CHAPTER 3

 

 

Centrifugal Systems

 

 

1.   FEW PEOPLE realize the importance of the refrigeration specialist in this age of aerospace weapons systems.  For them, refrigeration has nothing to do with launching a missile and reaching the moon.  However, we know that without control of the environment of a launch complex the military goals of defense and space conquest would never be achieved.

 

2.   The centrifugal refrigeration system is often used in such weapons systems as Titan, Bomarc, and SAGE.  In this chapter we will discuss the operation of this system, the complete refrigeration cycle, each component of the unit, and the general maintenance requirements.

 

9.   Refrigeration Cycle

 

1.   The centrifugal system uses the same general type of compression refrigeration cycle used on other mechanical systems.  Its features are:

 

·         A centrifugal compressor of two or more stages.

·         A low-pressure refrigerant known as Refrigerant-11.  Approximately 1200 pounds of refrigerant are required for fully charging a centrifugal machine.

 

2.   An economizer in the liquid return from the condenser to the evaporator acts as the expansion device.  You can compare the economizer to the high side float (metering device) used on older model refrigerators.  The use of this piece of equipment reduces the horsepower required per ton of refrigeration cycle.  This increase in efficiency is made possible by using a multistage turbocompressor and piping the flash gas to the second stage.

 

3.   A schematic of the centrifugal cycle is shown in figure 41.  We will begin the cycle at the evaporator.  The chilled water flowing through the tubes is warmer than the refrigerant in the shell surrounding the tubes, and heat flows from the chilled water to the refrigerant.  This heat evaporates the refrigerant at a temperature corresponding to the pressure in the evaporator.

 

Figure 41.  Centrifugal cycle.

Figure 41.  Centrifugal cycle.

 

4.   The refrigerant vapors are drawn from the evaporator shell into the suction inlet of the compressor.  The suction vapors are partially compressed by the first-stage impeller and join the flash gas vapor coming from the economizer at the second-stage impeller inlet.  The refrigerant gas discharged by the compressor condenses on the outside of the condenser tubes by giving up heat through the condenser tubes to the cooler condenser water.  The condensing temperature corresponds to the operating pressure in the condenser.

 

5.   The liquefied refrigerant drains from the condenser shell down through an inside conduit into the condenser float chamber.  The rising refrigerant level in this chamber opens the float valve and allows the liquid to pass into the economizer chamber.  The pressure in the economizer chamber is approximately halfway between the condensing and evaporating pressures: consequently, enough of the warm liquid refrigerant evaporates to cool the remainder to the lower temperature corresponding to the lower pressure in the economizer chamber.  This evaporation takes place by rapid "flashing" into gas as the liquid refrigerant passes through the float valve and the conduit leading into the economizer chamber.  The flashed vapors pass through eliminator baffles and a conduit to the suction side of the second stage of the compressor.

 

6.   The cooled liquid then flows into the economizer float chamber located below the condenser float chamber.  The rising level in the economizer float chamber opens the float valve and allows the liquid refrigerant to pass into the bottom of the cooler.  Since the evaporator pressure is lower than the economizer pressure, some of the liquid is evaporated (flashed) to cool the remainder to the operating temperature of the evaporator.  These vapors pass up through the liquid refrigerant to the compressor suction.  The remaining liquid serves as a reserve for the refrigerant continually being evaporated by the chilled water.  The cycle is thus complete.

 

7.   Now that you understand the complete refrigeration cycle, let us study the compressor in more detail.

 

10. Centrifugal Compressor

 

1.   A cutaway view of the compressor is shown in figure 42.  The easiest way to understand centrifugal compressor operation is to think of a centrifugal fan.  Like the fan, the compressor takes in gas at the end (in line with the shaft) and whirls it at a high speed.  The high-velocity gas leaving the impellers is converted to a pressure greater than the inlet.  At normal speed, with R-11, the suction temperature is 65° F. below the temperature of condensation.  At maximum speed, the compressor will produce a suction temperature of approximately 85° F. below the condensing temperature of R-11.  Changing the speed of the compressor varies the suction temperature.

 

Figure 42.  Compressor cutaway.

Figure 42.  Compressor cutaway.

 

2.   The compressor casing and the various stationary passages inside the compressor shaft are made of hard steel with keyways provided for each impeller.  The impellers are of the built-up type.  The hub disc and cover are machined steel forgings.  The blading is sheet steel formed to curve backward with respect to the direction of rotation and is riveted to the hubs and covers.  After assembly, the wheels are given a hot-dipped lead coating to reduce corrosion damage.  The rotor assembly, consisting of the shaft and impellers, runs in two sleeve type bearings.

 

3.   In figure 43 a thermometer is inserted in top of each bearing cover (1) for indicating temperature.  Each bearing also has two large oil rings (2) to insure lubrication.  The upper and lower bearing liners (3) are held in place by the upper and lower bearing retainers (4).

 

Figure 43.  Bearing assembly.

Figure 43.  Bearing assembly.

 

4.   Brass labyrinths (5) between stages and at the ends of the casing restrict the flow of gas between stages and between the compressor casing and bearing chambers.

 

5.   In operation, the pressure differential across each impeller produces an axial thrust toward the suction end of the compressor.  This thrust is supported by a "kingsbury" thrust bearing at the suction end of the shaft.

 

6.   Compressor Lubricating System.  The entire oiling system is housed within the compressor casing and the oil is circulated through cored opening, drilled pages, and fixed copper fines.  This eliminates all of the usual external lines and their danger of possible rupture, damage, or leakage.  All of the oil for the lubricating system is circulated by a helical gear pump, shown in figure 44, which is submerged in the oil reservoir.  The simple, positive drive insures ample oil for pressure lubricating and cooling all journal bearings, thrust bearings, and seal surfaces.  The reservoir which houses the oil pump is an integral part of the compressor casing and is accessible through a cover plate on the end of the compressor.  Circulating water cooling coils are fitted to the cover plate to maintain proper oil temperature.

 

Figure 44.  Compressor oil pump.

Figure 44.  Compressor oil pump.

 

7.   In general, the lubricating system (shown schematically in fig. 45) consists of the gear type oil pump, driven from the main compressor shaft and supplying oil through various connections and passages for the thrust bearing, the two shaft bearings, the oil pump worm gear drive, and for the shaft seal-with the necessary gauges and control valves to permit the system to operate automatically.

 

8.   The oil pressure or feed circuits are as follows, according to figure 45:

 

·         When the compressor starts, the pump (1) starts to circulate oil, which is supplied first entirely to the thrust bearing (3).

·         After passing through the thrust bearing, the oiling system divides into two paths known as "A" circuit and "B" circuit.

 

Figure 45.  Compressor oil system schematic.

Figure 45.  Compressor oil system schematic.

 

9.   In the first path, the oil flows through the strainer (29) and the proper orifices to the pump gear (2) and to the rear shaft journal bearing (4).  Since the thrust, rear journal bearing, and worm drive for the oil pump are all located above the oil pump chamber, the return oil merely drops back into the pump chamber from these parts.

 

10.  In the second path, oil flows through the check valve (5) and filter (7) to actuate the shaft seal (8) and supply the front shaft journal bearing (9).  Since part of the oil passes out through the front of the seal to atmospheric pressure, various valves are required in the supply lines as well as in the lines returning oil to the pump chamber.  The check valve (5) does not open during compressor startup until the pump pressure reaches 8 p.s.i.g.  After the valve (5) opens, the flow of oil is as described previously.  If the seal oil reservoir (6) is not full, a small part of the oil passes through the orifice (28) to fill the reservoir.  Oil under pressure to the seal expands the seal bellows to move the stationary seal back against its stop, allowing the oil to pass through the seal in two directions: (1) inside the compressor and (2) to the atmospheric side of the shaft seal.

 

11.  The oil passing to the compressor (vacuum) side of the seal flows to the front journal bearing (9), through two small holes in the inner floating seal ring (12) -which is located in the seal housing--to prevent unnecessary flow of oil from the vacuum side of the seal.  The bearing overflow drops to the bottom of the bearing chamber (10), draining back to the oil pump chamber through the proper passage in the manifold (18).

