Lesson 3
SOIL SURVEYS
| TASK: | Describe the Procedures Used to Direct a Deliberate Soil Survey for a Proposed Military Construction Project. |
| CONDITIONS: | Given this subcourse. |
| STANDARDS: | Demonstrate competency of the task skills and knowledge by responding correctly to 70% of the examination questions. |
| REFERENCE: | FM 5-530 |
Learning Event 1
IDENTIFY TYPES OF SOIL SURVEYS
The objective of the soil survey is to obtain information relating to the physical properties of the soil and the arrangement of the underlying materials. A soil survey can determine the location, sequence, thickness, and area extent of each soil stratum, including a description and classification of the soils and their structure and stratification in the undisturbed state. Significant geologic features, such as concretions, and mineral chemical constituents also are included in the data from exploration.
The investigation is conducted in the office, in the field, and in the laboratory. It begins with a preliminary program which discloses general characteristics that will provide you with a broad understanding of soil conditions and engineering problems which may be encountered, such as drainage, slope stability, differential settlement, and equipment production rates, to name a few. The basic soils information is invaluable when planning, conducting, and interpreting later detailed soil surveys.
The end product of the soils survey is an accurate engineering analysis of the subsurface conditions which will enable you to render the safest, most economical design.
TYPES OF SOIL SURVEYS
Although this lesson describes the hasty survey, it is primarily concerned with the deliberate survey.
HASTY SURVEY
The hasty survey should be preceded by as careful a study of all available sources of information as conditions permit. If possible, a trained person may observe soil conditions in the proposed construction area from the air. Careful aerial observation gives an overall picture, which is often difficult to secure at ground level because important features may be obscured in rough or wooded terrain. Rapid ground observation along the proposed road location or at the proposed airfield site will also yield useful information. Observation of the soil profile may be made along the natural banks of a stream, eroded areas, bomb craters, and other exposed places. As construction proceeds, additional soil studies will augment the basic data gained through the hasty survey and will dictate necessary modification in location, design, and construction.
The deliberate survey does not dismiss the fact that the time factor may be important; therefore, the scope of a deliberate survey may necessarily be limited in some cases. A deliberate survey is often performed while topographical data is being obtained, so that the results of the soil survey may be integrated with other pertinent information.
The principal methods of exploration used in soil surveys for roads, airfields, and borrow areas are soil samples obtained either by using hand augers or by digging a test pit. Other methods that may be used are power-driven earth augers, sounding rods, or earth moving equipment under expedient conditions to permit a hasty approach to the underlying soil.
SUBSURFACE EXPLORATION
A soil survey includes gathering data on soil layers, condition of soil in place, drainage characteristics, depth of water table, and soil profile. The explorations are conducted to determine the following information:
Location, Nature, and Classification of Soil Layers. Adequate and economic earthwork and foundation design of a structure can only be accomplished when the types and depths of soil to be encountered are known. By classifying the soils encountered, you can predict the extent of problems with drainage, frost action, settlement, stability, and similar factors. While an estimate of the soil characteristics may be obtained by field observations, you should also obtain samples of the major soil types as well as less extensive deposits, which may influence design.
Condition of Soils in Place. The moisture content and density of a soil in its natural state sometimes play an important part in design and construction. Moisture content of some soils, in place, may be so high that you should consider selecting another site for the airfield. If the natural soil is sufficiently dense or compact to meet the required specification, no further compaction of the subgrade will be required. Very compact soils in cut section may be difficult to excavate with ordinary tractor scraper units. Scarification or rooting before excavation may be necessary.
Drainage Characteristics. The drainage characteristics, in both surface and subsurface soils, are controlled by a combination of factors such as the void ratio, soil structure and stratification, temperature of soil, depth to water table, height of capillary rise, and the extent of local disturbances by roots and worms. The coarse-grained soils have better internal drainage than fine-grained soils. Remolding a soil also may change its drainage properties. Observations of the soil should be made in both the disturbed and undisturbed condition.
Ground Water and Bedrock. All structures must be constructed at such an elevation that they will not be adversely affected by the ground water table. The grade line must be raised or the ground water table must be lowered when a structure may be adversely affected by capillary rise or by the ground water table itself. Bedrock within the depth of excavation tremendously increases the time and equipment requirements for excavation. If the amount is very extensive, it may be cause for a change in the grade or even the site location.
