LESSON 4

 

DESIGN OPEN CHANNELS

Critical Tasks: 01-1990-20-1002

OVERVIEW

LESSON DESCRIPTION:

This lesson describes the proper procedures used in designing open channels for use in the TO.

TERMINAL LEARNING OBJECTIVE:

ACTION: Identify characteristics of runoff and design open channels to provide for the runoff.
CONDITION: Given this subcourse, a No 2 pencil, paper, and an ACCP examination response sheet.
STANDARD: Demonstrate competency of the task skills and knowledge by responding correctly to 70 percent of the examination questions.
REFERENCES: The material contained in this lesson was derived from the following publication: FM 5-430-00-1/AFPAM 32-8013, Volume 1 (to be published within the next six months).

INTRODUCTION

 

In the TO, you, the engineer, will be required to support maneuver elements by providing both access and sustaining movement along military supply routes and combat trails.

These roads, when built, usually interfere with the natural drainage patterns, and as such, can cause many problems that can be detrimental to mission accomplishment. Consequently, you can reduce the damage to roads and airfields by designing sound drainage structures.

This course describes the proper method used for designing drainage structures for use in the TO.

PART A - HYDRAULIC THEORY AND THE EQUATION OF
CONTINUITY AS IT APPLIES TO OPEN CHANNEL DESIGN

 

FLUID FLOW TYPES

Any discussion of hydraulics must begin with a study of the types of fluid flow.

It is reasonable to assume that to design an open channel capable of carrying the quantity of water (Q) without erosion or deposition problems, it is necessary to understand the flow of water in the channel. Fluid flow occurs in two states: laminar flow or turbulent flow.

Laminar Flow

In laminar flow, the water moves in parallel layers with no cross currents. Osborne Reynolds showed laminar flow in his classical dye experiment in overland or sheet flow as an example of this type of flow in nature. The chief advantage of describing the flow as laminar is that the total mathematics theory has been developed to describe it.

Turbulent Flow

In turbulent flow, the water is mixed thoroughly with velocity fluctuations in all directions. Almost all the flow in nature is turbulent. A good example of turbulent flow is the flow in a mountain stream. Turbulent flow does not have a precise mathematical theory describing the flow characteristics. Most of the theory is based upon empirical equations such as Manning's Equation (see Lesson 4, Part B).

FLOW ASSUMPTIONS

 

The state of flow is dependent on the strength of the viscosity forces or the thickness of the fluid. (Honey is very viscous while water is not.) Laminar flow is flow where the viscosity forces predominate and the fluid flows in smooth paths; for example, honey being poured out of a jar. Turbulent flow occurs when the viscous forces are relatively weak. It is characterized by individual water particles moving in random patterns while the aggregate motion represents the forward movement of the fluid. Natural channels contain turbulent flow. (Normally, the only time laminar flow in water occurs in nature is in thin films called sheet flow where the depth is extremely small.)

First Assumption

A basic assumption in open channel design is that the flow in the channel is steady. This means the depth is not varying rapidly with time. Although this assumption is not absolutely true in practice, generally changes in flow in open channels are slow and the errors introduced by this assumption are very small.

Second Assumption

Another basic assumption is that flow in the channel is uniform. The depth throughout a section of channel of constant dimension is constant. This assumption is found to be essentially correct for channels of reasonable slope that are not extremely short. This means the slope of the water surface is the same as the channel bottom. Flows over spillways or waterfalls are not uniform, while flows in rivers, ditches, and canals are the uniform type.

Third Assumption

The third assumption is continuity of flow. The equation of continuity states that within the section under consideration, energy is neither created nor destroyed, thus the principle of conservation of mass holds.

The equation is expressed as Q = AV where:

  Q  =  Rate of flow in cfs.
A  =  Cross-sectional area in square feet (sf).
V  =  Velocity in feet per second (fps).

Remember you learned how to determine Q in the first three lessons. When you design an open channel, you will use the equation of continuity--Q = AV to check that the design is the right size to carry the water.