 

12.  The oil passing to the atmosphere is restricted by floating rings between the stationary seal and rotating seal hubs and between the housing cover and the rotating seal hub.  Most of it passes directly to the atmospheric float chamber (13).  The water-jacketed seal housing cover (11) cools this oil and minimizes the refrigerant loss from it.  A small amount of oil passes the seal rings and is returned to the atmospheric float chamber (13) through a connection (30).  From the float chamber, the oil goes through the automatic oil stop valve (16), up to the bearing chamber (10), and returns through the manifold to the oil pump chamber along with the oil overflow from the front bearing.  Oil returns from the atmospheric float chamber since the pressure in the bearing chamber is always below atmospheric.  This pressure, being equalized with the compressor suction through the rear shaft labyrinth, is always a vacuum during operation.  From the bearing chamber, the oil flows by gravity through the manifold (18), to the oil pump chamber.  The automatic stop valve (16) is provided to prevent flow of refrigerant vapor from the machine in case the pressure inside the machine during shutdown rises above atmospheric.  The valve is set to open at approximately 8 pounds and is actuated by an oil pressure line taken from the oil pump discharge and, therefore, opens immediately after the compressor is started.  Valve 16 also prevents outside air from entering the machine when the machine pressure is below atmospheric.  This valve is necessary because the atmospheric float valve (14) is designed for level control only and is not a stop valve.  Valve 17 is the oil pressure regulator.  It is actuated by pressure "back of seal" through line 15 and controls oil pressure by returning excess oil back to the oil pump chamber.

 

13.  Oil pressure gauges 22 and 23 on the control panel indicate the seal oil reservoir pressure and the pressure back of seal respectively.  When the seal oil reservoir is full, gauge 22 indicates the pressure on the seal bellows.  Gauge 23 indicates the pressure in the space between the seal and the inner floating ring or back of seal pressure which controls valve 17.

 

14.  The air vent and vacuum breaker (27) admits atmospheric pressure during shutdown to the seal oil reservoir to maintain a head of oil on the seal.  It operates as a gravity check valve.

 

The oil heater (31) heats the oil during shutdown to prevent excessive absorption of refrigerant by the oil.  A flow switch located in the water supply to the oil cooler manifold automatically turns the heater on when the water supply is shut off by hand, and cuts the heater off when the water is turned on.  A schematic diagram of the oil heater is shown in figure 46.  The oil cooler (19) cools the oil as it is returned to the pump chamber during operation.  Bearing thermometers 24 and 25 indicate the temperature of the shaft bearings.  Oil rings 20 and 21--also shown in figure 45-bring additional oil from the bearing wells to the shaft.  Relief valve 26 in the oil pump discharge line relieves any unusually high pressure that may occur accidentally, and thus protects the system against any damage.

 

Figure 46.  Compressor oil heater.

Figure 46.  Compressor oil heater.

 

15.  Compressor Shaft Seal.  A shaft seal is provided where the shaft extends through the compressor casing.  The seal assembly is shown in figure 47.

 

Figure 47.  Shaft seal assembly.

Figure 47.  Shaft seal assembly.

 

16.  The seal is formed between a ring, called the rotating scaling seat which is fitted against a shoulder on the shaft, and stationary sealing seat which is attached to the seal housing through a flexible member or bellows assembly.  The contact faces on these seal seats are carefully machined and ground to make a vacuum-tight joint when in contact.  A spring called the seal spring moves the stationary seal seat into contact with the rotating seal seat to make the proper seal when the compressor is shut down.  A floating ring is located between the hub of the stationary sealing seat and the hub of the rotating sealing seat.  A seal oil reservoir and filter chamber is attached to the compressor housing above the seal to provide oil to maintain a head of oil to the seal surfaces during shutdown periods.  The shaft seal consists of two highly polished metal surfaces which are held tightly together by a spring during shutdown, but are separated by a film of oil under pressure during operation.  The positive supply of oil from the oil pump during operation and from the seal reservoir during shutdown prevents any inward leakage of air or outward leakage of refrigerant.  In addition, the low oil pressure safety control will automatically stop the compressor if the oil pressure to the seal falls below a safe minimum.  Figure 48 shows a cutaway diagram of the seal installed on the seal end of the compressor.

 

Figure 48.  Diagram of compressor seal end.

Figure 48.  Diagram of compressor seal end.

 

17.  Lubricant.  A high-grade turbine oil, such as DTE heavy medium or approved equal, is the type of oil recommended for centrifugal compressor usage.  To be sure of specifications on grade and type of oil to use, it is advisable to refer to the manufacturer's maintenance manual.

 

18.  If a machine is to be started for the first time or if all the oil has been drained from the unit, the following lubrication procedures are recommended:

 

·         The machine pressure must be atmospheric.

·         Remove the cover on the front bearing at the coupling end of the compressor and pour 1 gallon of oil into the front bearing level.

·         Fill the seal oil pressure chamber by removing the cover.

·         Remove the cover from the rear bearing and pour oil into the chamber until the indicated height is reached as recommended on the pump chamber plate.

·         Fill the atmospheric float chamber through the connection on the side of the chamber until oil shows in the sight glass.

·         Pour a small amount of oil into the thrust bearing housing by removing the strainer cap and pouring oil into the strainer.

·         Under normal operating conditions, the following lubrication procedures are recommended:

·         Replace the oil filter regularly, depending on the length of operation and the condition of the filter.

·         If at any time some oil is withdrawn from the machine, replace with new oil.

·         Clean and inspect the strainer in the thrust bearing at least once a year.  Replace the complete oil charge at least once a year.

·         After shutdown periods of more than a month, remove the bearing covers and add 1 quart of oil to each bearing well before starting.

 

19.  To drain the oil system, allow the machine to warm up until the temperature is approximately 75° F. The machine must be at atmospheric pressure.  Drain the pump chamber by removing the drain plug.  Replace the plug, then drain the atmospheric float chamber in the same manner.  By draining these two chambers, practically all of the oil is removed.  The oil left in the bearing wells and seal reservoir is useful for keeping the bearing in satisfactory condition and as a sealing oil.

 

20.  CAUTIONS: To keep the machine in the best operating condition, the following cautions must be observed:

 

·         The electric heater in the oil pump chamber must be turned on during shutdown periods and must be turned off when the cooling water is turned on.

·         Do not overcharge the system with oil.  The oil level will fall as the oil is circulated through the system; but under normal operation, the oil level will increase approximately 7 percent in volume as the refrigerant becomes absorbed in it.  The oil level in the machine will be approximately one-half glass.

·         Oil can be added to the filling connection on the side of the atmospheric float chamber only while the machine is in operation and the atmospheric return valve is open.

 

21.  Now that you have a proper knowledge of compressor operation, let's discuss the type of drive for the compressor.

 

11. Compressor  Gear Drive

 

1.   The gear drive is a separate component mounted between the compressor and electric motor.  The gears are speed increasers required to obtain the proper compressor speed through the use of standard speed motors.  The gears are of the double helical type, properly balanced for smooth operation, and pressure lubricated.  The gear wheel and pinion are inclosed in an oiltight case, split at the horizontal centerline.  Lubrication is from the gear type oil pump.  The unit has an oil level sight glass, a pressure gauge, and an externally mounted oil strainer and oil cooler.  A diagram illustrating the gear parts is shown in figure 49.

 

Figure 49.  Gear drive components.

Figure 49.  Gear drive components.

 

2.   Lubrication.  A good gear oil must be used for the lubrication of high-speed gears.  The oil must be kept clean by filtering, and filters changed as often as possible.  The temperature of the oil should be kept within the range of 130° F. to 180° F. Water cooling should be used whenever necessary to keep the temperature within these limits.

 

3.   Type of Oil.  The best grade of oil to use on a gear depends on journal speeds, tooth speeds, and clearances.  In general, it is better to use an oil too heavy than one too light.  The gears will be somewhat warmer, but the heavier oil will take care of higher temperature if it is not more than a few degrees.  The heavier oil is rated at 400 to 580 seconds Saybolt viscosity at 100° F.

 

4.   Water Cooling of Gears.  The gears are water cooled by circulating water through water jackets cast in the ends of the gear casing or by means of either an internal or an external oil cooler.  This system is connected to a supply of cool, clean water, at a minimum pressure of 5 pounds.  A regulating device must be installed in the water supply line.  The discharge line should have free outlet without valves to avoid possibility of excessive pressures on the system.  Piping must be arranged so that all the water can be drained or blown out of the water jackets or cooler if the unit is to be subjected to freezing temperatures.