Developing a Soils Profile. The soil profile is a graphical representation of a vertical cross-section of the soil layers from the surface of the earth downward. A description of the development of the soil profile will appear later in this lesson.
Learning Event 2
IDENTIFY THE STEPS IN A FIELD INVESTIGATION
Field investigation is done in three phases:
SITE EVALUATION
The first step is site evaluation. The object of site evaluation is to determine the soil strata and mineral composition of rocks and to try to foresee problems which may occur in construction or future expansion.
As described above in the section on hasty surveys, the soils engineer can obtain information from areas which expose the substrata. The areas include:
EXISTING INFORMATION
The next step is to obtain existing information. There are many sources of information available to the soils engineer. Using these to the fullest extent may help shorten the investigation. These sources will be used mostly to locate small areas of a large general area which are suitable for further investigation. For the final site selection, actual field investigations must be made.
Among the sources of information to be consulted in planning a soil survey are: intelligence reports, local inhabitants, and aerial photographs.
INTELLIGENCE REPORTS AND LOCAL INHABITANTS
Intelligence Reports. Intelligence reports which include maps and studies of soil conditions usually are available for areas in which military operations have been planned. Among the best and most comprehensive of these are the National Intelligence Surveys and Engineer Intelligence Studies. These reports are a source of information on geology, topography, terrain conditions, climate and weather conditions, and sources of construction materials.
Local Inhabitants. Local inhabitants may provide information to supplement intelligence reports or provide information about areas for which intelligence reports are unavailable. Information obtained from this source would include possible location of borrow material, sand and gravel deposits, and peat or highly organic soils, and information on the climate and topography of the area.
MAPS
Maps provide valuable information, especially when planning the soil survey. In some cases, maps showing the suitability of terrain for various military purposes, prepared by friendly foreign or enemy agencies, may be of considerable value in planning. There are several kinds of maps which provide different types of information about an area under investigation.
Geological Maps. Obviously a close relationship exists between geology and soil conditions. Geological maps and brief descriptions of regions and quadrangles have been published in the folios of the U.S. Geological Survey. Generally the smallest rock unit mapped is a formation, and geological maps indicate the area extent of these formations by means of letter symbols, color, or symbolic patterns. Letter symbols on the map also indicate the location of sand and gravel pits, and the rear of the map sheet sometimes has a brief discussion entitled "Mineral Resources," describing the location of construction materials.
Topographic Maps. Ordinary topographical maps may be of some use in estimating soil conditions, particularly when used with geologic maps. Topographic maps, especially when the contour interval is 20 feet or more, tend to give only a generalized view of the land surface. Inspection of the drainage pattern and slopes can provide clues of the nature of rocks, depth of weathering, soil, and drainage. For example, sinkholes may indicate limestone or glacial topography; hills and mountains with gently rounded slopes usually indicate deeply weathered rocks; and parallel ridges are commonly related to steeply folded, bedded rock with hard rock along the ridges. Features such as levees, sand dunes, beach ridges, and alluvial fans can be recognized by their characteristic shapes and geographic location.
Agricultural Soil Maps. Agricultural soil maps and reports are available for many of the developed agricultural areas of the world. These studies are concerned primarily with surface soils, generally to a depth of about six feet. Their value as aids in the engineering study of surface soils is apparent. For example, if the same soil is shown to occur in two different areas, it can be sampled and evaluated for engineering purposes in one area, and the amount of sampling and testing can then be sharply reduced in the second area. Information on topography, drainage, vegetation, temperature, rainfall, water sources, and rock location may be found in an agricultural report. Soils usually are classified according to their texture, color, structure, chemical and physical composition, and morphology.
Aerial Photographs. The use of aerial photographs in delineating and identifying soils is based upon the recognition of typical patterns formed under similar conditions of soil profile and weathering. Principal elements which can be identified on a photograph, and which provide clues to the identification of soils to a trained observer, are landforms, slopes, drainage patterns, erosional characteristics, soil color or "tone", vegetation, and land use. Each of the following brief descriptions serve only as an example of information which may be derived from the examination of aerial photographs.