PART B - MANNING'S EQUATION

 

The size and gradient of the channel used to carry the design storm runoff may be determined by Manning's Equation for velocity which states:

V  =  1.49 R2/3 S1/2
 "n"
Where: V  =  Velocity of flow in fps.
R  = 
Hydraulic radius = Cross-section area of the channel
Wetted perimeter (feet)
S  =  Slope of the channel in feet per foot (ft/ft), also called hydraulic slope.
"n"  =  Roughness coefficient or friction factor which depends on the material lining the channel.

Runoff water is responsible for the majority of military construction failures. The engineer must be able to design and construct ditches that will carry the proper amount of runoff without undesirable side effects.

Since design of the open channel depends so much on the use of Manning's Equation, this lesson will discuss variables in greater detail.

VELOCITY OF FLOW, V

 

Channels may have different side slopes and cross-sectional areas of flow and still have the same rate of runoff on the same longitude slope, but the velocity of flow in each ditch will be different. Since excess velocity will cause erosion in a ditch and damage to adjacent structures, it must be held within certain limits. The maximum permissible velocity depends entirely on the soil in which the ditch is constructed. Look at the maximum permissible velocities on table 4-1.

Table 4-1. Values for Manning's "n" and maximum permissible velocities for channel designTable 4-1.  Values for Manning's "n" and maximum permissible velocities for channel design

 

For a given rate of runoff and a given longitudinal slope, the velocity of flow may be controlled by the shape of the ditch, specifically the ditch side slope, and the ditch lining. Generally, a broad, shallow cross-section is desirable.

HYDRAULIC SLOPE, S

 

The hydraulic slope will be considered as the slope of the channel bottom, or longitudinal slope. S is normally determined by the natural slope of the site being drained. The minimum grade satisfactory for clear channels is 0.5 percent of S/0.005 ft/ft. On grades not exceeding 2 percent, checkdams may be used. On grades exceeding 8 percent or where erosion is a major problem, as in sand cuts, ditches should be paved.

PART C - DITCHES AND FUNCTIONS

 

The following are the three basic ditches and the functions they perform on a construction project.

INTERCEPTOR DITCH

 

An interceptor ditch is located on the hillside above a structure. Its function is to intercept runoff before it reaches the structure and direct its flow to a desired location. Generally it is used above the hill cuts to decrease erosion on the cut slope.

DIVERSION DITCH

 

A diversion ditch carries water away from structures to low areas. It is often used in conjunction with interceptor ditches.

SIDE DITCH

 

A side ditch is located along the side of a road. It collects water that runs off the road or surrounding ground and transports it to a drainage structure or diversion ditch.

These ditches are illustrated in figure 4-1.

Figure 4-1.  Ditch determined by function
Figure 4-1. Ditch determined by function

 

PART D - DITCH SHAPES OR SECTIONS

 

Channels or ditches are classified by their shapes. The five basic types are-

Table 4-2 shows the commonly used shapes with corresponding data to use with Manning's Equation. Any of these shapes may be used as side interceptor and diversion ditches. The primary consideration in the selection of a cross-section is its capacity to meet hydraulic requirements and the availability of equipment and use.

Table 4-2. Ditch sections
Table 4-2.  Ditch sections

 

Some of the factors in determining ditch shape are discussed below.

TRIANGULAR OR V

 

The triangular or V-shaped ditch is good for flows of less than 60 cfs. *Suggested side slopes of 3:1 allow vehicles to get out of the ditch easily and prevent accidents related to overturned vehicles.

TRAPEZOIDAL

 

The trapezoidal ditch is good for flows larger than 60 cfs. *Suggested side slopes of 1:1 are sufficient where there is no possibility of the ditch being a vehicle hazard.

*NOTE: The 60 cfs limit between triangular and trapezoidal ditches should be used only as a guide. The type of ditch that is used will also depend on the equipment available to construct the ditch. For example, if scrapers are not available, then the construction of a trapezoidal ditch may be much more difficult than a large triangular ditch cut with a grader.

SYMMETRICAL

 

The symmetrical ditch is either a V or trapezoidal configuration, and both are suitable for interceptor, diversion, or main channels between culverts.