 

5.   Inspection.  Inspect to see that both the driving and driven machines are in line.  If you are not sure that alignment is correct, check this point with gauges.  Try out the water cooling system to see if it is functioning properly.  When starting, see that you have sufficient oil in the gear casing and that the oil pump gives required pressure (4 to 8 pounds).  When the temperature of the oil in the casing reaches 100° F. to 110° F., turn on the water cooling system.  Add sufficient oil from time to time in order to maintain the proper oil level.  Never allow the gear wheel to dip into the oil.

 

6.   Regular cleaning of the lubrication system and tests of the lubricant are essential.  Clean the strainer at least once a week and more often if necessary.  The manufacturer recommends that the gear case should be drained and be completely cleaned out every 2 to 3 months.  Refill with new filtered oil.  Between oil changes, samples of oil should be drawn off and the oil checked.  If water is present, the water should be drawn off. If there is a considerable amount of water in the oil, remove all oil and separate the water from the oil before it is used again.

 

7.   Repair.  All working parts of the gear drive are easily accessible for inspection and repair except the oil pump.  If you should have to dismantle the gears, you must take precautions to prevent any damage to gear teeth.  The slightest bruise will result in noisy operation.  When the gears are removed, place them on a clean cloth placed on a board and block them so that they cannot roll off.  Cover the gears with a cloth to protect them from dust and dirt.

 

8.   Bearing shells, oil slingers, etc., are marked and should be returned to their proper places.  Gaskets are used between the oil pump bracket and oil pump and under handhole covers.  All parts must be clean before reassembly.  Make sure that no metal burrs or cloth lint is present on any part of the unit.  Coat faces of flanges with shellac before bolting them together.  A thin coat of shellac on the bearing supports will prevent oil leaks at these points.  Before final replacement of the cover, make a careful inspection to see that all parts are properly placed and secured.

 

9.   Worn bearings must be replaced immediately because they will cause the gears to wear.  Bearings are interchangeable, and when new bearings are installed the gears are restored to their original center distance and alignment.  It is not recommended to rebabbit bearings, for the heat required to rebabbit the bearings will cause some distortion of the bearing shell.  Do not renew or scrape one bearing alone, but always renew or scrape in pairs; this will help eliminate tooth misalignment.  Do not adjust bearing clearances by planing the joint, thereby bringing the halves closer together, since trouble will result.

 

10.  The oil pump is a geared type.  During assembly, care must be taken to see that the paper gasket between the pump body and bracket is of the proper thickness.  A gasket that is too thick will reduce the capacity and cause failure in oil pressure, while a too thin gasket will cause an excessive load to be thrown on the gears, resulting in wear and destruction of the gears.  Writing paper makes a good gasket when shellacked in place.  Never use a rubber gasket on any oil joint.  "Cinch" fittings are used on all pipes connected to the oil pump bracket; use this type on all replacements.  Threaded fittings may cause the bracket to be pulled out of line, causing noisy operation and wear on gears.  Couplings should not be driven on or off the gear or pinion shafts, since hammering is liable to injure both surfaces.  Provisions have been made for using a jacking device for putting on or removing couplings from shafts.

 

11.  Gear tooth contact and wear should be uniformly distributed over the entire length of both gear and pinion helixes.  If heavier wear is noted on any portion of the helixes or any part of the tooth face, it may indicate improper setting of the gear casing, misalignment of connecting shafts, vibration, excessive or irregular wear on the bearings, or poor lubricant.  Should gear teeth become damaged during inspection or operation, remove burrs by use of a fine file or oil stone.  Never use these tools to correct the tooth contour.  Misalignment, poor lubrication, and vibration can cause pitting of tooth surfaces or flaking of metal in certain areas of the gear.  If this happens, check alignment and remove all steel particles.  Check the manufacturer's maintenance manual for specific maintenance procedures and instructions.

 

12.  You now understand the drive system for the compressor, but we must learn how the drive is coupled to the motor and the compressor.

 

12. Couplings

 

1.   The couplings used to connect the motor to the speed-increasing gears and from the gears to the compressors are self-alining coupling.  They are of the flexible geared type, consisting of two externally geared hubs that are pressed on and geared to the shaft.  These hubs are inclosed by a two-piece externally geared floating cover which functions as a single unit when the halves are bolted together.  The cover is supported on the hub teeth during operation.  A spacer or spool piece is used with the cover for the compressor coupling.  The hub teeth and cover teeth are engaged around the complete circumference, and the cover and shafts revolve as one unit.  The cover and each shaft is free to move independently of each other within the limits of the coupling, thus providing for reasonable angular and parallel misalignment as well as end float.  The amount of misalignment that the coupling will handle without excessive stressing varies with the size of the coupling.  In all cases, the coupling should be treated as a joint that will take care of only small misalignments.

 

2.   Installation and Alignment Procedures or Coupling.  Figure 50 illustrates the method used to mount each half coupling on the shaft.  In reference to figure 50, place the sleeve over the shaft end and lubricate the surface of the shaft.  Expand the hub with heat, using hot oil, steam, or open flame.  When using a flame, do not apply the flame to the hub teeth.  Use two long bolts in the puller holes to handle the war coupling.  Locate the hub on the shaft with the face of the hub flush with the shaft end.  Install the key with a tight fit on the sides and a slight clearance between the top of the key and the hub.

 

Figure 50.  Mounting coupling on shaft.

Figure 50.  Mounting coupling on shaft.

 

3.   Check the angular alignment, as shown in figures 51 and 52.  For normal hub separation, as shown in figure 51, use a feeler gauge at five points 90° apart.  Recheck the angular alignment as discussed above.  Figure 53 shows how to check the offset alignment by the sight method.  Figure 54 illustrates the method for checking alignment by the instrument method.  This method is recommended by the manufacturer.  Fasten or clamp the indicator bracket on one hub with the dial indicator button contacting the alignment surface of the opposite hub.  Rotate the shaft on which the indicator is attached to the hub, and take readings at four point, 90° apart.  Move either machine until readings are identical.  Reverse the indicator to the opposite hub and check.  Recheck the angular alignment as discussed before.

 

Figure 51.  Checking angular alignment (normal separation).

Figure 51.  Checking angular alignment

(normal separation).

 

Figure 52.  Checking angular alignment (wide separation).

Figure 52.  Checking angular alignment

(wide separation).

 

Figure 53.  Checking offset alignment (sight method).

Figure 53.  Checking offset alignment

(sight method).

 

Figure 54.  Checking offset alignment (instrument method).

Figure 54.  Checking offset alignment

(instrument method).

 

4.   Figure 55 illustrates the method for checking offset alignment with wide hub separation.  Use the dial indicator as discussed in checking offset alignment by the instrument method, then check the angular alignment as discussed before.

 

Figure 55.  Checking offset alignment (wide hub separation).

Figure 55.  Checking offset alignment

(wide hub separation).

 

5.   In checking for angular and offset alignment on the floating shaft arrangement, it is possible to correct both angular and offset misalignment in one operation.  In reference to figure 56, position units to be coupled with the correct shaft separation.  Install and assemble the coupling.  Clamp the indicator bar to the flange of one coupling with the indicator button resting on the floating shaft approximately 12 inches from the teeth centerline of this coupling.  Rotate the units, taking readings at four points, 90° apart.  Move either machine until the readings are identical.

 

Figure 56.  Checking angular and offset alignment.

Figure 56.  Checking angular and offset alignment.

 

6.   After checking and setting the offset and angular alignment, insert the gasket as shown in figure 57.  Inspect to insure the gasket is not torn or damaged.  Clean the coupling flanges and insert the gasket between the flanges, making sure to position the O-ring in the groove.  Figure 58 illustrates the method of positioning gaskets between each set of flanges for spacer and floating shaft type coupling.  Assemble the coupling as shown in figure 59.  Keep the bolt holes in both flanges and gasket in line.  Insert the body fitting bolts and nuts and tighten the bolts and nuts with wrenches no larger than the one furnished with the coupling until the flanges are drawn together.  Using an oversize wrench on the heads of nuts and bolts may round their heads or strip the threads.

 

Figure 57.  Gasket insert.

Figure 57.  Gasket insert.

 

Figure 58.  Insertion of both gaskets.

Figure 58.  Insertion of both gaskets.

 

Figure 59.  Assembling the coupling.

Figure 59.  Assembling the coupling.

