LESSON 1

 

WASTE SYSTEM AND MATERIALS

 

Critical Task: 052-248-1003

 

 

OVERVIEW

 

LESSON DESCRIPTION:

 

This lesson covers the classification of piping used in a waste system, the measurement of piping, and the preparation of piping material for installation. It also covers the identification of fittings and the use of joint connections.

 

TERMINAL LEARNING OBJECTIVE:

 

ACTION:

You will learn to describe the procedures for preparing various types of pipes for installation into a waste system.

 

CONDITION:

You will be given the material contained in this lesson.

 

STANDARD:

You will correctly answer the practice exercise questions at the end of this lesson.

 

REFERENCES:

The material contained in this lesson was derived from Field Manual (FM) and Technical Manual (TM)

 

FM 3-34.471

TM 5-551K.

 

 

INTRODUCTION

 

The piping of a waste system carries liquid and semisolid waste to a point of disposal. It also includes venting for the elimination of sewer gases. The various components in a waste system are shown in Figure 1-1. The types of piping that can be used in a waste system are cast-iron soil pipe, plastic pipe (two kinds), galvanized-steel/iron pipe, and copper tubing. The type of copper tubing used in a waste system is called drain, waste, and vent (DWV).

 

Figure 1-1. Components of a Waste System

 

Figure 1-1. Components of a Waste System

 

 

PART A: CLASSIFYING THE TYPES OF PIPING

 

1-1.      Cast-Iron Soil Pipe. Cast iron is available in two different wall thicknesses or weights, service weight (SW) and extra-heavy weight (XH). Cast-iron soil pipe is used for sewers, drains, stacks, and vents in a waste system. SW is used in households and is adequate for most military construction; XH is used where liquids may corrode the pipe or where greater strength is needed for tall stacks or under roadways. Cast-iron pipe is heavy and brittle; therefore, it must be stored and handled with care to prevent cracks or breakage. It is manufactured in three different types: hub and spigot, double-hub, and hubless.

 

            a.         Hub and Spigot Pipe. This pipe (Figure 1-2) has a hub on one end and a spigot on the other. The spigot of one section fits into the hub of the next. It is used for pipe-to-pipe and/or pipe-to-fitting connections. It comes in 5-foot lengths, ranging in diameter from 2 to 15 inches.

 

Figure 1-2. Cast-Iron Soil Pipes

 

Figure 1-2. Cast-Iron Soil Pipes

 

            b.         Double-Hub Pipe. This pipe (Figure 1-2) has a hub on each end. It comes in lengths ranging in diameter from 2 to 15 inches. It is cut and used when pieces of pipe shorter than 5 feet are needed. Waste is minimized because two usable lengths of pipe result. It is used for pipe-to-pipe or pipe-to-fitting connections.

 

            c.         Hubless Pipe. This pipe (Figure 1-2) has plain ends and comes in 10-foot lengths ranging in diameter from 1 1/2 to 8 inches. It is used for pipe-to-pipe or pipe-to-fitting connections. A hubless pipe enables a faster method of joining than the method used for pipes with hubs.

 

1-2.      Plastic Pipe. Plastic pipe (Figure 1-3) is lightweight and can be rigid or flexible. It is easily joined and is corrosion-resistant. It can be used for water or waste systems. It is used for hot- or cold-water piping and for DWV piping. Plastic pipe is joined with solvent cement. Plastic pipe is classified by the acronym for the type of material from which it is made.

 

Figure 1-3. Plastic Pipe

 

Figure 1-3. Plastic Pipe

 

            a.         Polyvinyl chloride (PVC). PVC pipe is cream or white colored and used only for cold-water pipelines, sanitary drainage, and venting. It comes in 10- and 20-foot lengths. Diameter sizes range from 1/2 to 6 inches.

 

            b.         Chlorinated polyvinyl chloride (CPVC). CPVC pipe is light or cream colored and used for hot-water pipelines. It can also be used for cold-water lines. It comes in 10- and 20-foot lengths. Diameter sizes range from 1/2 to 3/4 inch.

 

            c.         Acrylonitrile butadiene styrene (ABS). ABS pipe is black or gray and used for above- and belowground sanitary drainage and venting. It comes in 10- and 20-foot lengths. Diameter sizes range from 1 1/4 to 6 inches.

 

            d.         Polybutylene (PB). PB pipe is black or dark gray and used for cold-water lines. It is available in coils of 100 feet or more. Diameter sizes range from 3/4 to 2 inches. It is costly, requires special fittings, and is not widely used.

 

            e.         Polyethylene (PE). PE is black and used for cold-water lines and sprinkler systems. It comes in coils of 100 feet. Diameter sizes range from 3/4 to 2 inches.

 

1-3.      Galvanized-Steel/Iron Pipe. Galvanized-steel/iron pipe (Figure 1-4) can be used for hot- and cold-water supply distribution, certain drainage applications, and vent installations. It is made from mild carbon steel and is galvanized to prevent rust. It is joined with a threaded joint in pipe-to-pipe or pipe-to-fitting connections. This pipe comes in three strengths: (1) standard, (2) extra strong, and (3) double extra strong. The definitions Schedule 40 and Schedule 80 also describe pipe strengths. Schedule 40 standard is most commonly used in plumbing. Galvanized-steel/iron pipe should not be used underground and should be stored in a dry place. If the pipe ends are threaded, they must be protected from damage. This pipe comes in 21-foot lengths.