NONSYMMETRICAL

 

The nonsymmetrical ditch is used on road side ditches to prevent vehicle hazard and to decrease the possibility of erosion on the side of the ditch closest to the road. It can be used in either the V or the trapezoidal configuration. The 3:1; 1:1 nonsymmetrical V is widely used since the 1:1 backslope does not have to be worked by the grader. When the 3:1 side is cut, the 1:1 slope will be cut automatically by the front edge of the blade, thus the grader only works the ditch from one side--the side closest to the road structure.

SEGMENTAL

 

A segmental ditch is a ditch cut by explosives. It is suitable for swampy areas where equipment is unable to work.

PART E - HOW TO PREVENT EROSION IN AN OPEN CHANNEL

 

CHECKDAMS TO SLOW VELOCITY

 

Erosion presents many difficult problems in designing open channels. Erosion tends to change the shape of channels, which can cause many problems near structures such as roads, bridges, and culverts. Erosion also presents problems when the eroded material is deposited where it is not wanted.

The primary cause for erosion is the velocity of the water in the channel exceeding the velocity at which soil of the channel will erode, "n". The primary method for preventing erosion is to lower the velocity in the channel below the soil erosion velocity.

Checkdams are the most common structure used to reduce velocity in ditches that have longitudinal grades not exceeding 8 percent.

Note that in Manning's Equation the velocity is dependent on the slope of the channel. If the slope is increased, the velocity increases. One method of decreasing the velocity of the water in a channel to decrease erosion is to decrease the slope. Since constructing a new ditch at a different slope is impractical, the most common approach is to construct a checkdam. It works by decreasing the slope of the water surface. Eventually soil is deposited on the ditch bottom and the ditch slope itself is decreased.

Checkdams should be considered when the slope ranges between 2 and 8 percent. Channels with slopes of 2 percent or less generally do not require extensive erosion controls. Usually with slopes in excess of 8 percent, it is more economical to pave the ditch with asphalt or concrete material.

Normally checkdams are constructed of timber. They should extend at least 24 inches into the bottom and sides of the ditch. The top of the ditch should be at least 12 inches above the top of the checkdam. The effective height of the checkdam should be at least 12 inches, but not more than 36 inches. An apron of rubble or riprap should extend at least 4 feet from the face of the checkdam on the discharge side. A weir notch must be cut in the top of the checkdam with a capacity large enough to discharge the anticipated runoff. Figure 4-2 shows two views of a checkdam.

Figure 4-2.  Checkdam
Figure 4-2. Checkdam

 

The spacing between checkdams can be found by using the blowing formula:

S =  100 (H)
A-B
Where:

S

 =  Spacing in feet between checkdams. This value should not be less than 50 feet for a practical solution

H

 =  The height of the bottom of the weir notch from the channel bottom. This value should not be greater than 3 feet unless the dam is to be structurally designed. The practical lower limit for H is 1 foot to prevent unnecessary work.

A

 =  Slope of the original ditch in percent

B

 =  Desired slope n percent. This value should be set at 2 percent as this is the maximum slope that will not require additional erosion control.

For H = 3 feet, S = 50 feet, and B = 2 percent, we can solve for the maximum grade for which simple checkdams can be used.

50 =  100 (3) A =  8 percent
A-2

It is considered uneconomical to space checkdams closer than 50-foot intervals. An alternate solution should be considered for shorter intervals, such as the use of concrete, timber, or boulder linings. For slopes over 8 percent, consideration should be given to paving the channel.

Example: Original slope = 5 percent; chosen desired slope = 2 percent; and chosen H = 3 feet. Find S.

S =  100 (H)
A-B

 

S =  100 (3)  =  300  = 100 feet
5-2 3

The spacing between checkdams is 100 feet.

The weir notch must be designed to carry the flow in the ditch.

Problems which occur involving checkdams include erosion around the dam. Causes include the weir notch being too small or being clogged with debris so that flow occurs across the top of the dam. This causes erosion where the dam is anchored into the ground, and if continued long enough, will erode around the dam. If this occurs, there will be more damage to adjacent structures than if the dam was never installed.

RIPRAP AND RUBBLE

 

Since the values of "n" are in the denominator in Manning's Equation, increasing "n" will decrease the velocity. To increase "n" the effective roughness of the ditch must be increased. This can be accomplished by protecting the channel with riprap and rubble.