 

7.   Lubricate the coupling as illustrated in figure 60.  Remove both lubricating plugs and apply the quantity and type of lubricant as specified by the manufacturer's instruction data sheet.  If grease is used, positioning of the lubrication holes is not necessary.  When a fluid lubricant is used, it is recommended that the lubricating holes be positioned approximately 45° from the vertical to prevent loss of lubricant.  A good oil lubricant no lighter than 150 seconds Saybolt Universal (SSU) or heavier than 1000 SSU at 210° F. can be used.  Before replacing the lubrication plugs, check the copper ring gaskets to make sure they are in position and are undamaged.  Tighten plugs with the wrench furnished with coupling as shown in figure 61.

 

Figure 60.  Coupling lubrication.

Figure 60.  Coupling lubrication.

 

Figure 61.  Tightening the coupling plug.

Figure 61.  Tightening the coupling plug.

 

8.   The coupling must be well lubricated at all times.  The couplings that use oil collector rings in the end of the cover can be lubricated while stopped or running.  The compressor should not be started until the coupling has been checked for proper amount of oil.  Oil will overflow the oiling ring with the coupling at rest when enough oil has been added.  Other types of couplings may have sleeves attached by a gasket to the hubs with no oiling ring.  The manufacturer will give specifications as to the amount of oil required to fill this unit.  Unless a large amount of oil is lost from the gasketed type, it is only necessary to check the amount of oil in the coupling twice a year by draining and refilling with the correct amount.

 

9.   Check of Coupling Alignment on Operating Machine.  In checking the alignment of an operating centrifugal unit, proceed as follows:  Make sure the machine has operated long enough to bring the compressor gear and motor up to operating temperatures.  Then stop the machine and disconnect both couplings, and with straightedge and feelers check the hubs.  Check the compressor coupling for parallelism, vertically and horizontally, noticing how much it will be necessary to move the gear, vertically or horizontally, to bring the coupling within 0.002 inch tolerance for alignment.  Then check the coupling for angularity by use of feelers to insure that the faces of the hubs are spaced equally apart at the top and bottom.  To secure this alignment for angularity, it is necessary to shift the gear at one end either vertically or horizontally.  Caution must be used so that the parallel alignment is not disturbed.  Recheck the parallel alignment to make sure that it is within its tolerance.  After the coupling has been aligned, assemble the coupling.  Now that we have reassembled the coupling, we shall study the drive motor and controls.

 

13. Drive Motor and Controls

 

1.   The motor furnished with a centrifugal machine is an a.c. electric motor, three-phase, 60 cycle.  The motor will be a general-purpose type with a normal starting torque, adjustable speed wound rotor and sleeve bearings.  For wound rotor motors, the controller consists of three component parts:

 

·         Primary circuit breaker panel

·         Secondary drum control panel

·         Secondary resistor grids

 

2.   The primary circuit breaker is the main starting device used to connect the motor to the power supply.  Air breakers are supplied for the lower voltages and oil breakers for 1000 volts.  This breaker is a part of the control for the motor and should be preceded by an isolating switch.  The breaker provides line protection (short circuit and ground fault) according to the rating of the size of breaker and is equipped with thermal over-load relays for motor running protection set at 115 percent of motor rating.  Undervoltage protection and line ammeter also form a part of the primary panel.

 

3.   The secondary drum control is used to adjust the amount of resistance in the slipring circuit of the motor and is used to accelerate and regulate the speed of the motor.  A resistor, which is an energy dissipating unit, is used with the drum to provide speed regulation.  The maximum amount of energy turned into heat in the resistor amounts to 15 percent of the motor rating.  In mounting the resistor, allow for free air circulation by clearance on all sides and at the top.

 

4.   Manual starting of the machine at the motor location assures you complete supervision of the unit.  Interlocking wiring connections between drum controller and circuit breaker makes it necessary to return the drum to full low-speed position (all resistance in) before the breaker can be closed.  The oil pressure switch is bypassed when holding the start button closed.  Releasing the start button before the oil pressure switch closes will cause the breaker to trip out-hence a false start.  Very large size air breakers are electrically operated but manually controlled by start-stop pushbuttons on the panel.  The drum controller lever must always be moved to the OFF position before pressing the start button.

 

5.   The motor, controlled by various automatic and manual controls propels the compressor.  The compressor in turn pumps the refrigerant through the system's condenser, cooler, and economizer.

 

14. Condenser, Cooler, and Economizer

 

1.   The condenser is a shell and tube type similar in construction to the cooler.  The primary function of the condenser is to receive the hot refrigerant gas from the compressor and condense it to a liquid.  A secondary function of the condenser is to collect and concentrate noncondensable gases so that they may be removed by the purge recovery system.  The top portion of the condenser is baffled, as shown in figure 62.  This baffle incloses a portion of the first water pass.  The noncondensables rise to the top portion of the condenser because they are lighter than refrigerant vapors and because it is the coolest portion of the condenser.

 

Figure 62.  Cross section of the condenser.

Figure 62.  Cross section of the condenser.

 

2.   A perforated baffle or distribution plate, as shown in figure 62, is installed along the tube bundle to prevent direct impact of the compressor discharge on the tubes.  The baffle also serves to distribute the gas throughout the length of the condenser.  The condensed refrigerant leaves the condenser through a bottom connection at one end and flows it the condenser float trap chamber into the economizer chamber.  The water boxes of all condensers are designed for a maximum working pressure of 200 p.s.i.g.  The water box, item 1 in figure 63, is provided with the necessary division plates to give the required flow.  Water box covers, items 2 and 3 in figure 63, may be removed without disturbing any refrigerant joint since the tube sheets are welded into the condenser and flange.  Vent and drain openings are provided in the water circuit.  The condenser is connected to the compressor and the cooler shell with expansion joints to allow for differences in expansion between them.  Figure 63 is a side view of the condenser.

 

Figure 63.  Condenser diagram.

Figure 63.  Condenser diagram.

 

3.   Condenser.  The following procedures should be followed in cleaning condenser tubes:

 

(1)     Shut off the main line inlet and outlet valves.

 

(2)     Drain water from condenser through the water box drain valve.  Open the vent cock in the gauge line or remove the gauge to help draining.

 

(3)     Remove all nuts from the water box covers, leaving two on loosely for safety.

 

(4)     Using special threaded jacking bolts, force the cover away from the flanges.  As soon as the covers are loose from the gaskets, secure a rope to the rigging bolt in the cover and suspend from overhead.  Remove the last two nuts and place on the floor.

 

(5)     Scrape both the cover and the matching flange free of any gasket material, items 4, 5, and 6 in figure 63.

 

(6)     Remove the water box division plate by sliding it out from its grooves.  Caution should be used in removing this plate; it is made of cast iron.  Penetrating oil may be used to help remove the plate.

 

(7)     Use a nylon brush or equal type on the end of a long rod.  Clean each tube with a scrubbing motion and flush each tube after the brushing has been completed.  CAUTION:   Do not permit tubes to be exposed to air long enough to dry before cleaning since dry sludge is more difficult to remove.

 

(8)     Replace the division plate after first shellacking the required round rubber gasket in the two grooves.

 

(9)     Replace the water box covers after first putting graphite on both sides of each gasket, since this prevents sticking of the gaskets to the flanges.  CAUTION:   Care must be taken with the water box cover on the water box end to see that the division plate matches up the rib to the flanges.

 

(10)   Tighten all nuts evenly.

 

(11)   Close the drain and gauge cock.

 

(12)   Open the main line water valve and fill the tubes with water.  Operate the pump, if possible, to check for leaktight joints.

 

4.   Cooler.  The cooler is of horizontal shell and tube construction with fixed tube sheets.  The shell is low carbon steel plate rolled to shape and electrically welded.  The cooler and condenser both have corrosion-resistant cast iron water boxes.  They are designed to permit complete inspection without breaking the main pipe joints.  Full-size separate cover plates give access to all tubes for easy cleaning.  The cooler water boxes are designed for maximum 200 pounds working pressure.  They are provided with cast iron division plates to give the required water pass flow.  Both the cooler and condenser have tube sheets of cupro-nickel, welded to the shell flange.  Cupronickel is highly resistant to corrosion.

 

5.   The tubes in the cooler are copper tubes with an extended surface.  The belled ends are rolled into concentric grooves in the holes of the tube sheets.  Tube ends are rolled into the tube sheets and expanded into internal support sheets.  The normal refrigerant charge in the cooler covers only about 50 percent of the tube bundle.  However, during operation, the violent boiling of the refrigerant usually covers the tube bundle.  The cooler is equipped with multibend, nonferrous eliminator plates above the tube bundle which remove the liquid droplets from the vapor stream and prevent carryover of liquid refrigerant particles into the compressor suction.  Inspection covers are provided in the ends of the cooler to permit access to the eliminators.  Figure 64 is a cross-section diagram of the cooler.