 

Figure 1-4. Galvanized-Steel/Iron Pipe

 

Figure 1-4. Galvanized-Steel/Iron Pipe

 

1-4.      Copper Tubing. Copper tubing (Figure 1-5) is lightweight, easily joined, and corrosion-resistant. It can be rigid or flexible and is classified by its wall thickness. It is used in hot- and cold-water distribution systems, in hot water heating systems, and in DWV lines. It is connected to the fittings by a soldered, flared, or compression type joint. Rigid copper tubing is hard-tempered and comes in 20-foot lengths. It does not bend, so changes in direction must be made with fittings. Flexible copper tubing is soft tempered, easily bent for changes in direction, and comes in coils of 40 to 100 feet.

 

Figure 1-5. Copper Tubing

 

Figure 1-5. Copper Tubing

 

 

 

 

 

1-5.      Advantages and Disadvantages of Each Pipe Type. Each pipe type has advantages and disadvantages to consider when determining which type of pipe to use. Tables 1-1, 1-2, 1-3, and 1-4 provide the advantages and disadvantages of each type of pipe.

 

Table 1-1. Advantages and Disadvantages of Cast-Iron Soil Pipe

 

Cast-Iron Soil Pipe

Advantages

Disadvantages

Durable

Strong

Corrosion resistant

Quiet

Less expensive than copper

Heavy

Cumbersome to work with

Difficult to join

Difficult to repair

Low in tensile strength

 

Table 1-2. Advantages and Disadvantages of Plastic Pipe

 

Plastic Pipe (ABS and PVC)

Advantages

Disadvantages

Lightweight

Easy to work with

Easy to cut and join

Easy to disassemble (for repairs)

Corrosion-proof

A natural insulator

Inexpensive

Easy to install without special tools

Low resistance to heat

Internal pressure ratings lower than metal

Imperfect seal in severely cold weather

Hazardous vapors from cement used for joining

Several closely spaced pipe hangers and supports

Low crush resistance compared to metal

Lack of acceptance by some local plumbing codes

 

Table 1-3. Advantages and Disadvantages of Galvanized-Steel/Iron Pipe

 

Galvanized-Steel/Iron Pipe

Advantages

Disadvantages

Inexpensive

Strong, rugged

Durable

Able to withstand high water pressure

     well

Time-consuming and difficult to install if not already threaded

Not resistant to corrosion and scaling with certain types of

     water

Not recommended for use underground

Subject to buildups of corrosion that impede water flow

Heavy

 

Table 1-4. Advantages and Disadvantages of Copper Tubing

 

Copper Tubing (DWV)

Advantages

Disadvantages

Lightweight

Easily joined

Easily assembled before making permanent

    connections

Durable

 

Expensive

Not resistant to corrosion from certain commercial

    wastes

 

 

PART B: MEASURING THE PIPES

 

1-6.      Engagement. A pipe engagement is the distance the pipe goes into a fitting. Different sizes of pipes require different amounts of engagement. This distance is determined by the pipes nominal size diameter (Table 1-5).

 

Table 1-5. Pipe Engagement in Fittings

 

Type of Fitting Material

Nominal Size Diameter

(in inches)

Approximate Pipe Engagement (in inches)

 

Steel, threaded (pipe-joint compound)

Steel, threaded (pipe-joint compound)

 

 

1/8

1/4

3/8

1/2

3/4

1

1 1/4

1 1/2

2

3

 

1/4

3/8

3/8

1/2

9/16

11/16

11/16

11/16

3/4

1

 

Copper (solder)

Copper (solder)

 

 

1/4

3/8

1/2

3/4

1

1 1/4

1 1/2

 

5/16

3/8

1/2

3/4

15/16

1

1/18

 

Plastic (solvent cement)

Plastic (solvent cement)

 

 

1/2

3/4

1

1 1/4

1 1/2

2

3

4

 

1/2

5/8

3/4

11/16

11/16

3/4

1 1/2

1 3/4

 

Cast-iron (oakum and lead)

Cast-iron (oakum and lead)

 

 

 

2

3

4

5

6

 

 

2 1/2

2 3/4

3

3

3

 

 

            a.         Engagement for a Cast-Iron Soil Pipe (Hub and Spigot) (Figure 1-6). A pipe engagement occurs when the spigot end of one pipe fits into the hub end of another pipe. A fitting engagement occurs when the end of a fitting fits into the hub end of a pipe. Always measure the distance inside the hub for a true pipe or fitting engagement.

 

Figure 1-6. Pipe and Fitting Engagements for a Cast-Iron Soil Pipe

 

Figure 1-6. Pipe and Fitting Engagements for a Cast-Iron Soil Pipe

 

            b.         Engagement for a Plastic Pipe (Figure 1-7). Engagement occurs when the end of a pipe fits into the collar of a fitting. Always measure the distance inside the collar for a true fitting engagement.

 

Figure 1-7. Pipe and Fitting Engagements for a Plastic Pipe

 

Figure 1-7. Pipe and Fitting Engagements for a Plastic Pipe

 

            c.         Engagement for a Galvanized-Steel/Iron Pipe (Figure 1-8). Engagement occurs when the threaded end of a pipe fits into the collar of a fitting. Always measure the distance inside the collar for a true fitting engagement.

 

Figure 1-8. Pipe and Fitting Engagements for a Galvanized-Steel/Iron Pipe

 

Figure 1-8. Pipe and Fitting Engagements for a Galvanized-Steel/Iron Pipe

 

            d.         Engagement for a Copper Tubing. Engagement occurs when the end of the tubing fits into the collar of a fitting (Figure 1-9). Always measure the distance inside the collar for a true fitting engagement.

 

Figure 1-9. Pipe and Fitting Engagements for a Copper Tubing

 

Figure 1-9. Pipe and Fitting Engagements for a Copper Tubing

 

1-7.      Fitting Dimension. A fitting dimension is needed when determining the amount of pipe required for installation. The fitting dimensions for all types of waste fittings are determined in the same way. A fitting dimension is the distance from the center of the fitting to the end of the fitting (Figure 1-10).

