fra0408
plumbing04.htm
|
Unit I: Legends,
| TESTING FOR MECHANICAL OPERATION AND LEAKS The installation of a new lavatory/sink requires that the fixture be tested for mechanical operation and leaks. Check the operation of each faucet and water retaining plug, such as PO and pop-up type. Then check all water and waste joint connections for leaks, as follows (see Figure 17):
|
| Most of the content of this course is provided courtesy of US Army Engineer School, Fort Leonard Wood, Missouri |
Copyright � David L Heiserman |