 

Figure 64.  Cross section of cooler.

Figure 64.  Cross section of cooler.

 

6.   A rupture valve with a 15-pound bunting disc is provided on the cooler, and a 15-p.s.i.g. pop safety valve is screwed into a flange above the rupture disc.  These items are strictly for safety, because it is highly improbable that a pressure greater than 5 to 8 p.s.i.g. will ever be attained without purposely blocking off the compressor suction opening.

 

7.   An expansion thermometer indicates the temperature of the refrigerant within the cooler during operation.  A sight glass is provided to observe the charging and operating refrigerant level.  A charging valve with connections is located on the side of the cooler for adding or removing refrigerant.  The connection is piped to the bottom of the cooler so that complete drainage of refrigerant is possible.  A refrigerant drain to the atmosphere is also located near the charging connection and expansion thermometer.

 

8.   A small chamber is welded to the cooler shell at a point opposite the economizer and above

the tube bundle.  A continuous supply of liquid from the condenser float chamber is brought to the expansion chamber while the machine is running.  The bulb of the refrigerant thermometer and the refrigerant safety thermostat bulb are inserted in this expansion chamber for measuring refrigerant temperature.

 

9.   Cleaning.  Depending on local operating conditions, the tubes of the evaporator should be cleaned at least once a year.  Cleaning schedules should be outlined in the standard operating procedures.  You will be required to make frequent checks of the chilled water temperatures in the evaporator.  If these temperature readings at full load operation begin to vary from the designed temperatures, fouling of the tube surfaces is beginning.  Cleaning is required if leaving chilled water temperature cannot be maintained.

 

10.  Repair.  Retubing is about the only major repair that is done on the evaporator (cooler).  This work should be done by a manufacturer's representative.

 

11.  Cooler and Condenser Checkpoints.  You must check the cooler and condenser for proper refrigerant level and make sure that the tubes in the cooler and condenser are in efficient operating condition.  The correct refrigerant charging level is indicated by a cross wire on the sight glass.  The machine must be shut down to get an accurate reading on the sight glass.  For efficient operation, the refrigerant level must not be lower than one-half of an inch below the cross wire; a refrigerant level above this reference line indicates an over-charge.  Overcharging is caused by the addition of too much refrigerant.  When this condition exists, the overcharged refrigerant must be removed.

 

12.  If the machine has been in operation for long periods of time, the refrigerant level will drop due to refrigerant loss.  When this condition exists, additional refrigerant must be added to the system to bring the refrigerant level up to its proper height as indicated on the cross wire.  Observe all cautions and do not overcharge the cooler.

 

13.  A method of determining if the tube bundle of either the cooler or condenser is operating efficiently is to observe the relation between the change in temperature of the condenser water or brine and the refrigerant temperature.  In most cases, the brine or condenser waterflow is held constant.  Under such conditions, the temperature change of chilled and condenser water is a direct indication of the load.  As the load increases, the temperature difference between the leaving chilled water or condenser cooling water and the refrigerant increases.  A close check should be made of the temperature differences at full load when the machine is first operated, and a comparison made from time to time during operation.  During constant operation over long periods of time, the cooler and condenser tubes may become dirty or scaled and the temperature difference between leaving water or brine will increase.  If the increase in temperature is approximately 2° or 3° at full load, the tubes should be cleaned.

 

14.  Read the condenser pressure gauge when taking readings of the temperature difference between leaving condenser water and condensing temperature.  Before taking readings, make sure the condenser is completely free of air.  The purge unit should be operated for at least 24 hours before readings are taken.

 

15.  Economizer.  A complete explanation of the function of the economizer was given under the refrigeration cycle.  The economizer is located in the cooler shell at the opposite end from the compressor suction connection and above the tube bundle.

 

16.  The economizer is a chamber with the necessary passages and float valves, connected by an internal conduit passing longitudinally through the cooler gas space to the compressor second-stage inlet.  This connection maintains a pressure in the economizer chamber that is intermediate (about 0 p.s.i.g.) between the cooler and condenser pressures and carries away the vapors generated in the chamber.  Before entering the conduit, the economizer vapors pass through eliminator baffles to extract any free liquid refrigerant and drain it back into the chamber.  (Item 9 of fig. 64 is a front view of the economizer chamber.)

 

17.  There are two floats in separate chambers on the front end of the economizer.  The top or condenser float valve keeps the condenser drained of refrigerant and admits the refrigerant from the condenser into the economizer chamber.  The bottom, or economizer, float valve returns the liquid to the cooler.

 

18.  This system is also equipped with another fine feature to assure smoother operation.  Let's discuss the hot gas bypass system.

 

15. Hot Gas Bypass

 

1.   The automatic hot gas bypass is used to prevent the compressor from surging at low loads.  In case of low load conditions, hot gas is bypassed directly from the condenser through the cooler to the suction side of the compressor.  The hot gas supplements the small volume of gas that is being evaporated in the evaporator due to low load conditions.  Surging generally occurs at light load, and the actual surge point will vary with different compressors.  In most instances, it usually develops at some point well below 50 percent capacity.  If the leaving chilled water is held at a constant temperature, the returning chilled water temperature becomes an indication of the load.  This temperature is used to control the hot gas bypass.  A thermostat, set in the returning chilled water, operates to bleed air off the branch line serving the hot gas bypass valve.  The thermostat is set to start opening the bypass valve slightly before the compressor hits its surge point.  Figure 65 illustrates components and location of the hot gas bypass line.

 

Figure 65.  Hot gas bypass.

Figure 65.  Hot gas bypass.

 

2.   A liquid line injection system is provided in the hot gas bypass system to desuperheat the gas by vaporization in the bypass line before it enters the compressor suction.  If the gas is not desuperheated, the compressor will overheat.  The automatic liquid injection system components consist of a pair of flanges in the hot gas line, an orifice, a liquid line from the condenser to one of the flanges, and a liquid line strainer with two shutoff valves.

 

3.   The automatic valve shown in figure 65 is normally closed.  When this valve is closed, there is no flow of gas through the orifice.  The pressure at point M, just below the orifice, is the same as the condenser pressure; therefore, no liquid will flow through the liquid line.  When the occasion arises for the need of hot gas, the valve is opened automatically and a pressure drop will exist across the orifice.  The amount of pressure drop is a direct function in determining the rate of gasflow through the orifice.  The larger the flow of hot gas through the bypass and orifice, the lower the pressure at point M will become in relation to the condenser pressure, and the greater will be the pressure differential to force desuperheating liquid through the liquid line.  As the amount of hot bypass gas is increased or decreased by the opening or closing of the valve, the amount of desuperheating liquid forced through the liquid line is automatically increased or decreased.

 

4.   The two shutoff valves in the liquid line are normally left wide open and are closed only to service the liquid line components.  The special flange (located near the orifice) is installed at a slightly higher level than the surface of the liquid lying in the bottom of the condenser.  When no hot gas is flowing through the bypass, no unbalance will exist in the liquid line.  Therefore, the liquid will not flow and collect in the gas pipe above the automatic valve.  This prevents the danger of getting a “slug” of liquid through the hot gas bypass line whenever the valve is opened.  It also provides a means of distributing the liquid into the hot gas stream as evenly and as finely as possible.  The flange is constructed with a deep concentric groove in one face for even distribution of the liquid.

 

5.   How are undesirables such as water and air expelled from this system?  The purge unit will do this important task for us.

 

16. Purge Unit

 

1.   The presence of even a small amount of water in a refrigeration system must be avoided at all times; otherwise excessive corrosion of various parts of the system may occur.  Any appreciable amount of water is caused by a leak from one of the water circuits.  Since the pressure within a portion of the centrifugal refrigeration system is less than atmospheric, the possibility exists that air may enter the system.  Since air contains water vapor; a small amount of water will enter whenever air enters.

 

2.   The function of the purge system is to remove water vapor and air from the refrigeration system and to recover refrigerant vapors which are mixed with these gases.  The air is automatically purged to the atmosphere.  The refrigerant is condensed and automatically returned to the cooler as a liquid.  Water, if present, is trapped in a compartment of the purge separator unit from which it can be drained manually.  Thus the purge and recovery system maintains the highest possible refrigerating efficiency.