 

Figure 1-10. Determining a Fitting Dimension

 

Figure 1-10. Determining a Fitting Dimension

 

1-8.      Pipe Length Measurement. Determining the length of a pipe, at times, must include the fitting dimension. Figures 1-11, 1-12, and 1-13 show pipe-length determinations.

 

Figure 1-11. End-to-End Measuremen

 

Figure 1-11. End-to-End Measurement

 

Figure 1-12. End-to-Center Measurement

 

Figure 1-12. End-to-Center Measurement

 

Figure 1-13. Center-to-Center Measurement

 

Figure 1-13. Center-to-Center Measurement

 

1-9.      Pipe Length Determination. The following paragraphs describe the three different types of pipe connections. Tables 1-6, 1-7, and 1-8 provide the steps on how to determine the amount of pipe required for an installation.

 

            a.         Pipe-to-Pipe. Table 1-6 explains how to determine the length of pipe required when using a hub and spigot, cast-iron pipe.

 

Table 1-6. Length of Pipe Determination When Using a Hub and Spigot, Cast-Iron Pipe

 

Table 1-6. Length of Pipe Determination When Using a Hub and Spigot, Cast-Iron Pipe

 

Step 1. Measure the end-to-end distance from the place where the new pipe will be installed (42 inches).

 

Step 2. Add the amount of engagement (3 + 3 = 6 inches); (42 + 6 = 48 inches).

 

Step 3. Cut the pipe at the required length.

 

 

            b.         Pipe-to-Fitting. Table 1-7 explains how to determine the length of pipe required for a pipe-to-fitting connection. This method is the same for all types of piping.

 

Table 1-7. Length of Pipe Determination When Using a Pipe-to-Fitting Connection

 

Table 1-7. Length of Pipe Determination When Using a Pipe-to-Fitting Connection

 

Step 1. Measure the end-to-center distance from the place where the new pipe will be installed

(60 inches).

 

Step 2. Subtract the fitting dimension (60 - 6 = 54 inches).

 

Step 3. Add the amount of the engagement (54 + 2 1/2 = 56 1/2 inches).

 

Step 4. Cut a pipe the length of the total (56 1/2 inches).

 

 

            c.         Center-to-Center. Table 1-8 explains how to determine the length of pipe required for a connection between fittings. The method is the same for all types of piping.

 

Table 1-8. Length of Pipe Determination When Using a Pipe

Between a Fitting Connection

 

Table 1-8. Length of Pipe Determination When Using a Pipe 
Between a Fitting Connection

 

Step 1. Measure the center-to-center distance from the place where the new pipe will be installed

(66 inches).

 

Step 2. Subtract both fitting dimensions (66 – [5 + 5]  = 56 inches).

 

Step 3. Add the amount of engagement for both fittings (56 + [2 + 2]  = 60 inches).

 

Step 4. Cut a pipe the length of the total (60 inches).

 

 

 

PART C: PREPARING THE PIPING MATERIALS

 

1-10.    Preparing a Cast-Iron Soil Pipe. Preparing the piping material for installation requires that the pipe be measured, marked, cut, and cleaned. These paragraphs describe how to mark, cut, and clean cast-iron piping material.

 

a.         Marking Pipe. When cutting with a hammer and cold chisel, mark completely around the pipe where it is to be cut (Figure 1-14). When cutting with a soil pipe cutter, one mark on the pipe is adequate. Use a crayon or a piece of chalk to mark the piping material.

 

Figure 1-14. Marking to Cut With a Hammer and Chisel

 

Figure 1-14. Marking to Cut With a Hammer and Chisel

 

b.         Cutting Pipe With a Soil Pipe Cutter. Table 1-9 explains how to cut uninstalled pipes. These steps can also be used to cut pipes that are already installed but need to be repaired.

 

Table 1-9. Cutting Pipe With a Soil Pipe Cutter

 

Table 1-9. Cutting Pipe With a Soil Pipe Cutter

 

Step 1. Set the pipe in a vise if it is not already installed.

 

Step 2. Place the cutting wheels of the cutter on the measured mark. Tighten the adjusting knob.

 

Step 3. Rotate the cutter back and forth around the pipe.

 

Step 4. Continue tightening the adjusting knob and rotating the cutter until the pipe is cut.

 

 

c.         Cutting Pipe With a Hammer and Cold Chisel. Table 1-10 explains how to cut cast-iron soil pipe when a cutter is unavailable.

 

Table 1-10. Cutting Pipe With a Hammer and Cold Chisel

 

Table 1-10. Cutting Pipe With a Hammer and Cold Chisel

 

Step 1. Lay the pipe on a wooden board or a mound of dirt.

 

Step 2. Place the chisel on the measured mark. Tap it lightly with the hammer, scoring completely around the pipe.

 

Step 3. Score around the pipe again, using firmer blows.

 

Step 4. Continue scoring until the pipe breaks off.

 

 

d.         Cleaning Pipe. Clean the pipe ends to ensure a good joint connection. Use a rag to remove any foreign matter or moisture on the pipe ends.

 

1-11.    Preparing a Plastic Pipe. Preparing the piping material for installation requires that the pipe to be measured, marked, cut, and cleaned. Table 1-11 explains how to prepare plastic pipe to get a good joint connection. PVC and ABS are the types of plastic pipe used in a waste system.

 

Table 1-11. Preparing a Plastic Pipe

 

Table 1-11. Preparing a Plastic Pipe

 

Step 1. Determine the length of pipe required, and mark the spot for the cut.

 

Step 2. Place the pipe in a miter box or jig, and cut the pipe with a hacksaw or a fine-tooth handsaw. Use a miter box to get a square cut.