SUBSURFACE INVESTIGATION
The third phase of the field investigation is to obtain data on the subsurface soils and formations. You may do this directly with Samples or indirectly with geophysical surveys and seismic probes. Table 6 shows the range of possible methods of subsurface exploration.
TABLE 6. METHODS OF SUBSURFACE EXPLORATION
Sampling Methods
The following paragraphs describe the conventional methods of subsurface sampling.
Test Pits. A test pit is an open excavation which is large enough for a man to enter and study the soil in its undisturbed condition. This method provides the most satisfactory results for observing the natural condition of the soil and collecting undisturbed samples. The test pit usually is dug by hand but power excavation by dragline, clamshell, bulldozer, backhoe, or a power-driven earth auger can expedite the digging. Load bearing tests can also be performed on the soil in the bottom of the pit. Figures 23 shows a soldier taking a chunk sample in a test pit.
FIGURE 23. TAKING A CHUNK SAMPLE FROM A VERTICAL FACE
Test Holes. Test hole exploration includes several methods as described below.
Hand Auger. The use of the hand auger is the most common method of digging test holes. It is best suited to cohesive soils but can be used on cohesionless soils above the water table, provided the diameter of the individual aggregate particles is smaller than the bit clearance of the auger. The auger borings are principally used for work at shallow depths. By adding pipe extensions, the earth auger may be used to a depth of about 30 feet in relatively soft soils. The sample is completely disturbed and is satisfactory for determining the soil profile, classification, moisture content, compaction capabilities, and similar properties of the soil. Figure 24 shows a soldier obtaining samples with a hand auger.
FIGURE 24. OBTAINING INDIVIDUAL BAG SAMPLES FROM AN AUGER BORING
Methods of Subsurface Exploration and Sampling. Table 7 shows methods of underground exploration and sampling in a condensed table.
TABLE 7. METHODS OF UNDERGROUND EXPLORATION AND SAMPLING
PLANNING THE SOIL SURVEY
The location of auger holes or test pits will depend upon the particular situation. In any case, the method described locates the minimum amount of holes. The completeness of the exploration will depend on the time available. A procedure for road, airfield, and borrow area investigation will be described.
Subgrade and Borrow Areas
Subgrade. Since soil tests should be made on samples representing the major soil types in the area, the first step in subgrade exploration is to develop a general picture of the subgrade conditions to assist in determining the representative soils. Perform a field reconnaissance to study landforms and soil conditions in ditches and cuts. Techniques have been developed whereby aerial photographs can be used for delineating areas of similar soil conditions. Full use should be made of existing data in agricultural soil maps for learning subsurface conditions.
The second step usually consists of preliminary borings spaced at strategic points. Arbitrary spacing of these borings at regular intervals is not recommended because it does not give a true picture. Intelligence use of the procedure described above, especially the technique of identifying soil boundaries from aerial photographs, will permit strategic spacing of the preliminary borings to obtain the maximum possible information with the least number of borings. In theater of operations cut areas, all holes should extend four feet below final subgrade elevation, if possible. In theater of operations fill areas, they should extend four feet below the natural ground elevation. The boring requirements stated above usually will result in the borings penetrating beyond the depth of maximum frost penetration (or thaw in permafrost areas). Where the above requirements do not achieve this result, the borings must extend to the depth of maximum frost (or thaw) areas.
Step three is to obtain soil samples for classification purposes in these preliminary borings. After these samples are classified, soil profiles should be developed, and representative soils should be selected for detailed testing. Test pits, or large-diameter borings, should then be made to obtain the samples needed for testing, or in-place pit tests. The types and number of samples required will depend on the characteristics of the subgrade soils. Subsoil investigations in the areas of proposed pavement must include measurements of the in-place water content, density, and strength. These are used to determine the depth of compaction and to ascertain the presence of any soft layers in the subsoil.
Borrow Areas. When material is to be borrowed from adjacent areas, borings should be made in these areas and carried two to four feet below the anticipated depth of borrow. Samples from the borings should also be classified and tested for water content, density, and strength.