 

3.   Components.  The following discussion of the component items of the purge system is referenced to figure 66.

 

·         Stop valve--on main condenser, item 1.  This valve is always open except during repairs.

·         Pressure-reducing valve--in suction line, item 2, to regulate the compressor suction pressure.

·         Stop valve--in suction line, item 3, located in the end of the purge unit casing.  This valve is to be open when the purge unit is in operation and closed at all other times.

·         Pressure gauge--this gauge, item 4, indicates the pressure on the oil reservoir.  NOTE:  Before adding oil, at item 23, be sure the pressure is at zero.

 

Figure 66.  Purge unit schematic.

Figure 66.  Purge unit schematic.

 

·         Compressor, item 5--to be operated continuously when the centrifugal compressor is operating, and before starting the machine as required by the presence of air.

·         High-pressure cutout switch, item 7--connected to the compressor discharge.  Adjusted to stop the compressor if the purge condenser pressure increases to about 110 p.s.i.g. because of some abnormal condition.  The switch closes again automatically on the reduction of pressure to about 75 p.s.i.g.

·         Auxiliary oil reservoir, item 8--this reservoir serves as a chamber to relieve the refrigerant from the compressor crankcase and also to contain extra oil for the compressor.  The refrigerant vapor, which flashes from the compressor crankcase, passes up through the reservoir and into the compressor suction line.  The free space above the oil level separates the oil from the refrigerant vapor before the vapor goes into the suction side of the purge compressor.  The oil storage capacity of the reservoir is slightly larger than the operating charge of oil required by the compressor.

·         Sight glass, item 9--for oil level in the compressor and auxiliary oil reservoir, located in front of casing.

·         Compressor discharge line, item 10.

·         Condenser, item 11--cooled by air from a fan on compressor motor.  It liquefies most of the refrigerant and water vapor contained in the mixture delivered by the compressor.

·         Evacuator chamber, item 12--for separation of air, refrigerant, and water.  Chamber can be easily taken apart for inspection and repairs.

·         Baffle, item 13--allows the condensate to settle and air to separate for purging.  This is the delivery point for the mixture of air, water (if any), and liquid refrigerant from condenser.

·         Weir and trap, item 14--located in the center of evacuation chamber.  Since the water is lighter than liquid refrigerant the water is trapped above the liquid refrigerant in the upper compartment.  Only refrigerant liquid can pass to the lower compartment.

·         Float valve, item 15--a high-pressure float valve, opening when the liquid level rises, allows the gas pressure to force the liquid refrigerant into the economizer.

·         Equalizer tube, item 16--to equalize the vapor pressure between the upper and lower compartments.

·         Two sight glasses, items 17 and 17A--on lower liquid compartment, visible at the end of the casing.  These glasses show refrigerant level in the separator.

·         Sight glass, item 18--on upper compartment to indicate the presence of water.

·         Stop valve at the end of casing, item 19--permits water to be drained from the upper compartment.  The valve is marked "Water Drain" and is closed except when draining water.

·         Automatic relief valve, item 20--to purge air to the atmosphere.

·         Stop valve marked “Refrigerant Return" in the return liquid refrigerant line, item 21-located at the end of the casing.  Open only when purge is operating.

·         Stop valve, item 22--on economizer in the return refrigerant connection.  Open at all times except when machine is shut down for a long period or being tested.

·         Plug in oil filling connection of reservoir, item 23--pressure in the system must be balanced with the atmospheric pressure to add oil through this fitting.

·         Cap, item 24--or draining oil from the compressor crankcase and oil reservoir.  Oil may also be added through this connection (not shown in fig. 66) if (1) a packless refrigerant valve is installed in place of cap at the connection and (2) the purge compressor is operated in a vacuum.

·         Connections between auxiliary reservoir and compressor crankcase, item 25.

·         Motor and belt--not shown in figure 66.

·         Wiring diagram inside the casing.

·         Casing that completely incloses the purge recovery unit and is removable to provide a means to work on components.

·         Plugged tee after pressure-reducing valve on line from condenser, item 26.

·         Capped tee on line leading to cooler, item 27.

·         Temporary connector pipe from water drain from separator to liquid refrigerant line to cooler, item 28.

 

4.   Purge Recovery Operation.  The purge recovery operation is automatic once the purge switch is turned on and the four valves listed below and referred to in figure 66 are opened:

 

(1)  Stop valve on main condenser

 

(2)  Stop valve in suction line

 

(3)  Stop valve in the return liquid refrigerant line

 

(4)  Stop valve on economizer in return refrigerant connection

 

5.   If there should be an air leakage in the system, operation of the purge unit will remove this air.  It is recommended that you stop the purge unit at intervals and shut off valves (1) an (4) listed above to check for leaks in the system.  A tight machine will not collect air no matter how long the purge unit is shut off.  Presence of air in the system is shown by an increase in head pressure in the condenser.  The pressure can develop suddenly or gradually during machine operation.  By checking the difference between leaving condenser water temperature and the temperature on the condenser gauge, you can determine the presence of air.  A sudden increase between these temperatures may be caused by air.  In some instances, a sudden increase in cooler pressure over the pressure corresponding to cooler temperatures during operation may be caused by air leakage.

 

6.   Small air leakages are very difficult to determine.  It may take one or more days to detect an air leakage in the machine.  A leak that shows up immediately or within a few hours is large and must be found and repaired immediately.  Air pressure built up in the condenser is released to the atmosphere by the purge air relief valve.  Excessive air leakage into the machine will cause the relief valve to pop off continuously, resulting in a large amount of refrigerant discharged to the atmosphere.

 

7.   Refrigerant loss depends on operational conditions; therefore, these conditions have a determining effect on the amount of refrigerant lost.  You should maintain a careful log on refrigerant charged and the shutdown level in the cooler.  In this manner, you can determine the time a leak develops and the amount of refrigerant lost, find the cause, and correct the trouble.

 

8.   Moisture removal by the purge recovery unit is just as important as air removal.  The moisture may enter the machine by humidity in the air that can leak into the machine or by a brine or water leak in the cooler or condenser.  If there are no water leaks, the amount of water collected by the purge unit will be small (1 ounce per day) under normal operating conditions.  If large amounts of water are collected by the purge unit (one-half pint per day), the machine must be checked for leaky tubes.  Water can be removed more rapidly when the machine is stopped than when operating.  If the machine is collecting a large amount of moisture.  It is advisable to run the purge unit a short time after the machine is stopped and before it is started.  Running the purge unit before the machine is started will help to reduce purging time after the machine is started.

 

9.   The pressure-reducing valve (2), shown in figure 66, is adjusted to produce a suction pressure on the purge recovery unit and will not allow condensation in the suction line.  If condensation does occur, the condensate will collect in the crankcase of the purge unit compressor, causing a foaming and excessive oil loss.  The table in figure 67 can be used as a guide for setting the pressure-reducing valve.  If the pressure-reducing valve is wide open, there will be a pressure drop of a few pounds across the valve and the suction pressure cannot be adjusted higher than a few pounds below the machine condensing pressure.

 

Figure 67.  Suction and relief pressure.

Figure 67.  Suction and relief pressure.

 

10.  Purge Unit Maintenance.  After repairs or before charging, it is necessary to remove large quantities of air from the machine.  This can be done by discharging the air from the water removal valve (item 19, fig. 66).  Caution must be observed in the removal of air, since there is some danger of refrigerant being discharged with the air and being wasted to atmosphere.

 

11.  If the normal delivery of refrigerant is interrupted, it is usually caused by the stop valve (item 21, fig. 66) being closed or because the float valve is not operating.  This malfunction is indicated by a liquid rise in the upper sight glass.  Immediate action must be taken to correct this trouble.  If the liquid is not visible in the lower glass, the float valve is failing to close properly.

 

12.  Water or moisture in the system will collect on the top of the refrigerant in the evacuation chamber.  If any water does collect, it can be seen through the upper sight glass and should be drained.  In most normal operating machines, the water collection is small; but if a large amount of water collects quite regularly, a leak in the condenser or cooler has most likely occurred and must be located and corrected immediately.