 

Step 3. Remove burrs from both the inside and the outside of the pipe with a pocketknife. Use sandpaper if a pocketknife is not available. Avoid damaging the ends of the pipe.

 

Step 4. Use sandpaper to remove the gloss from the outside ends of the pipe to get good joint connections. Clean the pipe with a universal solvent cleaner.

 

 

1-12.    Preparing a Galvanized-Steel/Iron Pipe. Preparing the piping material for installation requires that the pipe be measured, marked, cut, and cleaned. These paragraphs describe how to mark, cut, and clean galvanized-steel/iron piping material.

 

 

            a.         Marking Pipe. Measure the pipe to determine the proper length. Mark the pipe with a crayon or a piece of chalk at the required length.

 

            b.         Cutting Pipe With a Pipe Cutter. Table 1-12 explains how to cut a pipe with a pipe cutter.

 

Table 1-12. Cutting With a Pipe Cutter

 

Table 1-12. Cutting With a Pipe Cutter

 

Step 1. Place the pipe in a vise with the measured mark about 8 inches from the vise.

 

Step 2. Set the cutting wheel on the mark and turn the cutter handle clockwise to get a bite on the pipe.

 

Step 3. Turn the whole cutter clockwise, applying cutting oil to the cutting wheel.

 

Step 4. Give the handle a quarter turn after each complete turn of the cutter until the pipe is cut.

 

 

            c.         Cutting Pipe With a Hacksaw. Table 1-13 explains how to cut a pipe with a hacksaw.

 

Table 1-13. Cutting Pipe With a Hacksaw

 

Table 1-13. Cutting Pipe With a Hacksaw

 

Step 1. Determine the length of pipe required and mark the spot for the cut.

 

Step 2. Place the pipe in a vise and cut the pipe with a fine-tooth hacksaw.

 

Step 3. Make the cut as squarely as possible to simplify threading the pipe when joining.

 

 

            d.         Removing Burrs. Use a fine metal file to remove the burrs located on the outside of the cut end of the pipe. Remove the burrs on the inside, using a pipe reamer. Table 1-14 explains how to remove the burrs, using a pipe reamer.

 

Table 1-14. Removing Burrs

 

Table 1-14. Removing Burrs

 

Step 1. Push the pipe reamer into the pipe, applying pressure with one hand.

 

Step 2. Turn the pipe reamer clockwise with the other hand. Use short, even strokes and continue to turn the pipe reamer until all the burrs are removed.

 

 

            e.         Threading Pipe. Table 1-15 explains how to use a die and diestock to thread the ends of the pipe.

 

Table 1-15. Threading Pipe

 

Table 1-15. Threading Pipe

 

Step 1. Lock the pipe securely in the vise, with enough pipe projecting for threading.

 

Step 2. Slide the diestock over the end of the pipe, with the guide on the inside. Push the die against the pipe with one hand.

 

Step 3. Make three or four short, slow, clockwise strokes until the die is firmly started on the pipe. Apply a generous amount of cutting oil on the die.

 

Step 4. Give the stock one complete clockwise turn, and then turn it counterclockwise a quarter turn. This will clear cut metal from the die and burrs from the new threads. Continue to apply oil, as needed.

 

Step 5. Continue step 4 until 1/2 to 1/4 inch (or two threads) extends from the diestock.

 

Step 6. Turn the diestock carefully and counterclockwise, until the die is free of the cut threads.

 

Step 7. Use a heavy rag to wipe away excess oil and a wire brush to remove any chips. The pipe is now ready to be joined.

 

CAUTION

 

Wear gloves and use eye protection. Personal injury may result from long-term failure to follow the correct procedures.

 

 

 

 

1-13.    Preparing Copper Tubing (DWV). Preparing the piping material for installation requires that the tubing be measured, marked, cut, and cleaned. These paragraphs describe how to mark, cut, and clean copper tubing (DWV).

 

a.         Marking Copper Tubing (DWV). Measure the copper tubing (DWV) to determine the proper length. Mark it with a crayon or a piece of chalk at the required length.

 

            b.         Cutting Copper Tubing (DWV). Table 1-16 explains how to cut copper tubing (DWV) with a tube cutter or a fine-tooth hacksaw (32-teeth per inch).

 

Table 1-16. Cutting Copper Tubing (DWV)

 

Table 1-16. Cutting Copper Tubing (DWV)

 

Step 1. Determine the length of tubing required and mark the spot for the cut.

 

Step 2. Set the cutting wheel on the mark and turn the cutter knob clockwise to get a bite on the tubing.

 

Step 3. Hold the tubing firmly with one hand and use the other hand to turn the cutter clockwise around the tubing until the tubing is cut. Place the tubing in a miter box or a jig made of lumber to make a square cut if using a fine-tooth hacksaw.

 

Step 4. Ream the end of the tubing with the reamer attached to the tubing cutter. Use a fine metal file if the cutter does not have a reamer.

 

 

            c.         Cleaning Copper Tubing (DWV). To get a good joint connection, use an emery cloth to clean the outside end of the copper tubing (DWV) and the inside of the fitting (Figure 1-15). Clean to a bright shine.

 

Figure 1-15. Cleaning Copper Tubing (DWV)

 

Figure 1-15. Cleaning Copper Tubing (DWV)

 

 

PART D: IDENTIFYING FITTINGS AND USING JOINT

CONNECTIONS FOR RIGID PLASTIC PIPES

 

1-14.    Fittings. This part shows rigid plastic pipe fittings (ABS and PVC) and explains how to make a joint connection on plastic pipes. Figure 1-16 shows fittings for ABS plastic pipes. Fittings for PVC plastic pipes are the same, except that the color is white or pastel.

 

Figure 1-16. Fittings for Plastic Pipes

 

Figure 1-16. Fittings for Plastic Pipes

 

1-15.    Joint Connections. Joint connections for ABS and PVC plastic pipes are made with solvent cement. Table 1-17 shows the types of cement that can be used with ABS and PVC pipes. The joint connection on plastic pipes should be made as fast as possible without error, because the solvent cement dries very quickly. Table 1-18 explains how to make the joint connection.

 

Table 1-17. Types of Cement Used For ABS and PVC Pipes

 

Pipe Type

ABS Cement

PVC Cement

All-Purpose Cement

ABS

X

 

X

PVC

 

X

X

 

Table 1-18. Making the Joint Connection

 

Table 1-18. Making the Joint Connection

 

Step 1. Inspect the pipe end for burrs and the fitting for cracks.

 

Step 2. Clean the pipe and the inside of the fitting with an authorized cleaning primer, using a clean rag.

 

Step 3. Coat the outside of the pipe end and the inside of the fitting with solvent cement.

 

Step 4. Push the pipe as quickly as possible into the fitting as far as it will go. A small bead of cement will be visible.

 

Step 5. Give the fitting a quarter turn to spread the solvent cement evenly.

 

Step 6. Hold the joint connection for about 30 seconds to be sure it is solidly set.

 

Step 7. Wipe off all excess cement.

 

 

 

PART E: IDENTIFYING FITTINGS AND USING JOINT

CONNECTIONS FOR GALVANIZED-STEEL/IRON PIPES

 

1-16.    Fittings. This part shows threaded drainage fittings used for galvanized-steel/iron pipes and explains how to make a threaded joint connection on galvanized-steel/iron pipe. Drainage fittings for galvanized-steel/iron pipes used in a waste system are cast with a recessed shoulder. This design allows a smooth flow of waste material. Ts (Figure 1-17) are used when a pipe run branches at a 90-degree angle. Elbows (Figure 1-18) are used to change the direction of a pipeline. Couplings (Figure 1-19) are used to connect two lengths of pipe.

 

Figure 1-17. Ts

 

Figure 1-17. Ts

 

Figure 1-18. Elbows

 

Figure 1-18. Elbows

 

Figure 1-19. Couplings

 

Figure 1-19. Couplings

 

1-17.    Joint Connections. The threads of drainage fittings are placed at a slight angle (Figure 1-20). This angle causes horizontal drainage pipes to slope about 1/4 inch per foot. Table 1-19 explains how to make a threaded joint connection.

 

Figure 1-20. Slope of Horizontal Drainage Pipes

 

Figure 1-20. Slope of Horizontal Drainage Pipes

 

Table 1-19. Steps For Making the Joint Connection

 

Table 1-19. Steps For Making the Joint Connection

 

Step 1. Check the fitting threads for cleanliness and damage. If necessary, clean with a wire brush or replace.

 

Step 2. Repeat step 1 for the pipe threads.

 

Step 3. Apply pipe joint compound or Teflon® tape to the pipe threads only.

 

Step 4. Screw the fitting on hand tight.

 

Step 5. Tighten the fitting, using two pipe wrenches. Use one pipe wrench on the fitting and the other on the pipe and turn clockwise.

 

 

 

PART F: IDENTIFYING FITTINGS AND USING JOINT

CONNECTIONS FOR COPPER TUBING

 

1-18.    Fittings. This part shows fittings used for copper tubing (DWV) and explains how to make a soldered joint connection on copper tubing. Figure 1-21 shows the fittings for copper tubing (DWV).

 

Figure 1-21. Fittings for Copper Tubing (DWV)

 

Figure 1-21. Fittings for Copper Tubing (DWV)

 

1-19.    Joint Connections. Joint connections for copper tubing (DWV) are made with flux, solder, and a heat source. The flux permits even spreading of molten solder. The molten solder flows into the space between the fitting and the tubing. Table 1-20 explains how to use Flux,   50-50 solder, and a torch to make the joint connection.

 

Table 1-20. Steps For Making the Joint Connection

 

Table 1-20. Steps For Making the Joint Connection

 

Step 1. Apply flux to the outside end of the tubing.

 

Step 2. Apply flux to the inside end of the fitting.

 

Step 3. Push the fitting onto the tubing, giving it a quarter turn to spread the flux evenly.

 

Step 4. Apply heat to only the fitting by using a torch and continue until the flux begins to bubble.

 

Step 5. Keep the flame on the fitting and apply solder to the joint. Melt the solder around the joint.

 

Step 6. Remove the flame.

 

Step 7. Clean the joint with a wet cool rag. Avoid burning your fingers.

 

NOTE: A well-soldered joint should have an even bead around the entire joint.

 

 

 

 


Practice Exercise

 

Table of Contents

 

 

Downloadable Files

LESSON 2

 

WASTE SYSTEM ROUGHING-IN

 

Critical Task: 052-248-1003

 

 

OVERVIEW

 

LESSON DESCRIPTION:

 

This lesson covers the roughing-in of a waste system, such as the installation of sewer pipelines, drain lines, stacks, venting, and piping material. It also covers methods for supporting pipeline runs and testing a system for leaks.

 

TERMINAL LEARNING OBJECTIVE:

 

ACTION:

You will learn to describe the procedures for preparing cast-iron pipe for a rough-in waste system.

 

CONDITION:

You will be given the material contained in this lesson.

 

STANDARD:

You will correctly answer the practice exercise questions at the end of this lesson.

 

REFERENCES:

The material contained in this lesson was derived from FM 3-34.471 and TM 5-551K.