The method involves placing rocks or rubble in the ditch bottom so that the rocks prevent the soil from being eroded. Usually the rocks should be larger than 6 inches. They should be hand-placed and compacted individually in at least two layers. The riprap not only prevents erosion, but will also tend to decrease the velocity in the channel due to its high "n" value, which makes it useful for lowering velocities in sections of channel when making transitions to soil ditches from paved to other high-velocity ditches.

DECREASING THE HYDRAULIC RADIUS

 

Decreasing the hydraulic radius (R) will also decrease the velocity in a channel. This can be accomplished by increasing the wetted perimeter (P) in relation to the area (A); in other words, making the ditch wider and shallower. For example, consider the following ditch cross-sections (see figure 4-3).

Figure 4-3.  Comparing hydraulic radii
Figure 4-3. Comparing hydraulic radii

 

In this example we can see that the triangular ditch has a hydraulic radius approximately one-half of the rectangular ditch and thus would be expected to have a lower velocity since the larger surface area causes greater friction.

PAVEMENT

 

Another form of channel protection is pavement. Paving the ditch with asphalt or concrete will prevent erosion of the soil. Due to the low "n" values of pavements, the velocity may increase enough to prevent a problem where the pavement in the ditch terminates. Special protection may be required to slow down the velocity before allowing the flow to continue in an earthen channel. Two possible solutions are a stilling basin or riprap. Additionally, due to pavements' low "n" values, it may be used to increase the velocities if they are too low, thus preventing deposition.

Some sort of the channel protection is required if the slope of the channel is above 2 percent, and it may be a good solution for dopes lower than 2 percent with excessive velocities. In any event, channel protection and/r ditch shape may be used together as they generally are the most effective methods of erosion control. Due to the large effort of installation, do not use checkdams unless absolutely necessary.

PART F - DESIGNING AN OPEN CHANNEL FOR A GIVEN DRAINAGE AREA

 

OPEN CHANNEL DESIGN

In Lessons 1 through 3 you learned how to use the Rational Method to obtain Q, the quantity of flow in cfs. Q allows you to use the first basic equation necessary to open channel design. It is the equation of continuity, Q = VAw. The second basic equation in Manning's Equation,

V =  1.49 R2/3 S1/2
"n"

The variables in these equations are:

  •  
Q = Quantity of flow (cfs)
  •  
V = Velocity of flow (fps)
  •  
Aw = Cross-sectional area of water (square feet (sq ft))
  •  
"n" = Roughness coefficient
  •  
R = Hydraulic radius = Aw
  P
  •  
S = Slope (gradient) of the channel ft/ft) =  Beginning elevation (ft) - Ending elevation (ft)
Distance

To design an open channel for a known area, the military engineer works within the constraints of his known variables to decide on the best values for the unknown variables.

The known values are-

Figure 4-4 shows the velocity (V) relationships.

Figure 4-4.  Velocity relationships
Figure 4-4. Velocity relationships

 

Table 4-3. Hydraulic radius (R) and area (A) of asymmetrical triangular channels
Table 4-3.  Hydraulic radius (R) and area (A) of asymmetrical triangular channels

 

DESIGN A CHANNEL FOR A ROADSIDE DITCH

 

Given the following information. (The next pages follow the design of an open channel step-by-step.)

Design Example. Problem: Design a diversion ditch using the given information.

Known: Location-Seoul, Korea

Q = 27.0 cfs (from Rational Method)

Soil = GMd

STEP 1. Determine Q for the basin, given 27 cfs.

STEP 2. Determine the slope of the channel.

Slope = 0.5 percent = 0.005 ft/ft (invert elevation of No 4 = 52.0 ft; mean elevation of swamp = 49.5 ft; change in elevation = 52.0 - 49.5 = 2.5 ft; length = 500 ft; therefore, slope = 2.5500 = 0.005 ft/ft)

STEP 3. Select the trial value for "n" and V from table 4-1.

NOTE: For "n" and V, use mean values.

n = 0.024 (from table 4-1; use average of "n" values range, unless additional information indicates otherwise)

V = 3-5 fps (from table 4-1) (Use the mean value for Vmax.)