 

13.  The purge unit compressor and centrifugal compressor use the same type and grade of oil.  Oil can be added to purge the compressor by closing stop valves (items 3 and 21, fig. 66), removing plug (23) in the top of the oil sight glass, and adding oil.  Oil can be drained by removing the oil plug (24, fig. 66).  The oil level can be checked by a showing of oil at any point in the oil sight glass while the compressor is running or shut down.  The level of oil will fluctuate accordingly.  The oil level should be checked daily.

 

14.  Other components that must be closely checked in the purge recovery unit are as follows:

 

·         Belt tension.

·         Relief valve for rightness when closed to prevent loss of refrigerant.

·         Condenser clean and free from air obstruction

·         High-pressure cutout which shuts down if condenser pressure reaches 110 pounds.

 

15.  CAUTION:  The high-pressure cutout remakes contact automatically to startoff the purge recovery unit on 75 pounds.  Single-phase motors have a built-in thermal overload to stop the motor on overload.  It automatically resets itself to start the motor in a few minutes.

 

16.  The system is running and purged.  Let us now study our safety controls:

 

17. Safety Controls

 

1.   Safety controls are provided to stop the centrifugal machine under any hazardous condition.  Figure 68 illustrates the electrical wiring diagram.  All the controls are mounted on a control panel.  The safety controls are as follows:

 

·         Low water temperature cutout

·         High condenser pressure cutout

·         Low refrigerant temperature cutout

·         Low oil pressure cutout

 

Figure 68.  Control panel electrical diagram.

Figure 68.  Control panel electrical diagram.

 

2.   All of the safety controls except the low oil pressure cutout are manual reset instruments.  Each safety instrument operates a relay switch which has one normally open and one normally closed contactor.  When a safety instrument is in the safe position, the corresponding relay is energized and the current is passed through the closed contactor to a pilot light which lights to indicate a safe operating condition.  Should an unsafe condition exist, a safety control will deenergize the corresponding relay and the normally open contactor will open to deenergize the pilot light; the normally closed contactor will then close to energize the circuit breaker trip circuit.

 

When the circuit breaker trip circuit is energized, the circuit breaker trips open and stops the compressor motor.  The pilot light will not go back on until a safe operating condition exists and the safety cutout has been manually reset.  The oil safety switch operates somewhat differently.  Since the oil pressure is not up to design conditions until the compressor comes up to speed, the relay for the oil pressure switch must be bypassed when the machine is started.  The relay for the oil safety switch is bypassed by a time-delay relay, which keeps the trip circuit open until the compressor is up to speed.  After a predetermined time interval, the time-delay relay closes the trip circuit at the circuit breaker and the oil safety switch serves its function.  If the oil pressure does not build up before the time-delay relay closes, the trip circuit will be energized and the machine will stop.

 

3.   The low oil pressure cuts out at 6 pounds and in at 12 pounds.  The high condenser pressure cuts out at 15 pounds and in at 8 pounds.  The low refrigerant and temperature cutout is set after operation in accordance to the job requirement.  Generally, these controls should be set to cut out at 32° F. and to cut in at approximately 35° F.  The low water temperature cutout should be set to cut out at 38° F. and to cut in at 43° F.

 

4.   There are other safety controls built into the circuit breaker which are not part of the control panel, and reference should be made to the circuit breaker operating instructions for details of these controls.  Such items as overload protection and undervoltage protection will be covered therein.

 

5.   In addition to the pilot lights mentioned, a pilot light for the purge high-pressure cutout is on the safety control panel.  The high-pressure cutout, which serves to protect the purge recovery compressor from high head pressure, is located in the purge recovery unit.  When the high-pressure cutout functions on high head pressure, the pilot light on the control panel is lighted.

 

6.   One or more machines at each installation are provided with two sets of starting equipment.  One set is an operating controller and the other a standby controller.  In order that the machine safety controls can operate the controlling breaker, a rotary selector switch is provided on the safety control panel.  By means of the rotary selector switch, the machine safety controls can operate either of the controlling circuit breakers.  Safety controls are used for safe operation of the system, but operating controls affect the capacity.

 

18. Operating Controls

 

1.   The three methods of controlling the capacity output of a centrifugal machine are listed below:

 

·         Controlling the speed of the compressor

·         Throttling the suction of the compressor

·         Increasing the discharge pressure of the compressor.

 

2.   The three methods given are listed in order of their efficiency.  At partial loads, the power requirements will be least if the compressor speed is reduced, not quite as low if the suction is throttled, and highest if the condenser water is throttled to increase the discharge pressure.

 

3.   Where the compressor is driven by a variable-speed motor, motor speed and compressor speed are controlled by varying the resistance in the rotor circuit of the motor by means of a secondary controller.

 

4.   Damper Control.  Throttling the suction of the compressor is obtained by means of a throttling damper built into the cooler suction flange.  By throttling the compressor suction, the pressure differential through which the compressor must handle the refrigerant vapor is increased.  Suction damper control requires somewhat more power at partial loads than at variable-speed control.  The increase in power consumption is overbalanced by the increased effectiveness in maintaining a nonsurging operation at lower loads.  For this reason, the machines are equipped with dampers, even though the main control is variable speed.  Suction damper control modulation is effected by means of a temperature controller that sends air pressure signals to the suction damper motor in response to temperature changes of chilled water leaving the cooler.

 

5.   Condenser Water Control.  By throttling the condenser water, the condenser pressure is increased, thereby increasing the pressure differential on the compressor and reducing its capacity.  The occasion may arise where the variable-speed control cannot be adjusted low enough to meet operating conditions.  In such a case, the condenser water may be throttled and the compressor speed requirement brought up into the range of speed control.

 

6.   Speed control and suction damper control are combined to control the temperature of the chilled water leaving the cooler.  The suction damper modulates to control the leaving chilled water temperature on each balanced speed step.  As the refrigeration load decreases, the suction damper will gradually close in response to decreasing air pressure in the branch line from the suction damper controller.  As the suction damper approaches the closed position, a light on the control panel will indicate that the motor speed should be decreased to the next balanced step.  The converse is true if the refrigeration load increases.

 

7.   The lights for indicating a speed change are energized by mercury type pressure controls that sense branch air pressure from the suction chamber controller.  The controller that energizes the "speed decrease" light also closes the light circuit on decreasing branch air pressure; the controller that energizes the "speed increase" light also closes the light circuit on increasing branch air pressure.  The control system drawings give actual settings for pressure controllers; the final settings should be determined under actual operating conditions.  You must determine what pressure change corresponds to a speed change and then adjust the pressure controller accordingly.  Refer to the manufacturer's manual on details of adjustments.  This information on operating controls will help you better understand the operation of the entire system.

 

19. System Operation

 

1.   It is very difficult to give definite instructions in this text on the operating procedures for a given installation.  Various design factors change the location of controls, types of controls used, and equipment location, and will have a definite effect on operational procedures.  Listed below is a general description of startup and shutdown instruction.  It is recommended that you follow your installation standard operating procedures for definite operating instructions.

 

2.   Seasonal Starting.  Listed below are the recommended steps that can be used in normal starting:

 

(1)  Check oil levels for motor, gear, coupling, compressor, and bearing wells.

 

(2)  Allow condenser water to circulate through the condenser.  Be sure to vent air and allow the water to flow through slowly.  This precaution must be observed to avoid water hammer.

 

(3)  Allow water or brine to circulate through the cooler.  Be sure to vent air and allow the liquid to flow through slowly.  As explained above, this will help in preventing water hammer.

 

(4)  Make sure that air pressure is present at all air-operated controls.

 

(5)  Start the purge unit before starting the machine; this helps in removing air from the machine.  Then move the switch on the front of the casing to the ON position.  The purge recovery unit should be operated at all times while the machine is operating.

 

(6)  Make sure all safety controls have been reset and that the control lever is in position No. 1 (all resistance in).

 

(7)  Close the circuit breaker for all safety controls by pushing the starting switch or button in.

 

(8)  Bring the machine up to 75 percent full load with all resistance in.  Check oil gauges to make sure proper oil pressure is being developed.  If proper oil pressure is not developed in approximately 10 seconds, the machine will cut out on low oil pressure.

 

(9)  Open the valve to allow the cooling water to circulate to the compressor oil cooler, gear or turbine oil cooler, and seal jacket.  The water circulating to the compressor oil cooler must be kept low enough in temperature to prevent the highest bearing temperature from exceeding a temperature of 130° F.  Then adjust to give a temperature from 140° F. to 180° F.  The seal bearing temperature should run approximately 160° F., while the thrust bearing temperature is running at approximately 145° F. under normal operating conditions.  These temperatures should be checked closely until they maintain a satisfactory point.