Select Material and Subbase
Areas within the airfield site and within a reasonable haul from the site should be explored for possible sources of select material and subbase. Exploration procedures are similar to those described for subgrades since the select material and subbase generally are natural materials. Test pits or large auger borings put down with power augers are needed in gravelly materials.
Base and Pavement Aggregates.
Since these materials are generally crushed and processed, you should make a survey of existing producers plus other possible sources in the general area. Significant savings have been made by developing possible alternate quarry sites near the airfield location. This is particularly important in remote areas where no commercial producers are operating and in areas where commercial production is limited in quantity.
LOCATING, NUMBERING, AND RECORDING SAMPLES
The engineer in charge of the soil survey is responsible for properly surveying, numbering, and recording each auger boring, test pit, or other exploration investigation. A log is kept of each test hole which shows the elevation (or depth below the surface) of the top and bottom of each soil layer, the field identification of each soil encountered, and the number and type of each sample taken. Other information which should be included in the log is that relating to density of the soil, changes in moisture content, depth to ground water, and depth to rock. A typical boring log from a deliberate survey is shown in Figure 25.
FIGURE 25. SAMPLE BORING LOG
WHAT TO INCLUDE ON A BORING LOG
1. Depth below ground surface.
2. Elevation of soil layers and ground water table.
3. Thickness of layers.
4. Graphical symbol of the soil type.
5. Description of soil.
6. Position where soil sample is taken; whether disturbed or undisturbed.
7. Sample number.
8. Natural moisture content, in percent of dry weight of soil.
9. Number of blows of a 140-pound or 300-pound hammer falling 30 inches to
penetrate a 2-inch diameter sampling device or a casing one foot into soil.
10. Notes indicating position of ground water table, encountered tree roots,
or other pertinent facts.
11. Title of the project, job and/or contract number.
12. Location of the project.
13. Boring number.
14. Surface elevation of the boring.
15. Date.
16. Name of the foreman in charge of drilling.
The type of tools used in making the boring should be recorded. If the tools were changed, the depth at which the change was made and the reason for change should be noted. Incomplete or abandoned borings should be described with no less care than successfully completed drill holes. The notes should contain everything of significance observed on the job, such as the elevations at which wash water was lost from the hole.
The information contained in the field notes should be assembled in the form of boring logs in which the boundaries between the strata are plotted at their correct elevation on a suitable vertical scale.
THE SOIL PROFILE
Development
The engineer keeps detailed field logs of all auger borings or test pits made during the soil survey. When the survey has been completed, the information contained in the separate logs is consolidated. In addition to the classification and depth of soil layers encountered in each log, it is desirable to show the natural water contents of fine-grained soils along the side of each log when possible as shown in Figure 25. Also the elevation of the ground water table should be noted. The elevation is determined during the soil survey by observing the level at which free water stands in the test holes. To get an accurate determination, holes should be covered and inspected 24 hours after being dug, in order to allow the water to reach maximum level. The soil profile shown in Figure 26 is a graphical representation of a vertical cross-section of the soil layers from the surface of the earth downward. It shows the location of test holes, profile of the natural ground to scale, location of any ledge rock encountered, field identification of each soil type, thickness of each soil stratum, and profile of the water table.
FIGURE 26. TYPICAL SOIL PROFILE
Uses of the Soil Profile
The soil profile has many practical uses in the location; design, and construction of roads, airfields, and structures. It has a great influence in the location of the grade line, which should be placed so that full advantage is taken of the best soils which are available at the site. The profile will show whether soils to be excavated are suitable for use in embankments, or if borrow soils will be required. It may show the existence of undesirable conditions, such as peat or organic matter or bedrock close to the surface, which will require special construction measures. It will aid in the planning of drainage facilities so that advantage may be taken of the presence of well-draining soils. It may indicate that special drainage installations will be needed with soils which are more difficult to drain, particularly in areas where the water table is high. Considerations relative to capillary and frost action may be particularly important when frost-susceptible soils are shown on the profile.
RECOMMENDED PROCEDURES FOR SOIL SURVEYS
The following guide and step-by-step procedures are a summary and review of soils exploration.
Objective of Soil Exploration
Soil Types and Securing of Samples.