 

 

INTRODUCTION

 

Roughing-in is the installation of all the parts of a waste system that can be completed before installing the fixtures (Figure 2-1). These are the parts of a waste system that will be out of sight (behind walls and floors). These parts of a waste system must be carefully installed. After the walls and flooring are in place, it is difficult and expensive to make repairs to the rough-in waste system.

 


 

Figure 2-1. Roughing-In a Waste System

 

Figure 2-1. Roughing-In a Waste System

 

The rough-in waste system includes a building drain line, a stack, branch lines, venting, and fittings. The building drain line ties into the building sewer line. Of the four types of piping discussed in Lesson 1, cast-iron and plastic are most often used for a rough-in waste system. No matter which type of piping is used, the process of roughing-in will be the same except for the joint connections.

 

 

PART A: INSTALLING SEWER PIPELINES

 

2-1.      Connecting the Building Sewer Pipeline to the Main Sewer Pipeline. When a building foundation is under construction, the building sewer pipeline is installed in the ground. First, a hole is cut in the main sewer line. Then a thimble, which is a fitting that connects the two sewer systems, is attached to the main sewer line. Finally, the building sewer pipeline is laid, supported, and connected at the correct grade slope.

 

a.         Cutting a Hole in the Main Sewer Pipeline. Cut a hole in the main sewer pipeline above the normal sewerage flow level to install a thimble. Table 2-1 explains how to cut a hole in the main sewer pipeline.

 

Table 2-1. Cutting a Hole in the Main Sewer Pipeline

 

Table 2-1. Cutting a Hole in the Main Sewer Pipeline

 

Step 1. Tap gently around the circumference of the main sewer to find the depth of low for placing a thimble. A dull sound results from tapping below the sewer lever, and a ringing sound results from tapping above the sewer level.

 

Step 2. Use the thimble as a pattern for marking the size of the hole with a crayon or a piece of chalk. This tracing marks where to cut the hole.

 

Step 3. Make the cut on this line with a small, cold chisel and an 8-ounce ball peen hammer. Use light blows to prevent damage to the main sewer.

 

Step 4. Work around the cut until a depth of 1/8 to 3/16 inch is reached.

 

Step 5. Make a small hole in the center of the area to be removed. Always use light blows.

 

Step 6. Try the thimble in the made-to-fit hole on the main sewer pipeline often to see if it will fit the hole. Continue until the hole is the correct size.

 

 

            b.         Installing a Thimble. The thimble is the fitting that connects the main sewer pipeline to the building sewer pipeline. Table 2-2 explains how to install the thimble on the main sewer pipeline.

 

Table 2-2. Installing the Thimble

 

Table 2-2. Installing the Thimble

 

Step 1. Place the thimble in the proper position.

 

Step 2. Support the thimble in place with pieces of scrap lumber.

 

Step 3. Pack the connection with oakum and seal it with a portland cement mortar (one part sand to one part cement) around the thimble. Use enough mortar under the thimble, on the bottom of the tap, and on the top and sides.

 

Step 4. Do not remove the support until the joint sets.

 

Step 5. Test the system when completed.

 

 

            c.         Laying the Building Sewer Pipeline. Cast-iron soil pipe is normally used for sewer pipelines. Table 2-3 explains how to install the building sewer pipeline.

 

Table 2-3. Laying the Building Sewer Pipeline

 

Table 2-3. Laying the Building Sewer Pipeline

 

Step 1. Place the piping in a dug-out trench, one length at a time. Start at the sewer thimble and work toward the building.

 

Step 2. Set the pipe to a grade slope of 1/4 inch per foot with a carpenter's level.

 

Step 3. Support the pipe to maintain the grade slope.

 

Step 4. Make the joint connections after all the pipes are set.

 

 

 

PART B: INSTALLING DRAIN LINES AND STACKS

 

2-2.      Installing the Building Drain Line. The drain line of the building connects to the building sewer pipeline and continues to the point where the stack will rise vertically. The drainpipe of the building must be the same size as the building sewer pipe.

 

a.         Installing a Drain Line Under a Foundation Floor. Table 2-4 explains how to install a horizontal drain line under a foundation floor.

 

Table 2-4. Installing a Drain Line Under a Foundation Floor

 

Table 2-4. Installing a Drain Line Under a Foundation Floor

 

Step 1. Place the piping in a trench, one length at a time. Start at the building sewer pipeline and work towards the place where the stack will be installed.

 

Step 2. Set the pipe to a grade slope of 1/4 inch per foot with a carpenter’s level. The slope will rise from the building sewer line to the stack.

 

Step 3. Support the pipe at each connection to maintain the grade slope.

 

Step 4. Make the joint connections after all the pipes are set. Use a 1/4 bend with a long sweep fitting at the location where the stack will be erected.

 

 

            b.         Installing a Building Drain Line Through a Foundation Wall. Table 2-5 explains how to install a building drain line through a foundation wall.

 

Table 2-5. Installing a Building Drain Line Through a Foundation Wall

 

Table 2-5. Installing a Building Drain Line Through a Foundation Wall

 

Step 1. Start at the building sewer pipeline and determine where the foundation wall will be cut, using the proper grade slope. Mark the wall and then cut the hole.

 

Step 2. Run a chalk line from the hole to the proposed location of the stack, still using a rising grade slope of 1/4 inch per foot.

 

Step 3. Place each length of pipe along the chalk line. Support the joint connections with hangers.

 

Step 4. Place a 90-degree Y fitting to form the bottom of the stack and support it from the bottom.

 

Step 5. Check pipe alignment and make the joint connections.

 

Step 6. Patch the foundation wall where the pipe runs through it.

 

 

2-3.      Installing the Stack. A combination of vertical pipes with fittings forms the stack in a plumbing waste system. It is used for waste disposal and venting.