 

(10)   After starting, the machine may surge until the air in the condenser has been removed.  During this surging period, the machine should be run at a high speed; this helps in the process of purging.  The condenser pressure should not exceed 15 p.s.i.g., and the input current to motor-driven machines should not run over 100 percent of the full load motor rating.  The machine will steady itself out as soon as all the air has been purged.  After leveling out the motor speed, the damper maybe adjusted to give the desired coolant temperature.  The motor should be increased slowly, point to point.  Do not proceed to the next speed point until the motor has obtained a steady speed.  Keep a close observation on the ammeter to make sure that the motor does not become overloaded.

 

3.   Normal and Emergency Shutdown.  Normal shutdown procedures are performed in the same manner as emergency shutdown procedures.  The following steps are used in shutting down the centrifugal machine:

 

(1)  Stop the motor by throwing the switch on the controller.

 

(2)  After the machine has stopped, turn off the water valve which supplies water to the compressor oil, gear oil cooler, and seal housing.

 

(3)  Shut down all pumps as required.

 

4.   Shutdown periods may be broken down into two classes.  The two classes are standby and extended shutdown.  Standby shutdown may be machine must be available for immediate use; extended shutdown is defined as that period of time during which the machine is out of service.

 

5.   Standby shutdown.  The following checks must be made during standby shutdown and corrective action taken:

 

(1)  Maintain proper oil level in the oil reservoir and in the suction damper stuffing box.

 

(2)  Room temperature must be above freezing.

 

(3)  Machine must be kept free of leaks.

 

(4)  Purge unit must be operated as necessary to keep the machine pressure below atmospheric pressure.

 

(5)  If the machine pressure builds up in the unit due to room temperature rather than leakage of air into the machine, a small quantity of water circulated through the condenser or cooler will hold the machine pressure below atmospheric.  Periodic operation of the purge unit will accomplish the same result.

 

(6)  The machine should be operated a few minutes each week to circulate oil and lower the refrigerant temperature.

 

6.   Extended shutdown.  If the system is free of leaks and the purge unit holds down the machine pressure, the following instructions and corrective actions must be taken in long shutdown periods:

 

(1)  Drain all water from the compressor, gear and turbine oil cooler, condenser, cooler, seal jacket, pumps, and piping if freezing temperatures are likely to develop in the machine room.

 

(2)  It is possible for the oil to become excessively diluted with refrigerant, causing the oil level in the pump chamber to rise.  This level should not be allowed to rise into the rear bearing chamber; if this occurs, remove the entire charge of oil.

 

7.   Logs and Records.  A daily operating log is maintained at each attended plant for a record of observed temperature readings, waterflow, maintenance performed, and any unusual conditions which affect an installation operation.  You are held responsible for keeping an accurate log while on duty.  A good log will help you spot trouble fast.  A typical log sheet has spaces for all important entries, and a carefully kept log will help to make troubleshooting easier.

 

8.   A master chart of preventive maintenance duties, each component identified, is usually prepared by the supervisor and includes daily, weekly, and monthly maintenance services.  The preventive maintenance items included on the chart are applicable to a specific installation.  The items on the chart must be checked accordingly.  Proper sustained operation is the result of good maintenance.

 

20. Systems Maintenance

 

1.   It is very difficult to set up a definite maintenance schedule since so many operational factors must be considered.  You must familiarize yourself with the operating procedures at your installation and follow recommendations.  We shall discuss the proper procedures for replacing oil, charging the unit, removing refrigerant, and troubleshooting.

 

2.   Replacing Oil.  The following procedure is used in the renewal of the oil:

 

(1)     Pressure in the machine should be approximately 1 p.s.i.g.

 

(2)     Drain oil from the bottom of the main oil reservoir cover.

 

(3)     Remove the main oil reservoir cover and clean the chamber to remove all impurities.

 

(4)     Replace the main oil reservoir cover and secure tightly.

 

(5)     Remove the bearing access cover plates.

 

(6)     Lift up the shaft bearing caps by reaching through the bearing access hole and removing the two large capscrews.

 

(7)     Fill the bearing approximately three-fourths of the full charge, allowing the excess oil to flow into the main oil reservoir.

 

(8)     Replace the bearing cap and secure with capscrews.

 

(9)     Remove the brass plug from the thrust housing, and remove the strainer; clean and replace.

 

(10)   Replace the plug and secure.

 

(11)   Drain oil through the plug in back of the seal oil reservoir.

 

(12)   Remove the cover from the seal oil reservoir.

 

(13)   Remove the filter from the chamber; replace with a new filter.

 

(14)   Refill the reservoir with oil.

 

(15)   Replace the cover and secure tightly.

 

(16)   Drain the oil through the plug at the bottom of the atmospheric oil reservoir.

 

(17)   Remove the atmospheric oil filling plug and pour in fresh oil until the level is halfway in the atmospheric reservoir sight glass.

 

(18)   Replace the plug and secure tightly.

 

(19)   Operate the purge unit to remove as much air as possible.

 

(20)   Add oil to the atmospheric float chamber, if main oil reservoir indicates under-charge after short operation.

 

3.   Charging the Unit.  The manufacturer ships the refrigerant (R-11) in large metal drums which weigh approximately 200 pounds.  At temperatures above 74° F., the drum will be under pressure.  To prevent injury or loss of refrigerant, never open the drums to the atmosphere when they are above this temperature.

 

It is possible to charge refrigerant from an open drum a 60° temperatures, although it is recommended that leaktight connections be made to the charging valve.  The charging valve is located on the side of the cooler.  To help in the charging procedure, each refrigerant drum has a special type plug installed on the side of the drum.  This plug is specially engineered for charging purposes.  The charging connection on the drum consists of a 2-inch plug in which is inserted a smaller 3/4-inch plug.  The 3/4-inch opening inside the drum is covered with a friction cap.  The cap prevents leakage into or out of the drum when the 3/4-inch plug is unscrewed.

 

4.   Refrigerant charging.  To charge the machine with refrigerant, proceed as follows:

 

(1)  The machine must be under a vacuum.

 

(2)  Fit a 3/4-inch nipple into the standard globe valve and close the valve.

 

(3)  Remove the 3/4-inch plug inserted in the 2-inch plug from the drum.

 

(4)  Place the valve with the nipple into the opening, making sure that it is far enough in to push off the cap inside the drum.

 

(5)  Place the drum in a horizontal position near the cooler charging valve with the use of a hoist.  The drum should be high enough to allow the refrigerant to flow as a liquid, by gravity, from the drum into the charging line.  Rotate the drum so that the valve is at the bottom.

 

(6)  Connect the two valves (drum and cooler) with a copper tube and fittings, making sure all the joints are leakproof.

 

(7)  Open both valves and allow the refrigerant to flow into the cooler.  Operate the machine to maintain a vacuum after the initial reduction to zero.

 

(8)  When the drum is empty, close the valve on the cooler and disconnect the drum.  Remove the valve for use with the next drum.  Complete charging of the machine requires 1200 pounds of refrigerant.

 

5.   Adding refrigerant to bring refrigerant to standard level.  When adding refrigerant, use the same procedures that we have just discussed.  Another method that can be used to add refrigerant is simply to allow the refrigerant to be drawn in as a gas.  Let the drum rest on the floor and let the gas escape into the cooler while the machine is in operation or idle.

 

6.   Removing refrigerant.  In removing refrigerant from the cooler, the following procedure is recommended:

 

(1)  By use of the purge recovery unit, inject air into the machine until the pressure is 5 pounds gauge.

 

(2)  Connect tubing to the charging valve on the cooler and allow the refrigerant to discharge into the refrigerant drum.

 

(3)  Less loss of refrigerant will take place if the refrigerant is cold.  Always allow space in the drum for refrigerant expansion.

 

7.   Troubleshooting.  The steps to be taken in detecting and correcting improper operation of the centrifugal machine are outlined in table 19.  Use the proper methods for making these service adjustments, repairs, and corrections as outlined in this chapter.  All settings, clearances, and adjustments must be made to manufacture’s specifications.  The manufacturer’s maintenance catalog gives definite clearances, temperatures, pressure, and positions for adjustment of component parts.  These tolerances must be set as recommended for efficient operation; carelessness in these settings can cause extensive damage to the machine.

 