STEP 4. Determine the hydraulic radius using "n" and V from STEP 3 and slope (S) from STEP 2. Using figure 4-5 or the equation, determine the hydraulic radius.

Table 4-4. Ditch selection

 

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1            

STEP 5. Determine the type of ditch based on the Q design.

Select Ditch. Since the Q design (QD) is less than 60 cfs, the ditch should be triangular. Side slopes for the triangular ditch should be 3:1 as a first trial. They can be changed if the ditch is found to be not suitable. Enter this information in the columns under the ditch selection in the ditch design work sheet. Also, the ditch should be symmetrical (Sym), since it is not adjacent to a road.

Select Velocity. The erosion velocity for the GMd soil is 3-5 fps. This means that at 3 fps the soil in the ditch will begin to erode and at 5 fps the whole ditch will be eroding. Since we do not want to exceed the Vmax of 5 fps, the best initial choice usually is 1 fps lower than Vmax or 4 fps.

Table 4-5. First trial velocity

 

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1 4.0          

Using the nomograph in figure 4-5, we must first locate a turning point on the turning line. This line is the center line on the nomograph. The turning point is found by locating the slope(s) in ft/ft in the column at the far left of the chart and the roughness coefficient ("n") on the far right column and connecting them with a straight line. Where the line crosses the turning line is the turning point. This turning point will remain the same as long as S and "n" do not change.

NOTE: Another method using the Manning Equation with a calculator is shown below.

The hydraulic radius is found by connecting the velocity in the second column from the right, and the turning point by a straight line through to the R scale and reading the hydraulic radius (R) off the second column from the left. This gives the required R for any given V in Manning's Equation. In this example, R equals 0.87 which shows the calculator method for solving the radius.

Table 4-6. Calculated radius

 

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1 4.0 0.87        

Determining the Hydraulic Radius Using Manning’s Equation

If your calculator has the function Calculator Function and yx, you can determine R more quickly and accurately than with the nomograph provided in the workbook Transposing Manning's Equation,

V = 1,486 R 2/3 S 1/2
arrow R = infinity V "n" 
3/2
"n" 1,486

Since n and S are constant for various trial iterations, you need only enter different values for V to arrive at an acceptable value for R. Therefore, if S and n are constant, the above equation for R becomes:

R = [V x K]1.5 where K =     "n"    
1,486

To calculate R, use the above equation for numerous iterations until you have "bracketed" flowrate Q within acceptable limits. Below are keystrokes which will work on most calculators.

Figure 4-5.  Nomograph for Manning's Equation
Figure 4-5. Nomograph for Manning's Equation

 

STEP A: First, input and store values for K:

.xxx Enter value for S
Square Rootx Square root of S
x 1.486 Times constant of 1.486
= 1/x Calculate and invert denominator
x .xxx Times value for n
= STO or M+ Store constant K

STEP B: To calculate R for various values of V:

RCL or MRC Recall K
x V Times value for velocity
 =  Equals
Yx 1.5 Raise product to 3/2 power
 =  Displays value for R

NOTE: RCL stands for recall memory and MRC stands for clear memory.

STEP C: Repeat Step B for different V values until you reach an acceptable R and Q.

Find Hydraulic Radius in Ditch Table

STEP 6. Select the appropriate hydraulic radius from the appendix.

Use the ditch table, table 4-3. There are four types of tables; V symmetrical, V nonsymmetrical, trapezoidal symmetrical, and trapezoidal nonsymmetrical, listed in FM 5-430-00-1/AFPAM 32-8013, Volume 1. For this problem, use table 4-2.

Locate the columns representing the side slopes of the ditch being designed, for example, 3:1.

Locate the R values that fall above and below, or the one that is exactly equal to the R value found from the nomograph of Manning's Equation. In the example, the values are 0.85 and 0.90. USE THE LOWER VALUE! For example, use 0.85.

Table 4-7. Selected appendix radius

 

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1 4.0 0.87 0.85      

Record Area and Depth

Associated with R = 0.85 the area is 9.72 square feet and the depth (d) found in the column at the far left is 1.8 feet. Record these values under the appropriate headings in the ditch design work sheet.