 

a.         Sections of the Stack. The main stack is composed of three sections: the soil, the waste, and the vent stacks. A soil stack carries waste disposal from water closets. A waste stack carries waste disposal from all other fixtures. A vent stack provides air circulation throughout the waste system and allows for the release of sewer gases.

 

b.         Placement of the Stack. The stack runs in the building wall, up through each floor, and out through the roof. It is installed after the building framework is in place. Table 2-6 explains how to complete the placement of the stack.

 

Table 2-6. Placement of the Stack

 

Table 2-6. Placement of the Stack

 

Step 1. Use a plumb line to ensure that the stack will be vertical.

 

Step 2. Cut holes in the framework for running the stack vertically.

 

Step 3. Set the pipes in place.

 

Step 4. Support the fittings.

 

Step 5. Ensure that the vent stack rises at least 12 inches from the highest point of the hole that was cut through the roof.

 

Step 6. Place the cleanouts at possible waste stoppage points.

 

Step 7. Make the joint connections.

 

NOTE: All open space around the stacks that stub through different floors need to be fire-caulked.

 

 

            c.         Connections to the Stack. Branch lines are for the disposal of waste (Figure 2-2). All rough-in horizontal branch lines in the waste system must slope 1/4 inch per foot toward the stack.

 

Figure 2-2. Connections to the Stack

 

Figure 2-2. Connections to the Stack

 

 

PART C: VENTING WASTE SYSTEM

 

2-4.      Vents. The waste system is vented to allow free air circulation within the system, to reduce the pressure on trap seals, and to remove foul gas odors caused by sewerage. Venting must tie into the stack. The method used to vent the waste system depends on where the fixtures are to be located and how they are grouped. There are three methods: common venting, wet venting, and circuit venting.

 

            a.         Common Venting. Common venting allows two similar fixtures to use the same stack fitting (Figure 2-3). Fixtures mounted side by side or back to back on a wall are common-vented. The waste drains of the two fixtures must be at the same height from the floor. This venting system usually is found in buildings where two bathrooms have a common partition.

 

Figure 2-3. Common Venting

 

Figure 2-3. Common Venting

 

            b.         Wet Venting. Wet venting (Figure 2-4) is part of a vent line through which liquid wastes flow from another fixture that has an individual vent. It is used most commonly on a small group of bathroom fixtures. A disadvantage is that the vent tends to become fouled with waste material, which reduces its diameter or causes a stoppage. The size of the pipe for a wet vent must be large enough to take care of the fixtures, based on the total drainage fixture units (DFUs). A common measure is that one DFU equals 7.5 gallons per minute discharge.

 

Figure 2-4. Wet Venting

 

Figure 2-4. Wet Venting

 

            c.         Circuit Venting. Circuit venting (Figure 2-5) extends from the main vent to connections on the horizontal-soil or waste branch pipe between the fixture connections. This vent is used in buildings having a battery of two or more fixtures, such as lavatories. A maximum of eight fixtures are permitted on any one circuit vent. The circuit vent is usually installed between the next to the last and the last fixture on the line. Since some fixtures discharge their waste through a part of the pipe that acts as a vent for other fixtures, the vent may become clogged. Reduce clogging by connecting the vent into the top of the branch rather than its side. Water and waste from the last fixture scours the vents of the other fixtures.

 

Figure 2-5. Circuit Venting

 

Figure 2-5. Circuit Venting

 

2-5.      Water Seals. A water seal stops sewer gases from coming into a building. It is a column of water in a fixture trap. The column is maintained by the atmospheric pressure from venting (14.7 pounds per square inch at sea level).

 

            a.         Water Seal for a Water Closet. Water closets have built-in traps that provide a visible water seal (Figure 2-6). This seal keeps sewer gases from coming into the building.

 

Figure 2-6. Water Seals for Water Closets

 

Figure 2-6. Water Seals for Water Closets

 

            b.         Water Seal for Other Fixtures. Other fixtures require a P-trap to provide a water seal (Figure 2-7). The P-trap seal is a column of water (about 2 inches) between the crown weir of the trap and the top dip of the trap.

 

Figure 2-7. Water Seal for Other Fixtures

 

Figure 2-7. Water Seal for Other Fixtures

 

2-6.      Cleanouts. A cleanout is a fitting with a removable plug that is placed in a roughed-in waste system to help clear any stoppage in waste drain lines. Cleanouts are placed at the connection between the building sewer line and drain line, at the base of a vertical stack and at all places where the pipe direction changes 90 degrees.

 

a.         Cleanout for a Building Sewer Line. This cleanout can be just outside or inside the building. It must be 2 or more inches above the ground or the building floor (Figure 2-8).

 

Figure 2-8. Cleanout for a Building Sewer Line

 

Figure 2-8. Cleanout for a Building Sewer Line

 

            b.         Cleanout at the Base of a Vertical Stack. This cleanout must be 6 inches or more above the floor (Figure 2-9). This is required due to the 90-degree directional change in the pipeline.

 

Figure 2-9. Cleanout at the Base of Vertical Stack

 

Figure 2-9. Cleanout at the Base of Vertical Stack

 

c.         Cleanout for a 90-Degree, Change-of-Pipe Direction. This cleanout is installed to clear any possible stoppage caused by the 90-degree turn in the line (Figure 2-10). It is important to keep the cleanout accessible.

 

Figure 2-10. Cleanout for a 90-Degree, Change-of-Pipe Direction

 

Figure 2-10. Cleanout for a 90-Degree, Change-of-Pipe Direction

 

 

PART D: INSTALLING PIPING MATERIAL

 

2-7.      Installing Pipe Runs Through Floor Joists. Roughed-in waste system piping and fittings are installed between and through the building framework (Figure 2-11). Installation is done before the exposed wall studs and floor joists are covered. Installation at this time makes it easier to rough-in the pipe runs.