Condition of Soil In-place.
Drainage Characteristics.
Depth to Ground Water and Bedrock
Development of a Soil Profile for the Area.
Sources of Information
Published Information.
Field Information
General observation of road cuts, stream banks, eroded slopes, earth cellars, mine shafts, existing pits and quarries, etc.
Planning of General Layout
Primary Objective. The primary objective is to determine the extent of the various soil types, vertically and laterally, within the zone where earthwork may occur.
Airfields Exploration. Place borings at high and low spots, wherever a soil change is expected, and in transitions from cut to fill. There is no maximum or minimum spacing requirement between holes; however, the number of holes must be sufficient to give a complete and continuous picture of the soil layers throughout the area of interest. As a general rule, the number of exploration borings required on a flat terrain with uniform soil condition will be less than in a terrain where the soil conditions change rather frequently.
Exploration borings generally should be conducted at the point of interest, and located in a manner to get the maximum value from each boring. This may require exploration borings in the centerline as well as edges of runways or roads, but no specific pattern should be employed except perhaps a staggered or offset pattern, to permit the greatest coverage.
It is generally accepted policy to conduct the exploration borings at the edges of existing pavements, unless these pavements have failed completely, in which case the reason for the failure should be found.
Large cuts and fills are the most important areas for detailed exploration.
Depth of Exploration in the Theater of Operations. The cut section should be four feet below subgrade, if possible. (The fill section should be four feet below original ground level, if possible.) Effort should be made to locate the ground water table.
Procedures in Sampling
Exploration holes or pits must be carefully logged. Samples must be accurately located and numbered. The elevation and exact location of each hole should be determined and tied into the site layout.
Preparation of Soil Profile
The soils profile shows boundaries of soil strata, location and depth of test holes and samples, elevation of bedrock, and water table. Laboratory test results should be included when available. The soils profile is used to locate grade line, for excavation and grading plan, and for drainage plan.
Learning Event 3
PREPARE A TECHNICAL SOIL REPORT
The organization and presentation of the soils report is very important. It must be well organized and presented in a logical and concise format with emphasis on the technical conclusions. The following outline should help to organize a technical soils report successfully:
1. PROJECT
1--01 General Description of Project
1--02 Extent and Authority for Proposed Construction
1--03 Purpose and Scope of Report
2. DESCRIPTION OF SITE
2--01 Description of Location and Existing Facilities
2--02 Topography, Cultivation, and Drainage
3. GEOLOGY
3--01 Description of Subsurface Materials At and Near Site
3--02 Description of Overburden and Rock
4. AGGREGATES
4--01 Field Explorations
4--02 Field Tests
4--03 Laboratory Tests
4--04 Results of Field and Laboratory Investigations
5. FOUNDATION CONDITIONS
5--01 Field Explorations
5--02 Field Tests
5--03 Laboratory Tests
5--04 Results of Field and Laboratory Investigations
6. FILLS AND BORROW MATERIALS
6--01 Field Explorations
6--02 Field Tests
6--03 Laboratory Tests
6--04 Results of Field and Laboratory Investigations
7. CONCLUSIONS AND RECOMMENDATIONS
7--01 Site Selection
7--02 Economical Design
7--03 Minimum Specifications
ANNEXES
A. General Plan Drawings
B. Location Plan Drawings (existing and proposed features)
C. Profiles
D. Cross-Sections
E. Boring Logs
F. Laboratory Testing Data
G. Field Testing Data
It can be seen from an inspection of the outline that not every subject will apply to every report and that some of the items must be repeated several times in the same report. For example, items 5, 6, and 7 would have to be repeated for each runway in an airfield and item 4--03 might be omitted for expedient situations.
Frequently, portions of the information shown in the outline will be required at different time intervals. For this reason, a preliminary report and several supplementary reports may actually be made before the project is completed. However, if all of the information provided follows the same basic outline, filing the data and assembling the final report will be greatly simplified.
The type of survey conducted will determine the length and detail of the report. In the hasty survey, most of the items can be covered in one or two sentences and almost all of the annexes can be omitted. When a deliberate survey is made, it may be necessary to make a detailed soil profile and detailed plan drawing might be required.
GO TO: