet, depending on the character and extent of the project and the nature of the terrain. Besides contour lines, show any spot elevations required to indicate surface relief. Additional detail features that are usually required include the following:

  1. Plane coordinates for grid systems, grid lines, and identification of the particular system or systems.
  2. Directional orientation, usually indicated by the north arrow.
  3. Survey control with ties to the grid system, if there is one. This means that the principal instrument stations from which details were located should be indicated in a suitable manner.
  4. All property, boundary, or right-of-way lines with identification.
  5. Roads and parking areas, including center-line location and elevation, curbs, gutters, and width and type of pavement.
  6. Airport runways, taxiways, and apron pavements, including center-line locations with profile elevations and width and type of pavement.
  7. Sidewalks and other walkways with widths and elevations.
  8. Railroads, including center-line location, top-of-rail elevations, and any turnouts or crossovers.
  9. Utilities and drainage facilities, such as gas, power, telephone, water, sanitary sewer and storm sewer lines, including locations of all valve boxes, meter boxes, handholes, manholes, and the invert elevations of sewers and appurtenances.
  10. Locations, dimensions, and finished floor (usually first floor) elevations of all structures.

 

Test Your Knowledge

8. What is the definition of relief as it applies to surveying?

A. Difference in elevation of the earth’s surface
B. Variation in the natural and man-made features of the earth’s surface
C. Variation of natural features of the earth’s surface
D. Man-made variations of the earth’s surface

9. What term is used for the type of line on a map representing the same elevation for all points on the line?

A. Contour
B. Elevation
C. hachure
D. Grid

10. What term is used for the difference between the values of adjacent contour lines?

A. Index contour
B. Contour interval
C. Intermediate contour
D. Elevation interval

11. The grid coordinate system works best on what type of features?

A. Slopes
B. Relatively level ground
C. Valleys
D. Shorelines and cliffs

12. What type of area is represented on a topographic map by contour lines that are evenly spaced and wide apart?

A. Valley
B. Gentle, uniform slope
C. Steep, uniform slope
D. Ridge

13. In what manner does a panoramic sketch shows the terrain?

A. In contour lines
B. In elevation
C. In perspective
D. Both B and C

14. What type of lines are drawn before the actual contour lines are plotted on a topographic map?

A. Spur and ridge
B. Vertical control and spur
C. Spur and valley
D. Ridge and valley

15. Which of the following devices is useful for interpolating contour lines rapidly?

A. Engineer’s scale
B. Tracing cloth
C. Graduated rubber band
D. All of the above

 

Summary

This lesson discussed the characteristic of topography including relief, natural features, and artificial features. This lesson also introduced you to the methods and procedures used to perform topographic surveying and to prepare topographic maps. You learned that a topographic map is simply a drawing that shows natural and artificial features of an area and that topographic survey is a survey conducted to obtain the data needed to prepare a topographic map.

Review Questions

1. In a topographic survey of an area, what kind of control is established by crossties from one side of the area to another?

A. Primary
B. Secondary
C. Horizontal
D. Vertical

2. Vertical control is normally established by what type of leveling?

A. Direct
B. Trigonometric
C. Barometric
D. Indirect

3. When time is more critical than a high degree of accuracy, what method of locating details is recommended?

A. Transit and tape
B. Transit and stadia
C. Transit and trigonometric leveling
D. EDM and level

4.  The stadia method provides horizontal distances of a higher precision than those obtained by taping, EDM, or differential leveling.

A. True
B. False

5. The stadia interval is defined as the ________.

A. reading on the rod between the stadia hairs.
B. distance to the stadia rod.
C. reading between the upper stadia hair and the middle cross hair.
D. reading between the lower stadia hair and the middle cross hair.

6. Stadia distance is equal to the ________.

A. rod reading.
B. rod reading divided by the stadia constant.
C. stadia interval.
D. stadia interval times the stadia constant.

7. Stadia horizontal distances are normally recorded to what degree of accuracy?

A. To 0.01 foot with a target
B. To 0.1 foot over 300 feet
C. To the nearest foot
D. As close as possible 

8. How do you compensate for refraction?

A. By ignoring the instrument constant
B. By taking all readings at two different times of the day
C. By shading the instrument
D. By using the refraction compensation formula

9. Which of the following methods are used for relief maps?

A. 3-D models
B. Hachure lines
C. Shading representing shadows
D. All of the above

10. Contour lines are used to show what type of information on a topographic map?

A. Quickest route
B. Boundaries
C. Rivers and streams
D. Relief

11. In a topographic survey, what term is used for the system in which the actual contour points on the ground are located and plotted?

A. Cross profiles
B. Control points
C. Grid control
D. Tracing contours

12. When drawing contour lines by using control points, what must you do to locate contour lines?

A. Scale
B. Interpolate
C. Average
D. Randomize

13. In what direction does the curve of a contour line cross a stream?

A. Upstream
B. Westward
C. Downstream
D. Eastward

14. What do contour lines represent in relation to the earth’s surface?

A. Horizontal planes
B. Vertical planes
C. Grid lines
D. Different points of elevation

15. Which of the following scales represents a large-scale topographic map?

A. 1 inch = 50 feet
B. 1 inch = 120 feet
C. 1 inch = 500 feet
D. 1 inch = 1,000 feet

16. Which of the following operations is NOT one of the basic operations for construction of a topographic map?

A. Plotting horizontal control
B. Plotting details and ground points
C. Determining slope distances
D. Drawing contour lines

17. For clarity on small-scale maps, how should buildings and other features be shown?

A. To scale
B. Larger than scale and true to shape
C. Larger than scale and by symbols
D. By location in the notes

18. Topographic maps used for the design of construction drawings normally use what contour interval, in feet?

A. 1 or 2
B. 1, 2, or 5
C. 10
D. 20