Table 4-8. Selecting the area and depth

 

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1 4.0 0.87 0.85 9.72 1.8  

Check for Q

STEP 7. Calculate the ditch Q using the Continuity Equation and the cross-sectional area (A) and the depth (d) from the appendix.

Make a check to see if this particular ditch will meet the requirements of our design by performing the calculation using the Continuity Equation.

Table 4-9. Q calculation

 

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1 4.0 0.87 0.85 9.72 1.8 38.9
Qc  =  AV
Qc  =  (9.72 sq ft) (4 fps)
qc = 38.9 cfs

If this requirement is not met, then a new velocity should be tried. If the Qc is higher than Qd, then a lower velocity than the previous trial should be used. For this example, since 38.8 cfs is greater than 28.35 cfs, the upper limit of the acceptable range, a velocity of 3.5 fps would be appropriate for the next trial.

STEP 2 V  =  3.5 fps
STEP 3 R  =  0.72
STEP 4 R  =  0.71
STEP 5 A  =  6.75; d = 1.5 ft
STEP 6 Qc  =  (3.5 fps)(6.75 sq ft) = 23.6 ft
STEP 7 Qc = 25.65, so the next trial velocity must be larger than 3.5 fps but smaller than 4.0 fps. Try 3.6 fps.

Table 4-10. Second trial velocity

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1 4.0 0.87 0.85 9.72 1.8 38.9
  3:1 3.5 0.71 0.71 6.75 1.5 23.6
STEP 2 V  =  3.6 fps
STEP 3 R  =  0.76
STEP 4 R  =  0.76
STEP 5 A  =  7.68; d = 1.6 ft
STEP 6 Qc  =  (3.6 fps) (7.68 sq ft) - 27.6
STEP 7 27.6 >  =  25.65 < 28.35, so this depth is within the range and thus defines the ditch water depth, area, and velocity.

Table 4-11. Third trial velocity

Ditch Selection Given Nomograph Table 4-3 Calculate
Type Side Slope V R R A-sq ft d-ft Q cfs
V Sym 3:1 4.0 0.87 0.85 9.72 1.8 38.9
  3:1 3.5 0.71 0.71 6.75 1.5 23.6
  3:1 3.6 0.74 0.76 7.68 1.6 27.6

Determine if Ditch is Appropriate

The process tells us that a symmetrical triangular ditch, in GMd soil with a slope of .005 ft/ft and 3:1 side slopes, that carries 27.0 cfs runoff will have a water depth of 1.6 feet and a velocity of 3.6 fps.

Since the velocity of the ditch is greater than 3 fps, the ditch can be considered self-cleaning. The peak runoff will remove the silt buildup from the channel bottom; thus, it requires little maintenance. With V at 3.6 fps, there will be some erosion of the ditch but it should not be a large maintenance problem. Therefore, the ditch is deemed appropriate and should be used.

Determine Cutting Depth

STEP 8. Calculate the cutting depth (d) and draw a sketch of the ditch.

It is desirable to have the water level in the ditch at least 6 inches below the edge of the ditch as a factor of safety, then the cutting depth is the water depth plus 6 inches of free board.

Cutting depth = d + free board

In the example, the cutting depth equals 1.6 feet plus 0.5 feet (6 inches) or 2.1 feet (see figure 4-6).

Figure 4-6.  Example of a designed ditch
Figure 4-6. Example of a designed ditch

 

Final Cross-Section

NOTE: It is very important for the designer to communicate the right design to the equipment operator. This is accomplished by providing a good sketch.

See figure 4-6 for an example of a designed ditch.

NOTE: If the velocity for the ditch had been too high, then another slope ditch with shallower side slopes could be used; say 4:1 or 5:1 to get lower velocities. On the other hand, if the velocity were too low (for example, less than 3 fps), we could raise the velocity by decreasing the side slope to 2:1 or 1:1. If no ditch can be made to work, then a change to some artificial type of channel lining should be considered. If you change the design of the ditch by installing a lining, the size of the ditch must be recalculated by calculating the hydraulic radius and finding a new cross-sectional area and depth.


GO TO:

Lesson 4 Practice Exercise