 

Figure 2-11. Installing Piping Material

 

Figure 2-11. Installing Piping Material

 

a.         Cutting a Joist. Table 2-7 explains how to cut a notch in a joist.

 

Table 2-7. Cutting a Joist

 

Table 2-7. Cutting a Joist

 

Step 1. Use a handsaw to cut a notch in the joist. Ensure that the notch can be cut at the top or bottom of the joist. Ensure that the width of the notch is slightly larger than the outside diameter of the pipe. The depth of the notch cannot be larger than 1/4 of the joist depth (8 x 1/4 = 2 inches).

 

Step 2. Use a sharp wood chisel to cut away any wood between the saw cuts.

 

 

            b.         Bracing a Joist. A joist with a notch cut on top is braced with a 2- by 4-inch board on each side (Figure 2-12). The boards are nailed in place and centered under the notch. A joist with a notch cut in the bottom is braced with a steel plate centered on the notch.

 

Figure 2-12. Bracing a Joist

 

Figure 2-12. Bracing a Joist

 

            c.         Cutting a Joist for a Water Closet Bend. Table 2-8 explains how to cut a joist for a water closet bend.

 

Table 2-8. Cutting a Joist for a Water Closet Bend

 

Table 2-8. Cutting a Joist for a Water Closet Bend

 

Step 1. Ensure that there is enough room to install and support a closet bend before cutting the joist.

 

Step 2. Completely cut out and remove a section of the joist.

 

Step 3. Reinforce the joist, using boards of the same size, called headers. Use two headers on each side of the cut.

 

Step 4. Install the closet bend.

 

 

2-8.      Installing Pipe Runs Through Wall Studs. Table 2-9 explains how to cut a notch in a stud wall. Always measure before cutting. Figure 2-13 shows how to brace wall studs. Studs with a notch cut at the top or bottom are braced with steel plates over the center of the notch.

 

Table 2-9. Cutting the Wall Studs

 

Table 2-9. Cutting the Wall Studs

 

Step 1. Cut the notch from the top or bottom half of the stud. A notch cut from the top cannot be greater than 1/2 of the depth of the stud. A notch cut from the bottom cannot be greater than 1/3 of the depth of the stud.

 

Step 2. Ensure the width of the notch is slightly larger than the outside diameter of the pipe to be installed.

 

Step 3. Cut the notch with a handsaw.

 

 

Figure 2-13. Bracing the Wall Studs

 

Figure 2-13. Bracing the Wall Studs

 

 

PART E: SUPPORTING PIPELINE RUNS

 

2-9.      Pipe Hangers and Supports. All pipe runs, whether vertical or horizontal, must be supported in place. The length of the pipeline run, location, and joints will determine the kind of support to use and where to use it. The building material and type of pipe will also determine the kind of support to use. Figure 2-14 shows the different types of hangers and supports.

 

Figure 2-14. Hanger and Support Types

 

Figure 2-14. Hanger and Support Types

 

2-10.    Vertical Pipe Support Methods. Vertical pipe must be supported to keep it in a straight, vertical position (Figure 2-15). The method of support is determined by the location of the pipe run and joist.

 

Figure 2-15. Vertical Pipe Support Methods

 

Figure 2-15. Vertical Pipe Support Methods

 

2-11.    Horizontal Pipe Support Methods. Horizontal pipes must be supported to keep them in line and prevent sagging (Figure 2-16). The type of pipe and the location of the pipe run determine the support method and location of the supports.

 

Figure 2-16. Horizontal Pipe Support Methods

 

Figure 2-16. Horizontal Pipe Support Methods

 

 

PART F: TESTING THE SYSTEM FOR LEAKS

 

2-12.    Using Plugs. Once the waste system rough-in is completed, test it for leaks. Repair any leaks found and retest the system. A water test and/or an air test can be used. Testing the system for leaks must be completed before the walls are put up.

 

a.         Mechanical Plugs. To test with mechanical plugs, place a rubber spreader into the opening to be plugged (Figure 2-17). Expand the rubber spreader by turning the wing nut and/or ratchet in a clockwise direction.

 

Figure 2-17. Mechanical Plugs

 

Figure 2-17. Mechanical Plugs

 

b.         Inflatable Air Plugs. To test with inflatable air plugs, place an inflatable plug into the opening to be plugged (Figure 2-18). Inflate the plug with the hand-operated air pump.

 

Figure 2-18. Inflatable Air Plugs

 

Figure 2-18. Inflatable Air Plugs

 

2-13.    Performing a Water Test. A new system with oakum and lead joints must be filled with water at least 12 to 24 hours to allow the oakum in the joint to swell and form a watertight seal. The system is then drained and tested. To test all types of piping used in a waste system, perform the following steps:

 

Step 1. Seal off all openings with plugs except the highest vent opening. Seal off threaded piping with threaded plugs or caps.

 

Step 2. Fill the system with water through the highest vent opening and check for water leaks.

 

Step 3. Check the system for leaks if the water level drops more than 4 inches in 30 minutes.

 

Step 4. Remove the water from the system.

 

Step 5. Repair any leaks, if necessary, and retest.

 

2-14.    Performing an Air Test. Perform an air test, using the following steps:

 

Step 1. Seal off all the openings with plugs except for the one to be used for the test equipment and gauge.

 

Step 2. Force air through the system until the gauge reads 5 pounds per square inch.

 

Step 3. Let the air pressure remain at 5 pounds per square inch for 15 minutes.

 

Step 4. Put a soapy solution on the joints to test for leaks.

 

Step 5. Release the air, repair any leaks, if necessary, and retest.

 

 

 


Practice Exercise

 